This document announces a Request for Proposal for multiple award construction contracts to support both construction and design-build services at several NASA centers. NASA Armstrong Flight Research Center plans to award up to fourteen indefinite delivery indefinite quantity contracts with a total value of $300 million over five years. Twelve contracts will be set aside for various small business categories. Work may include general construction in areas such as maintenance, repair, alterations, and new building construction. The initial solicitation includes seed projects at Armstrong and Ames centers for the replacement of electrical systems and the restoration of Building 25, respectively. The period of performance for the Armstrong project is 424 days, while the period for the Ames project is to be determined. Proposals are due on April 3, 2018. Organized site visits for both seed projects are scheduled for March 2018.
Amendment 4
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80AFRC18R0007 Amendment 4
The purpose of this amendment is to make the following changes and to respond to some questions received for this solicitation.
1. Reference: Attachment A of solicitation (Armstrong Initial Model Task Order) Replace Attachment A SPECIFICATION: Replace Electrical Supporting Mission Control Specification, 551 pages of the task order with updated Attachment A SPECIFICATION:
Replace Electrical Supporting Mission Control Specification, 295 pages. The updated Attachment A will be provided by Large File Transfer.
2. Reference: Attachment A of solicitation (Armstrong Initial Model Task Order) Replace Attachment B Replace Electrical Supporting Mission Control Drawings EDM-1734, 21 pages of the task order with updated Attachment B Replace Electrical Supporting Mission Control Drawings EDM-1734, 21 pages. The updated Attachment B will be provided by Large File Transfer.
3. Reference: Attachment A of solicitation (Armstrong Initial Model Task Order) Replace Attachment C General Wage Determination, dated 05/18/2018 of the task order with updated Attachment C General Wage Determination, dated 06/15/2018. The updated Attachment C will be provided by Large File Transfer.
4. Reference: Attachment B of solicitation (Ames Initial Model Task Order) Change Section J
List of Attachments to include Attachment J LEED Requirements, 1 page and Attachment K
Amendment A, 2 pages. The attachments will be provided by Large File Transfer.
5. Reference: Attachment B of solicitation (Ames Initial Model Task Order) Replace Attachment I General Decision CA180018-Mod 9, dated 06/01/2018 of the task order with updated Attachment I General Decision CA180029-Mod 10, dated 06/15/2018.
The updated Attachment I will be provided by Large File Transfer.
6. Change Section L: Volume III Price and Other Required Documentation for Award, paragraph i to read as follows: i) In accordance with NFS 1852.223-73, NPR 8715.3D NASA General
Safety Program Requirements, and AFPD-8820.2-001A-3 Construction Safety, the offeror shall submit a detailed safety and occupational health plan as part of its proposal. The plan shall include a detailed discussion of the policies, procedures, and techniques that will be used to ensure the safety and occupational health of Contractor employees and to ensure the safety of all working conditions throughout the performance of the contract.
7. Reference 80AFRC18R0007 Amendment 3, response to Question 117 should be revised to read, “This section will apply to concrete pad for CD1A”.
8. The following questions were received, and responses are hereby provided as follows:
Question 122: Replace Electrical Supporting Mission Control (Armstrong Flight Research Center):
New location for the switchboard on E-14 is wrong, per the walk there was going to be a new location sent out.
Answer 122: Sheet E-14 has been revised to show the new location for the PDU.
Question 123: AFRC-Are these entire specs. applicable for this project?
Answer 123: Yes, the entire revised specifications included in this amendment are applicable to this project.
Question 124: AFRC- The specs go into great detail about metering, monitoring and integrated automation. Will meters and laptops need to be provided? Provide meter(s) and connect the meter(s) to the existing AFRC EMCS. The contractor shall provide laptop computers to configure the meter using latest version of software loaded on the computer.
Answer 124: Meters and laptops will not need to be provided for this project, and there are no planned meters or laptops for this project (sections removed from specs).
Question 125: AFRC-On sheet E2 it states all work must comply with the NASA Facilities
Engineering Electrical Safety Program. Can we have a copy of this program?
Answer 125: No, the requirement has been removed from Sheet E2.
Question 126: AFRC-Sheet E7 - The complete drawing is reference only? No work required?
Answer 126: Yes, sheet E7 is for reference only.
Question 127: AFRC-On Drawing Sheet E5, existing switchboard CD1B is labeled twice on the single line drawings. Should existing CD1B as shown, being fed from SS1A, be marked as New
CD1A? Related to the first part of this question; should Construction Note 1 indicate “new conductor from CD1A”, not “SD1A”?
Answer 127: Yes, CD1B should be marked as CD1A. Yes, construction note 1 should indicate
“new conductor from CD1A”, with note change to be reflected on Sheet E5 in this amendment, with the preceding to be reflected in this amendment.
Question 128: AFRC-Sheet E11 shows two lines of conduits going to the Fan house 7. One of the conduits is identified with three 200-D conduits from the conduit schedule and the other line is not identified, should the line be included with the three 200-D conduits?
Answer 128: Yes, the other line should be included with the three 200-D conduits.
Question 129: AFRC-Field observations have indicated that CD1B is located in a different location than as shown on the drawings. Can NASA please confirm the existing location of CD1B, as well as the routing of conduit to removed between CD1B and SS1A?
Answer 129: Yes, the existing location of CD1B, as well as the routing of conduit should be removed between CD1B and SS1A; Sheet E9 has been revised to reflect correct location of CD1B along with the routing of conduit removed between CD1B and SS1A, with the preceding to be reflected in this amendment.
Question 130: AFRC-Sheet E-4 Missing Construction Note 1. Please provide.
Answer 130: This sheet has been revised to remove construction note #1.
