Amendment+4+Signed+2-9-2024.pdf

PDF 3 MB Posted

Attached to
Water Chillers - (Capitol Complex, Job Service, Adj Gen Only)
Contract number
056-CHIL
Issued by
North Dakota

About this file

This document is a contract amendment for Water Chillers, State Contract 056, between the State of North Dakota, acting through its Office of Management & Budget, and Chiller Systems Inc. The amendment involves three primary purchasing agencies: Job Service, State Capitol Complex, and the Office of the Adjutant General. The contract covers comprehensive preventative maintenance services for various centrifugal and screw-type chiller equipment located at different state facilities in North Dakota.

The amendment extends the contract from its original term of 3/1/2020 through 2/28/2022 to a new expiration date of 2/28/2026, with one remaining option to renew for an additional 24 months. The contract includes price adjustments, with a 5% increase effective 3/1/2022 through 2/28/2024, and a 10% increase for the period of 3/1/2024 through 2/28/2026. Services include operating inspections, annual maintenance, Eddy current testing, and overhaul services for multiple chillers of various makes and models across different state buildings. Pricing covers non-emergency and emergency service time/labor rates, materials, and refrigerant costs, with a markup of 15% above Chiller Systems' current cost for materials and refrigerants.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT AMENDMENT

CONTRACT NAME AND NUMBER: Water Chillers, State Contract 056

AMENDMENT NUMBER: 4

This amendment is made to Water Chillers – State Contract 056 (Contract) between the State of North Dakota, acting through its Office of Management & Budget (STATE), and Chiller Systems Inc.

(CONTRACTOR).

The parties agree to the following terms and conditions and expressly agree that if any of the following terms and conditions conflict with any of the terms and conditions of the Contract, then, notwithstanding any term in the Contract, the following terms and conditions govern and control the rights and obligations of the parties.

The parties agree to amend the Contract as follows:

Renewal Contract Section 3, Term of the Contract. The Contract commenced on 3/1/2020 through 2/28/2022 with three (3) options to renew the contract for up to twenty-four (24) months each.

The parties have agreed to renew the Contract for an additional twenty-four (24) months; therefore, the contract is amended to change the expiration date to 2/28/2026. The Contract has one (1) renewal remaining. The Contract can be extended for an additional twenty-four (24) months.

Price Adjustment Contract Section 3, Price Adjustment. This section required pricing to be firm-fixed for the first contract period ending 2/28/2022.

Within Amendment 2, the parties agreed to an increase in pricing of 5% for all services and 15% over Contractor cost for all materials, including but not limited to refrigerant, as listed within the initial contract. The Amendment 2 increases can be seen within Attachment A to this amendment. That increase in pricing was effective 3/14/2022 through 2/28/2024.

The parties have agreed to an additional increase in pricing of 10% for the period of 3/1/2024- 2/28/2026, as shown in Attachment B to this amendment. The pricing shown in Attachment B to this amendment is firm-fixed for the period of 3/1/2024-2/28/2026.

All other terms of the Contract remain in effect. This Contract Amendment is not effective until fully executed by all parties.

EXECUTION

CONTRACTOR STATE OF NORTH DAKOTA

Chiller Systems Inc. Acting through its Office of Management & Budget

BY: BY:

Printed Name: Printed Name: Gabriel Hoggarth

Title: Title: State Procurement Officer

Date: Date: 2/9/2024

Office Manager

Renee Nelson

2/9/2024

Item No.

Equipment Details

Operating Inspection - All inlcusive rate per item per inspection

Annual Maintenance All-inclusive rate per item

Eddy Current

Allinclusive rate per Item

Allinclusive rate per Item

Updated pricing Effective 3/1/2022

Reflecting 5% Increase

Trane, 112-ton Centrifugal Chiller Model: PCV-1C-C202 Serial: L2L15846 Building:

Divide Ave Freon: 113

$475.00 $665.00 $1,050.00 $19,750.00

$498.75 $698.25 $1,102.50 $20,737.50

$21,940.00 $23,037.00

Item Description Unit Est Qty Unit Price / %

Discount Total Price ending 2/28/2024

Updated pricing Effective 3/1/2022

Reflecting 5% Increase

Non-Emergency Service

Time/Labor Rate Hourly Rate 100 hours $116.00 $11,600.00 12,200.00

$122.00 $12,200.00

Emergency On-Call Service Time/Labor Rate

Hourly Rate 50 hours $126.00 $6,300.00 $6,600.00

$132.00 $6,600.00

3 Materials % materials 15% above current Chiller Systems' cost needed

Cost per lb. 25 lbs.

