This is Addendum 3 to a Centralized Request for Quote (CRFQ) issued by the West Virginia Department of Administration Purchasing Division on behalf of the West Virginia Adjutant General's Office. The project involves providing all labor, materials, tools, supplies, and equipment to install sufficient drainage for a new transient motor pool at Camp Dawson in Kingwood, West Virginia. The work includes excavating and removing material to allow for drainage lines, installing new drainage piping around the motor pool, and connecting drainage into an existing drop inlet. A mandatory pre-bid meeting was held on August 26, 2026, at 1:00 PM EST, and vendor technical questions were due by August 31, 2026, at 11:00 AM EST. The original bid opening date was moved to September 15, 2026, at 1:30 PM EST per this addendum. The solicitation number is CRFQ ADJ2700000017, and bids must be submitted to the Department of Administration Purchasing Division in Charleston, West Virginia.
The contract will be awarded to the lowest qualified responsible bidder, with payment provided as a flat fee for all services performed and accepted. Vendors must demonstrate a minimum of five years of experience and successful completion of at least five similar drainage installation projects. All work must comply with applicable federal, state, and local codes, including the International Building Code and OSHA regulations. The contractor is responsible for obtaining all necessary permits and licenses and performing work during standard hours of Monday through Friday, 7:30 AM to 4:00 PM, excluding state holidays. Liquidated damages of $1,500 per day of delay, plus a one-time fixed cost of $1,250 for Staff Judge Advocate review, will apply for work not completed by the contract completion date. The award, execution, and completion of the project are contingent upon receipt of federal funding, and vendors are requested to honor their bid pricing for 90 days from the bid opening date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Printed: Sep 9, 2026 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05
Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130
State of West Virginia Centralized Request for Quote
Construction
Proc Folder: 2044986 Reason for Modification:
Doc Description: Camp Dawson - Transient Lot Drainage Addendum No. 3
Proc Type: Central Purchase Order
Date Issued Solicitation Closes Solicitation No Version
2026-09-09 2026-09-09 13:30 CRFQ 0603 ADJ2700000017 4
BID RECEIVING LOCATION
BID CLERK
DEPARTMENT OF ADMINISTRATION
PURCHASING DIVISION
2019 WASHINGTON ST E
CHARLESTON WV 25305
US
VENDOR
Vendor Customer Code:
Vendor Name :
Address :
Street :
City :
State : Country : Zip :
Principal Contact :
Vendor Contact Phone: Extension:
FOR INFORMATION CONTACT THE BUYER
David H Pauline 304-558-0067 david.h.pauline@wv.gov
Vendor Signature X FEIN# DATE
All offers subject to all terms and conditions contained in this solicitation
Date Printed: Sep 9, 2026 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05
ADDITIONAL INFORMATION
Addendum No. 3
To replace the entire specifications section of the solicitation documents that were inadvertently published, see attached.
To Move the Bid Opening Date and Time to 9/15/2026, 1:30 pm EST.
No other changes.
INVOICE TO SHIP TO
ADJUTANT GENERALS
OFFICE
KINGWOOD ARMED FORCES
RESERVE CENTER
1707 COONSKIN DR 240 ARMY RD
CHARLESTON WV KINGWOOD WV
US US
Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 install sufficient drainage for the new transient motor pool
Comm Code Manufacturer Specification Model #
30111500
Extended Description:
install sufficient drainage for the new transient motor pool
SCHEDULE OF EVENTS
Line Event Event Date 1 Mandatory Pre-bid Meeting At 1:00 pm EST. 2026-08-26 2 Vendor Technical Questions Due By 11:00 am EST. 2026-08-31
SOLICITATION NUMBER: CRFQ ADJ2700000017
Addendum Number: 3
The purpose of this addendum is to modify the solicitation identified as (“ADJ2700000017”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
☐ Modify bid opening date and time.
☒ Modify specifications of product or service being sought.
☐ Attachment of vendor questions and responses.
☐ Attachment of pre-bid sign-in sheet.
☒ Correction of error.
☐ Other.
Description of Modification to Solicitation:
To remove and replace the entire Specifications Sections of the Solicitation Documents, including Exhibits A, and B, that were inadvertently omitted from the original documents. (see attached)
To Move the Bid Opening Date & Time to 09/15/2026, at 1:30 PM EST.