Question 131: AFRC-Sheet E-6 Construction Note 3 not found on plans. Appears to be mislabeled as Note 2. Please confirm. Also please provide length of the runs.
Answer 131: Construction note 3 has been removed, and construction note 2 has been corrected. For length of runs, refer to response to Question 18 in Amendment 3.
Question 132: AFRC-There are some conduits that are not completed, are they the conduits on the E sheets to be installed as new?
Answer 132: Yes, they are the conduits shown on the E sheets and will be existing.
Question 133: AFRC-Sheet E-9 Construction Note 2. Please provide the length of run from New
CD1A to Building 4800 1st floor.
Answer 133: Length of run is shown on revised Sheet E5.
Question 134: AFRC-Sheet E-15 Please confirm that the conduit and wire runs between Pull box
(as identified in note 2) to the PDU LRO and RED are existing and no work required under this contract.
Answer 134: Conduit and pull box to be existing, with contractor to install wire.
Question 135: AFRC- Sheet E-16 Note 1 is not called out on the plan. Are to assume it is referring to panel board CD2B?
Answer 135: Note 1 refers to Switchboard CD2A on revised drawing E16.
Question 136: Will civil construction projects be considered relevant to this RFP or is NASA looking for vertical remodel/renovation, or only Design-Build vertical projects, designed using
BIM with a LEED certification requirement? Please clarify relevant past project experience requirements.
Answer 136: Yes, civil construction projects are considered relevant.
Question 137: Can prime contractors submit experience of their team members who have been subcontractors on Federal, DOD or Public Works contracts as qualifying recent and relevant past experience?
Answer 137: Refer to response to Question 37 in Amendment 3.
Question 138: Will NASA accept subcontractors project evaluations completed by the project prime contractor?
Answer 138: Refer to response to Question 61 in Amendment 3.
Question 139: Will NASA consider expanding the time period for a Designer’s relevant past project experience to five years? By extending the relevant time period, NASA will increase the competitiveness of contractor’s proposals by allowing a designer to pull from a larger group of projects, some of which may include LEED requirements or designed using BIM software.
Answer 139: Refer to response to Question 4 in Amendment 3.
Question 140: Once NASA responds to the RFI questions, we kindly request at least a two week extension to incorporate the changes in to our proposal and to coordinate with our designer and subcontractors.
Answer 140: NASA has issued Amendment 3 which extended proposal due date to July 12, 2018 at 4:00 p.m. Pacific Time.
Question 141: Would the government consider granting an extension so offerors can solicit bids from site visit participants now that the participant list is available?
Answer 141: Refer to response to Question 140.
Question 142: Solicitation – Volume 2 indicates that “…of the six contracts submitted in the Past
Performance Information Summary, a past performance evaluation on each offeror’s overall
BIM experience as it relates to recent and relevant contracts…” Please advise an offeror’s past performance evaluation will not be negatively affected by not having a recent/relevant BIM project/contract to submit.
Answer 142: Refer to response to Question 55 in Amendment 3.
Question 143: Solicitation, page 73 of 82, page totals – Please increase the pages for the bid bond requirement in volume 3 from 5 pages to 8 pages to allow a bid bond to be submitted for both task orders separately.
Answer 143: No, the number of pages remains unchanged. The bid bond shall be one total for both task orders combined.
Question 144: Ames- The mechanical equipment schedule on plan sheet M601 (Bldg. 25
Renovation Moffett Field) is missing the performance requirements for the mechanical equipment. Please provide a corrected plan sheet to include the missing data.
Answer 144: Please refer to sheet notes 1 and 2 on sheet M601 as follows: Sheet note 1 states
“Schedule provided for guidance to Contractor and for Contractor use. Provided schedules represent required design information to be provided by Contractor.” Sheet note 2 states “Refer to mechanical design criteria documents when specifying equipment”. The mechanical equipment schedule on sheet M601 is a template for the Contractor to use and represent the required design information to be provided by Contractor as part of a Design-Build contract/project. The mechanical design criteria shall be in accordance with the contract drawings and specifications.
Question 145: Ames-The specifications for Bldg. 25 omits the performance specifications for the
4,000 lbs. elevator. Please provide the missing specification.
Answer 145: The elevator is not part of the scope.
Question 146: Ames- The FP plans for Bldg. 25 doesn’t show the POC for the new fire sprinkler system. Furthermore, no site utility map is provided to show where water can be tapped for the new fire suppression system. Additionally, we were unable to locate flow test for the existing fire water loop. Please provide the above missing information.
Answer 146: The Point of Connection (POC) for the Fire Sprinkler System water source can be at the south west corner of Building 25. The most current hydrant flow test shows a 750 gpm flow rate and 50 psi water pressure at the nearest fire hydrant which is close by. The hydrant pipe size is 10” diameter. The preceding will be reflected in an amendment.
Question 147: Ames-The Project Requirements notes on drawing sheet M025-1800-G003 for the AMES Research Center task order indicated that the contractor shall be responsible for Final
Design and Final Permit Submission to NASA for review and approval. Upon reviewing the drawings and specifications it would appear that this task order is already 100% designed and approved for construction by the Moffett Field Permit Board. Please confirm that this project does not require design services of the contractor, except for any incidental engineering required for shop drawings or deferred design submittals? If the intent of the solicitation is to have the contractor be responsible for another designers 100% design documents as a design-build solicitation, this imposes a significant amount of risk to the contractor and contradicts any industry standard practices for Design-Build project delivery.