15% above current

Chiller Systems' cost

39,840.00 $41,837.00

PURCHASING AGENCY 1: JOB SERVICE

GRAND TOTAL for chiller services (Purchasing Agency 1) ending 2/28/2024

Other Services and Products:

GRAND TOTAL for chiller services (Purchasing Agency 1):

Job Service 1000 E Divide Ave

Bismarck, ND 58501

Randy Kaiser Phone: (701) 328-3014 Email: rkaiser@nd.gov

Job Service North Dakota Attn: Randy Kaiser

PO Box 5507 Bismarck, ND 58506-5507

A

ATTACHMENT 2 - BID RESPONSE REVISED

AMENDMENT 2

SECTION 6 BID RESPONSE REVISED

COMPREHENSIVE PREVENTATIVE CENTRIFUGAL & SCREW-TYPE CHILLER EQUIPMENT

MAINTENANCE SERVICES

Equipment Details

Operating Inspections - All-inclusive rate per

Item per Inspection

Annual Maintenance -

All-inclusive rate per item

Eddy Current Test - All-inclusive rate per item

Overhaul - All-inclusive rate per item

Updated pricing Effective 3/1/2022

Reflecting 5% Increase

Trane, 250-ton Centrifugal Chiller Model: PCV2F C1 D2

Serial: 7723 Building:

NDDOT Freon: 11

$475.00 665.00 1,245.00 21,250.00

$498.75 $698.25 $1,307.25 $22,312.50

Daikin, 115-ton WaterCooled Scroll Chiller Model:

WGZ115DW4NNDPN Serial:

STNU180100106 Building:

Heritage Center Freon: 410A

$425.00 $440.00 $540.00

$446.25 $462.00 $567.00

Trane, 150-ton Rotary Screw- Type Chiller Model: RTAC

1554 UR0N UAFN L1TX

1DDN NN0N N10A R0CXN

Serial: U08H01305 Building:

Heritage Arch Freon: 134A

$580.00 $440.00 $N/A

$609.00 $462.00 $N/A

Trane, 150-ton Centrifugal Chiller Model: CVHA-016-

DL4530-5407 Serial:

L80B06257 Building: J-Wing

Freon: 113

$475.00 $565.00 $950.00 $12,600.00

$498.75 $593.25 $997.50 $13,230.00

Trane, 205-ton Centrifugal Chiller Model: CVHA-025- DL4530-4299-01 Serial:

L808B06258 Building: J-

Wing Freon: 11

$475.00 $665.00 $950.00 $13,100.00

$498.75 $698.25 $997.50 $13,755.00

Trane, 400-ton Centrifugal Chiller Model: CVHE-045G-

AK2LC242ECEZA12CEZA0

000000021Y2T0 Serial:

L86E38543 Building: J-Wing

Freon: 11

$475.00 $665.00 $950.00 $13,550.00

$498.75 $698.25 $997.50 $14,227.50

$2,905.00 $3,440.00 $4,635.00 $60,500.00

$3,050.25 $3,612.00 $4,866.75 $63,525.00

PURCHASING AGENCY 2: STATE CAPITOL COMPLEX

Subtotals for Chiller Services:

$71,480.00 $75,054.00

Item Description Unit Est Qty Unit Price / %

Discount Total Price

Updated pricing Effective 3/1/2022

Reflecting 5% Increase

Non-Emergency

Service Time/Labor Rate

Hourly Rate 100 Hours $116.00 $11,600.00 $12,200.00

$122.00 $12,200.00

Emergency On-Call Service Time/Labor

Rate % 50 hours $126.00 $6,300.00 $6,600.00

$132.00 $6,600.00

3 Materials 15% above current cost materials 15% above current Chiller Systems' cost needed

Cost per lb. 25 lbs. 15% above current Chiller Systems' cost needed

Cost per lb. 30 lbs. 15% above current Chiller Systems' cost needed

Cost per lb. 30 lbs. 15% above current Chiller Systems' cost needed

Cost per lb. 25 lbs. 15% above current Chiller Systems' cost

$89,380.00 $93,854.00

Facility Management 600 E Boulevard Ave Bismarck, ND 58505

Tom Job Phone: (701) 328-4783

Email: tjob@nd.gov

Facility Management Attn:

