ATT_ _SDG E_Work_Summary.pdf

PDF 12 KB Posted

Attached to
Kitchen Creek Helibase Federal contract opportunity
Solicitation number
AG-9A40-S-13-0007
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

AT T and SDG E Work Summary

View the file

Other files for this federal contract opportunity

Other files attached to Kitchen Creek Helibase, newest first.
File Type Posted
RFI_Response_.pdf PDF
SF-30_Amendment_No._5.pdf PDF
2011_Kitchen_Creek_Geotechnical__Foundation_Report_-_Final_-_Amended_1303.pdf PDF
SPEC__88_ATT.pdf PDF
SF_30.pdf PDF
Amendment_3.pdf PDF
sdge_maps.pdf PDF
Attendance_Sheet.pdf PDF
SF-30_Amendment_No._2.pdf PDF
Business_Cards.PDF PDF
pre-bid_meeting.pdf PDF
C3_GradingPlan_KCH.dwg DWG drawing
01_32_23_SurveyAndLayoutData.pdf PDF
02_41_00_Demolition.pdf PDF
Lead_Sampling_Site_Map.pdf PDF
SF-30_Amendment_No_1.pdf PDF
RFIs_Kitchen_Creek_Helibase-030413.pdf PDF
00_01_10_TableOfContentsKCH.pdf PDF
L4_Instructions_for_the_preparation_of_proposals_.pdf PDF
SF_24.pdf PDF
Wage_Determination_CA130001.pdf PDF
Drawings.pdf PDF
Solicitation.pdf PDF
TelecommunicationsDesignGuideLines.pdf PDF
CSI_Specifications.pdf PDF
Fire_Plan.pdf PDF
Applicable_Codes _Regulations_ _Requirements.pdf PDF
Sample_Docs.pdf PDF
LightningProtectionAndGroundVol7.pdf PDF
14May2012Geotechnical_ _Foundation_Report_-_Final.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AT&T and SDG&E Work Summary

AT&T contact information: Tom Halluer 619-266-4680, th2795@att.com.

The following is a brief description from AT&T but the Forest Service does not have this in writing:

The work includes but is not limited to the following: AT&T requirements are per AT&T Spec #88. Contractor will be responsible for paying fees to AT&T, coordination with AT&T for AT&T work, clearing and grubbing, trenching, conduit, grounds, boxes/handholds and backfilling trenches. AT&T will place cable in conduit. No as built survey will be needed by AT&T. It will take AT&T approximately 1 week to issue work order after fees are paid. Latest estimated fees quoted were $36,000.

The first portion of AT&T and SDGE trenching will be separate trenches and then will be one shared trench from the point where they meet just outside of ROW of Kitchen Creek Road up to the project location. Total trenching is 1 mile to the project site.

SDG&E permit fees have already been paid by the Forest Service. SDG&E does not anticipate any additional fees. The Forest Service has the work order and construction/trench inspection paperwork from SDG&E. A copy will be given to the successful contractor upon award.

The following is a brief description of the SDGE work. The work includes but is not limited to the following: Contractor will be responsible for clearing and grubbing, trenching, concrete pads, conduit, backfilling and service panels. SDG&E will pull wiring, put in connections (junction box to junction box), supply and set transformer, supply and set boxes, make connection to transformer, and transformer to meter box/panel. See SDG&E sketch.