803-GS-ESP-ES-F10-01 F-10 Explosive Site Plan.pdf

PDF 1 MB Posted

Attached to
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary Federal contract opportunity
Solicitation number
80GSFC21R0037-eLibrary
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document is an explosive site plan for Building F-10 at Wallops Flight Facility. The plan provides details on the explosive storage and handling processes at the site. Building F-10 is a multi-purpose facility used for administrative offices, machine shop work, laboratory functions, testing and evaluation, and integration of systems. The plan establishes a restricted area within the building for storage of up to 100 pounds of Hazard Class 1.4 explosives and pyrotechnics. It specifies the explosive siting distances, engineering and lightning protections, restricted access protocols, and other health and safety requirements for the storage and handling of ordnance materials at the designated rooms within Building F-10. The plan also includes maps of the building layout and ordnance grounding safety points.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary, newest first.
File Type Posted
SRPO Cryogenic Safety Users Guide Revision A Final.pdf PDF
NSROC III NNG16WA70C Attachment M - Contract Historical Data 19-20.pdf PDF
SRPO Technology Roadmap June 2021.pdf PDF
NSROC III List of Ongoing Work - October 2021.pdf PDF
SRPO Annual Report 2016.pdf PDF
Rocket_Report_4th_quarter_2019.pdf PDF
SR User Handbook Final_July 2015.pdf PDF
SRPO Annual Report 2019.pdf PDF
Doing Business with Wallops.pdf PDF
Sounding Rockets_NASA_fact_sheet.pdf PDF
NASA-STD-8719.12A Safety Standard for Explosives, Propellants, and Pyrotechnics.pdf PDF
803-PG-8730 1 WFF Met and Cal Lab Quality Manual.pdf PDF
GPR 8710.2.pdf PDF
NPR 8715.3.pdf PDF
NPR 4200.2.pdf PDF
GPD 7150.0.pdf PDF
GPR 1840.1.pdf PDF
GPR 8715.8.pdf PDF
GPR 8715.1.pdf PDF
GPR 8710.7.pdf PDF
GPR 7120.11.pdf PDF
200-PG-8812.1.1 Wallops Facilities Review Committee.pdf PDF
800-PG-8715.5.1A Range Safety Process for Programs and Projects.pdf PDF
GPR 8500.1.pdf PDF
NPR 1040.1 Updated.pdf PDF
NPD 8730.5.pdf PDF
GPR 1820.2.pdf PDF
GPR 1840.2.pdf PDF
GPR 1600.2.pdf PDF
GPR 8800.1.pdf PDF
GPR 8715.12.pdf PDF
GPR 4100.2.pdf PDF
NPD 8700.1 Updated.pdf PDF
800-PG-8715.0.4C_Certification Procedures for OSS at WFF.pdf PDF
NPD 2800.1.pdf PDF
NPR 6000.1.pdf PDF
NPD 2025.1.pdf PDF
800-PG-8710.0.2D Operations in Cold Weather Environments.pdf PDF
GPD 1800.0.pdf PDF
800-PG-7120.4.1 Risk Mgmt.pdf PDF
NPR 5200.1.pdf PDF
Vehicle Launcher and Performance Info.pdf PDF
NSROC III SOW Rev 10 - April 2021.pdf PDF
Acronym List.pdf PDF
Rocket_Report_2nd_quarter_2019.pdf PDF
Sounding_Rocket_Brochure1.pdf PDF
SRWG Findings_June_2021.pdf PDF
SRWG_Findings_July_2019.pdf PDF
810-PG-5100.1.1F Management of the NASA Sounding Rockets Operations Contract (NSROC).pdf PDF
500-PG-4520.2.1 EEE CPAP.pdf PDF
Show all 50

NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

803-GS-ESP-ES-F10-01

WALLOPS FLIGHT FACILITY BUILDING F-10

EXPLOSIVE SITE PLAN

Effective Date

January 2015 Version 01

803/Safety Office

Goddard Space Flight Center

Wallops Flight Facility

Wallops Island, Virginia 23337 National Aeronautics and Space Administration

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that this is the correct version.