4th Floor Capitol Tower 600 E Boulevard Ave, Dept 130

Bismarck, ND 58505-0310 Contact:

Email:

GRAND TOTAL FOR CHILLER SERVICES (Purchasing Agency 2):

OTHER SERVICES & Products:

GRAND TOTAL FOR OTHER SERVICES AND PRODUCTS (Purchasing Agency 2):

Equipment Details

Opeating Inspection - All- Inclusive rate per Inspection

Annual

All-inclusive rate per Item

Eddy Current Test All-inclusive rate per Item

Allinclusive rate per Item

Updated pricing Effective 3/1/2022

Reflecting 5% Increase

Daikin, 200-ton Centrifugal Chiller Model: WSC06L Serial: STNU120900134

Freon: R134A Address: 3920 31st St N Fargo, ND 58102- 6206 Operations Contact:

Martin Tonn Phone: (701)

451-6071 Email:

martin.f.tonn.nfg@mail.mil

$665.00 $1,200.00 $1,400.00 $7,800.00

$698.25 $1,260.00 $1,470.00 $8,190.00

Daikin, 400-ton Mag Centrifugal Chiller Model:

WMC290D Serial:

STNU090400037 Freon:

R134A, 1,100 lb. charge

Address: 4200 E Divide Ave Bismarck, ND 58501

Operations Contact: Mike Fischer Phone: (701) 333-

3270 Email:

valentine.m.fischer.nfg@ mail.mil

$565.00 $700.00 $1,400.00

$593.25 $735.00 $1,470.00

Daikin, 400-ton Mag Centrifugal Chiller Model:

WMC290D Serial:

STNU100800057 Freon:

R134A, 1,100 lb. charge Address: 3420 2nd St NE

Minot, ND 58703-0527 Operations Contact: Steve Brunelle Phone: (701) 420-

5891 Email:

steven.r.brunelle2.nfg@m ail.mil

$660.00 $900.00 $1,460.00

$693.00 $945.00 $1,533.00

$1,890.00 $2,800.00 $4,260.00 $7,800.00

$1,984.50 $2,940.00 $4,473.00 $8,190.00

$16,750.00 $17,587.50

Phone: (701) 328-1024

PURCHASING AGENCY 3: OFFICE of the ADJUTANT GENERAL

SUBTOTALS FOR CHILLER

SERVICES:

GRAND TOTAL FOR CHILLER SERVICES (Purchasing Agency 3):

Unit Prices / %

Discount Total Price

Updated pricing Effective 3/1/2022

Reflecting 5% Increase

Non-Emergency Service

Time/Labor Rate Hourly Rate 100 Hours $116.00 $11,600.00 $12,200.00

$122.00 $12,200.00

Emergency On-Call

Service Time/Labor Rate Hourly Rate 50 Hours $126.00 $6,300.00 $6,600.00

$132.00 $6,600.00

3 Materials 15% above current cost materials 15% above current Chiller Systems' cost needed

Cost per lb. 30 lbs 15% above current Chiller Systems' cost

$34,650.00 $36,387.50

$163,870.00 $172,078.50

Office of the Adjutant General

DFE-CM

Attn: Emily Kilber PO Box 5511, Bismarck, ND 58506

Contact:

Emily Kilber Email: emily.a.kilber.nfg@mail.mil

Phone: (701) 333-2069

WATER CHILLER BID RESPONSE GRAND TOTAL:

Other Services & Products:

GRAND TOTAL FOR OTHER SERVICES AND PRODUCTS (Purchasing Agency 3):

Equipment Details

Operating Inspection - All inlcusive rate per item per inspection

Annual Maintenance All-inclusive rate per item

Eddy Current

Allinclusive rate per Item

Allinclusive rate per Item

Updated pricing Effective 3/1/2024

Reflecting 10% Increase

Trane, 112-ton Centrifugal Chiller Model: PCV-1C-C202 Serial: L2L15846 Building:

