Section_B.1_ _B.2.docx

DOCX document 52 KB Posted

Attached to
National Mobile Shower Facilities
Solicitation number
AG-024B-S-12-9030
Issued by

View the file

Other files

File Type Posted
Summary_of_Awards_AG-024B-S-12-9030_-_Corrected.pdf PDF
Summary_of_Awards_AG-024B-S-12-9030.pdf PDF
Exhibit_L.1_Revised_per_Amendment_01.docx DOCX document
Mobile_Shower_Solicitation_Q_and_As.pdf PDF
Corrected_Replacement_Page_C-10.pdf PDF
Amendment_01.pdf PDF
Exhibit_L.2.docx DOCX document
Exhibit_L.1.docx DOCX document
Solicitation_AG-024B-S-12-9030.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. AG-024B-S-12-9030U.S. Forest Service
National Mobile Shower FacilitiesNational Office

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 proposed MOBILE SHOWER FACILITIES UNIT Note: Offerors are required to completely fill out a copy of this form for each Mobile Shower Facilities Unit for each DDP location offered.

If you are proposing the same MSFU with the same prices for multiple DDPs, list all applicable DDPs below.

OFFEROR’S NAME: Designated Dispatch Point:

(See page B-2 for DDPs to choose from. Attach a separate page if necessary for multiple DDPs).

Proposed address where the unit must be physically located, and dispatched from during the Mandatory Availability Period. (No P.O. Boxes Allowed).

B.2MOBILE SHOWER FACILITY UNIT DESCRIPTION AND PRICES
Unit ID No.
Number of

Shower Heads

Water Vehicle Capacity (Gallons)
Equipment Type
Unit Identification No. (UIN)
Male
Female

Shower Trailer

Water Vehicle

Tractor

Wash Basins (Sinks)

Other

Other

Contract Year
Mobile Shower Facility Unit Usage Price Per Day

(Including all peripheral support equipment) Water Vehicle – Intermittent Use Price Per Hour

Base Year (2014)
$
$
Option Year 1 (2015)
$
$
Option Year 2 (2016)
$
$
Option Year 3 (2017)
$
$
Option Year 4 (2018)
$
$

Mobile Shower Facility Unit Mileage Rate to & From the Incident Price Per Mile Water Vehicle – Mileage Price Per Mile

Base Year (2014)
$
$

*Note: Mileage prices for Option Years 2015 through 2018 will be adjusted in accordance with Section I Economic Price Adjustment Clause.

Complete the Hypothetical Quantities Table below by inserting your Base Year (2014) unit prices from Section B.2. The Government will compute the Grand Total Evaluated Price per Showerhead using the hypothetical quantities stated below. These hypothetical quantities are for price evaluation purposes only. These quantities are not intended to be estimates for the purposes of FAR 16.503(a) (1). Due to the sporadic occurrence of incident activity, the Government does not guarantee the placement of any orders. See Section M, Evaluation Factors for Award, for additional information. For contract award purposes, only the computed Grand Total Evaluated Price Per Showerhead will be considered.

Service Description
Unit of Measure
Base Year 2014 Unit Prices
*Hypothetical Quantity
Total
Mobile Shower Facility Unit Usage
Per Day
$
10 Days
$
Mobile Shower Facility Unit Mileage to & From the Incident
Per Mile
$
300 Miles
$
Transport Water Vehicle Mileage
Per Mile
$
30 Miles
$
Transport Water Vehicle – Intermittent Use
Per Hour
$
4 Hours
$
Total Price
$

Total Number of Showerheads

(Total Price ÷ Total Number of Showerheads) = Grand Total Evaluated Price Per Showerhead
$

Relocation Fee: $ Provide a price for unit relocation, the Government will not set this price. (Reference Section C.2 (f)) All prices proposed will be evaluated to determine reasonableness for the effort proposed and to determine the demonstrated understanding of the level of effort needed to successfully perform these services.

Section L.1 incorporates by reference FAR 52.215-1, Instruction to Offerors – Competitive Acquisition (JAN 2004). Section (f) (8) of this clause states the following: “The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or sub line items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.”