Solicitation_AG-024B-S-12-9030.pdf
PDF 964 KB Posted
- Attached to
- National Mobile Shower Facilities
- Solicitation number
- AG-024B-S-12-9030
About this file
Solicitation AG-024B-S-12-9030
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Summary_of_Awards_AG-024B-S-12-9030_-_Corrected.pdf | ||
| Summary_of_Awards_AG-024B-S-12-9030.pdf | ||
| Exhibit_L.1_Revised_per_Amendment_01.docx | DOCX document | |
| Mobile_Shower_Solicitation_Q_and_As.pdf | ||
| Corrected_Replacement_Page_C-10.pdf | ||
| Amendment_01.pdf | ||
| Section_B.1_ _B.2.docx | DOCX document | |
| Exhibit_L.2.docx | DOCX document | |
| Exhibit_L.1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFEROR’S COPY
(Ref. 48 CFR 1)
Issuing Office:
NATIONAL INTERAGENCY FIRE CENTER
U.S. FOREST SERVICE, CONTRACTING
OWYHEE BUILDING - MS 1100
3833 S. DEVELOPMENT AVE
BOISE, ID 83705-5354 This solicitation can be downloaded from the following
Internet site: https://www.fbo.gov/ Offers Are Solicited For:
National Mobile Shower Facilities
Solicitation No:
AG-024B-S-12-9030
Issued Date:
02/27/2013
IMPORTANT – NOTICE TO OFFEROR
- Offers will be due on March 29, 2013 close of business 4:30 PM local time.
- The offeror shall submit the following items in response to this solicitation:
1. Solicitation Offer and Award form SF-33, blocks 15 through 18. (Complete, date, and sign.)
2. Fill in and provide the appropriate information requested in Sections B-1 and B-2.
3. Provide two (2) copies of your Business proposal and four (4) copies of your Technical proposal in response to Section L and Exhibits L.1 and L.2 of the solicitation. The Technical Proposal information shall be provided on four (4) read-only compact disks or USB flash drives.
4. Provide your responses to Section K Representations and Certifications.
THE SOLICITATION PACKAGE SHALL BE RETURNED TO THE FOLLOWING ADDRESS:
National Interagency Fire Center U.S. Forest Service, Contracting Attn: Solicitation No. AG-024B-S-12-9030 Owyhee Building - MS 1100 3833 S. Development Ave Boise, ID 83705-5354
No facsimile (FAX) or e-mail offers will be accepted.
Offeror’s questions must be submitted and received by mail, e-mail or fax no later than March 18, 2013. Offerors may contact Kellen Logan for information about this solicitation at 208-387-5361 or E-mail: klogan@fs.fed.us.
“The policy of the United States Department of Agriculture Forest Service prohibits discrimination on the basis of race, color, national origin, age, religion, sex, disability, family status, and/or political affiliation.” Persons believing they have been discriminated against in any Forest Service related activity should write to: Chief, Forest Service, USDA, P. O. Box 96090, Washington, DC 20090-6090.
Previous editions of this form are obsolete. FS-6300-44 (11/79)
SOLICITATION OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)
RATING PAGE OF PAGES
1 91
2. CONTRACT NUMBER 3. SOLICITATION NUMBER
AG-024B-S-12-9030
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
5. DATE ISSUED
02/27/2013
6. REQUISITION/PURCHASE NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)
U.S. FOREST SERVICE – CONTRACTING
NATIONAL INTERAGENCY FIRE CENTER
3833 S. DEVELOPMENT AVENUE, MS 1100
BOISE, ID 83705-5354
NOTE: In sealed bid solicitations, "offer" and "Offeror" mean "bid" and "Bidder".
SOLICITATION
9. Sealed offers in original and (See Section L.6) copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 7, or if hand carried, in the depository located in FOREST SERVICE CONTRACTING OFFICE until 4:30 PM (C.O.B.) local time 03/29/2013
(Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All Offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME
KELLEN A. LOGAN
B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS
klogan@fs.fed.us
AREA CODE
(208)
NUMBER
387-5361
EXT.
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)
PART I – THE SCHEDULE PART II – CONTRACT CLAUSES
X A SOLICITATION/CONTRACT FORM 1 X I CONTRACT CLAUSES 8
X B SUPPLIES OR SERVICES AND PRICES/COSTS 5 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
X C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 12 X J LIST OF ATTACHMENTS 27
X D PACKAGING AND MARKING 1 PART IV - REPRESENTATIONS AND INSTRUCTIONS
X E INSPECTION AND ACCEPTANCE 2
X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS TO OFFERORS OR RESPONDENTS
X F DELIVERIES OR PERFORMANCE 1
X G CONTRACT ADMINISTRATION DATA 4 X L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS 15
X H SPECIAL CONTRACT REQUIREMENTS 3 X M EVALUATION FACTORS FOR AWARD 2
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within 180 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52-232-8)
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
14. ACKNOWLEDGMENT OF AMEND-
MENTS (The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
AMENDMENT NO. DATE AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or Print)
NINE DIGIT DUNs NUMBER: .
15B. TELEPHONE NUMBER 15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE – ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AREA CODE NUMBER EXT.