Divide Ave Freon: 113

$498.75 $698.25 $1,102.50 $20,737.50

$548.63 $768.08 $1,212.75 $22,811.25 $23,037.00 $25,340.71

Item Description Unit Est Qty Unit Price / %

Discount Total Price ending 2/28/2024

Updated pricing Effective 3/1/2024

Reflecting 10% Increase

Non-Emergency Service

Time/Labor Rate Hourly Rate 100 hours $122.00 $12,200.00 $13,420.00

$134.20 $13,420.00

Emergency On-Call Service Time/Labor Rate

Hourly Rate 50 hours $132.00 $6,600.00 $7,260.00

$145.20 $7,260.00

3 Materials % materials 15% above current Chiller Systems' cost needed

Cost per lb. 25 lbs.

15% above current

Chiller Systems' cost

41,837.00 $46,020.71

PURCHASING AGENCY 1: JOB SERVICE

GRAND TOTAL for chiller services (Purchasing Agency 1) ending 2/28/2024

Other Services and Products:

GRAND TOTAL for chiller services (Purchasing Agency 1):

Job Service 1000 E Divide Ave

Bismarck, ND 58501

Randy Kaiser Phone: (701) 328-3014 Email: rkaiser@nd.gov

Job Service North Dakota Attn: Randy Kaiser

PO Box 5507 Bismarck, ND 58506-5507

B

COMPREHENSIVE PREVENTATIVE CENTRIFUGAL & SCREW-TYPE CHILLER EQUIPMENT

MAINTENANCE SERVICES

Equipment Details

Operating Inspections - All-inclusive rate per

Item per Inspection

Annual Maintenance -

All-inclusive rate per item

Eddy Current Test - All-inclusive rate per item

Overhaul - All-inclusive rate per item

Updated pricing Effective 3/1/2024

Reflecting 10% Increase

SMARDT, 200-ton Chiller Model: WB0802E6 Serial:

FF0010Q351Q3204 Building:

NDDOT Freon: 134A

$498.75 $698.25 1,307.25 N/A

$548.63 $768.08 $1,437.98 N/A

Daikin, 115-ton WaterCooled Scroll Chiller Model:

WGZ115DW4NNDPN Serial:

STNU180100106 Building:

Heritage Center Freon: 410A

$446.25 $462.00 $567.00

$490.88 $508.20 $623.70

Trane, 150-ton Rotary Screw- Type Chiller Model: RTAC

1554 UR0N UAFN L1TX

1DDN NN0N N10A R0CXN

Serial: U08H01305 Building:

Heritage Arch Freon: 134A

$609.00 $462.00 N/A

$669.90 $508.20 N/A

Trane, 150-ton Centrifugal Chiller Model: CVHA-016-

DL4530-5407 Serial:

L80B06257 Building: J-Wing

Freon: 113

$498.75 $593.25 $997.50 $13,230.00

$548.63 $652.58 $1,097.25 $14,553.00

SMARDT, 200-ton Chiller Model: WE085.2EGXX

Serial: FF00105121Q3583 Building: J-Wing

Freon: 134A

$498.75 $698.25 $997.50 N/A

$548.63 $768.08 $1,097.25 N/A

Trane, 400-ton Centrifugal Chiller Model: CVHE-045G-

AK2LC242ECEZA12CEZA0

000000021Y2T0 Serial:

L86E38543 Building: J-Wing

Freon: 11

$498.75 $698.25 $997.50 $14,227.50

$548.63 $768.08 $1,097.25 $15,650.25

$3,050.25 $3,612.00 $4,866.75 $27,457.50 $3,355.30 $3,973.22 $5,353.43 $30,203.25

PURCHASING AGENCY 2: STATE CAPITOL COMPLEX

Subtotals for Chiller Services:

