Addendum 3 - Attachment B.1 - Price Proposal.xlsx
XLSX spreadsheet 173 KB Posted
- Attached to
- Emergency Standby Materials and Services State and local contract opportunity
- Solicitation number
- RFP-05620
- Issued by
- Leon County, Florida
About this file
This document is a Request for Proposals (RFP) issued by the Florida Division of Emergency Management (FDEM) to establish Emergency Standby Material and Services Contracts. These contracts will be used in preparation for and response to emergencies or disasters within the state of Florida, specifically in Leon County and the city of Tallahassee. The RFP covers a wide range of products and services, including generators, pumps, heavy equipment, communications equipment, personnel, environmental control systems, temporary structures, and more. Bidders are required to submit pricing for various sized packages and individual assets, with the response packages required to begin mobilization within 12 hours of order and be fully delivered to the site within 96 hours. The contract period is 3 years with potential renewal options.
The pricing terms in the RFP include base rates, reserve rates, and extended use discounts. There are no set-asides mentioned, and the incumbent contractors are not specified. The funding requirements and sources are not detailed, but the RFP indicates these contracts will be used for emergency preparedness and response activities within the state of Florida.
View the file
Other files for this state and local contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS
| 7/7/2023: ADDENDUM #3 | |||
| ATTACHMENT B PRICE PROPOSAL | |||
| CONTRACTOR NAME: | [BLANK - TYPE HERE] | Contract Period (Years 1-3) | |
| PRINCIPAL POC: | [BLANK - TYPE HERE] | ||
| 24/7 CONTACT TELEPHONE: | [BLANK - TYPE HERE] | ||
| REVISION DATE: | [BLANK - TYPE HERE] |
JUMP DIRECTLY TO: LINK TO NIMS RESOURCE TYPING
| TYPE I RESPONSE PACKAGE | |
| TYPE II RESPONSE PACKAGE | https://rtlt.preptoolkit.fema.gov/Public |
| TYPE III RESPONSE PACKAGE | |
| RESPONDER BASE CAMPS | |
| EMERGENCY SHELTER COMPLEXES | |
| SANPACS | |
| TYPED SUPPORT PACKAGES | |
| Prime Power - Individual | The State of Florida follows the National Incident Management System (NIMS) definitions where they apply. Where there are no NIMS definitions, the State of Florida then Types a resource as FL TYPED. |
| Pumps - Individual | |
| MHE - Individual | |
| Heavy Equipment | |
| Personnel | |
| Supplies Mass Care | |
| Environmental Control | |
| Temporary Structures - Indiv. | |
| Support Equipment | |
| Tarps | |
| Meals | |
| PPE |
https://rtlt.preptoolkit.fema.gov/Public
SUMMARY
| RATE SHEET (TAB) | BASE RATE / HOURLY RATE / DAILY RATE / PURCHASE PRICE | RESERVE RATE | AVERAGE OF EXTENDED USE DISCOUNT |
| TYPE I RESPONSE PACKAGE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| TYPE II RESPONSE PACKAGE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| TYPE III RESPONSE PACKAGE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| RESPONDER BASE CAMPS | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| EMERGENCY SHELTER COMPLEXES | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| SANPACS | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| TYPED SUPPORT PACKAGES | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| Prime Power - Individual | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| Pumps - Individual | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| MHE - Individual | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| Heavy Equipment | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| Personnel | PRICE SHEET INCOMPLETE | N/A | N/A |
| Supplies Mass Care | PRICE SHEET INCOMPLETE | N/A | N/A |
| Environmental Control | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| Temporary Structures - Indiv. | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| Support Equipment | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE | PRICE SHEET INCOMPLETE |
| Tarps | PRICE SHEET INCOMPLETE | N/A | N/A |
| Meals | PRICE SHEET INCOMPLETE | NA | N/A |
| PPE | PRICE SHEET INCOMPLETE | N/A | N/A |
TYPE I RESPONSE PACKAGE
| Attachment B.1 Price Proposal - Contract Period Years 1-3 | ||||||||||||
| TYPE I RESPONSE PACKAGE RATE SHEET | CONTRACTOR NAME: | [BLANK - TYPE HERE] | ||||||||||
| PRINCIPAL POC: | [BLANK - TYPE HERE] | |||||||||||
| REVISION DATE: | [BLANK - TYPE HERE] | |||||||||||
| RESPONSE PACKAGES ARE TO BEGIN MOBILIZATION WITHIN 12 HOURS OF ORDER, AND ALL RESOURCES MUST BE DELIVERED TO SITE WITHIN 96 HOURS OF ORDER. | ||||||||||||
| NOTE: DOES NOT INCLUDE OTHER SUPPORT PACKAGES LISTED ELSEWHERE. | ||||||||||||
| UNIT LEGEND:EA=Each; E/D=Each/Day; HR=Hour; ML=Meal; TL=Truck Load; E/W=Each/Week; BG=Bag; DY=Day; CS=Case; LT=Lot; MI=Mile; PU=Per Unit; SHFT=Shift; SEC=Section | ||||||||||||
| Generators | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | Base | Reserve | E.U. |
| 20 | NIMS TYPE V | 100 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 5 | 125 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 5 | 150 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 15 | 175 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 12 | 250 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 5 | NIMS TYPE IV | 400 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 12 | 500 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 8 | NIMS TYPE III | 800 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 | NIMS TYPE II | 1250 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | 1500 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| Generator Total | $0.00 | $0.00 | 0.00% | |||||||||
| Power Ancillaries | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 30,000 | N/A | Generator Cable | P/F/W | $0.00 | P/F/W | $0.00 | 0 | 0 | 0 | |||
| 10 | N/A | 500 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 15 | N/A | 750 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 5 | N/A | 1500 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | 600 Amp Line Panel | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | 800 Amp Line Panel | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 20 | N/A | Variable Message Board | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Power Ancillaries Total | $0.00 | $0.00 | 0.00% | |||||||||
| Pumps, Hoses & Fittings | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 10 | N/A | 4" x 4" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 10 | N/A | 6" x 6" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | 8" x 8" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 168 | N/A | 6" Suction / Discharge Hose 50' Section | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 168 | N/A | 8" Suction / Discharge Hose 50' Section | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| Pumps, Hoses & Fittings Total | $0.00 | $0.00 | 0.00% | |||||||||