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304 (c) ( ) 41 U.S.C. 253 (c) ( )
23. SUBMIT INVOICES TO ADDRESS
SHOWN IN (4 copies unless otherwise specified)
ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
ATTN: INCIDENT BUSINESS – CONTRACTS
ALBUQUERQUE SERVICE CENTER
101B SUN AVENUE NE
ALBUQUERQUE, NM 87109
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
Solicitation No. AG-024B-S-12-9030 U.S. Forest Service National Mobile Shower Facilities National Office
TABLE OF CONTENTS
i
PART I - THE SCHEDULE
SECTION A - SOLICITATION OFFER AND AWARD (STANDARD FORM SF-33)
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
DESIGNATED DISPATCH POINTS B-2
MAP OF DESIGNATED DISPATCH POINTS B-3
B.1 PROPOSED MOBILE SHOWER FACILITIES UNIT B-4
B.2 MOBILE SHOWER FACILITY UNIT DESCRIPTION AND PRICES B-4
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GENERAL REQUIREMENTS C-1
C.2 ORDERING, RELOCATING, REDUCING, RELEASING, REASSIGNING
AND CANCELING PROCEDURES C-4
C.3 MINIMUM EQUIPMENT REQUIREMENTS C-7
C.4 PERFORMANCE REQUIREMENT SUMMARY C-11
SECTION D - PACKAGING AND MARKING
D.1 EQUIPMENT MARKING D-1
SECTION E - INSPECTION AND ACCEPTANCE
E.1 CLAUSES INCORPORATED BY REFERENCE E-1
E.2 INSPECTION OF SERVICES -- FIXED-PRICE E-1
E.3 PRE-USE INSPECTION OF EQUIPMENT E-1
E.4 INSPECTIONS DURING USE E-2
SECTION F - DELIVERIES AND PERFORMANCE
F.1 CLAUSES INCORPORATED BY REFERENCE F-1
F.2 PERIOD OF PERFORMANCE F-1
F.3 LOCATION(S) F-1
F.4 UNAVAILABILITY F-1
F.5 CONTRACTOR EVALUATIONS F-1
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 MOBILE SHOWER FACILITY – MILEAGE G-1
G.2 MOBILE SHOWER FACILITY UNIT – DAILY USAGE RATE G-1
G.3 INTERMITTENT USE OF CONTRACTORS POTABLE WATER VEHICLE G-2
G.4 RELOCATION FEE G-3
G.5 MISCELLANEOUS CHARGES AND CREDITS G-3
G.6 PAYMENT PROCEDURES G-3
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 PERMITS AND RESPONSIBILITIES H-1
H.2 POST AWARD CONFERENCE H-1
ii
H.3 KEY PERSONNEL H-1
H.4 EMPLOYMENT OF ELIGIBLE WORKERS H-1
H.5 ON-SITE REPRESENTATIVE/EMPLOYEES H-2
H.6 WORKMANSHIP H-2
H.7 INCIDENT BEHAVIOR H-2
H.8 COMMERCIAL FILMING OR VIDEOTAPING H-3
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 CLAUSES INCORPORATED BY REFERENCE I-1
I.2 CENTRAL CONTRACTOR REGISTRATION I-2
I.3 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES I-2
I.4 ORDERING I-4
I.5 ORDER LIMITATIONS I-5
I.6 REQUIREMENTS I-5
I.7 OPTION TO EXTEND THE TERM OF THE CONTRACT I-6
I.8 INSURANCE COVERAGE I-6
I.9 ECONOMIC PRICE ADJUSTMENTS I-7
I.10 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR
CORPORATE APPLICANTS ALTERNATIVE 1 I-7
I.11 GOVERNMENT LIABILITY I-8
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
J.1 POTABLE WATER STANDARDS J-2
J.1A SUPPLEMENTAL POTABLE WATER STANDARDS FOR OTHER THAN POTABLE WATER
TRUCKS IN WHICH NWCG STANDARDS J.1 APPLY J-7
J.2 HARASSMENT FREE WORKPLACE POLICY J-8
J.3 DAILY SHOWER ORDER/INVOICE, MOBILE SHOWER FACILITIES J-9
J.4 WAGE RATE DETERMINATION J-11
J.5 INTERAGENCY MOBILE SHOWER FACILITIES PERFORMANCE EVALUATION J-19
J.6 WORK ORDER AND NOTICE OF NONCOMPLIANCE J-22
J.7 MOBILE FOOD & SHOWER SERVICE REQUEST FORM J-23
J.8 MOBILE SHOWER FACILITIES UNIT INSPECTION FORM J-24
J.9 SHOWER STALL MEASUREMENT GUIDE J-25
J.10 DEFINITIONS J-26
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
K.1 ANNUAL REPRESENTATIONS AND CERTIFICATIONS K-1
K.2 INFORMATION REGARDING RESPONSIBILITY MATTERS K-5
K.3 SIZE STANDARD AND NAICS CODE INFORMATION K-6
K.4 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID
DELINQUENT TAX LIABILITY OR A FELONY CONVICTION (ALTERNATIVE 1) K-6
iii
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
L.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE L-1
L.2 TYPE OF CONTRACT L-1
L.3 SERVICE OF PROTEST L-1
L.4 PRE-BID/PRE-PROPOSAL CONFERENCE L-1
L.5 SINGLE OR MULTIPLE AWARDS L-2
L.6 INSTRUCTIONS FOR THE PREPARATION OF TECHNICAL AND
BUSINESS PROPOSALS L-2
L.7 INQUIRIES L-5
L.8 AMENDMENTS TO PROPOSALS L-5
EXHIBIT L.1 MINIMUM EQUIPMENT REQUIREMENTS CHECKLIST L-6
EXHIBIT L.2 MOBILE SHOWER FACILITY UNIT DESCRIPTION L-15
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE M-1
M.2 AWARD DETERMINATION M-1
M.3 EVALUATION FACTORS M-1
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B-1
This solicitation will result in multiple awards for performance based, fixed-price with economic price adjustments, requirements type contracts. Some charges will be credited on cost reimbursable basis (See G.5 (c) (1)). Estimating the total overall contract quantity is difficult. From 2009 through 2011, average annual historical total costs for these services were $2,302,564.00, which may provide some indication of estimated quantities. However, this is not a representation to an offeror that the estimated quantities will be required or ordered, or those conditions affecting requirements will be stable or normal.