No other changes.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
REQUEST FOR QUOTATION CRFQ ADJ27*17
Transient Lot Drainage
Revised 06/08/18
GENERAL CONSTRUCTION SPECIFICATIONS (No AIA Documents)
1. PURPOSE AND SCOPE: The West Virginia Purchasing Division is soliciting bids on behalf of West
Virginia Adjutant Generals Office to establish a contract for the following:
Provide all labor, materials, tools, supplies and equipment to install sufficient drainage for the new transient motor pool at Camp Dawson. The project involves excavating and removing material to allow for drainage lines, installing new drainage piping around motor pool connect drainage into existing drop inlet as specified in the Scope of Work. Contractor shall coordinate work through the Agency Project Manager
The Vendor shall furnish all materials, labor, and equipment necessary to complete all Construction Services.
The Vendor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction Services, even if such incidental work is not explicitly included in the Project Plans.
The award, execution and completion of this project is contingent upon receipt of federal funding;
therefore, vendors are requested to honor the pricing submitted on their bids for 90 from the date bids are opened on this project.
Where brand names are shown, these names are intended to describe the quality of product, and in no way are intended to limit products of equal quality. Therefore, products of other manufacturers may be employed for this work provided they are of equivalent materials and construction and are equally adaptable to the conditions as approved by the agency.
2. DEFINITIONS: The terms listed below shall have the meanings assigned to them below. Additional definitions can be found in section 2 of the General Terms and Conditions and in the Project Plans as defined below.
2.1 “Construction Services” means to removal of existing spalled concretes, prepping the sub-base, and pouring concrete as specified in the Scope of Work
2.2 “Pricing Page” means the pages contained in wvOASIS, attached hereto as Exhibit A, or included in the Project Plans upon which Vendor should list its proposed price for the Construction Services.
2.3 “Solicitation” means the official notice of an opportunity to supply the State with Construction
Services that is published by the Purchasing Division.
2.4 “Project Plans” means documents developed by an architect, an engineer, the Agency, or another design professional, which are attached hereto as Exhibit B, that provide detailed instructions on how the Construction Services are to be performed. In the event that Project Plans contain drawings or other documents too large to attach in Exhibit B, Vendors can obtain copies in accordance with Section 9 of these Specifications.
3. ORDER OF PRECEDENCE: This General Construction Specifications document will have priority over, and supersede, anything contained in the Project Plans.
4. QUALIFICATIONS: Vendor, or Vendor’s staff if requirements are inherently limited to individuals rather than corporate entities, shall have the following minimum qualifications:
4.1. Experience: Vendor, or Vendor’s supervisory staff assigned to this project, must have successfully completed at least (5) Five projects and have (5) years of experience installing sufficient drainage for the new transient motor pool that involved work similar to that described in these specifications or the Project Plans. Compliance with this experience requirement will be determined prior to contract award by the State through references provided by the Vendor upon request, through knowledge or documentation of the Vendor’s past projects, through confirmation of experience requirements from the architect assisting the State in this project, or some other method that the State determines to be acceptable. Vendor must provide any documentation requested by the State to assist in confirmation of compliance with this provision. References, documentation, or other information to confirm compliance with this experience requirement may be requested after bid opening and prior to contract award.
5. CONTRACT AWARD: The Contract is intended to provide Agency with a purchase price for the
Construction Services. The Contract will be awarded to the lowest qualified responsible bidder meeting the required specifications. If the Pricing Pages contain alternates/add-ons, the Contract will be awarded based on the grand total of the base bid and any alternates/add-ons selected.
6. SELECTION OF ALTERNATES: Pursuant to W. Va. Code § 5-22-1(f), any solicitation of bids shall include no more than five alternates. Alternates, if accepted, shall be accepted in the order in which they are listed on the bid form. Any unaccepted alternate contained within a bid shall expire 90 days after the date of the opening of bids for review. Determination of the lowest qualified responsible bidder shall be based on the sum of the base bid and any alternates accepted. This Project contains No(0) alternates
7. PERFORMANCE: Vendor shall perform the Construction Services in accordance with this document and the Project Plans.
8. SUBSTITUTIONS: Any substitution requests must be submitted in accordance with the official question and answer period described in the INSTRUCTIONS TO VENDORS SUBMITTING BIDS, Paragraph 4.
Vendor Question Deadline. Vendors submitting substitution requests should submit product brochures and product specifications during the official question and answer period.
9. PROJECT PLANS: The checked box will apply to Project Plans for this solicitation.
x No Additional Project Plan Documents: There are no additional Project Plans other than those attached hereto as Exhibit B or any subsequent addenda modifying Exhibit B.
10. CONDITIONS OF THE WORK
10.1. Permits: The Vendor shall procure all necessary permits and licenses to comply with all applicable
Federal, State, or Local laws, regulations and ordinances of any regulating body.