| Miscellaneous | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 2 | N/A | Fork-lift Carpet Poles (For Use w/Rolls of FEMA roofing tarps) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | Pallet Grabbers w/Chain | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 10 | N/A | Pallet Jacks | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Miscellaneous Total | $0.00 | $0.00 | 0.00% | |||||||||
| Heavy Equipment | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 50 | N/A | Telehandler W/ operator lift capacity 8000# or similar | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 160 | N/A | Roll-Back (Self loading / Unloading) Unit w/Operator | DY | $0.00 | DY | $0.00 | 0 | 0 | 0 | |||
| 504 | N/A | Fuel Trucks; with Operators - # of hours | HR | $0.00 | HR | $0.00 | 0 | 0 | 0 | |||
| 5 | N/A | Dock Plates | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 50 | N/A | 5000 LB Forklifts | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 25,000-35,000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | 9,000 - 10,000 lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 25 | N/A | 6000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 15 | N/A | 8000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Heavy Equipment Total | $0.00 | $0.00 | 0.00% | |||||||||
| Chillers, Warmers & Air Handling Equipment | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 6 | NIMS TYPE V | 20 - Ton Air Conditioner Unit | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 | NIMS TYPE IV | 40 - Ton Air Conditioner Unit | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 80 | N/A | Insulated Ductwork | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Chiller, Warmers & Air Handling Equip. Total | $0.00 | $0.00 | 0.00% | |||||||||
| Communications | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | N/A | Communications Satellite, Modem, Wireless Router | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Communications Data Liaison (Mobilization/Demobilization) | HR | $0.00 | HR | $0.00 | 0 | 0 | 0 | |||
| 20 | N/A | 100' 12/3 Extension Cords | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 20 | N/A | Electrical Strips | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | KA band Satellite Data unit 17mbps down by 6mbps up | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Cradlepoint unit that is firstnet capable and has provider diversity | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 | N/A | VOIP Lines integrated into data package | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Verizon capable network extender | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | AT&T capable network extender | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | Iridium PTT Satellite Phones | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Communications Total | $0.00 | $0.00 | 0.00% | |||||||||
| Personnel | ||||||||||||
| Qty | Est Wrk Hours | Description | HR RATE | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 2 | 84 | Project / Operations Manager | HR | $0.00 | 0 | |||||||
| 2 | 44 | Project / Operations Manager; Overtime | HR | $0.00 | 0 | |||||||
| 8 | 84 | Resource Supervisors | HR | $0.00 | 0 | |||||||
| 8 | 44 | Resource Supervisor; Overtime | HR | $0.00 | 0 | |||||||
| 3 | 84 | Logistical Staging Area Manager | HR | $0.00 | 0 | |||||||
| 3 | 44 | Logistical Staging Area Manager Overtime | HR | $0.00 | 0 | |||||||
| 2 | 84 | Warehouse Supervisor | HR | $0.00 | 0 | |||||||
| 2 | 44 | Warehouse Supervisor Overtime | HR | $0.00 | 0 | |||||||
| 30 | 84 | Warehouse Workers Fork Lift Certified | HR | $0.00 | 0 | |||||||
| 30 | 44 | Warehouse Workers Fork Lift Certified Overtime | HR | $0.00 | 0 | |||||||
| 2 | 84 | Resource Technicians | HR | $0.00 | 0 | |||||||
| 2 | 44 | Resource Technicians; Overtime | HR | $0.00 | 0 | |||||||
| 2 | 84 | Field Clerk | HR | $0.00 | 0 | |||||||
| 2 | 44 | Field Clerk; Overtime | HR | $0.00 | 0 | |||||||
| 12 | 84 | Electrical Technicians | HR | $0.00 | 0 | |||||||
| 12 | 44 | Electrical Technicians; Overtime | HR | $0.00 | 0 | |||||||
| 12 | 10 | Electrical Technicians; Double time | HR | $0.00 | 0 | |||||||
| 12 | 84 | Operators, Equipment | HR | $0.00 | 0 | |||||||
| 12 | 44 | Operators, Equipment; Overtime | HR | $0.00 | 0 | |||||||
| Personnel Total | $0.00 | |||||||||||
| Transportation & Other | ||||||||||||
| Qty | NIMS Typing | Description | Work Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 158 | N/A | Per Diem (Per Man) | WK | $0.00 | 0 | |||||||
| 1 | N/A | Mobile Command Trailer w/tow vehicle | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Equipment Mobilization/Demobilization (Trucking/Freight) | EA | $0.00 | EA | $0.00 | 0 | 0 | 0 | |||
| 158 | N/A | Personnel Mobilization | EA | $0.00 | EA | $0.00 | 0 | 0 | 0 | |||
| Transportation & Other Total | $0.00 | $0.00 | 0.00% | |||||||||
| SUMMARY (INFORMATION ONLY) | ||||||||||||
| Generator Total | $0.00 | $0.00 | 0.00% | |||||||||
| Power Ancillaries Total | $0.00 | $0.00 | 0.00% | |||||||||
| Pumps, Hoses & Fittings Total | $0.00 | $0.00 | 0.00% | |||||||||
| Miscellaneous Total | $0.00 | $0.00 | 0.00% | |||||||||
| Heavy Equipment Total | $0.00 | $0.00 | 0.00% | |||||||||
| Chiller, Warmers & Air Handling Equip. Total | $0.00 | $0.00 | 0.00% | |||||||||
| Communications Total | $0.00 | $0.00 | 0.00% | |||||||||
| Personnel Total | $0.00 | N/A | N/A | |||||||||
| Transportation & Other Total | $0.00 | $0.00 | 0.00% | |||||||||
| Total Summary | $0.00 | $0.00 | 0.00% | |||||||||
| 0 | 0 | 0 |
TYPE I RESPONSE PACKAGE RATE SHEET &P OF &N STATE OF FLORIDA STANDBY SERVICES CONTRACT
TYPE II RESPONSE PACKAGE
| Attachment B.1 Price Proposal - Contract Period Years 1-3 | ||||||||||||
| TYPE II RESPONSE PACKAGE RATE SHEET | CONTRACTOR NAME: | [BLANK - TYPE HERE] | ||||||||||
| PRINCIPAL POC: | [BLANK - TYPE HERE] | |||||||||||
| REVISION DATE: | [BLANK - TYPE HERE] | |||||||||||
| RESPONSE PACKAGES ARE TO BEGIN MOBILIZATION WITHIN 12 HOURS OF ORDER, AND ALL RESOURCES MUST BE DELIVERED TO SITE WITHIN 96 HOURS OF ORDER. | ||||||||||||
| NOTE: DOES NOT INCLUDE OTHER SUPPORT PACKAGES LISTED ELSEWHERE. | ||||||||||||
| UNIT LEGEND:EA=Each; E/D=Each/Day; HR=Hour; ML=Meal; TL=Truck Load; E/W=Each/Week; BG=Bag; DY=Day; CS=Case; LT=Lot; MI=Mile; PU=Per Unit; SHFT=Shift; SEC=Section | ||||||||||||
| Generators | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | Base | Reserve | E.U. |