This acquisition is 100% set-aside for small business concerns. See size standard in Sections K.1 & K.3.
The effective period of the resultant contract(s) will be from January 1, 2014 through December 31, 2014. At the Government’s option, the contract(s) may be renewed for additional one-year periods, not to exceed four renewal periods (5-year maximum potential contract). Care should be taken to provide a Technical and Business/Price Proposal in accordance with the solicitation instructions in Sections L & M.
Offerors may propose a complete Mobile Shower Facility Unit (MSFU) for multiple Designated Dispatch Point (DDP) locations. Contractors must state the minimum and maximum number of locations they can accept. Offerors shall propose each MSFU as either a small or large capacity unit; however they cannot offer the same unit as both a small and large unit. The proposed physical address offered will become the Designated Dispatch Point (DDP) for that location. The proposed physical address provided must be within a 75 mile radius from the city listed. The DDP will be the contractually required physical location for the complete MSFU and other optional equipment to be kept within the defined Mandatory Availability Period for that DDP. For example, Offeror A proposes to be located at 123 Hillcrest Lane, Caldwell, ID 83605. If Offeror A is awarded a contract, its DDP will be 123 Hillcrest Lane, Caldwell, ID 83605 for the life of the contract. The Contracting Officer must approve any DDP address changes by contract modification.
The Government anticipates awarding no more than 40 large and 10 small capacity MSFUs. Only those MSFUs determined to be technically acceptable with reasonable prices will be awarded. The Government may award one small and one large capacity unit at the same DDP. Reference Section M Evaluation Factors for Award.
B-2
DESIGNATED DISPATCH POINTS
Contractor personnel and equipment will be physically located and available to perform services at the following locations; during the Mandatory Availability Period specified. Contractors may propose the same unit for multiple locations. Offerors may propose either a large or small capacity unit at any of the Designated Dispatch Points listed.
STATE CITY *RADIUS AVAILABILITY DATES
Arizona Flagstaff 75 Miles April 01 – June 30
Phoenix 75 Miles April 01 – June 30
Tucson 75 Miles April 01 – June 30
California Corona 75 Miles May 01 – November 15
Porterville 75 Miles May 01 – November 15
Redding 75 Miles May 01 – November 15
Sacramento 75 Miles May 01 – November 15
Santa Barbara 75 Miles May 01 – November 15
Colorado Grand Junction 75 Miles May 01– September 30
Idaho Boise 75 Miles June 01 – October 15
Idaho Falls 75 Miles June 01 – October 15
Montana Billings 75 Miles June 15 – September 30
Butte 75 Miles June 15 – September 30
Missoula 75 Miles July 01 – September 30
Nevada Ely 75 Miles June 01 – October 31
Las Vegas 75 Miles May 01 – November 15
Reno 75 Miles June 01 – October 31
New Mexico Albuquerque 75 Miles April 01 – June 30
Oregon Bend 75 Miles June 15 – September 30
Lakeview 75 Miles June 15 – September 30
Medford 75 Miles June 15 – September 30
Pendleton 75 Miles June 15 – September 30
Utah Richfield 75 Miles May 01– September 30
Salt Lake City 75 Miles June 01 – September 30
Washington Goldendale 75 Miles June 15 – September 30
Okanogan 75 Miles June 15 – September 30
Wenatchee 75 Miles July 01 – September 30
Wyoming Cody 75 Miles June 01 – September 30
Lander 75 Miles June 01 – September 30
*Note: All proposed addresses must be within a 75 mile radius from the DDPs listed.
B-3
MAP OF DESIGNATED DISPATCH POINTS
B-4
B.1 PROPOSED MOBILE SHOWER FACILITIES UNIT
Note: Offerors are required to completely fill out a copy of this form for each Mobile Shower Facilities Unit for each DDP location offered.
If you are proposing the same MSFU with the same prices for multiple DDPs, list all applicable DDPs below.
OFFEROR’S NAME: Designated Dispatch Point:
(See page B-2 for DDPs to choose from. Attach a separate page if necessary for multiple DDPs).
Proposed address where the unit must be physically located, and dispatched from during the Mandatory Availability Period. (No P.O. Boxes Allowed).
B.2 MOBILE SHOWER FACILITY UNIT DESCRIPTION AND PRICES
Unit ID No.
Number of
Shower Heads Water Vehicle
Capacity (Gallons) Equipment Type Unit Identification No. (UIN)
Male Female
Shower Trailer Water Vehicle
Tractor Wash Basins (Sinks) Other Other
Contract Year Mobile Shower Facility Unit Usage Price Per Day
(Including all peripheral support equipment) Water Vehicle – Intermittent Use
Price Per Hour Base Year (2014) $ $ Option Year 1 (2015) $ $ Option Year 2 (2016) $ $ Option Year 3 (2017) $ $ Option Year 4 (2018) $ $
Mobile Shower Facility Unit Mileage Rate to & From the Incident Price Per Mile Water Vehicle – Mileage
Price Per Mile Base Year (2014) $ $
*Note: Mileage prices for Option Years 2015 through 2018 will be adjusted in accordance with Section I Economic Price Adjustment Clause.
B-5
Complete the Hypothetical Quantities Table below by inserting your Base Year (2014) unit prices from Section B.2. The Government will compute the Grand Total Evaluated Price per Showerhead using the hypothetical quantities stated below. These hypothetical quantities are for price evaluation purposes only. These quantities are not intended to be estimates for the purposes of FAR 16.503(a) (1). Due to the sporadic occurrence of incident activity, the Government does not guarantee the placement of any orders. See Section M, Evaluation Factors for Award, for additional information. For contract award purposes, only the computed Grand Total Evaluated Price Per Showerhead will be considered.