Answer 147: This project is considered as minimal design-build with areas in need to have the design submitted for final construction permits. The drawings to be provided are at the conceptual stage. As an example, even though the drawings show substantial completion for the seismic retrofits, the design would still need professional licensed engineer stamped calculations and drawings to verify the conceptual design and complete the details. For some portions of the work where only performance requirements are specified, the successful offeror is expected to provide actual design with design submittals to be permitted prior to construction.
Question 148: Ames-Drawing M025-1800-G101 Legend states, Option Priority item number relates to specific option bid item, and to reference drawing number M025-1800- G001 for priority list number. No option priority list is shown on this drawing M025-1800-G001, should this drawing be M025-1800-G000 for the Option Priority item number specific option bid item?
Answer 148: The reference drawing sheet shall be AM025-1800- G000 for priority list number.
The preceding will be reflected in an amendment.
Question 149: Ames- During the site walk the building was dark, we utilized our cell phone lights to observe the existing conditions. There were no lights in the building. We request another site walk to further assess the scope of work. Please consider scheduling another site visit.
Answer 149: No further site visit will be provided.
Question 150: Ames- Loads allowed on floor for high work. RFP states that ceiling work is to be completed in the auditorium area with high ceilings. We request that the government provide the allowable loads that can be placed on the flooring for use of equipment.
Answer 150: It is the Contractors' responsibility to determine the allowable load for equipment use during construction, with contractor to make determination through field verification.
Question 151: Ames-Attachment B, Additional Information/Item No. 2 - Identifies design to be stamped by a professional engineer in State of California. Please provide a list of items that are to be designed and stamped.
Answer 151: The solicitation package is a bridging document as an acceptable concept. The contractor is required to complete the design with drawings, specifications and calculations with sufficient details as a submittal for a construction permit from the Government in accordance with the California Building Code.
Question 152: Ames- We do not see specifications for design requirements, yet Plan Sheet G-
003 calls out for design submissions at 30%, 60%, 90% and 100%. Please clarify if this seed project is DBB or DB. If the project DBB, please provide complete structural design.
Answer 152: The project is a minimal design-build with the bridging document provided. Design is required for construction permit review in accordance with California Building Code.
Question 153: Ames- Sheet-002, LEED Certifications – Scope of work under the base bid and option do not provide complete reconstruction of the building. LEED cannot be achieved as specified under our scope of work. Please clarify the intent of LEED requirements.
Answer 153: This project, if with the full scope is implemented, shall achieve a minimum of
LEED-NC Silver as the goal. However, since the work on this project is phased due to incremental funding, it is therefore acknowledged by the Government that the current scope in implementation may not be sufficient to attain LEED Silver Certification. However, the Design-
Build Contractor is responsible for submitting and getting approval for the credits, as the intent is that the project will be certified at a later date when a tenant is identified and the needed tenant improvements are completed. The preceding will be reflected in an amendment.
Question 154: Ames- Sheet G002 Hazardous Material – Hazardous material required to be abated do not show quantities for abatement. Please provide quantities.
Answer 154: The Offeror is to estimate quantities based on drawings provided by the
Government.
Question 155: Ames- Sheet G-002 Hazardous Material - There is a disclaimer in the notes stating
“some testing has been completed on this project”. Are we to assume that a COMPLETE survey is to be completed by the contractor prior to start of demolition or are we to assume that this is a complete survey and no additional survey is required?
Answer 155: No additional survey is required by the Contractor. The Offeror is to use the survey reports for bidding purposes. The surveys provided for lead and asbestos should be considered complete for the interior of the building. The Government will provide additional survey of the building exterior and roof. Note that the Offeror must follow all requirements in the Project
Specifications.
Question 156: Ames- Sheet Various – Throughout the plans, there are statements that state
“remove and replace as necessary”. We are not able to complete a full survey of the project, we do not have any means of documenting quantities of work to be replaced. For each item that is identified as “removed and replace as necessary”, please provide quantities.
Answer 156: See response to Question 154.
Question 157: Ames- Sheet Various – Throughout the plans, there are statements that state
“Patch and Repair where water damage has occurred” on floors, walls and ceilings. We are not able to complete a full survey of the project, we do not have any means of documenting quantities of work to be replaced. How does a contractor quantify these areas? Please provide quantities for walls, ceiling, flooring and wood flooring to be repaired.
Answer 157: Water damage exists on the stage at the top of Stair S104, on the wall between the stage and Room 108, and the ceiling in Storage 215 and 216. Assume 42 SF of stage repair, 50
SF of ceiling repair, and 30 SF of wall repair.
Question 158: Ames- Sheet Architectural Various – Project plans do not contain window and door schedules. Please provide schedules.
Answer 158: Estimate in accordance with information already shown on the elevations views.
Question 159: Ames- Sheet F-001, Fire Sprinkler System –identifies fire sprinkler connection.
Plans do not identify size of the line, point of connection, and water flow test. Please provide this information in order for us to provide a complete bid.
Answer 159: See response to Question 146.
Question 160: Ames- Building 25 Restoration (Ames Flight Research Center): Confirm whether
“Notifier” will be an acceptable alternate for Fire Detection and Mass Notification system
Answer 160: "Notifier" will not be acceptable. In accordance with Project Specifications Section
28 31 76 Paragraph 2.17, Siemens, Simplex, or Edwards System Technology (EST) are the three acceptable manufacturers, no other manufacturers will be accepted. All fire alarm equipment shall be of a single manufacturer.
Question 161: Ames- Building 25 Restoration (Ames Flight Research Center): Sheet G003 Project
Requirements notes #1-9 do NOT apply to this Design-Bid-Build project. The only design/build element on this project is for the fire alarm and mass notification system. Delete notes #1-9 on
Sheet G003.