| 15 | NIMS TYPE V | 100 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 5 | 125 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 5 | 150 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 5 | 175 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 10 | 250 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 5 | NIMS TYPE IV | 400 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 | 500 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 6 | NIMS TYPE III | 800 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | NIMS TYPE II | 1250 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Generator Total | $0.00 | $0.00 | 0.00% | |||||||||
| Power Ancillary Tools | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 20,000 | N/A | Generator Cable | P/F/W | $0.00 | P/F/W | $0.00 | 0 | 0 | 0 | |||
| 6 | N/A | 500 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | 750 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 1500 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 | N/A | 600 Amp Line Panel | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 | N/A | 800 Amp Line Panel | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 10 | N/A | Variable Message Board | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Power Ancillary Total | $0.00 | $0.00 | 0.00% | |||||||||
| Pumps, Hose & Fittings | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 8 | N/A | 4" x 4" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | 6" x 6" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 4 | N/A | 8" x 8" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 64 | N/A | 6" Suction / Discharge Hose 50' Section | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 32 | N/A | 8" Suction / Discharge Hose 50' Section | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| Pumps, Hose & Fittings Total | $0.00 | $0.00 | 0.00% | |||||||||
| Heavy Equipment | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 140 | N/A | Roll-Back (Self loading / Unloading) Unit w/Operator | DY | $0.00 | DY | $0.00 | 0 | 0 | 0 | |||
| 504 | N/A | Fuel Trucks; with Operators - # of hours | HR | $0.00 | HR | $0.00 | 0 | 0 | 0 | |||
| 5 | N/A | Dock Plates | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 50 | N/A | 5000 LB Forklifts | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 25,000-35,000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | 9,000 - 10,000 lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 25 | N/A | 6000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 15 | N/A | 8000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Heavy Equipment Total | $0.00 | $0.00 | 0.00% | |||||||||
| Chillers, Warmers & Air Handling Equipment | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 3 | NIMS TYPE V | 20 - Ton Air Conditioner Unit | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 30 | N/A | Insulated Ductwork | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Chillers, Warmers & Air Handling Equip. Total | $0.00 | $0.00 | 0.00% | |||||||||
| Communications | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | N/A | Communications Satellite, Modem, Wireless Router | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Communications Data Liaison (Mobilization/Demobilization) | HR | $0.00 | HR | $0.00 | 0 | 0 | 0 | |||
| 20 | N/A | 100' 12/3 Extension Cords | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 20 | N/A | Electrical Strips | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | KA band Satellite Data unit 17mbps down by 6mbps up | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Cradlepoint unit that is firstnet capable and has provider diversity | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 | N/A | VOIP Lines integrated into data package | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Verizon capable network extender | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | AT&T capable network extender | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | Iridium PTT Satellite Phones | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Communications Total | $0.00 | $0.00 | 0.00% | |||||||||
| Personnel | ||||||||||||
| Qty | EST WK Hours | Description | HR RATE | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 2 | 84 | Project / Operations Manager | HR | $0.00 | 0 | |||||||
| 2 | 44 | Project / Operations Manager; Overtime | HR | $0.00 | 0 | |||||||
| 8 | 84 | Resource Supervisors | HR | $0.00 | 0 | |||||||
| 8 | 44 | Resource Supervisor; Overtime | HR | $0.00 | 0 | |||||||
| 3 | 84 | Logistical Staging Area Manager | HR | $0.00 | 0 | |||||||
| 3 | 44 | Logistical Staging Area Manager Overtime | HR | $0.00 | 0 | |||||||
| 2 | 84 | Warehouse Supervisor | HR | $0.00 | 0 | |||||||
| 2 | 44 | Warehouse Supervisor Overtime | HR | $0.00 | 0 | |||||||
| 30 | 84 | Warehouse Workers Fork Lift Certified | HR | $0.00 | 0 | |||||||
| 30 | 44 | Warehouse Workers Fork Lift Certified Overtime | HR | $0.00 | 0 | |||||||
| 2 | 84 | Resource Technicians | HR | $0.00 | 0 | |||||||
| 2 | 44 | Resource Technicians; Overtime | HR | $0.00 | 0 | |||||||
| 1 | 84 | Field Clerk | HR | $0.00 | 0 | |||||||
| 1 | 44 | Field Clerk; Overtime | HR | $0.00 | 0 | |||||||
| 12 | 84 | Electrical Technicians | HR | $0.00 | 0 | |||||||
| 12 | 44 | Electrical Technicians; Overtime | HR | $0.00 | 0 | |||||||
| 12 | 10 | Electrical Technicians; Double time | HR | $0.00 | 0 | |||||||
| 12 | 84 | Operators, Equipment | HR | $0.00 | 0 | |||||||
| 12 | 44 | Operators, Equipment; Overtime | HR | $0.00 | 0 | |||||||
| Personnel Total | $0.00 | |||||||||||
| Transportation & Other | ||||||||||||
| Qty | NIMS Typing | Description | Work Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 156 | N/A | Per Diem (Per Man) | WK | $0.00 | 0 | |||||||
| 1 | N/A | Mobile Command Trailer w/tow vehicle | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Equipment Mobilization/Demobilization (Trucking/Freight) | EA | $0.00 | EA | $0.00 | 0 | 0 | 0 | |||
| 156 | N/A | Personnel Mobilization | EA | $0.00 | EA | $0.00 | 0 | 0 | 0 | |||
| Transportation & Other Total | $0.00 | $0.00 | 0.00% | |||||||||
| SUMMARY (INFORMATION ONLY) | ||||||||||||
| Generator Total | $0.00 | $0.00 | 0% | |||||||||
| Power Ancillary Total | $0.00 | $0.00 | 0% | |||||||||
| Pumps, Hose & Fittings Total | $0.00 | $0.00 | 0% | |||||||||
| Heavy Equipment Total | $0.00 | $0.00 | 0% | |||||||||
| Chillers, Warmers & Air Handling Equip. Total | $0.00 | $0.00 | 0% | |||||||||
| Communications Total | $0.00 | $0.00 | 0% | |||||||||
| Personnel Total | $0.00 | N/A | N/A | |||||||||
| Transportation & Other Total | $0.00 | $0.00 | 0% | |||||||||