10.2. Existing Conditions: If discrepancies are discovered between the existing conditions and those noted in the specifications, Vendor must immediately notify the Agency's representative. Vendor must also immediately notify the Agency if suspected hazardous materials are encountered.
10.3. Standard Work Hours: The standard hours of work for this Contract will be Monday through Friday from 7:30am to 4:00pm excluding holidays recognized by the State of West Virginia. Any work outside of the standard hours of work must be approved in advance at the Agency’s sole discretion.
Authorization of work outside of the standard hours of work will not entitle Vendor to additional compensation.
10.4. Project Closeout: Project Closeout shall include the following:
10.4.1. Final Cleanup: Vendor shall perform the final cleanup activities listed below, along with any other final cleanup activities normally associated with the work performed under this Contract, prior to final inspection:
10.4.1.1. Contractor is responsible for removing all construction debris daily.
10.4.1.2. Contractor is responsible for removing and disposing of any demolished material;
off site and at the contractor’s expense.
10.4.2. Final Inspection: Vendor shall participate in a final inspection with the Agency’s project manager. The purpose of the final inspection will be to identify deficiencies that need to be remedied prior to Agency’s final acceptance of the work. Vendor shall at all times be obligated to perform in accordance with the Contract and must take all actions necessary to ensure that work complies with requirements of Contract prior to final acceptance. Final acceptance does not waive or release Vendor from its obligation to ensure that work complies with the Contract requirements. Vendor shall submit any warranty documents to the Agency project manager at final inspection.
10.5. Payment:
10.5.1. Agency shall pay flat fee as shown on the Bid Form, for all Contract Services performed and accepted under this Contract. Vendor shall accept payment in accordance with the payment procedures of the State of West Virginia.
10.5.2. Invoices shall be submitted for payment (in arrears) and must include the following information:
10.5.2.1. Invoice must include, at a minimum, Invoice date, FEIN number, complete address of vendor and Contract Number.
10.5.2.2. Invoices shall be mailed to the following address:
WV Army National Guard Construction & Facilities Management Office
1707 Coonskin Drive Attn: Accounts Payable Charleston WV 25311
11. FACILITIES ACCESS: Performance of Contract Services may require access cards and/or keys to gain entrance to Agency’s facilities. In the event that access cards and/or keys are required:
11.1. Vendor must identify principal service personnel which will be issued access cards and/or keys to perform service.
11.2. Vendor will be responsible for controlling cards and keys and will pay replacement fee, if the cards or keys become lost or stolen.
11.3. Vendor shall notify Agency immediately of any lost, stolen, or missing card or key.
11.4. Anyone performing under this Contract will be subject to Agency’s security protocol and procedures.
11.5. Vendor shall inform all staff of Agency’s security protocol and procedures.
12. MISCELLANEOUS:
12.1. Contract Manager: During its performance of this Contract, Vendor must designate and maintain a primary contract manager responsible for overseeing Vendor’s responsibilities under this Contract. The Contract manager must be available during normal business hours to address any customer service or other issues related to this Contract. Vendor should list its Contract manager and his or her contact information below.
Contract Manager: _________________________________________________
Telephone Number: ________________________________________________
Fax Number: ______________________________________________________
Email Address: ____________________________________________________ а. Liquidated Damages: Contractor shall pay liquidated damages in the amount of $1,500.00 per day of delay, plus a one-time fixed cost of $1,250.00 for Staff Judge Advocate review for work not completed after contract completion date. This clause shall in no way be considered exclusive and shall not limit the State or Agency's right to pursue any other available remedy.
EXHIBIT A – Pricing Page
ALL LABOR, MATERIALS, EQUIPMENT, AND SUPPLIES NECESSARY TO INSTALL
SUFFICIENT DRAINAGE FOR THE NEW TRANSIENT MOTOR POOL AS SPECIFIED IN
THE SCOPE OF WORK
BID FORM
The undersigned, hereafter called the Bidder, being familiar with and understanding documents;
and being familiar with the site and all local conditions affecting the Project, hereby proposes to furnish labor, material, equipment, supplies, and transportation to perform the work as described in the bidding documents
BIDDER COMPANY NAME:____________________________________________________
VENDOR ADDRESS: __________________________________________________________
TELEPHONE: __________________________________________________________
FAX NUMBER: __________________________________________________________
WV CONTRACTOR’S
LICENSE No: ___________________________________________________________
CONTRACT OVERALL TOTAL COST:BASE BID FOR THE install sufficient drainage for the new transient motor pool as specified in the Scope of Work at Camp Dawson, Kingwood, WV per the attached specifications.
($______________________) ***(Contract bid to be written in words and number.)