Service Description Unit of
Measure Base Year 2014
Unit Prices *Hypothetical
Quantity Total
Mobile Shower Facility Unit Usage Per Day $ 10 Days $
Mobile Shower Facility Unit Mileage to & From the Incident Per Mile $ 300 Miles $
Transport Water Vehicle Mileage Per Mile $ 30 Miles $
Transport Water Vehicle – Intermittent Use Per Hour $ 4 Hours $
Total Price $
Total Number of Showerheads
(Total Price ÷ Total Number of Showerheads) = Grand Total Evaluated Price Per Showerhead $
Relocation Fee: $ Provide a price for unit relocation, the Government will not set this price. (Reference Section C.2 (f))
All prices proposed will be evaluated to determine reasonableness for the effort proposed and to determine the demonstrated understanding of the level of effort needed to successfully perform these services.
Section L.1 incorporates by reference FAR 52.215-1, Instruction to Offerors – Competitive Acquisition (JAN 2004). Section (f) (8) of this clause states the following: “The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or sub line items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques.
A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.”
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1
C.1 GENERAL REQUIREMENTS
(a) Scope of Contract
(1) The intent of this solicitation and any resultant contract is to obtain the services of Mobile Shower Facility Units (MSFUs) at various field locations during wildland fire and other types of incidents throughout the Western United States. The expectation and desired result of this contract is to provide: 1) clean, sanitary, and properly maintained shower units that meet contract specifications at all times, 2) sufficient supplies such as towels and soap for incident personnel use, 3) sufficient potable hot and cold water needed to take safe, comfortable showers, 4) timely arrival, set-up, and hours of operation that accommodate all of the incident personnel needs, and 5) knowledgeable, trained and dependable Mobile Shower Facility Managers and personnel on site at all times.
(2) MSFUs are to include all equipment, labor, supervision, materials, supplies, equipment set up and take down, transport and maintenance (except for those items listed as Government furnished) to accomplish the full scope of the work defined herein.
Only equipment necessary for the operation of a MSFU will be allowed and approved for use under this contract. Equipment must be capable of operating in remote, primitive locations with limited access.
(3) Any time Mobile Shower Facilities are needed for federal wildland fire incidents in the United States, the Federal Wildland Fire Agencies (see Section J.10), hereinafter referred to as the Government, are obligated to order services from the National Mobile Shower Facilities Contractors, provided that the Contactors can reasonably meet the incident’s needs and required time frames (See Section C.2 (b)). At the Government’s option MSFUs also may be ordered for other types of incidents. State and other federal cooperators may also utilize this contract at their option, however, the ordering procedures at Section C.2 will be followed for all orders.
(4) For the purposes of FAR 16.503 (a)(1), to date the total quantities purchased from 2009 through 2011 was $6,907,692.00 for all Mobile Shower Services ordered through the National Interagency Coordination Center. The incidents average duration was 10.5 days. On average each Contractor received 2.8 total dispatches per year. These quantities are not a representation to an offeror or Contractor that the same quantities will be required or ordered, or that conditions affecting requirements will be normal or stable.
(5) Due to the sporadic occurrence of incident activity, the Government DOES NOT GUARANTEE placement of any orders for service.
(i) The Contractor is required to provide written notification to the Contracting Officer (CO) and the National Interagency Coordination Center (NICC) any time their unit is unavailable for dispatch. Failure to provide this notification may result in a poor past performance evaluation and/or suspension of the unit.
(ii) The Contractor is not obligated to accept orders if written notification has been submitted, stating the Contractor is unavailable, to CO and NICC in advance of the placement of an order.
(iii) The Government may at any time order more than one Mobile Shower Facility.
C-2
(b) Government Furnished Property
The Government shall deliver to the Contractor the following Government furnished property (see Section I, Contract Clauses).
Interagency Mobile Shower Facilities Daily Shower Order/Invoices, & Continuation Sheet, 1276- C & 1276-D (NFES 2054 & NFES 2055); Interagency Mobile Shower Facilities Performance Evaluation 1276-F & 1276-G (NFES 2056 & NFES 2743). Contractors shall notify the Facilities Unit Leader (FACL) or Logistics Section Chief (LSC) when forms are needed to ensure timely delivery.
(c) Government Furnished Services
(1) Waste Products - The Government will arrange for pick up and disposal of all waste products (trash), after the waste products have been placed in the Government provided containers by the Contractor at a Government designated location.
(2) Gray Water - The Government will arrange for removal of waste (gray) water from the Contractor's holding facilities.
(3) Meals - When the Government is providing meals for an incident via a Mobile Food Service Unit, or by other means, meals for Contractor’s employees will be furnished without charge.
(4) Potable Water -
(i) The Government will designate a potable water source.
(ii) If a water-use fee is required for the Government designated potable water source, the Government shall be responsible for payment of the water-use fee.
(5) Fuel Tender - The Government may allow the Contractor to use a Government fuel tender when available. The Contractor shall pay directly via credit card for any costs of these supplies. At times it may be necessary for the Contractor to deduct the cost of petroleum products from payments due on Form 1276-D Daily Shower Order/Invoice - Mobile Shower Facilities Continuation Sheet when no credit card services are available.
(6) Government Escort - When it is difficult for the Contractor to locate an incident with the directions provided by the Government, the Contractor may request an escort to the incident.
(d) Contractor Furnished Equipment, Supplies, and Personnel
The MSFU is to include all equipment, labor, supervision, materials, supplies, equipment set up/take down, living accommodations, shower services for Contractor’s personnel, all fuel, electricity required for heat, lights, hot water, transport, and maintenance necessary for the operation of the MSFU.