| Total Summary | $0.00 | $0.00 | 0.00% | |||||||||
| 0 | 0 | 0 |
TYPE II RESPONSE PACKAGE RATE SHEET &P OF &N STATE OF FLORIDA STANDBY SERVICES CONTRACT
TYPE III RESPONSE PACKAGE
| Attachment B.1 Price Proposal - Contract Period Years 1-3 | ||||||||||||
| TYPE III RESPONSE PACKAGE RATE SHEET | CONTRACTOR NAME: | [BLANK - TYPE HERE] | ||||||||||
| PRINCIPAL POC: | [BLANK - TYPE HERE] | |||||||||||
| REVISION DATE: | [BLANK - TYPE HERE] | |||||||||||
| RESPONSE PACKAGES ARE TO BEGIN MOBILIZATION WITHIN 12 HOURS OF ORDER, AND ALL RESOURCES MUST BE DELIVERED TO SITE WITHIN 96 HOURS OF ORDER. | ||||||||||||
| NOTE: DOES NOT INCLUDE OTHER SUPPORT PACKAGES LISTED ELSEWHERE. | ||||||||||||
| UNIT LEGEND: EA=Each; E/D=Each/Day; HR=Hour; ML=Meal; TL=Truck Load; E/W=Each/Week; BG=Bag; DY=Day; CS=Case; LT=Lot; MI=Mile; PU=Per Unit; SHFT=Shift; SEC=Section | ||||||||||||
| Generators | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | Base | Reserve | E.U. |
| 5 | NIMS TYPE V | 75 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 10 | 100 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 3 | 125 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 3 | 150 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 3 | 175 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 4 | 250 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 2 | NIMS TYPE IV | 400 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | NIMS TYPE III | 800 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | NIMS TYPE III | 1250 kW Generator | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Generator Total | $0.00 | $0.00 | 0.00% | |||||||||
| Power Ancillary Tools | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 8,000 | N/A | Generator Cable | P/F/W | $0.00 | P/F/W | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 500 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 750 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | 1500 kVA Transformer | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 600 Amp Line Panel | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 800 Amp Line Panel | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 5 | N/A | Variable Message Board | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Power Ancillary Total | $0.00 | $0.00 | 0.00% | |||||||||
| Pumps, Hose & Fittings | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 4 | N/A | 4" x 4" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 6" x 6" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | 8" x 8" Diesel Pump | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 16 | N/A | 6" Suction / Discharge Hose 50' Section | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 8 | N/A | 8" Suction / Discharge Hose 50' Section | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| Pumps, Hose & Fittings Total | $0.00 | $0.00 | 0.00% | |||||||||
| Heavy Equipment | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 70 | N/A | Roll-Back (Self loading / Unloading) Unit w/Operator | DY | $0.00 | DY | $0.00 | 0 | 0 | 0 | |||
| 400 | N/A | Fuel Trucks; with Operators - # of hours | HR | $0.00 | HR | $0.00 | 0 | 0 | 0 | |||
| 3 | N/A | Dock Plates | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 25 | N/A | 5000 LB Forklifts | E/W | $0.00 | E/W | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | 25,000-35,000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 | N/A | 9,000 - 10,000 lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 12 | N/A | 6000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 7 | N/A | 8000 Lb. Forklift | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Heavy Equipment Total | $0.00 | $0.00 | 0.00% | |||||||||
| Chillers, Warmers & Air Handling Equipment | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 2 | NIMS TYPE V | 20 - Ton Air Conditioner Unit | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 20 | N/A | Insulated Ductwork | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Chillers, Warmers & Air Handling Equip Total | $0.00 | $0.00 | 0.00% | |||||||||
| Communications | ||||||||||||
| Qty | NIMS Typing | Description | Lease Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | N/A | Communications Satellite, Modem, Wireless Router | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Communications Data Liaison (Mobilization/Demobilization) | HR | $0.00 | HR | $0.00 | 0 | 0 | 0 | |||
| 20 | N/A | 100' 12/3 Extension Cords | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 20 | N/A | Electrical Strips | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | KA band Satellite Data unit 17mbps down by 6mbps up | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Cradlepoint unit that is firstnet capable and has provider diversity | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 | N/A | VOIP Lines integrated into data package | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Verizon capable network extender | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | AT&T capable network extender | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 | N/A | Iridium PTT Satellite Phones | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| Communications Total | $0.00 | $0.00 | 0.00% | |||||||||
| Personnel | ||||||||||||
| Qty | EST WK Hours | Description | HR RATE | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 3 | 84 | Project / Operations Manager | HR | $0.00 | 0 | |||||||
| 3 | 44 | Project / Operations Manager; Overtime | HR | $0.00 | 0 | |||||||
| 8 | 84 | Resource Supervisors | HR | $0.00 | 0 | |||||||
| 8 | 44 | Resource Supervisor; Overtime | HR | $0.00 | 0 | |||||||
| 3 | 84 | Logistical Staging Area Managers | HR | $0.00 | 0 | |||||||
| 3 | 44 | Logistical Staging Area Managers Overtime | HR | $0.00 | 0 | |||||||
| 2 | 84 | Warehouse Supervisor | HR | $0.00 | 0 | |||||||
| 2 | 44 | Warehouse Supervisor Overtime | HR | $0.00 | 0 | |||||||
| 30 | 84 | Warehouse Workers - Forklift Certified | HR | $0.00 | 0 | |||||||
| 30 | 44 | Warehouse Workers - Forklift Certified Overtime | HR | $0.00 | 0 | |||||||
| 2 | 84 | Resource Technicians | HR | $0.00 | 0 | |||||||
| 2 | 44 | Resource Technicians; Overtime | HR | $0.00 | 0 | |||||||
| 1 | 84 | Field Clerk | HR | $0.00 | 0 | |||||||
| 1 | 44 | Field Clerk; Overtime | HR | $0.00 | 0 | |||||||
| 12 | 84 | Electrical Technicians | HR | $0.00 | 0 | |||||||
| 12 | 44 | Electrical Technicians; Overtime | HR | $0.00 | 0 | |||||||
| 12 | 10 | Electrical Technicians; Double time | HR | $0.00 | 0 | |||||||
| 12 | 84 | Operators, Equipment | HR | $0.00 | 0 | |||||||
| 12 | 44 | Operators, Equipment; Overtime | HR | $0.00 | 0 | |||||||
| Personnel Total | $0.00 | |||||||||||