Failure to use bid form may result in bid disqualification.
Signature: _________________________________ Date: ______________________
Name: _________________________________
Title: _________________________________
EXHIBIT B – PROJECT PLANS
13. GENERAL REQUIREMENTS:
13.1 Mandatory Contract Item Requirements: Contract Item must meet or exceed the mandatory requirements listed below.
13.1.1 All work to be performed according to specifications provided in the following attachments.
13.1.1.1 Exhibit A Pricing Page
13.1.1.2 Exhibit C Scope of Work-Transient Lot Drainage
14. PERFORMANCE: Vendor and Agency shall agree upon a schedule for performance of Contract Services and Contract Services Deliverables, unless such a schedule is already included herein by Agency.
15. TRAVEL: Vendor shall be responsible for all mileage and travel costs, including travel time, associated with performance of this Contract. Any anticipated mileage or travel costs may be included in the Vendor’s bid, but such costs will not be paid by the Agency separately.
16. PROJECT SPECIFIC CONDITIONS OF THE WORK
16.1 Limits of Work
16.1.1 Work areas will be limited to those spaces required for access to the jobsites.
16.1.2 Some interior space may be utilized for temporary (overnight) storage of equipment and tools. Coordinate storage needs with the Agency Project Manager. Vendor shall take full responsibility for the storage of any supplies or equipment on the jobsite, whether inside or outside. Agency cannot guarantee availability of its employees during off-hours (evenings, holidays, weekends, etc.) to provide access to any supplies and equipment stored inside.
16.1.3 Agency facilities shall remain in use during this contract. Contractor shall work with the Trades Specialist to coordinate the temporary access to work areas and otherwise provide for the Contractor needs to complete work. Contractor shall minimize disruption to building work areas and loading dock access. Contractor shall be permitted reasonable use of building utilities including power, water and sanitary sewage disposal as required for conducting the work. Contractor shall coordinate the location of service connections or use of receptacles with the Trades Specialist to avoid overloading existing circuits.
16.2 Contractor Visitor Badges
Contractor shall provide a list of all personnel working on this project within the facility. This list shall include a copy of a valid driver’s license or other legal identification and include date of birth and cell phone number. Workers shall carry valid Contractor Photo ID Badges to be worn when working in the facility. Under no circumstances shall a worker be assigned to this project without the validation first being submitted to the WV Army National Guard and approval given.
16.3Work Restrictions
Access to the buildings shall be coordinated with the Owner. Contractor shall not leave open doors unattended and shall close doors when not in use.
These are non-smoking buildings. Smoking is not permitted within the buildings or near entrances, operable windows or outdoor air intakes.
Vendor MAY NOT block access to any fire hydrant located at jobsite.
Vendor MAY NOT block access to parking lot entrances and exits without prior approval of the Agency.
16.4Parking
Some parking is available on the project sites. Parking in non-designated areas is not permitted.
Parking is the responsibility of the contractor. With prior approval, contractor’s vehicles may be brought on-site for loading & unloading or to provide equipment necessary for conducting the work.
Use of loading dock areas or sidewalk areas for parking is strictly prohibited.
16.5Codes
All work is to be performed in compliance with applicable Federal and State codes including but not limited to the International Building Code, International Mechanical Code, Life Safety Code, NEC, OSHA, UL, ANSI, ASME and related standards.
16.6Safety
All applicable local safety and OSHA rules and guidelines shall be met by the Contractor. Work shall be subject to verification and inspection by WV Army National Guard Safety representatives.
Such verification shall not relieve the Contractor from meeting all applicable safety regulations and inspection by other agencies.
16.7 Hot Work Permit
Contractor shall obtain Owner’s permission prior to performing any work that requires an open flame, creates sparks, use’s equipment that creates combustible temperatures, or performs any work that could result in a fire hazard. Owner will review work area and issue a ‘Hot Work
Permit’ prior to Contractor commencing work. Note that the Contractor must take proper precautions and may be required to provide a Fire Watch as a condition of the permit.
16.8 Workmanship
Contractor shall complete all work in a neat and workmanlike manner. All work shall be done using new materials in a manner that meets commercial quality standards. Work shall be neat, true, plumb and square, as applicable. Contractor shall verify all dimensions.
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.: CRFQ ADJ2700000017
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.
Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
☒ Addendum No. 1 ☐ Addendum No. 6
☒ Addendum No. 2 ☐ Addendum No. 7
☒ Addendum No. 3 ☐ Addendum No. 8
☐ Addendum No. 4 ☐ Addendum No. 9
☐ Addendum No. 5 ☐ Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.