C-3
(e) Contractor Responsibilities
The Contractor shall perform in a professional, cooperative and workman like manner. All equipment and service is required to meet current Federal, State and local laws or regulations, the National Electric Code (NEC), the Uniform Plumbing Code (UPC), Federal and State potable water codes, Occupational Safety and Health Administration (OSHA), National Sanitation Foundation Standards (NSFs) and other contractual requirements.
(1) Provide the supplies and services described herein.
(2) All equipment shall be in acceptable condition and meet minimum equipment requirements. The Government reserves the right to reject equipment that is not in a safe and operable condition. The Government may allow the Contractor to correct minor deficiencies within 24 hours upon arriving at the incident. Repairs to equipment shall be made and paid for by the Contractor. At the Contractor’s request, the Government may, at its option, make repairs when necessary to keep the equipment operating. The cost of such repairs will be determined by the Government and deducted from payments to the Contractor. No payment will be made for travel to an incident for equipment that does not pass inspection and cannot be made compliant within 24 hours. No payment will be made for time the equipment was not available. (Reference Section E.2).
(3) Report immediately to the Facilities Unit Leader (FACL), or Logistics Section Chief (LSC) upon arriving at the incident and provide a copy of the Mobile Food and Shower Service Request Form (Attachment J.7).
(4) Provide for the transportation of all potable water to the MSFU unless the Government determines alternate transportation is more advantageous.
(5) Provide personnel to keep the Mobile Shower Facility in continuous operation during showering use periods specified by the Government. Operational hours shall be clearly posted at the entrance to the shower facility. Hours of operation shall be approved by the FACL or LSC. The MSFU is not required to operate 24 hours per day. Ensure a Mobile Shower Facilities Unit Manager (Key Personnel listed in Exhibit L.1) is available at the incident at all times. The Contracting Officer (CO) shall approve any designated or alternate representatives. Approved Key Personnel are stated on Contractor’s Mobile Shower Facilities Unit Summary issued by the CO. (Reference Sections H.3 and H.5)
(6) Ensure that all waste products (trash) are placed in Government provided containers (Dumpsters) at a Government designated location.
(7) Provide dust control around the waiting and wash basin (sink) areas.
(8) All employees shall wear nametags and other easily visible identification that distinguishes the company represented.
(9) No alcoholic beverages and/or controlled substances are allowed. There shall be no use of tobacco products within the immediate area or in the MSFU.
(10) Only the number of personnel approved in the awarded contract may remain at the incident.
C-4
(11) Have copies of the contract; all modifications; invoice forms; Quality Control Plan and Safety Plan with the MSFU at all times. Completed past performance evaluation forms, from the previous and current year, shall be kept with the unit at all times. The Quality Control Plan shall address the Contractor’s self-inspection procedures. The Safety Plan shall address the Contractor’s oversight of work/rest and length of assignment guidelines.
(12) Comply with National Wildfire Coordinating Group (NWCG) Potable Water Standards in Section J.1 and J.1A.
(13) The Contractor shall perform one microbiological test for total coliform bacteria upon arrival at the incident. The Contractor will be reimbursed for additional water testing fees if the Government requires a water sample to be submitted more than once every 30 days or if the Government chooses to change water sources, while the unit is assigned to the same incident. The costs of the additional water tests will be added as a credit on Form 1276-D Daily Shower Order/Invoice – Mobile Shower Facilities (Continuation Sheet). The purpose for the required additional water test shall be clearly documented on the invoice form.
(14) The Contractor shall not bring pets to the incident.
Note: Violation of any one or combination of any of the above requirements may result in suspension or termination of the Contractor’s Mobile Shower Facility Unit Contract.
C.2 ORDERING, RELOCATING, REDUCING, RELEASING, REASSIGNING AND CANCELING
PROCEDURES
(a) Information required by NICC on the Shower Service Request Form when placing orders.
(1) Resource Order Number, Request Number, Name of Incident and Job Code.
(2) Exact location to designated site where the Contractor can meet a Government representative for escort or further instructions to the incident.
(3) Estimated time needed by the incident to provide shower services.
(4) Size of MSFU required. Large capacity shower units have a minimum of 12 shower heads and small capacity shower units have a minimum of 4 and a maximum of 11 shower heads.
(5) Name, title, and phone number of person to contact for further information.
(6) Name and title of Government representative to contact at the incident.
(b) Dispatch Procedures
(1) The Government has contracts with multiple vendors for Mobile Shower Facilities.
During periods of availability, the Government will utilize the Contractor whose DDP is closest to the incident as determined by using the Rand McNally Road Atlas® or the latest version of Microsoft Expedia Streets & Trips®, provided that the unit can meet the incident’s needs and required time frames.
C-5
(2) Contractor personnel and equipment are required to be physically located and available to perform services from each of their DDPs during the defined mandatory availability period (MAP). The DDP is the location where the unit must be physically located during the mandatory availability period, unless the Contractor has provided written notification to the CO and the NICC of its unavailability status. NICC is the only designated dispatch center authorized to place orders for all the National Mobile Shower Facility Units. NICC shall place orders against an overriding Delivery Order; issued by the CO at time of award.
(3) Outside the (MAP), priority consideration will be given to units physically located and available to perform services closest to the incident; provided that the unit can meet the incident’s needs and required time frames. The only two locations to be considered for dispatch outside of the availability dates are the DDP or the Company’s Headquarters.
Outside the availability dates, Contractors have the option of remaining at their DDP or returning to their Company’s Headquarters. Company’s Headquarters is defined as the company’s regular operating physical address (Block 15A on Standard Form 33).
Contractors are responsible for notifying the CO and the appropriate Coordination Center, in writing, of availability status and locations outside of their mandatory availability period.
(4) The Government intends to dispatch resources in accordance with this procedure.