| Transportation & Other | ||||||||||||
| Qty | NIMS Typing | Description | Work Rate | Unit | Amt | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 158 | N/A | Per Diem (Per Man) | WK | 0 | ||||||||
| 1 | N/A | Mobile Command Trailer w/tow vehicle | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 | N/A | Equipment Moblization/Demoblization (Trucking/Freight) | EA | $0.00 | EA | $0.00 | 0 | 0 | 0 | |||
| 158 | N/A | Personnel Mobilization | EA | $0.00 | EA | $0.00 | 0 | 0 | 0 | |||
| Ttransportation & Other Total | $0.00 | $0.00 | 0.00% | |||||||||
| SUMMARY (INFORMATION ONLY) | ||||||||||||
| Generator Total | $0.00 | $0.00 | 0.00% | |||||||||
| Power Ancillary Total | $0.00 | $0.00 | 0.00% | |||||||||
| Pumps, Hose & Fittings Total | $0.00 | $0.00 | 0.00% | |||||||||
| Heavy Equipment Total | $0.00 | $0.00 | 0.00% | |||||||||
| Chillers, Warmers & Air Handling Equip Total | $0.00 | $0.00 | 0.00% | |||||||||
| Communications Total | $0.00 | $0.00 | 0.00% | |||||||||
| Personnel Total | $0.00 | N/A | N/A | |||||||||
| Ttransportation & Other Total | $0.00 | $0.00 | 0.00% | |||||||||
| Total Summary | $0.00 | $0.00 | 0.00% | |||||||||
| 0 | 0 | 0 |
TYPE III RESPONSE PACKAGE RATE SHEET &P OF &N STATE OF FLORIDA STANDBY SERVICES CONTRACT
RESPONDER BASE CAMPS
| Attachment B.1 Price Proposal - Contract Period Years 1-3 | ||||||||||||
| RESPONDER BASE CAMPS RATE SHEET | CONTRACTOR NAME: | [BLANK - TYPE HERE] | ||||||||||
| PRINCIPAL POC: | [BLANK - TYPE HERE] | |||||||||||
| REVISION DATE: | [BLANK - TYPE HERE] | |||||||||||
| UNIT LEGEND: EA=Each; E/D=Each/Day; HR=Hour; ML=Meal; TL=Truck Load; E/W=Each/Week; BG=Bag; DY=Day; CS=Case; LT=Lot; MI=Mile; PU=Per Unit; SHFT=Shift; SEC=Section | ||||||||||||
| RESPONDER BASE CAMP (SUPPORTS 1,000 PERSONS) | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | Base | Reserve | E.U. |
| 1 | FL TYPE I | MOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1 | FL TYPE I | OPERATIONS | Day | $0.00 | Day | $0.00 | 0 | 0 | 0 | |||
| 1 | FL TYPE I | DEMOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1,000 person Base Camp with HVAC capabilities to meet the situation, ADA compliance required for all facilities, lavatory facilities provided, laundry facilities, showering facilities, cooking facilities and food services, satellite communication capability, waste / refuse collection and removal as necessary, lodging facilities to include bedding, linens, and applicable hygiene kits as requested. Must be fully operational 72-96 hours from notification to mobilize. | ||||||||||||
| RESPONDER BASE CAMP (SUPPORTS 750 PERSONS) | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | FL TYPE II | MOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1 | FL TYPE II | OPERATIONS | Day | $0.00 | Day | $0.00 | 0 | 0 | 0 | |||
| 1 | FL TYPE II | DEMOBILIZATION | Ea | $0.00 | 0 | |||||||
| 750 person Base Camp with HVAC capabilities to meet the situation, ADA compliance required for all facilities, lavatory facilities provided, laundry facilities, showering facilities, cooking facilities and food services, satellite communication capability, waste / refuse collection and removal as necessary, lodging facilities to include bedding, linens, and applicable hygiene kits as requested. Must be fully operational 72-96 hours from notification to mobilize. | ||||||||||||
| RESPONDER BASE CAMP (SUPPORTS 500 PERSONS) | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | FL TYPE III | MOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1 | FL TYPE III | OPERATIONS | Day | $0.00 | Day | $0.00 | 0 | 0 | 0 | |||
| 1 | FL TYPE III | DEMOBILIZATION | Ea | $0.00 | 0 | |||||||
| 500 person Base Camp with HVAC capabilities to meet the situation, ADA compliance required for all facilities, lavatory facilities provided, laundry facilities, showering facilities, cooking facilities and food services, satellite communication capability, waste / refuse collection and removal as necessary, lodging facilities to include bedding, linens, and applicable hygiene kits as requested. Must be fully operational 72-96 hours from notification to mobilize. | ||||||||||||
| RESPONDER BASE CAMP (SUPPORTS 250 PERSONS) | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | FL TYPE IV | MOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1 | FL TYPE IV | OPERATIONS | Day | $0.00 | Day | $0.00 | 0 | 0 | 0 | |||
| 1 | FL TYPE IV | DEMOBILIZATION | Ea | $0.00 | 0 | |||||||
| 250 person Base Camp with HVAC capabilities to meet the situation, ADA compliance required for all facilities, lavatory facilities provided, laundry facilities, showering facilities, cooking facilities and food services, satellite communication capability, waste / refuse collection and removal as necessary, lodging facilities to include bedding, linens, and applicable hygiene kits as requested. Must be fully operational 48-72 hours from notification to mobilize. | ||||||||||||
| RESPONDER BASE CAMP (SUPPORTS 100-150 PERSONS) | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | MOBILE | MOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1 | MOBILE | OPERATIONS | Day | $0.00 | Day | $0.00 | 0 | 0 | 0 | |||
| 1 | MOBILE | DEMOBILIZATION | Ea | $0.00 | 0 | |||||||
| 100-150 person Base Camp with HVAC capabilities to meet the situation, ADA compliance required for all facilities, lavatory facilities provided, laundry facilities, showering facilities, cooking facilities and food services, satellite communication capability, waste / refuse collection and removal as necessary, lodging facilities to include bedding, linens, and applicable hygiene kits as requested. Must be fully operational 24-36 hours from notification to mobilize. | ||||||||||||
| Totals | $0.00 | $0.00 | ERROR:#DIV/0! | 0 | 0 | 0 |
RESPONDER BASE CAMPS RATE SHEET &P OF &N STATE OF FLORIDA STANDBY SERVICES CONTRACT
EMERGENCY SHELTER COMPLEXES
| Attachment B.1 Price Proposal - Contract Period Years 1-3 | ||||||||||||
| EMERGENCY SHELTER COMPLEXES RATE SHEET | CONTRACTOR NAME: | [BLANK - TYPE HERE] | ||||||||||
| PRINCIPAL POC: | [BLANK - TYPE HERE] | |||||||||||
| REVISION DATE: | [BLANK - TYPE HERE] | |||||||||||
| UNIT LEGEND: EA=Each; E/D=Each/Day; HR=Hour; ML=Meal; TL=Truck Load; E/W=Each/Week; BG=Bag; DY=Day; CS=Case; LT=Lot; MI=Mile; PU=Per Unit; SHFT=Shift; SEC=Section | ||||||||||||
| EMERGENCY PUBLIC SHELTER COMPLEX (SUPPORTS 2,500 PERSONS) | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | Base | Reserve | E.U. |
| 1 | FL TYPE III | MOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1 | FL TYPE III | OPERATIONS | Day | $0.00 | Day | $0.00 | 0 | 0 | 0 | |||
| 1 | FL TYPE III | DEMOBILIZATION | Ea | $0.00 | 0 | |||||||