Answer 161: Project is a minimal design-build. Sheet G003 Project Requirements #1-9 are therefore applicable.
Question 162: Ames-Building 25 Restoration (Ames Flight Research Center): Provide hazardous material report for asbestos and lead paint, or else provide measurable quantities and location to abate. Sheet G002 only summarizes potentially contaminated items.
Answer 162: Hazardous material reports for asbestos and lead were provided as part of the solicitation. Reference responses to Questions 154 and 155.
Question 163: Ames- Building 25 Restoration (Ames Flight Research Center): Confirm that the
Owner will be responsible for all testing and inspection costs.
Answer 163: The Government is only responsible for the testing and inspection performed by the Government. All those requiring testing or inspection reports as submittals will be the responsibility of the Contractor.
Question 164: Ames- Building 25 Restoration (Ames Flight Research Center): Provide as-built site utility plan for tie-in of storm drain system, and invert elevations of nearby manholes.
Answer 164: The referenced ‘as-built’ drawings will be provided to the successful Offeror on this task order later. The invert elevation for the SS manhole on the east side of the Building 25 is
19.76’, and the invert elevations of the other manholes will need field survey. All of the preceding information to be reflected in an amendment.
Question 165: Ames-Building 25 Restoration (Ames Flight Research Center): Provide section detail of storm drainage system (including any drain tile/burrito drains) along the perimeter of the building.
Answer 165: Section detail is not available. No additional storm drainage exists beyond what is shown on drawings. Invert elevation at existing stone pit is ~27.5' and the stone pit bottom is
23.5’, approximately 5' and 9' below grade, respectively. The preceding information will be provided in an amendment.
Question 166: Ames- Note A7 on sheet AS101 states for the contractor to excavate the entire perimeter of the building, provide shoring along the entire perimeter, clean out all storm drain piping, and replace any sections that are damaged or beyond their usable life. The note then goes on to state the contractor shall reference the plumbing plans for more details. In review of the plumbing plans we see minimal storm drain work with most of the work associated with the installation of a new storm drain man hole. The plumbing plans
Answer 166: Question appears to be incomplete. Note A7 on Sheet AS101 only refers to excavation on the west side of the building to repair the existing storm drain. Note A15 on
Sheet AS101 states for the contractor to excavate the entire perimeter of the building to clean out the existing storm drain piping.
Question 167: Please reference sheet G000 and Attachment B for the following question. The base bid for Building 025 calls for the contractor to perform extensive demolition to the building and building systems. If all the bid options are executed per Bldg. 025’s bid schedule the contractor would not deliver a completed and usable facility as many areas of work would remain unfinished including domestic water systems, restrooms, HVAC systems including boilers and chillers, storm drain piping, etc. Please advise if NASA’s intention is for the contractor to only perform the portions of the work outlined in the Attachment B bid schedule or if NASA want’s the entire scope of work completed as shown in the plan set.
Answer 167: The Offeror will only perform the work as specified in the solicitation.
Question 168: Due to the significant number of unanswered RFIs, we respectfully request a two week extension of the proposal due date to allow offerors time to incorporate necessary changes to our approach based on the Government’s answers.
Answer 168: Refer to response to Question 140.
Question 169: In order to allow offerors the opportunity to evaluate RFI answers and ask follow-up RFIs for clarification, we respectfully request that the RFI deadline be extended to the day after the last RFI answers are released.
Answer 169: No, the RFI response deadline is not extended.
Question 170: Ames- Bldg. 025 Sheet G000 under Scope of Work (Base Bid) states the following, “The Scope of Services includes providing design-build services for the following major elements
– Reference Plans for detailed extent of work, as the list below is not intended to be all-inclusive of the entire scope.” The plans and specifications for this project are stamped and appear to be fully designed. Please clarify which portion, if any, of this project is design-build.
Answer 170: See response to Question 151.
Question 171: Ames-General Question Task Order B – Is it a correct summation that
Specifications, Bridging Documents, and Drawings associated with Task Order B are conceptual in nature and that this project is a design build project to be completed by the bidding general contractor’s? Or is this project a design bid build wherein costing is calculated from the aforementioned documents? Please advise!
Answer 171: See response to Question 152.
Question 172: Ames- Bridging Documents Title Sheet – Please clarify “Design Build Entity” note under engineers stamp on title page of Bridging Documents?
Answer 172: The "design-build entity" is the Contractor.
Question 173: Ames- Bridging Documents – Is the asbestos report contained in the Bridging
Documents the most current report, being that it is dated 7/19/2001? Have any hazardous materials been removed since this report as site visit photos give the appearance some assemblies have been removed?
Answer 173: Yes, the hazardous material reports provided as part of the solicitation documents are the most current reports available. No hazardous material remediation has occurred since the date of the report.
Question 174: Ames- Bridging Documents – Is the Lead Report contained in the Bridging
Documents the most current report being its dated 6/7/2001? Have any assemblies covered or containing lead been removed?
Answer 174: Yes, the hazardous material reports provided as part of the solicitation documents are the most current reports available. No hazardous material remediation has occurred since the date of the report.
Question 175: Ames- Engineering Report “Document Report No. AM025-1600-XA1 – Have all of the items identified in this report been addressed or included in the specifications and drawings for Task Order B? I.e. downspout drains………….
Answer 175: The report is not comprehensive and is provided for reference only.
Question 176: Ames- Engineering Report – This report indicates no Geotechnical Report is required, yet excavation for roof drains is indicated. What type of soil condition exists at 23’-0” below finish grade in regards to the extension or tie in of existing roof drains?
Answer 176: Invert depth at stone pit is approximately 5 feet below grade. Excavation shouldn't exceed 10 feet.