$38,986.50 $42,885.20

Unit Price / %

Discount Total Price

Updated pricing Effective 3/1/2024

Reflecting 10% Increase

Non-Emergency

Service Time/Labor Rate

Hourly Rate 100 Hours $122.00 $12,200.00 $13,420.00

$134.20 $13,420.00

Emergency On-Call Service Time/Labor

Rate % 50 hours $132.00 $6,600.00 $7,260.00

$145.20 $7,260.00

3 Materials 15% above current cost materials 15% above current Chiller Systems' cost needed

Cost per lb. 25 lbs. 15% above current Chiller Systems' cost needed

Cost per lb. 30 lbs. 15% above current Chiller Systems' cost needed

Cost per lb. 30 lbs. 15% above current Chiller Systems' cost needed

Cost per lb. 25 lbs. 15% above current Chiller Systems' cost

$57,786.50 $63,565.20

Facility Management 600 E Boulevard Ave Bismarck, ND 58505

Tom Job Phone: (701) 328-4783

Email: tjob@nd.gov

Facility Management Attn:

4th Floor Capitol Tower 600 E Boulevard Ave, Dept 130

Bismarck, ND 58505-0310 Contact:

Email:

GRAND TOTAL FOR CHILLER SERVICES (Purchasing Agency 2):

OTHER SERVICES & Products:

GRAND TOTAL FOR OTHER SERVICES AND PRODUCTS (Purchasing Agency 2):

Phone: (701) 328-1024

Equipment Details

Opeating Inspection - All- Inclusive rate per Inspection

Annual

All-inclusive rate per Item

Eddy Current Test All-inclusive rate per Item

Allinclusive rate per Item

Updated pricing Effective 3/1/2024

Reflecting 10% Increase

Daikin, 200-ton Centrifugal Chiller Model: WSC06L Serial: STNU120900134

Freon: R134A Address: 3920 31st St N Fargo, ND 58102- 6206 Operations Contact:

Martin Tonn Phone: (701)

451-6071 Email:

martin.f.tonn.nfg@mail.mil

$698.25 $1,260.00 $1,470.00 $8,190.00

$768.08 $1,386.00 $1,617.00 $9,009.00

Daikin, 400-ton Mag Centrifugal Chiller Model:

WMC290D Serial:

STNU090400037 Freon:

R134A, 1,100 lb. charge

Address: 4200 E Divide Ave Bismarck, ND 58501

Operations Contact: Mike Fischer Phone: (701) 333-

3270 Email:

valentine.m.fischer.nfg@ mail.mil

$593.25 $735.00 $1,470.00

$652.58 $808.50 $1,617.00

Daikin, 400-ton Mag Centrifugal Chiller Model:

WMC290D Serial:

STNU100800057 Freon:

R134A, 1,100 lb. charge Address: 3420 2nd St NE

Minot, ND 58703-0527 Operations Contact: Steve Brunelle Phone: (701) 420-

5891 Email:

steven.r.brunelle2.nfg@m ail.mil

$693.00 $945.00 $1,533.00

$762.30 $1,039.50 $1,686.30

$1,984.50 $2,940.00 $4,473.00 $8,190.00

$2,182.95 $3,234.00 $4,920.30 $9,009.00

$17,587.50 $19,346.25

PURCHASING AGENCY 3: OFFICE of the ADJUTANT GENERAL

SUBTOTALS FOR CHILLER

SERVICES:

GRAND TOTAL FOR CHILLER SERVICES (Purchasing Agency 3):

Unit Prices / %

Discount Total Price

Updated pricing Effective 3/1/2024

Reflecting 10% Increase

Non-Emergency Service

Time/Labor Rate Hourly Rate 100 Hours $122.00 $12,200.00 $13,420.00

$134.20 $13,420.00

Emergency On-Call

Service Time/Labor Rate Hourly Rate 50 Hours $132.00 $6,600.00 $7,260.00

$145.20 $7,260.00

3 Materials 15% above current cost materials 15% above current Chiller Systems' cost needed

Cost per lb. 30 lbs 15% above current Chiller Systems' cost

$36,387.50 $40,026.25

$136,011.00 $149,612.16

Office of the Adjutant General Directorate of Installations and Environment

Attn: Emily Kilber PO Box 5511, Bismarck, ND 58506

Contact: Emily Kilber Email: emily.a.kilber.civ@army.mil

Phone: (701) 333-2069

WATER CHILLER BID RESPONSE GRAND TOTAL:

Other Services & Products:

GRAND TOTAL FOR OTHER SERVICES AND PRODUCTS (Purchasing Agency 3):

EXECUTION

File details come from the government source that posted it. Updated .