RFP# 80GSFC22R0044
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 3 (submit separate exhibit for base and all options)
TOTAL COST SUMMARY BY ELEMENT OF COST BY GFY
FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 To Comp Total Individual Labor Categories 0 Labor Category 1 0 Labor Category 2 0 Labor Category 3, etc. 0
Total Prime Hours 0 0 0 0 0 0 0 0 0 0 0 0
Individual Labor Categories 0.0 Labor Category 1 0.0 Labor Category 2 0.0 Labor Category 3, etc. 0.0
Total Prime Labor Cost 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Fringe Benefits 0.0 Engineering Overhead 0.0 Manufacturing Overhead 0.0 Major/Critical Subcontractor Cost 0.0 Other Subcontractor Cost 0.0 Interdivisional Cost 0.0 Material 0.0 Material Overhead 0.0 Travel 0.0 Other Direct Costs 0.0 Management Reserve 0.0 G&A 0.0 Subtotal Cost 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cost of Money 0.0 Award Fee 0.0
Total CPAF 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
This exhibit contains Source Selection Information. See FAR 3.104.
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 4 MATERIAL ITEMS (submit separate exhibit for base and all options)
CONTRACT
YEAR WBS(s) NOMENCLATURE PART NUMBER QUANTITY
REQUIRED UNIT PRICE TOTAL PRICE
TOTAL
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 5 TRAVEL COSTS (submit separate exhibit for base and all options)
FY WBS ORGIN/DESTINATION PURPOSE # OF TRIPS # OF PEOPLE # OF DAYS AIRFARE
RATE
AIRFARE
AMOUNT
PER DIEM
RATE
PER DIEM
AMOUNT
CAR
RENTAL
RATE
CAR
RENTAL
AMOUNT
TOTAL
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 6 OTHER DIRECT COSTS (submit separate exhibit for base and all options)
FY WBS DESCRIPTION QUANTITY
REQUIRED UNIT PRICE TOTAL PRICE
Exhibit 7
PRIME OFFEROR
FUNDING SUMMARY BY GOVERNMENT FY
Basic Contract Option 1 Option 2 Option 3
Quarter Cumulative
Funding Cumulative
Cost Cumulative Fee Cumulative
Price Man-Months Cumulative
Funding Cumulative
Cost Cumulative Fee Cumulative
Price Man-Months Cumulative
Funding Cumulative
Cost Cumulative Fee Cumulative
Price Man-Months Cumulative
Funding Cumulative
Cost Cumulative Fee Cumulative
Price Man-Months
FY23
FY24
FY25
FY26
FY27
FY28
FY29
FY30
FY31
FY32
FY33
FY34
FY35
FY36
FY37
FY38
FY etc