Question 177: Ames- Engineering Report ¶ 2.2.17 Sustainability Requirements indicates design and construction meet LEED – NC silver certification - Has this project been registered with
USGBC, as further language in paragraph would lead one to believe project is design build or design has not been completed yet?
Answer 177: The project has not been registered with USGBC.
Question 178: Ames- Engineering Report ¶ 3.1.1 Risk Analysis – Indicates building has been vacant for 10 years Appendix H Seismic Evaluation Report ¶ 2 Building Description indicates building has been vacant 20 years. Which is it and have any conditions of the building changed since these reports?
Answer 178: The building has been vacant for 20 years and no change since the report.
Question 179: Ames-Specification Section 01 14 00 ¶ 1.3.5 indicates there is furniture or equipment that must be moved or protected by Contractor…. - Is this accurate?
Answer 179: Yes, this is accurate.
Question 180: Ames- Specification Section 01 20 00.00 20 ¶ 1.3.3 indicates that “design build services shall be no more than 10% of the contract value on the schedule of values.” Is this percentage meant to limit or identify the fee the bidding contractor can charge if in fact this project is a design build by the contractor? Please clarify what is meant with this paragraph!
Answer 180: 10% is the design fee restriction for the Offeror to abide. It is intended for the project as a whole.
Question 181: Ames- Specification Section 01 30 00 ¶ 1.5 identifies Partnering – Will Partnering be formal or informal as both are referenced, more specifically will Contractor be required to provide Facilitator?
Answer 181: Informal Partnering is intended for this task order. Facilitator is not required for informal partnering. Changes to the language in this section of the specification will be reflected in an amendment.
Question 182: Ames-Specification Section 01 30 00 ¶ 1.7 references NASA’s online CMS….. – Can further clarification of NASA’s CMS (construction management system) be provided, is there special software required etc.…..?
Answer 182: Ames will use the SharePoint/Box software combination online CMS, and Ames will provide access to this system.
Question 183: Does the Government want us to include the 52.204-8 ANNUAL
REPRESENTATIONS AND CERTIFICATIONS (JAN 2018) from the RFP (total of 9 pages) or the electronic copy from our SAMs registration (many pages)? The RFP states we are limited to 4 pages. Please advise on which pages we should include.
Answer 183: Include documentation from the RFP. Refer to response to Question 22 in
Amendment 3 for further information.
Question 184: Please clarify if the Section K page limit is correct. On page 73 of 82, Proposal
Submission Checklist, it states Section K is limited to 6 pages maximum. But, Section K, included in the RFP, is 10 pages total. Please advise which of the pages should be counted in the 6 page limit or if all 10 should be included.
Answer 184: Refer to response to Question 22 in Amendment 3.
Question 185: Ames- Sheet G000 indicates the scope of work has been broken down into two
(2) categories – Base Bid Requirements and Option Requirements. The subsequent sheets identify base bid and option requirements but these requirements don’t match that which is identified on sheet G000. Are we to include pricing for items identified as base bid and options on the subsequent sheets in addition to that shown on sheet G000?
Answer 185: The Cover Sheet defines the Base Bid and the Option Packages. The Option
Packages define the Bid Option Items to be included in each package. Bid option priority item numbers shown subsequent sheets reference bid option numbers on Sheet G000. Provide pricing for each element in Bid Option Packages A, B, C & D.
Question 186: Ames- Sheet G001 Project Notification Requirements – Reference is made to
NASA Permit Board Approval yet drawings are stamped “Approved for Construction Moffett
Field Permit Board, Anthony Wong, Chief building Official Permit No. 17P037. Are these drawings approved for construction?
Answer 186: These drawings are not approved for construction but approved as the Bridging
Document as the basis for design-build process.
Question 187: Ames- Sheet G101 – This sheet identifies panic devices for egress doors yet the pair of doors on the east elevation and the door exiting the elevator lobby to the exterior don’t indicate “panic bars”. Will panic devices be required for these doors? Furthermore, is note #11D or E as shown on Sheet G000 which is part of CLIN #004 meant to coincide with these panic bars as indicated on Sheet G101? This question is also applicable to Sheets G102 & G103.
Answer 187: Only provide panic bars where shown on the solicitation drawings.
Question 188: Ames- Sheet G101 – This sheet identifies FEC’s, is note #4 D as shown on Sheet
G000, which is part of CLIN #4 meant to coincide with these FEC’s? This question is also applicable to Sheets G102 & G103?
Answer 188: Instead of following Sheets G101-G103, follow floor plan Sheets A101-A103 for new FEC locations and existing FHC locations to remain. Where existing FHCs are to remain or be reinstalled, new extinguisher shall be placed inside the FHC.
Question 189: Ames- Sheets G101, G102, and G103 – All of these sheets indicate FEC’s yet there is no specification section for type of cabinet or extinguishers. Please clarify what is required?
Answer 189: Instead of following Sheets G101-G103, follow floor plan Sheets A101-A103 for new FEC locations and existing FHC locations to remain. Where existing FHCs are to remain or be reinstalled, new extinguisher shall be placed inside the FHC. Project is design-build. FECs shall be recessed with standard ABC extinguisher.
Question 190: Ames- Sheet G103 – Are panic devices required on doors exiting basement, as none are shown?
Answer 190: Refer to response to Question 187.
Question 191: Ames- Please advise if LEED certification is required for the renovation of Bldg.
025? We have found on sheet G002 where LEED certification is noted yet it is not mentioned in the specifications.
Answer 191: Refer to response to Question 153.
Question 192: Ames- Who is supplying temporary power such as 110 volt and 220 volts?
Answer 192: The Government will supply 220V if available. Existing 110V power is available throughout the building.