However, the number of fire orders in process and actual fire conditions at the time of dispatch may require a deviation from procedures stated in C.2 in order to respond effectively to such conditions. Any such deviation will be within the discretion of the Government, and will not be deemed a violation of any term or condition of this contract.
(5) When a Contractor agrees to a delivery schedule at the time the order is placed, the Contractor is required to perform in accordance with the agreed upon schedule documented on the Mobile Food and Shower Service Request Form. In addition, the Contractor is required to follow DOT regulations at all times.
(6) When a small capacity unit is ordered and there are no small units that can meet the incidents required time frames; NICC may use a large capacity unit to fill the order using the procedures in C.2, provided the large capacity unit can meet the incidents needs and required time frames.
(c) Release and/or Reassignment
(1) When the MSFU has been released from an incident, the unit may remain in the nearest town up to 24 hours in available status. After this time, it must return to the unit's DDP. Priority consideration for assignment will be given to the unit closest to the incident that is physically located at its DDP over other available units remaining in the nearest town or enroute; provided that the unit at its DDP can reasonably meet the date and time needed by the incident.
(2) When a MSFU is reassigned enroute, the Contractor is obligated to report to the reassigned incident.
(d) Need for Additional Mobile Shower Facility(s) at an Incident
If an additional MSFU is ordered for the same Incident camp site, dispatch priority will be based on the same procedures in Section C.2.
C-6
(e) Procedure for Canceling a Mobile Shower Facility
The Government reserves the right to cancel any order at any time. Payment for services rendered will be made in accordance with Section G - Contract Administration Data.
(1) Canceling a Mobile Shower Facility
Notice of cancellation will be provided to the Contractor from NICC.
(2) Priority for Releasing/Reassigning a Mobile Shower Facility
National Mobile Shower Facilities Contractors shall be released after all additional Non- National Mobile Shower Facilities Contractors have been released. NICC will be notified of the release of The National Mobile Shower facilities Unit through established dispatch channels and the Contractor shall contact NICC to confirm status of release or reassignment. When there is more than one National MSFU at the same incident or complex of incidents, the FACL, LSC or Contracting Officers Representative (COR) will determine which National MSFU will be the first to be released based on design, capability, size, need, performance price and/or set-up location at the incident. The FACL, LSC or COR will forward documentation of this decision to the CO. At any time, the incident may determine to release and/or order a large or small MSFU that best meets the needs of the incident.
(f) Procedure for Relocating Mobile Shower Facilities Unit at an Incident
The Relocation Fee (in addition to mileage) is paid in the following cases:
(1) After a MSFU is on order and has arrived and completed the initial set-up at the incident; the Government may have a need to relocate the MSFU to another location within the same camp, or to a new, or different camp (in support of the same incident).
(2) When the original incident is or becomes incorporated into a complex and relocating the MSFU becomes necessary in support of that complex of incidents.
(3) Reduction in force resulting in reorganization within the incident or complex, but not demobilization. The relocation fee is paid when camps in a complex are collapsed and Mobile Shower Facility Units are relocated within that complex.
If a Unit is reassigned to another incident or demobilized, no relocation fee is paid.
(g) Procedure for Ordering Intermittent Use of Contractor's Potable Water Vehicle
After the Contractor has reached an incident and services have begun, the Government may order the Contractor's potable water vehicle on an intermittent basis for use other than transporting potable water to the shower unit; i.e., for providing support to Mobile Food Service Unit. Filling canteens and cubitainers is not considered intermittent use. Intermittent use of Contractor's potable water vehicle shall also include a Contractor furnished operator. Start and stop times for intermittent use shall be documented in block number 26 on Form 1276-D, Daily Shower Order/Invoice – Mobile Shower Facilities (Continuation Sheet). The purpose for intermittent use shall be clearly documented in the remarks block.
C-7
C.3 MINIMUM EQUIPMENT REQUIREMENTS
A MSFU shall consist of a showering unit (trailer), potable water vehicle, hand washing sinks and all peripheral equipment and trailers necessary to mobilize and support the shower unit and its personnel. Listed below are the minimum equipment requirements for a MSFU.
(a) Shower Units
Each MSFU at a minimum shall:
(1) Have the inside constructed of nonporous, readily cleanable surfaces to accommodate sanitization and cleaning. Exposed wood surfaces shall be sealed and waterproofed.
(2) Have nonskid surfaces on floors that are comfortable for bare feet. Wood surfaces, carpet, or similar material on the floors in the shower unit is not acceptable. Non-porous mats may only be used if they are completely removable for cleaning purposes.
(3) Have sturdy steps that are comfortable for bare feet and in compliance with Section C.3 (f), allowing entry to the Shower Unit in a safe manner.
(4) Minimum Shower Heads
(i) Large capacity units shall have no less than twelve (12) showerheads providing a comfortable shower with no pressure or temperature fluctuations.
A minimum of 2 gallons-per-minute (gpm) flow at the showerhead is required.
(ii) Small capacity units shall have no less than four (4) and no more than eleven
(11) showerheads providing a comfortable shower with no pressure or temperature fluctuations. A minimum of 2 gallons-per-minute (gpm) flow at the showerhead is required.
(5) Provide phosphate free liquid soap and all paper bath and hand towels.
(6) Provide a shower caddy or shelf at each shower head to accommodate soap, shampoo, etc.
(7) Have the capability of maintaining hot water up to 110° F. Water temperatures must be adjustable at each showerhead. Each shower stall shall provide hot water and cold water through a mixing faucet.
(8) Ensure that all equipment preserves the potable water quality throughout the shower unit and peripheral equipment where water is stored and used. No galvanized pipes, fittings, fixtures or other galvanized materials are allowed throughout the inside of each shower stall or the plumbing that provides the water to each shower stall.