| 2,500 person Emergency Public Shelter with HVAC capabilities to meet the situation, ADA compliance required for all facilities, lavatory facilities provided, laundry facilities, showering facilities, cooking facilities and food services, satellite communication capability, waste / refuse collection and removal as necessary, lodging facilities to include bedding, linens, and applicable hygiene kits as requested. Must be fully operational 7 days from notification to mobilize. | ||||||||||||
| EMERGENCY PUBLIC SHELTER COMPLEX (SUPPORTS 1,000 PERSONS) | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | FL TYPE IV | MOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1 | FL TYPE IV | OPERATIONS | Day | $0.00 | Day | $0.00 | 0 | 0 | 0 | |||
| 1 | FL TYPE IV | DEMOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1000 person Emergency Public Shelter with HVAC capabilities to meet the situation, ADA compliance required for all facilities, lavatory facilities provided, laundry facilities, showering facilities, cooking facilities and food services, satellite communication capability, waste / refuse collection and removal as necessary, lodging facilities to include bedding, linens, and applicable hygiene kits as requested. Must be fully operational 72-96 hours from notification to mobilize. | ||||||||||||
| EMERGENCY PUBLIC SHELTER COMPLEX (SUPPORTS 500 PERSONS) | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | |||
| 1 | FL TYPE V | MOBILIZATION | Ea | $0.00 | 0 | |||||||
| 1 | FL TYPE V | OPERATIONS | Day | $0.00 | Day | $0.00 | 0 | 0 | 0 | |||
| 1 | FL TYPE V | DEMOBILIZATION | Ea | $0.00 | 0 | |||||||
| 500 person Emergency Public Shelter with HVAC capabilities to meet the situation, ADA compliance required for all facilities, lavatory facilities provided, laundry facilities, showering facilities, cooking facilities and food services, satellite communication capability, waste / refuse collection and removal as necessary, lodging facilities to include bedding, linens, and applicable hygiene kits as requested. Must be fully operational 72-96 hours from notification to mobilize. | ||||||||||||
| Total | $0.00 | $0.00 | ERROR:#DIV/0! | 0 | 0 | 0 |
EMERGENCY SHELTER COMPLEXES RATE SHEET &P OF &N STATE OF FLORIDA STANDBY SERVICES CONTRACT
SANPACS
| Attachment B.1 Price Proposal - Contract Period Years 1-3 | ||||||||||||
| SANPACS RATE SHEET | CONTRACTOR NAME: | [BLANK - TYPE HERE] | ||||||||||
| PRINCIPAL POC: | [BLANK - TYPE HERE] | |||||||||||
| REVISION DATE: | [BLANK - TYPE HERE] | |||||||||||
| UNIT LEGEND: EA=Each; E/D=Each/Day; HR=Hour; ML=Meal; TL=Truck Load; E/W=Each/Week; BG=Bag; DY=Day; CS=Case; LT=Lot; MI=Mile; PU=Per Unit; SHFT=Shift; SEC=Section | ||||||||||||
| ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | Base | Reserve | E.U. |
| 1 | FL TYPE I | SANPAC (Sanitation Package) 3600 PERSONS PER DAY | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 40 each porta potties, 8 each ADA potties, 16 each hand wash stations, 2 each 30 Cu Yd roll-off dumpster. All with TWICE DAILY supplies and service. | ||||||||||||
| 1 | FL TYPE II | SANPAC (Sanitation Package) 1800 PERSONS PER DAY | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 20 each porta potties, 4 each ADA potties, 8 each hand wash stations, 1 each 30 Cu Yd roll-off dumpster. All with DAILY supplies and service. | ||||||||||||
| 1 | FL TYPE III | SANPAC (Sanitation Package) 1000 PERSONS PER DAY | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 12 each porta potties, 2 each ADA potties, 6 each hand wash stations, 2 each 3 Cu Yd dumpster. All with DAILY supplies and service. | ||||||||||||
| 1 | FL TYPE IV | SANPAC (Sanitation Package) 500-750 PERSONS PER DAY | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 8 each porta potties, 2 each ADA potties, 4 each hand wash stations, 1 each 3 Cu Yd dumpster. All with DAILY supplies and service. | ||||||||||||
| 1 | KITCHEN | FIELD KITCHEN SANPAC (Sanitation Package) for staff, not public use | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 each porta potties, 2 each ADA potties, 4 each hand wash stations, 2 each 40 Cu Yd dumpster. All with DAILY supplies and service. | ||||||||||||
| ADD-ON SINGLE RESOURCES (Optional) | ||||||||||||
| In addition to packages above, you may list pricing for supplemental individual resources meeting the same dimension and service specifications as above, at a weekly rental rate. Delivery timeframe is same as package delivery timeframe. Includes installation, mobilization and demobilization costs. | ||||||||||||
| 1 | 8 Stall Restroom Trailer or Similar | WK | $0.00 | WK | $0.00 | |||||||
| 1 | 8 Stall shower Trailer or Similar | WK | $0.00 | WK | $0.00 | |||||||
| 1 | Laundry Trailer | WK | $0.00 | WK | $0.00 | |||||||
| 1 | ADA Restroom Trailer | WK | $0.00 | WK | $0.00 | |||||||
| 1 | 3 CY Dumpster- Includes Daily service, installed and demobilized | WK | $0.00 | WK | $0.00 | |||||||
| 1 | 20 CY Open Top Dumpster- Includes Daily service, installed and demobilized | WK | $0.00 | WK | $0.00 | |||||||
| 1 | 30 CY Open Top Dumpster- Includes Daily service, installed and demobilized | WK | $0.00 | WK | $0.00 | |||||||
| 1 | Handwash Stations- Includes daily service and supplies, installed and demobilized | WK | $0.00 | WK | $0.00 | |||||||
| 1 | Portapotties- Includes daily service and supplies, installed and demobilized | WK | $0.00 | WK | $0.00 | |||||||
| 1 | Portapotties (ADA)- Includes daily service and supplies, installed and demobilized | WK | $0.00 | WK | $0.00 | |||||||
| $0.00 | $0.00 | ERROR:#DIV/0! | 0 | 0 | 0 |
SANPACS RATE SHEET &P OF &N STATE OF FLORIDA STANDBY SERVICES CONTRACT
TYPED SUPPORT PACKAGES
| Attachment B.1 Price Proposal - Contract Period Years 1-3 | ||||||||||||
| TYPED SUPPORT PACKAGES RATE SHEET | CONTRACTOR NAME: | [BLANK - TYPE HERE] | ||||||||||
| PRINCIPAL POC: | [BLANK - TYPE HERE] | |||||||||||
| REVISION DATE: | [BLANK - TYPE HERE] | |||||||||||
| UNIT LEGEND: EA=Each; E/D=Each/Day; HR=Hour; ML=Meal; TL=Truck Load; E/W=Each/Week; BG=Bag; DY=Day; CS=Case; LT=Lot; MI=Mile; PU=Per Unit; SHFT=Shift; SEC=Section | ||||||||||||
| Quantity | NIMS Typing | Description | Work Rate | Unit | Total Amount | Reserve Rate | Unit | Total Amount | Over 90 Days | Base | Reserve | E.U. |
| 1 | NEMA TYPE I | LSA SUPPORT PACKAGE (State LSA) (AVIATION SUPPORT) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 each, all terrain extended reach forklifts, 6 each 5000 pound warehouse forklifts, 8 each manual pallet jacks, 4 each dock plates, 4 sets Pallet Grabbers w/Chain, 2 each loading ramp, 10 each 4000 watt light towers - self contained, 10 each 10'X10' pop-up tents, 150 each folding chairs, 60 each folding tables, 4 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||||