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that

DOCUMENT HISTORY LOG

Revision Change Date Originator/Phone Description

- February 12, 2015 Ernest Cornwell / 757-824-2548 Initial Release

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that

Contents

ACRONYMS

1.0 GOVERNING STANDARD

2.0 SCOPE

3.0 SITE DESCRIPTION

Figure 1: Building F-10

4.0 SITE PLANNING

4.1 Methodology

4.2 Assumptions

4.2.1 Net Explosive Weight

4.2.2 Facility Boundaries

4.2.3 Public Transportation Routes

4.2.4 Electrical

4.3 Reference Documentation

5.0 EXPLOSIVE SITING DISTANCES

Figure 2: Building F-10 Site Location

Figure 3: Building F-10 Layout

6.0 SITING REQUIREMENTS

7.0 GLASS BREAKAGE ASSESSMENT

8.0 ELECTROMAGNETIC RADIATION RESTRICTIONS and RF CONTROLS

9.0 ENGINEERING CONTROLS

10.0 ADDITIONAL CONSIDERATIONS

11.0 SUMMARY OF CONSTRAINTS

12.0 FENCING AND PLACARD RESTRICTED AREAS

13.0 LIGHTNING PROTECTION

14.0 PERSONNEL LIMITS

Figure 4: Building F-10 Ordnance Ground Safety Points

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that

ACRONYMS

AHJ Authority Having Jurisdiction ESO Explosive Safety Officer ESP Explosive Site Plan GSFC Goddard Space Flight Center NEW Net Explosive Weight PTR Public Traffic Route QD Quantity Distance RF Radio Frequency T&E Test and Evaluation WFF Wallops Flight Facility

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that

1.0 GOVERNING STANDARD

Safety Standard for Explosives, Propellants and Pyrotechnics, NASA-STD-8719.12, is the document that is used for all NASA installations involved in explosive storage, handling, or processing, and complies with the cardinal principle for explosive safety. It also is the document upon which this Explosive Site Plan, ESP, was developed.

2.0 SCOPE

This ESP defines the process of performing and documenting an analysis of Building F-10, and storage involving energetic material with regard to explosive storage process. Building F-10 is located on the western end of Wallops Flight Facility (WFF) utilized for testing, evaluation, and integration of space flight components, with a restricted area specifically designated and set aside from other portions of the building. The process includes evaluations of blast, fragment, protective construction; grounding, bonding, and lightning protection systems; and electrical installations and local requirements.

This ESP provides information on the facility configuration. All receipts and movements of energetic materials shall comply with the storage requirements and limits of this ESP. Waivers to the requirements of this ESP shall be approved by the Goddard Space Flight Center (GSFC) Explosive Safety Officer (ESO), who is located in the WFF Safety Office, 30 days in advance for special projects. With the exception of Quantity Distances (QD) and explosive storage capacities, associated database inventory information and monthly reporting requirement will consistently change due to material receipts and movement.

3.0 SITE DESCRIPTION

Building F-10 is located on the western side of WFF main base. The facility consists of a multipurpose building used for administrative offices, machine shop, laboratory functions, Testing and Evaluation (T&E), and integration into systems.

Figure 1 displays a picture of Building F-10.

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that this is the correct version.

Figure 1: Building F-10

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that

4.0 SITE PLANNING

Building F-10 constitutes an explosive site used for storage of explosive articles and pyrotechnics for WFF projects. The facility is used for short-term explosives storage, testing and evaluation, and integration into systems of hazard class 1.4.

4.1 Methodology

Decisions regarding the siting of Building F-10 were made in the early 2014. The applicable documents that were utilized are listed in the Reference Documentation section of this document.

4.2 Assumptions

4.2.1 Net Explosive Weight

The maximum Net Explosive Weight (NEW) cumulative allowed in Building F-10 is 100 lbs. of hazard class 1.4. No external hazard area applies to this building.

Storage and use of explosive articles and systems is limited to the following rooms: N119 (Vacuum Lab Area and Storage), N121 (Spin/Deployment Area), W-100, N101, & N103 (Integration Areas), and N125 (T&E High Bay Area).

4.2.2 Facility Boundaries

The facility boundaries are identified in Figure 2, Building F-10 Site Location Map.

4.2.3 Public Transportation Routes

Public Transportation Route (PTR) distances do not apply to Building F-10.

4.2.4 Electrical

Building F-10 is fed by three separate service transformers: 12,470V is stepped down to 480/277V by a 1500KVA transformer. 12,470V is stepped down to 208/120V by a 500KVA dry transformer. 12,470V is stepped down to 480/277V by a 500KVA dry transformer.

4.3 Reference Documentation

Listed below are the various documents that were referenced in creating this ESP:

1. NASA-STD-8719.12, Safety Standard for Explosives, Propellants, and

Pyrotechnics

2. Air Force Manual 91-201, Explosive Safety Standards, 12 January 2011

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that

3. Department of Defense Explosive Safety Board TP 15 3 May 2010

5.0 EXPLOSIVE SITING DISTANCES

Limited amounts of hazard class 1.4 materials are stored in an approved magazine, located in room N-119 (Figure 3: Building F-10 Layout), grounded to facility grounding points. All items within the approved magazine shall be in approved storage/shipping containers.

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or

Figure 2: Building F-10 Site Location Map

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or

Figure 3: Building F-10 Layout

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that

6.0 SITING REQUIREMENTS

The QD are the acceptable minimum separation distances for storing and handling explosives. Siting was based on Hazard Division 1.4 Quantity-Distance; Table XXIV of the NASA-STD-8719.12, Safety Standard for Explosives, Propellants, and Pyrotechnics.

7.0 GLASS BREAKAGE ASSESSMENT

Assessment of glass breakage is not applicable to Building F-10.

8.0 ELECTROMAGNETIC RADIATION RESTRICTIONS and RF CONTROLS

Currently there are no EMR or RF controls applicable to Building F-10.

9.0 ENGINEERING CONTROLS

There are no engineering controls applicable to building F-10.

10.0 ADDITIONAL CONSIDERATIONS

All personnel within the hazard area shall complete NASA Wallops Flight Facility approved F-10 safety orientation.

Procedures and processes developed and certified shall include minimizing risk for all personnel within the hazard area.

Secondary Hazards exist within the applicable rooms, including electrical static discharge. Boundary tape, with appropriate signage, shows requirements and limitations.

11.0 SUMMARY OF CONSTRAINTS

Currently, there are no waivers or constraints applicable to Building F-10.

12.0 FENCING AND PLACARD RESTRICTED AREAS

Access to the storage locker is limited to those personnel essential for operations.

Visitors are denied access to the greatest extent possible. If visitor access is required they shall be escorted. Safety brief by qualified ordnance personnel are provided to transients. Explosive operations are suspended when transients are present, unless the transients are authorized for the operation. The building is placarded indicating these restrictions including explosive limits.

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or check with the 803/Configuration Management Specialist to verify that

The explosive storage locker has two locks. Access to the locker is provided by authorized F-10 ordnance handlers. Access list is posted on the exterior of the locker.

13.0 LIGHTNING PROTECTION

Building F-10 is an aboveground facility; lightning protection is required in the vicinity of the building. Certified ordnance grounds are provided throughout the building as shown in Figure 4: Building F-10 Ordnance Ground Safety Points.

14.0 PERSONNEL LIMITS

Personnel limits do not apply to this multi-use structure, limited to hazard class 1.4.

This is a WFF Safety Office Controlled Document. To verify this is the correct version check the WFF Safety Office library at \\code803\Documents\Approved Reference Materials\Safety Plans\ or

Figure 4: Building F-10 Ordnance Ground Safety Points

Ordnance Storage

File details come from the government source that posted it. Updated .