(9) Use potable water for all showers and wash basins. Showers and washbasins shall be equipped with water pumps that have a food grade pump housing and can be used for Domestic or Potable Water use.
C-8
(10) Provide all fuel and electricity required for heat, lights, and hot water.
(11) Provide privacy inside the shower unit from outside viewing. In order to provide semi-privacy for inside showering, each shower stall shall at a minimum have; solid, sturdy, heavy-duty partitions made of opaque material that limits the view from the person showering on either side. Shower stalls shall be a commercially available product or equivalent and may consist of coved, square, rectangle, or corner shaped floor pans.
Shower stalls at a minimum shall have an interior width measurement of 28 inches from wall to wall measured at the center of the stall 48 inches up from the floor and 26 inches in depth measured perpendicular from the center of the top interior lip of the shower pan to the center of the back wall. Shower stalls without shower pans shall be measured at the floor from the center of the back wall to the center front edge of the shower stall. For example of measurement locations refer to Attachment J.9. Shower stalls shall be equipped with heavy-duty shower curtains that provide privacy inside the stall from outside viewing, or solid, sturdy, and heavy-duty doors made of opaque materials.
(12) Ensure each individual shower stall shall be equipped with individually plumbed floor drains and shower walls that extend to the floor to avoid mixing of wastewater.
(13) Provide for segregated separate showering areas for men and women.
(14) Have adequate outside lighting at the shower entrance and around the washbasin area for use of the shower unit after dark.
(15) Provide light bulbs or fluorescent tubes covered with an enclosed plastic safety shield, tempered safety glass, or its equivalent, for all light fixtures. Light fixtures shall be installed so as not to constitute a hazard to personnel or shower unit materials. All electric receptacles not dedicated shall be grounded fault circuit interrupter (GFI) protected.
(16) Ensure any hand-held showerheads shall include a wall fixture to hold the unit while the water is flowing. Timing devices that restrict water flow are not allowed.
(17) Have a minimum enclosed storage capacity of 2,500 gallons of gray water for both large and small capacity units.
(18) Have a minimum enclosed storage capacity of 1,500 gallons of potable water for both large and small capacity units. This must be separate storage from the potable water vehicle. The use of bladder bag is prohibited.
(19) Provide garbage cans and bio-based/bio-preferred liners.
(20) Provide an outside waiting area with the minimum seating capacity of one chair per showerhead. Ground covering and rain/shade protection (such as waterproof tents, awnings, and canopies) shall be provided and set up over all waiting areas unless exempted by the FACL or LSC.
(b) Wash Basins (Sinks)
(1) Large capacity units shall have a minimum of eight (8) wash basins (sinks) and mirrors and may be located outside or inside of any enclosed trailers. Unobstructed
C-9 egress in or out of any enclosed trailer shall be maintained at all times. Large capacity units require one additional wash basin and mirror for every two shower heads over and above the minimum number of 12 required showerheads. Small capacity units shall have a minimum of four (4) wash basins (sinks). Wash basins may be located outside or inside of any enclosed trailers. Unobstructed egress in or out of any enclosed trailer shall be maintained at all times. All required washbasins shall be accessible for use by either men or women, have lighting for use of the wash basins in darkness and a minimum of 4 duplex electrical receptacles (120v) on large capacity units and 3 duplex electrical receptacles (120v) on small capacity units. Placement of electrical receptacles shall be located in areas that are convenient for all users. Placement of operational washbasins inside a shower unit or individual shower stalls is prohibited.
(2) Each wash basin (sink) shall provide hot and cold water, shall control gray water, and shall have a minimum of one liquid soap dispenser and one enclosed paper towel dispenser for every two sinks. Each wash basin (sink) shall also have the ability to hold water with built in or permanently attached stoppers.
(3) Each wash basin shall provide hot water and cold water through a mixing faucet that allows for the washing of both hands while the water is running and have continuous hot water heating capable of maintaining up to 110° F.
(4) Ground covering and rain/shade protection (such as waterproof tents, awnings, and canopies) shall be provided and set up over all wash basins, unless exempted by the FACL or LSC.
(c) Dressing Area
Dressing areas shall, at a minimum:
(1) Be capable of accommodating as many people as the number of showerheads provided for dressing and mobility. Adequate mobility shall be provided throughout the dressing area. The dressing area size shall be at least 30 inches square or 900 sq.
inches excluding the seating area. Units with retractable or folding seating may include this seating area as part of the minimum measurement. Adequate space shall be provided for a reasonable sized person to comfortably use the specified dressing area while the seat is being used.
(2) Provide seating for each shower head.
(3) Have three separate, sturdy, permanently affixed clothes hooks per shower head.
(4) Have sufficient built in heating and ventilation to provide a comfortable atmosphere and keep the steam/humidity level low.
(5) Provide sufficient drainage to prevent the puddling of water.
(6) Have flooring that can be sanitized in accordance with Section C.3 (e).
(7) Provide reasonable security from pilferage. Adequate security measures are needed if boots cannot be carried into the shower unit or left in an enclosed waiting area.
C-10
(8) Be located inside of the shower trailer. Tent systems connected to the shower trailer are not acceptable.
(9) Provide for privacy from outside viewing.
(d) Potable Water Vehicle
All potable water vehicles shall:
(1) Provide a minimum capacity of 1,500 gallons of potable water storage and be available to provide the shower unit with potable water.
(2) Comply with the National Wildfire Coordinating Group (NWCG) potable water standards in Section J.1 and J.1A, and with any Department of Transportation and Water Quality Authority requirements of the State in which the potable water vehicle is licensed and performing work.
(3) Provide Contractor furnished operator(s).
(4) Be equipped with a minimum of twelve (12) outside spigots/valves that can be separated from the potable water truck for use when the potable water truck is not available for filling canteens, cubitainers and water bottles.