| 1 | FL TYPE I - A | LSA SUPPORT PACKAGE (State LSA) (SNS SUPPORT - AVIATION) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 EACH K-LOADER, 4 each, all terrain extended reach forklifts, 6 each 5000 pound warehouse forklifts, 8 each manual pallet jacks, 4 each dock plates, 2 each loading ramp, 10 each 4000 watt light towers - self contained, 10 each 10'X10' pop-up tents, 150 each folding chairs, 60 each folding tables, 4 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||||
| 1 | NEMA TYPE II | LSA SUPPORT PACKAGE (State LSA) (NO AIRPORT) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 each, all terrain extended reach forklifts, 2 each 5000 pound warehouse forklifts, 8 each manual pallet jacks, 4 each dock plates, 4 sets Pallet Grabbers w/Chain, 2 each loading ramp, 10 each 4000 watt light towers - self contained, 10 each 10'X10' pop-up tents, 150 each folding chairs, 60 each folding tables, 4 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||||
| 1 | FL TYPE II - A | LSA SUPPORT PACKAGE (State LSA) GROUND SUPPORT EQUIPMENT MISSION STAGING AREA (5 Acre Footprint Support) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 4 each, all terrain extended reach forklifts, 1 each 25,000-35,000 Lb. Forklift, 1 each 35-ton mobile crane, 2 each 5000 pound warehouse forklifts, 1 EACH 4500 GALLON DIESEL FUEL TRUCK W/OPERATOR, 8 each manual pallet jacks, 4 each dock plates, 4 sets Pallet Grabbers w/Chain, 2 each loading ramps, 12 each 4000 watt light towers - self contained, 10 each 10'X10' pop-up tents, 150 each folding chairs, 60 each folding tables, 4 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||||
| 1 | NEMA TYPE III | LSA SUPPORT PACKAGE (County CSA) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 each, all terrain extended reach forklifts, 2 each 5000 pound warehouse forklifts, 6 each manual pallet jacks, 2 each dock plates, 4 each 4000 watt light towers - self contained, 1 each loading ramp, 6 each 10'X10' pop-up tents, 100 each folding chairs, 40 each folding tables, 4 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||||
| 1 | NEMA TYPE I | POD SUPPORT PACKAGE (Commodity Distribution, NOT MEDICAL) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 2 each, all terrain extended reach forklifts, 4 each manual pallet jacks, 4 each 4000 watt light towers - self contained, 6 each 10'X10' pop-up tents, 60 each folding chairs, 20 each folding tables, 4 each 24" warehouse fans, 20 each 100' 12/3 extension cords, 20 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||||
| 1 | NEMA TYPE II | POD SUPPORT PACKAGE (Commodity Distribution, NOT MEDICAL) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 each, all terrain extended reach forklifts, 4 each manual pallet jacks, 3 each 4000 watt light towers - self contained, 4 each 10'X10' pop-up tents, 40 each folding chairs, 12 each folding tables, 4 each 24" warehouse fans, 10 each 100' 12/3 extension cords, 10 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||||
| 1 | NEMA TYPE III | POD SUPPORT PACKAGE (Commodity Distribution, NOT MEDICAL) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |||
| 1 each, all terrain extended reach forklifts, 2 each manual pallet jacks, 2 each 4000 watt light towers - self contained, 2 each 10'X10' pop-up tents, 20 each folding chairs, 8 each folding tables, 2 each 24" warehouse fans, 8 each 100' 12/3 extension cords, 8 each 3-way splitters, 10 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||||
| 1 | MOBILE CATERING SERVICES | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | ||||
| 50-100 Persons per meal. Seating for 80% at a time. 40’ Type II or III Mobile Feeding Kitchen semi-trailer unit, commercial restaurant equipment. Plumbed fixtures, single serving line, |
Kitchen and Dining Facility which complies with US Public Health Service 2017 Food Code.
Four Meals per day (2 hot), USFS Food Service Contract Specifications, Negotiated hours of food services.
| 1 | MOBILE CATERING SERVICES | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 100-250 Persons per meal. Seating for 60% at a time. 40’ Type II or III Mobile Feeding Kitchen semi-trailer unit, commercial restaurant equipment. Plumbed fixtures, single serving line, |
Kitchen and Dining Facility which complies with US Public Health Service 2017 Food Code.
Four Meals per day (2 hot), USFS Food Service Contract Specifications, Negotiated hours of food services.
| 1 | MOBILE CATERING SERVICES | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 500 Persons per meal. Seating for 40% at a time. Fixed temporary ground level facility OR 53’ Type II Mobile Feeding Kitchen semi-trailer unit, commercial restaurant equipment. Plumbed fixtures, single serving line, air conditioned dining hall. |
Kitchen and Dining Facility: The Kitchen and Dining Facility provided at each base camp complies with US Public Health Service 2005 Food Code. Four Meals per day (2 hot), USFS Food Service Contract Specifications Negotiated hours of food services.
In addition, bids on this item include capacity to deliver meals to up to 5 locations within 30 miles of the deployment site. This includes, transportation, drivers and fuel costs.
| 1 | FL TYPE I | COOLING / COMFORT STATION | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 1 each all terrain extended reach forklift, 1 each manual pallet jack, 2 each 4000 watt light towers - self contained, 1 each 80 kW diesel generator, 2 each 40'X40' pole tents with side curtains and floors, 2 each 20 Ton Portable HVAC for Tents, 8 strings tent lighting, 150 each folding chairs, 40 each folding tables, 4 each 24" warehouse fans, 20 each 100' 12/3 extension cords, 20 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. |
Note: Forklift & pallet jack should be first to arrive and last to leave as they are required for set up and tear down of package.
| 1 | FL TYPE II | COOLING / COMFORT STATION | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 1 each all terrain extended reach forklift, 1 each manual pallet jack, 2 each 4000 watt light towers - self contained, 1 each 80 kW diesel generator, 2 each 20'X20' pole tents with side curtains and floors, 1 each 20 Ton Portable HVAC for Tents, 4 strings tent lighting, 100 each folding chairs, 30 each folding tables, 4 each 24" warehouse fans, 20 each 100' 12/3 extension cords, 20 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. |
Note: Forklift & pallet jack should be first to arrive and last to leave as they are required for set up and tear down of package.