Question 193: Ames- What percentage of epoxied bolts have to be pull tested?
Answer 193: Please refer to Note 8 under POST-INSTALLED CONCRETE ANCHORS on Sheet S001.
20% min unless any bolts fails, then test 100%.
Question 194: Ames-Is all material “Tax Free?”
Answer 194: The Offeror is responsible for resolving sales tax exemption.
Question 195: Ames-What is the method of overhang for gutter MO25-1700-S501, Detail 1?
Answer 195: Match existing roof overhang for gutter.
Question 196: Ames-What is the length of the anchors/size MO25-1700-S503 Detail 5?
Answer 196: The diameter and embedment of the anchors into the (e) concrete wall shall be as required by design to transmit the forces determined by Contractor's analysis.
Question 197: Ames- Drawings M025-1800-A131 to A132 show finishes as part of Bid Option 20 in Unisex Toilet. Unisex Toilets themselves are identified as Bid Option 13, which are Not-In-
Contract per Attachment B, Section C, General. Finishes should also be Not-In-Contract in the
NIC Unisex Toilets. Clarify what base bid finishes need to be included.
Answer 197: Finishes for unisex toilets are not to be included.
Question 198: Ames- Building square footages given in Description of Work in Attachment B totals 20,882, yet Document Report AM025-1600-XA1 page 6 show 24,225 while Lead Based
Paint Survey Report page 2 show 32,650. Please clarify discrepancies.
Answer 198: Use building square footage as stated on the solicitation drawings cover sheet, which is 20,882 SF.
Question 199: Ames-Eight additional steel columns are shown on structural drawing M025-
1700-S102 compared with that shown on architectural drawing M025-1800-A101. Please clarify discrepancy.
Answer 199: Key note 2 on S102 indicates the added steel column from basement to attic slab.
It is called out in twelve (12) locations; Gridline 6 @ GL B, C, K, and L; Gridline 10 @ B, C, K, and
L; Gridline 8 @ A and M; Gridline 9 @ A and M. The architectural sheet does not show all the columns. Refer to S sheets for structural elements.
Question 200: Ames- Base Bid notes on drawing M025-1800-A101 do not list a Box 2 symbol that is shown adjacent to Stair S102. Please clarify.
Answer 200: Omit key note 2 at Stair S102 for Base Bid notes on drawing sheet AM025-1800-
A101. Preceding will be reflected in an amendment.
Question 201: Ames-Cover sheet M025-1800-G000 identified the building’s Occupancy Type as
“B (possible A-1)” while Egress Plan M025-1800-G101 identified occupancy as “A-1” in the
Auditorium. Please clarify if there is a discrepancy and if additional scope of work is required.
Answer 201: There is no discrepancy. Future tenant has not been identified for Building 025, so the final occupancies are unknown. A-1 for Auditorium and B for the balance are the assumed occupancies and should be assumed for bidding purposes.
Question 202: Ames- Cover sheet M025-1800-G000 identified the building’s Construction Type as “VB” while Historic Preservation Report on page 7 identified Construction Type as “IIIB”.
Please clarify if there is a discrepancy and if additional scope of work is required.
Answer 202: Cover sheet AM025-1800-G000 identifies the building’s Construction Type as “VB” which is correct. Historic Preservation Report on page 7 identifies the Construction Type as
“IIIB” which is erroneous. Preceding will be reflected in an amendment.
Question 203: Ames- On drawing G003 under Project Requirements, note #6, Specifications, it is clearly noted that additional specs will not be required beyond listing their Master on our cover sheet. Note #6 goes on further to explain that changes to their master must be documented and approved as a substitution. There is no specs for the mechanical or the boiler so will they need to be added by the engineer? For example, will we need to mark-over their master with each proposed change or can a wholesale change be submitted without itemized identification?
Answer 203: Specifications for items such as the elevator and the boiler are not provided, as they are not in scope. There is no requirement to mark over the master or submit a wholesale change for items which are not in scope.
Question 204: Ames-Will our submittal drawings need to show demo scope or can demo work proceed based on demo drawings included in the task order?
Answer 204: Yes, your drawings need to include demo scope, with all drawings to be stamped with the Offerors' own Engineer and submitted to Government for review and approval.
Question 205: Ames-It states we are to submit a full set of signed drawings. Do the drawings for the demolition have to be duplicated since they were already in the bid documents? If so can the demolition begin before the submitted set is approved?
Answer 205: Yes, the demo drawings can be duplicated, and must be stamped by the Offerors' own Engineer and submitted to Government for review and approval. Demo can only proceed after submitted drawings are permitted by the Government.
Question 206: Ames- Attachment B – CLIN 0002-CLIN 0005 – Refers you to G000 which indicates which bid options to bid according to which CLIN #. This does not include the bid options key notes list on all the drawings. What are the bid options on the drawing in the plan set such as drawing M025-1800-A102 used for?
Answer 206: Contractor is required to bid on items as shown in Attachment B, CLIN 0001 – CLIN
0005 for bid option items as identified in the CLIN description. Other bid option items shown on the construction plans but not specifically identified in the CLIN description are not in the scope.
Question 207: Ames- Sheet AD101, AD102, AD103 - Keynote says - Remove & dispose (E) finish to bare concrete. I'm assuming they mean removal of the paint. Would Government allow sandblasting or does Government recommend an appropriate method to be used?
Answer 207: Sandblasting is allowed as long as it is completely contained within the interior and the exterior of the building and does not affect/damage any surrounding building elements, especially if the surrounding building elements contribute to the historical nature of the building. Contractor is solely responsible for repairing any damage to surrounding building elements and must fully clean the area when completed.
Question 208: Ames- Sheet AD201, AD202 - Keynote says - Prior to painting exterior, industry standard lead abatement measures shall be executed to remove all lead paint accordingly. Dose
Government want all the paint removed or just the loose / flaky?
Answer 208: All lead paint shall be abated and removed in its entirety.
Question 209: Ames-If all the paint is to be removed then can sandblasting be utilized or does
Government recommend an appropriate method to be used?
Answer 209: Refer to response to Question 207.
Question 210: Ames- Sheet AD101 - Bid Option Key Note A3 - Remove & Replace all (E) exterior doors and windows with safety glazing. Are the window panes just being removed or the entire window?
Answer 210: As long as the window glazing is replaced with double pane, low-e and with the appearance preserved, both methods are acceptable.
Question 211: Ames-Please confirm that Government want all the windows / panes removed on the first floor?
Answer 211: Yes, all windows and panes on the first floor are to be replaced.
Question 212: Ames- Sheet AD101 - Remove storage shed 102A - After demo of the shed, are we to remove all the concrete under and surrounding the shed and replace with asphalt?
Answer 212: Yes, in accordance with key note 13 on Sheet AD101, patch and repair to match existing adjacent surfaces (AC pavement).
Question 213: Ames- On site visit at Ames, it was noted there are radiators below the windows that provided heating in rooms. These are not shown on the plans. Are we to remove these as part of our proposal?
Answer 213: Removal/replacement is required for all radiators, unless otherwise noted.
Question 214: Ames- At Ames, will temp utilities be provided? Or will water and power still be active in the building while work is being performed?
Answer 214: Only building water and power will be provided and they are active.
Question 215: Is there a proprietary Fire Alarm company at Ames, similar to Simplex Grinnell at
Armstrong?
Answer 215: Yes. See Project Specifications.
Question 216: If we have a teaming agreement with a designer, can we submit their past experience to meet the design build, LEED or BIM qualification requirements or do we need to have a Joint Venture?
Answer 216: Refer to response to Question 37 in Amendment 3.
Question 217: Can we team with a designer who was part of the development of project drawings/specifications included in this solicitation?
Answer 217: If the Offeror believes it has a conflict of interest, it will be required to submit an
Organizational Conflict of Interest (OCI) Mitigation Plan, see solicitation provision NOTICE OF
POTENTIAL ORGANIZATIONAL CONFLICTS OF INTEREST on page 61 of the solicitation.
Question 218: Ames- AD201 - States prior to painting exterior, lead abatement to take place.
Lead based paint survey does not show lead based paint on exterior. Please clarify if exterior paint contains lead.
Answer 218: Assume existing exterior paint to contain lead.
Question 219: Ames- Lead Based Paint Survey - Page 10 - States that wall 1 is both positive and negative for lead paint. Please clarify.
Answer 219: Assume that it is positive for lead.
Question 220: Ames- Building 25 Renovation - Is the intent of the "design build" to repackage existing drawings; i.e. removing items not being done on this project, incorporating LEED silver certification, adding items such as door, window and finish schedules, in addition to providing stamped structural drawings and calcs?
Answer 220: Yes, this is the intent.
Question 221: Please provide specs on roofing replacement for base bid 4b and for option 1a, 1b, and 1c.
Answer 221: PROVIDE AND INSTALL (N) FELT ROOFING MEMBRANE UNDERLAYMENT AND ALL
ASSOCIATED ROOFNG ELEMENTS. REFERENCE HISTORIC PRESERVATION OF BUILDING 025
ENGINEERING REPORT FOR FUTHER INFORMATION. (E) SPANISH STYLE TERRACOTTA ROOF TILES
SHALL BE REMOVED, SALVAGED, AND REINSTALLED FOLLOWING MEMBRANE INSTALLATION
AND INSPECTION. ALL DAMAGED TILES SHALL BE REPLACED IN KIND TO MATCH (E). DESIGN-
BUILDER TO ASSUME 75% RETENTION AND REUSE OF (E) TILES. (N) TILES SHALL BE GROUPED
TOGETHER, AND (E) TILES SHALL BE GROUPED TOGETHER TO PREVENT PATCHWORK COLOR
VARIATIONS. NO (N) TILES SHALL BE USED ON THE SOUTH-FACING ROOFS AND SHOULD NOT BE
VISIBLE FROM THE MAIN SOUTH ELEVATION. WHERE FEASIBLE, USE (N) TILES AT THE RIDGE.
DESIGN-BUILDER SHALL PROVIDE A PHYSICAL COLOR SAMPLE AS A SUBMITTAL FOR REVIEW
AND APPROVAL BY THE SHPO AND COR, ALONG WITH A ROOF PLAN SHOWING THE PROPOSED
LOCATIONS OF (N) TILES PRIOR TO INSTALLATION. COMPLETE REPLACEMENT WITH (N) TILES
WHICH ARE EXACT MATCH OR VERY CLOSE MATCH TO THE (E) TILES AS APPROVED BY SHPO
AND COR CAN BE AN OPTION. The preceding will be reflected in an amendment.
Question 222: Are all drawings provided for the ARC project to be used as reference only? Are we expected to provide a full site stamped set of drawings in addition to the structural stamped set required? If so, will CAD files of the drawings be made available?
Answer 222: Drawings are provided for reference only. Yes, you are required to provide a full set of stamped drawings. Electronic CAD files will be provided later for the successful offeror on this task order.
Question 223: RFP Page 4 of 82 - Is 4Clicks the only software to be considered for future task order estimating?
Answer 223: Refer to response to Question 20 in Amendment 3.
Question 224: RFP Page 4 of 82 - Please confirm that licensing to perform work in the State of
California is required?
Answer 224: Yes, licensing to perform work in the state of California is required.
Question 225: RFP Page 10 of 82 - Are there any LDs associated with either of the seed projects?
If so, how much?
Answer 225: There are no liquidated damages associated with the Armstrong task order but the
Ames task order has $300 per calendar day as stated in 52.211-12 LIQUIDATED DAMAGES-
CONSTRUCTION in the task order.
Question 226: RFP Page 20 of 82 - Fair Opportunity - Would there ever be a case that task orders/RFP solicited on this MACC will be set aside to a socio-economic group based on the rule of two? For example, if 2 women owned business are selected on to this MACC, will there be a possibility to set a task order aside for only them to compete? Please clarify..
Answer 226: Yes, there may be cases where the task orders will be set aside to specific subcategories of small business.
Question 227: RFP Page 20 of 82 - Fair Opportunity (iii) - Do you plan to sole source task orders on this vehicle?
Answer 227: Yes, if there is a justification to do so.
Question 228: RFP Page 21 of 82 - Fair Opportunity (vii) - Would there ever be a case that task orders/RFP solicited on this MACC will be set aside to specific subcategories in small business, which all contract holders meeting the category will be considered? Please clarify
Answer 228: Yes, there may be cases where the task orders will be set aside to specific subcategories of small business.
Question 229: RFP Page 21 of 82 - Mitigation of Organizational Conflicts of Interests - Can you provide specific examples of all possible conflicts of interests?
Answer 229: See Section L: Notice Of Potential Organizational Conflicts Of Interest for some examples on page 61.
Question 230: RFP Page 41 of 82 - Performance of Work by the Contractor (52.236-1) - Does this only apply to labor costs on the task order? No material consideration should be factored on the
25% self-performance percentage, correct?
Answer 230: This requirement in terms of a percentage reflects the minimum amount of work the contractor must perform with its own forces.
Question 231: RFP Page 43 of 82 (c) - Will a task plan be required for every task order proposal?
Answer 231: Yes, a task plan is required in accordance with NFS 1852.216-80 Alt II and Section
H: Task Order Procedures.
Question 232: RFP Page 58 of 82 - Bid Guarantee - Will a bid guarantee be required for each seed project separately? Or one for both?
Answer 232: One bid guarantee is required for both, not separately.
Question 233: RFP Page 65 of 82 - Vol I - Bonding Capacity - If a small business can meet the unrestricted / full and open bonding capacity of 15/45, would their proposal be considered for this category as well?
Answer 233: Yes, small businesses may be considered for the unrestricted/full and open award if the bonding requirements can be met.
Question 234: RFP Page 66 of 82 (a) (1) Past Performance Information Summary - Please confirm all past performance must be performed as a prime contractor? Will subcontract experience be accepted?
Answer 234: No, all past performance does not have to be performed as a prime contractor. The recent, relevant, and quality of performance of any teaming partner(s) or joint venture participant whose efforts will meaningfully influence performance of the contract will be evaluated.
Question 235: RFP Page 77 of 82 c. Factor 2 Past Performance Evaluation - If a CPARS evaluation is not available, would NASA accept Past Performance Questionnaires (PPQs) as "other sources known to the government"?
Answer 235: Refer to response to Question 61 in Amendment 3.
Question 236: RFP Page 81 of 82 - Step 3 Evaluate Technical Acceptability and Past Performance
- Please clarify what is a "sufficient amount" of lowest-priced proposals in the WOSB category, nevertheless for all small business subcategories.
Answer 236: Sufficient amount means two or more.
Question 237: RFP Page 81 of 82 - Step 3 Evaluate Technical Acceptability and Past Performance
- Is it the intent to award two contractors per each small business category?
Answer 237: Refer to response to Question 8 in Amendment 3.
Question 238: RFP Page 81 of 82 - Step 3 Evaluate Technical Acceptability and Past Performance
- Can small business be considered for one of the two unrestricted/full and open contract awards (i.e. 2 of the 14 contracts), if it can meet the bondability requirements? Or is small business restricted to only proposing on the small business subcategories?
Answer 238: Refer to response to Question 233.
Question 239: RFP - Will each task order be sent out for proposal to all awardees or will each task order be set aside to socio-economic concerns?
Answer 239: Refer to response to Question 1 in Amendment 3.
Question 240: AFRC- Please clarify if QCM, SSHO and Superintendent are to be three separate personnel to be present on site on fulltime basis.
Answer 240: See response to Question 23 in Amendment 3 regarding separation of personnel.
Personnel need to be on-site during any construction activities.
Question 241: RFP - Will each awardee be required to submit a proposal on each task order?
Answer 241: It is our intent to award to firms that not only have the capability but have the desire to perform. For each task order solicitation issued under the MACC, Offerors are expected to be responsive to our requirements.
Question 242: AFRC Drawings - Request clarification of Dwg-E5 showing (2) existing 800A
480Y/277V Critical DSBN CD1B. (1) Being fed from SS-1B and (1) being fed from SS-1A. Dwg-E6
Shows DSBN CD1A Feeds CD2A this conflicts with Dwg-E5 Showing CD1B is feeding CD2A.
Construction Note 1, Dwg-E5 reads "INSTALL NEW CONDUCTOR FROM NEW DSBN SD1A TO
DSBN IN FAN HOUSE 7" -Unable to find details on gear "SD1A" Missing connection details on
TVSS system to DSBN CD1A.
Answer 242: SD1A is CD1A, and on sheet E17 there is an EMCS riser diagram. Drawings E5 and
E6 have been revised to reflect the preceding, which will be issued in this amendment.
Question 243: AFRC- Since a…