(5) Have a potable water/food-grade pump, which has the capacity to transfer potable water a minimum of twenty feet vertical.
(e) Sanitation Requirements
The entire inside of the Mobile Shower Facilities Unit shall be sanitized, at a minimum, twice daily (during non-peak periods) using the minimum following procedure:
(1) Wash down the MSFU with soap or detergent, rinse thoroughly, sanitize with a household bleach (5 percent chlorine) solution using a minimum of 1 tablespoon bleach per 2 gallons water, or equivalent and rinse unit thoroughly.
(2) Remove and sanitize floor mats twice daily.
(3) Shower curtains shall be sanitized twice daily and replaced as necessary.
(4) Maintain a log documenting the dates and times that the sanitizing is performed.
(f) Additional Safety Equipment
Any steps or platforms shall have solid handrails, not chain linked, in addition to other current OSHA standards for handrails and stairs (see 29 CFR 1910.23-1910.24). All Stationary equipment shall be supplied with oil spill containment units consisting of both pads and pans, under the fuel tank, engine, and any other petroleum containers, except miscellaneous “fuel containers” under 5 gallons. Stationary equipment is defined as that remaining in one position for 24 hours or more, or that is parked in the same location for over 24 hours.
C-11
C.4 PERFORMANCE REQUIREMENT SUMMARY
REQUIRED SERVICE PERFORMANCE STANDARD ACCEPTABLE QUALITY LEVEL
C.2 (b) (5) Timely arrival and set-up of MSFU.
Meets delivery schedule agreed upon with NICC. +/- 1 hour of agreed upon schedule.
C.1 (d) Supplies Provide all supplies necessary for the operation of the MSFU.
All supplies, such as soap and towels will be available at all times.
C.1 (e) (5) MSFU is in continuous operation during showering use periods specified by the Government.
Operational Hours posted at the entrance to the shower facility are met.
Operating Hours must be met at all times.
C.1 (e) (2) Provide all equipment necessary for the operation of the MSFU.
All equipment is in a safe and operable condition at all times. (Including all peripheral equipment such as sink units).
Equipment failures are corrected within 24 hours. No equipment failures allowed that will cause the shutdown of the unit.
C.1 (e) (5) Key Personnel Key Personnel available at the incident at all times. Key Personnel or Alternate must be available at the incident at all times.
C.1 (e) (6) Waste Products Trash in and around the MSFU is picked up at all times.
Trash will not be left unattended for more than 30 minutes.
C.1 (e) (7) Dust Control Contractor provides dust control around the waiting area and wash basins.
Dust control is provided when needed.
C.1 (e) (8) Employee Identification
All Contractors’ employees must wear nametags and other easily visible identification.
Identification is present on all employees at all times.
C.1 (e) (11) Administration Have copies of the contract, all modifications, invoice and performance evaluation forms, quality control and safety plans.
Copies will be provided to the Government upon request at all times.
C.1 (e) (12) & C.1 (e) (13) Potable Water Standards
Comply with NWCG potable water standards in Section J. Perform chlorine residual tests as required
Standards must be met at all times.
C.3 (a) (4) Water Pressure/Flow
A minimum 2 gallons per minute (GPM) flow at the shower head.
Standard must be met at all times.
C-12
REQUIRED SERVICE PERFORMANCE STANDARD ACCEPTABLE QUALITY LEVEL
C.3 (a) (7), C.3 (b) (3) Continuous Hot Water Capability
Water temperature at each shower stall and wash basin must have the capability to be adjusted up to 110°F.
Standard must be met at all times
C.3 (a) (8) Galvanized Materials
All equipment preserves the potable water quality throughout the MSFU.
No galvanized pipes, fittings, fixtures or other galvanized materials are allowed.
C.3 (a) (18) Potable Water Storage
All equipment preserves the potable water quality throughout the MSFU.
The use of bladder bags is prohibited Standard must be met at all times
C.3 (b) Wash Basins Provide wash basins as specified in Contractor’s proposal. (Equipment proposal is incorporated into Contractor’s contract).
Contractor’s proposal and contract performance standards must be met at all times
C.3 (c) Dressing Area Provide dressing area as specified in Contractor’s proposal. (Equipment proposal is incorporated into Contractor’s contract).
Contractor’s proposal and contract performance standards must be met at all times.
C.3 (d) Potable Water Vehicle
Provide potable water vehicle as specified in Contractor’s proposal. (Equipment proposal is incorporated into Contractor’s contract).
Contractor’s proposal and contract performance standards must be met at all times.
C.3 (e) Sanitation MSFU at a minimum will be sanitized twice daily. Standard must be met at all times.
C.3 (f) Additional Safety Equipment
Provide additional safety equipment as specified. Additional safety equipment provided at all times.
C.1 (e).(11) Quality Control Contractor adheres to and maintains an acceptable Quality Control Plan.
Performance is maintained at no less than an acceptable level at all times.
H.6 Workmanship & H.7 Incident Behavior
All work under this Contract shall be performed in a safe and professional manner.
Inappropriate behavior is all forms of harassment including sexual and racial harassment and will not be tolerated.
Standards must be met at all times.
SECTION D
PACKAGING AND MARKING
D-1
D.1 EQUIPMENT MARKING
(a) Mobile Shower Facility:
All vehicles comprising a complete MSFU shall be permanently marked with the company name and unit identification number (UIN) as identified in Section B. Potable Water vehicles shall also be marked in accordance with Section J, NWCG Potable Water Standards. The company name and UIN shall be located on the equipment with letters and numbers no less than 2 inches in height, (for example: Shower Power, S-1).
(b) Gray Water Bladder Bags:
All gray water…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .