Final Attachment O - CWBS.pdf

PDF 280 KB Posted

Attached to
Geostationary Extended Observations (GeoXO) Imager (GXI) Instrument Implementation
Solicitation number
80GSFC22R0044
Issued by

View the file

Other files

File Type Posted
GXI Instrument Final RFP QA (Batch 2).pdf PDF
Amendment 1 - Attachment O CWBS.pdf PDF
Amendment 1 - Cost Exhibit 3.pdf PDF
Amendment 1 Cover page - SF 30.pdf PDF
Amendment 1 - Questions and Answers.pdf PDF
Amendment 1 - Continuation pages.pdf PDF
Amendment 1 - Attachment B PORD .pdf PDF
Final Attachment I - OCI Plan DRD.pdf PDF
Final Attachment A - SOW.pdf PDF
Final Attachment B - PORD.pdf PDF
Final Attachment E - IMAR.pdf PDF
GXI Instrument Final RFP 80GSFC22R0044 .pdf PDF
Final Attachment S - CONOPS.pdf PDF
Final Attachment D - UIID.pdf PDF
Final Attachment F - CDRL.pdf PDF
Final Attachment C - GIRD.pdf PDF
Final Attachment H - Financial Mgmt Reporting.pdf PDF
Final Attachment K - Small Business Sub Plan.pdf PDF
Final RFP Enclosure B - ITSMP Template.pdf PDF
Final RFP SF33.pdf PDF
Signed Final RFP Cover Letter.pdf PDF
Enclosure A - Updated Draft PEP.pdf PDF
Final Attachment R - Radiation Environment for Electronic Devices.pdf PDF
Final Attachment N - QASP.pdf PDF
Final Attachment L - IT Security Mgmt Plan.pdf PDF
Final Attachment Q - GRDDP.pdf PDF
Final RFP Cost Exhibits.pdf PDF
Final Attachment U - FPGA.pdf PDF
Final Attachment G.pdf PDF
Final Exhibit 10 - PPQ.pdf PDF
Final Attachment M - IT Security ADL.pdf PDF
Final Attachment P - Radiance Upwelling Document .pdf PDF
Final Attachment T - DEIA DRD.pdf PDF
Final Attachment J - Safety and Health Plan .pdf PDF
GPR 8730.5 Reference Document.pdf PDF
GXI Instrument Draft RFP QA.pdf PDF
Attachment F - CDRL.pdf PDF
Attachment L - IT Security Managment Plan.pdf PDF
GXI Draft RFP 80GSFC22R0044.pdf PDF
Attachment C - GIRD.pdf PDF
Attachment U - FPGA.pdf PDF
Attachment B - PORD.pdf PDF
Attachment G.pdf PDF
DRFP Cover Letter.pdf PDF
Enclosure A - Draft PEP.pdf PDF
Attachment E - IMAR.pdf PDF
DRFP Cost Exhibits.pdf PDF
Attachment S - CONOPS.pdf PDF
Exhibit 10 - PPQ.pdf PDF
Attachment N - QASP.pdf PDF
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CANDACE CARLISLE CARLISLE

Digitally signed by CANDACE

Date: 2022.08.10 12:40:36 -04'00'

Geostationary eXtended Observations (GeoXO) Flight Project

Imager (GXI) Contractor Work Breakdown Structure

(CWBS)

August 5, 2022

Prepared by:

Heather

Digitally signed by Heather Matthews

Matthews Date: 2022.08.10 12:12:25 -04'00'

Heather Matthews GeoXO Flight Deputy Project Manager/Resources

Approved by:

Candace Carlisle GeoXO Flight Project Manager

Attachment O: Contractor Work Breakdown Structure (CWBS) and CWBS Dictionary

1. DESCRIPTION / PURPOSE

The CWBS establishes a product-oriented framework for reporting program cost, schedule, and technical performance and provides a basis for uniform planning, reporting status, program visibility, and assignment of responsibilities. Additionally, the CWBS provides a product-oriented logical subdivision of hardware, software, services, facilities, etc., that contribute to and/or make up the total project scope of effort and work. The CWBS dictionary provides a narrative description of the work tasks and effort to be performed in each CWBS element.

2. PREPARATION INFORMATION

Contents:

The CWBS and CWBS dictionary are two distinct project documents used for defining the approved project scope of work. The contents of each document are detailed in the following paragraphs:

CWBS – A logical, hierarchical display of the subdivision of all project work to be completed.

The CWBS shall include the approved element title and element number.

CWBS dictionary – The CWBS dictionary shall briefly describe and document the work content of every CWBS element and relevant efforts associated with each element (e.g., design, development, and manufacturing).

The CWBS levels shall be governed by the Following. The actual letter and number designations can be adapted to meet the needs of the Contractor’s systems

Level 1 - Total contract effort

Level 2 Definitions: Major contract activity as described below

A. Engineering Unit / Non-Recurring Activities – All effort to plan and manage the design of the instrument including detailed design activities, design reviews, risk reduction (engineering models, etc), software development, GSE development, verification planning, etc.

B. Flight Model (FM) -1 – All effort related to fabrication, assembly, test, launch operations and on-orbit testing of the satellite

C. FM-2

D. FM-3

E. FM-4

F. FM-5

G. Special Tasks – all un-issued special task funds remain in this level 2 WBS H. Mission Operations - Long term mission support including any management, business management support, systems engineering etc that is not unique to a particular mission

Level 3 Definitions (Note: X denotes the Level 2 Contract Activity) – the work content as described is not necessarily all inclusive.

X.01 Program Management – Including program leadership, resource management, program planning (schedule), data management, configuration management, support for major design reviews

X.02 Systems Engineering - Including system engineering leadership, interface management (instrument, launch vehicle, ground), system specification definition and flow-down, verification planning, system level analysis and modeling

X.03 Mission Assurance - Including mission assurance leadership, quality engineering, subcontract surveillance, safety, reliability, parts and materials management

X.04 Hardware / Software – All subsystem hardware and software effort including parts and materials which should be accounted for in a separate line. Effort included in each level 2 WBS

X.05 Integration & Test - Including instrument baseline testing and environmental testing and post environment test activities including instrument packing and shipping.

X.06 Ground Support Equipment (GSE) – design, fabrication, procurement assembly, test and maintenance of electrical, mechanical GSE and mission simulation and GSE software

X.07 Post Delivery Support (PDS) – Any support required after the Pre-Ship Review/Pre- Storage Review including satellite integration and testing and if needed storage costs or testing during storage prior to shipping to spacecraft vendor

X.08 Launch and Post Launch Testing– support for pre-launch planning, launch site support, support for mission unique or special launch services, launch-vehicle integration (spacecraft portion), and the first 6 months of post-launch testing prior to the handoff to NOAA.

X.09 Special Tasks – Actual and projected cost of special tasks issued for a specific level 2

WBS.

X.10 Long Term Support – Long term mission support including any management, business management support, systems engineering etc that is not unique to a particular mission

Level 4 – The Contractor shall define WBS level within each level 3 and provide a brief description of the work content. For Example A.04.01 C&DH