GXI Instrument Final RFP QA (Batch 2).pdf

PDF 525 KB Posted

Attached to
Geostationary Extended Observations (GeoXO) Imager (GXI) Instrument Implementation
Solicitation number
80GSFC22R0044
Issued by

View the file

Other files

File Type Posted
Amendment 1 - Attachment O CWBS.pdf PDF
Amendment 1 - Cost Exhibit 3.pdf PDF
Amendment 1 Cover page - SF 30.pdf PDF
Amendment 1 - Questions and Answers.pdf PDF
Amendment 1 - Continuation pages.pdf PDF
Amendment 1 - Attachment B PORD .pdf PDF
Final Attachment I - OCI Plan DRD.pdf PDF
Final Attachment A - SOW.pdf PDF
Final Attachment B - PORD.pdf PDF
Final Attachment E - IMAR.pdf PDF
GXI Instrument Final RFP 80GSFC22R0044 .pdf PDF
Final Attachment S - CONOPS.pdf PDF
Final Attachment D - UIID.pdf PDF
Final Attachment F - CDRL.pdf PDF
Final Attachment C - GIRD.pdf PDF
Final Attachment H - Financial Mgmt Reporting.pdf PDF
Final Attachment K - Small Business Sub Plan.pdf PDF
Final RFP Enclosure B - ITSMP Template.pdf PDF
Final Attachment O - CWBS.pdf PDF
Final RFP SF33.pdf PDF
Signed Final RFP Cover Letter.pdf PDF
Enclosure A - Updated Draft PEP.pdf PDF
Final Attachment R - Radiation Environment for Electronic Devices.pdf PDF
Final Attachment N - QASP.pdf PDF
Final Attachment L - IT Security Mgmt Plan.pdf PDF
Final Attachment Q - GRDDP.pdf PDF
Final RFP Cost Exhibits.pdf PDF
Final Attachment U - FPGA.pdf PDF
Final Attachment G.pdf PDF
Final Exhibit 10 - PPQ.pdf PDF
Final Attachment M - IT Security ADL.pdf PDF
Final Attachment P - Radiance Upwelling Document .pdf PDF
Final Attachment T - DEIA DRD.pdf PDF
Final Attachment J - Safety and Health Plan .pdf PDF
GPR 8730.5 Reference Document.pdf PDF
GXI Instrument Draft RFP QA.pdf PDF
Attachment F - CDRL.pdf PDF
Attachment L - IT Security Managment Plan.pdf PDF
GXI Draft RFP 80GSFC22R0044.pdf PDF
Attachment C - GIRD.pdf PDF
Attachment U - FPGA.pdf PDF
Attachment B - PORD.pdf PDF
Attachment G.pdf PDF
DRFP Cover Letter.pdf PDF
Enclosure A - Draft PEP.pdf PDF
Attachment E - IMAR.pdf PDF
DRFP Cost Exhibits.pdf PDF
Attachment S - CONOPS.pdf PDF
Exhibit 10 - PPQ.pdf PDF
Attachment N - QASP.pdf PDF
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GXI Instrument Implementation Final RFP 80GSFC22R0044

Questions and Answers

Answer: Yes, the $35M for Special Task Support Requirements should be submitted as part of the Cost Volume, but for Exhibit 3 only. The cost exhibit and section L.14(b)(4) will be updated to reflect this change. Amendment 1 will reflect this update.

Based upon NASA’s response to question #9 and the corresponding changes to Cost Exhibit 3, we have the following additional requests for clarification:

Please confirm H.12 Options 4-7 “Special Studies” are distinct from H.13 “Special Task Support”?

4 Please confirm H.12 Options 4-7 “Special Studies” (valued at $8M, total) are in addition to the H. 13 “Special Task Support” (valued at up to $35M)?

Yes, H.12 is in addition (if needed), to H.13. See answer to Question 2 and 3 above. Special Studies and Special Task Support are interchangeable titles and refer to the same body of work.

5 We understand H.13 Special Task Support ($35M) is to be reflected in WBS X.09. Please confirm how H.12 Special Studies Options 4-7 should be documented in the WBS?

You do not need to document H.12 options for special studies or include them in any cost exhibit.

6 The submitted question #9 related to H.13 “Special Task Support”, while the Amendment #1 revisions to Cost Exhibit 3 reference “Special Studies”, which matches nomenclature of H.12 Options 4-7 “Special Studies”. The Cost Exhibit #3 instructions indicated Exhibit #3 should be completed for the Base and All Options. Based on the preceding, we are looking for the following clarifications:

a. Should Cost Exhibit #3 prepared for the Base effort include the H.13 “Special Task Support”($35M) on the new line titled “Special Studies” that was added to Cost Exhibit #3 via Amendment #1?

b. Should Cost Exhibit #3 prepared for the Options 4-7 include the H.12 “Special Studies” ($2M/Option) on the new line titled “Special Studies” that was added to Cost Exhibit #3 via Amendment #1, or should those costs be dispersed appropriately in the lines above “Subtotal CPAF”?

c. Based on responses to a & b above, should the newly added lines be changed From: “Special Studies” and “Sub Total Special Studies” To:

“Special Task Support” and “Sub Total Special

See answers to questions 2-5 above. Exhibit 3 is for the $35M of Special Studies (Tasks) H.13. The options for special studies H.12, should not be included in any cost exhibit.

GXI Instrument Implementation Final RFP 80GSFC22R0044

Questions and Answers

Task Support”

Does NASA intend to award H.13 “Special Task Support” as part of the Base Award (and therefore included in “TOTAL CPAF”), or will it be considered separately from the base award (and not included in “TOTAL CPAF”)?

The total contract value will include the $35M of special studies (tasks).

File details come from the government source that posted it. Updated .