| 1 | FL TYPE I | MOBILE DRC SUPPORT PACKAGE (Field Facility) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 4 each 4000 watt light towers - self contained, 1 each 80 kW diesel generator, 2 each 20'X20' pole tents one with and floors - 1 20'X20' with side curtains and floors, 1 each 20 Ton Portable HVAC for Tents, 12 strings tent lighting, 150 each folding chairs, 50 each 6' folding tables, 6 each 36" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | |||||||||
| 1 | NIMS TYPE II | MOBILE DRC SUPPORT PACKAGE (Field Facility) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 2 each 4000 watt light towers - self contained, 1 each 80 kW diesel generator, 1 each 20'X20' pole tents one with and floors - 1 20'X20' with side curtains and floors, 1 each 20 Ton Portable HVAC for Tents, 8 strings tent lighting, 100 each folding chairs, 40 each 6' folding tables, 4 each 36" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | |||||||||
| 1 | NIMS TYPE III | MOBILE DRC SUPPORT PACKAGE (Field Facility) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 2 each 4000 watt light towers - self contained, 1 each 60 kW diesel generator, 1 each 20'X20' pole tents one with side curtains and floors, 1 each 20 Ton Portable HVAC for Tents, 4 strings tent lighting, 100 each folding chairs, 40 each 6' folding tables, 4 each 36" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | |||||||||
| 1 | FL TYPE IV | MOBILE DRC SUPPORT PACKAGE (Fixed Facility) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 1 each 4000 watt light tower - self contained, 150 each folding chairs, 60 each 6' folding tables, 4 each 24" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 10 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | |||||||||
| 1 | FL TYPE I | SHELTER SUPPORT PACKAGE (General Public) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 1 each manual pallet jack, 2 each 4000 watt light towers - self contained, 4 each 52" warehouse fans, 20 each 100' 12/3 extension cords, 20 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | |||||||||
| 1 | FL TYPE I-A | SHELTER SUPPORT PACKAGE (Special MEDICAL Needs) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 1 each manual pallet jack, 2 each 4000 watt light towers - self contained, 2 each 20 Ton Portable HVAC with ducting for building, 8 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 20 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. NOTE: GENERATOR MAY ALSO BE REQUIRED BUT WOULD NEED TO BE SIZED TO TH FACILITY. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | |||||||||
| 1 | FL TYPE I | MOBILE / FIXED KITCHEN SUPPORT PACKAGE (W/TENT PACKAGE) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 1 each all terrain extended reach forklifts, 1 each manual pallet jack, 4 each 4000 watt light towers - self contained, 1 each 80 kW diesel generator, 2 each 40'X40' pole tents with side curtains and floors, 2 each 20 Ton Portable HVAC for Tents, 8 strings tent lighting, 150 each folding chairs, 60 each folding tables, 4 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. |
Note: Forklift & pallet jack should be first to arrive and last to leave as they are required for set up and tear down of package.
| 1 | FL KITCHEN | MOBILE / FIXED KITCHEN SUPPORT PACKAGE (W/TENT PACKAGE) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 1 each all terrain extended reach forklifts, 1 each manual pallet jack, 4 each 4000 watt light towers - self contained, 1 each 80 kW diesel generator, 1 each 40'X40' pole tents with side curtains and floors, 1 each 20 Ton Portable HVAC for Tents, 4 strings tent lighting, 100 each folding chairs, 10 each folding tables, 4 each 52" warehouse fans, 20 each 100' 12/3 extension cords, 20 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. |
Note: Forklift & pallet jack should be first to arrive and last to leave as they are required for set up and tear down of package.
| 1 | NIMS TYPE II | MOBILE / FIXED KITCHEN SUPPORT PACKAGE (NO TENTS) | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 |
| 1 each all terrain extended reach forklifts, 1 each manual pallet jack, 2 each 4000 watt light towers - self contained, 1 each 80 kW diesel generator, 4 each 52" warehouse fans. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. |
Note: Forklift & pallet jack should be first to arrive and last to leave as they are required for set up and tear down of package.
| 1 | NIMS TYPE I | WARMING CENTER (Cold Weather Event) 100-150 persons | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |
| 3 @ 60'x100' Tents with Sides and floors, 1@ 150kW High Temperature Heater and Duct Work, 1 @ Generator, Cables, Spider Boxes and 12 each tent Light Strings, 6 each 4000 watt Light Towers, 150 each folding chairs, 60 each folding tables, 4 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. This does not include Cots. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||
| 1 | FL TYPE I | STATE LOGISTICS RESPONSE CENTER (SLRC) SUPPORT PACKAGE | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |
| 1 each, all terrain extended reach forklifts, 15 each 5000 pound warehouse forklifts, 10 each 3500 pound warehouse forklifts, 2 each 26" 24' scissor lifts, 5 each 4000 watt light towers - self contained, 5 each 10'X10' pop-up tents, 100 each folding chairs, 30 each folding tables, 10 each 52" warehouse fans, DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||
| 1 | FL TYPE I | STATE MOBILIZATION AREA SUPPORT PACKAGE | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |
| 20-30 acre site | 2 Each, all terrain extended reach forklifts, 1 each 35-ton mobile crane, 1 EACH 4500 GALLON DIESEL FUEL TRUCK W/OPERATOR, 12 each 4000 watt light towers - self contained, 10 each 10'X10' pop-up tents, 2 each 20'X20' pole tents with side curtains and floors, 20 Ton Portable HVAC for Tents, 150 each folding chairs, 30 each folding tables, 4 each 52" warehouse fans, 40 each 100' 12/3 extension cords, 40 each 3-way splitters, 20 each 55 gallon plastic trash cans with lids. DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | |||||||||
| 1 | FL TYPE I | Multi Agency Donation Warehouse - SUPPORT PACKAGE | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |
| 8 Each 4000 pound forklifts, 8 each pallet jacks, 2 each 4000 watt light tower trailers, 8 each hand trucks, 25 each folding tables, 100 each folding chairs, 8 each electric golf carts, 12 each floor warehouse fans, 50 each 100' 12/3 extension cords, 40 each 3-way splitters, extension cords, 8 each 55 gallon trash containers, DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||
| 1 | FL TYPE II | Multi Agency Donation Warehouse - SUPPORT PACKAGE | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |
| 6 Each 4000 pound forklifts, 6 each pallet jacks, 2 each 4000 watt light tower trailers, 6 each hand trucks, 25 each folding tables, 100 each folding chairs, 6 each electric golf carts, 8 each floor warehouse fans, 50 each 100' 12/3 extension cords, 40 each 3-way splitters, extension cords, 8 each 55 gallon trash containers, DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||
| 1 | FL TYPE III | Multi Agency Donation Warehouse - SUPPORT PACKAGE | WK | $0.00 | WK | $0.00 | 0 | 0 | 0 | |
| 4 Each 4000 pound forklifts, 4 each pallet jacks, 2 each 4000 watt light tower trailers, 4 each hand trucks, 25 each folding tables, 100 each folding chairs, 4 each electric golf carts, 6 each floor warehouse fans, 50 each 100' 12/3 extension cords, 40 each 3-way splitters, extension cords, 8 each 55 gallon trash containers, DAILY REFUELING SERVICES FOR EQUIPMENT. ALL SYSTEMS DELIVERED, INSTALLED AND DEMOBILIZED. | ||||||||||
| 1 | FL TYPE I | SITE PREPARATION PACKAGE (Team to prepare a site to accept equipment, staging area, Base Camp, Shelter System, MDRC etc.) | FLAT RATE | $0.00 | FLAT RATE | $0.00 | 0 | 0 | 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .