B01 75H70122R00036 Amendment 08.pdf
PDF 317 KB Posted
- Attached to
- Replace Heating Plant
- Solicitation number
- 75H70122R00036
About this file
This document contains an amendment to a solicitation for replacing the heating plant at Pine Ridge Hospital in Pine Ridge, South Dakota. The contractor shall furnish all labor, equipment, materials, and transportation necessary to perform Project 129162 to replace the existing heat plant, in accordance with the attached scope of work, technical provisions, and drawings. Key requirements include replacing the existing expansion tank with a new 515 gallon expansion tank, providing dual arm pumps or a 100% redundant pump assembly that fits in the existing space and meets maintenance requirements, and installing pump motors with shaft grounding rings. Questions from vendors are answered regarding pump specifications, motor speed and sensorless technology options, strainer requirements, and clarification that the expansion tank replaces rather than supplements the existing system. The response due date is extended to August 12, 2022.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The reason for this amendment is to answer vendor questions and to extend the due date for proposals.
A. Change the due date for the proposals to 2:00 PM Pacific Time, Friday, 12 August 2022.
B. See attached Questions and Responses.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
DES - SEATTLE
701 5th Ave, Suite 1600 Seattle, WA 98104
75H70122R00036
129162
1 3
07/29/2022
05/17/2022
Solicitation 75H70122R00036 Amendment 08 Project: Replace Heat Plant– Pine Ridge, SD
QUESTIONS AND RESPONSES
1. MUST THE PUMPS HAVE CERTIFIED FLOW TESTS?
RESPONSE: THIS WILL NOT BE REQUIRED.
2. DO THE PUMPS NEED TO HAVE SHAFT GROUNDING RINGS?
RESPONSE: YES. THE PUMP MOTORS MUST HAVE SHAFT GROUNDING RINGS WHETHER IN THE
SPEC. OR NOT.
3. DOES SPEC. SECTION 23 21 23, 2.1, D. APPLY TO THE SECONDARY PUMPS SINCE THEY ARE SPLIT‐
COUPLED?
RESPONSE: SPEC SECTION 23 21 23, 2.1, D DOES NOT APPLY TO SPLIT COUPLED PUMPS.
4. ARE DUAL ARM PUMPS THE ONLY ACCEPTABLE OPTION? WOULD A PUMP ASSEBLY BE
ACCEPTABLE?
RESPONSE: THE SECONDARY PUMPING SYSTEM SHALL BE 100% REDUNDANT OR N+1
REDUNDANCY. A PUMP ASSEMBLY THAT IS 100% REDUNDANT OR WITH N+1 REDUNDANCY
THAT MEETS THE PLANS AND SPECIFICATIONS WOULD BE ACCEPTABLE. HOWEVER, IT MUST FIT
IN THE EXISTING SPACE AND MEET ALL CODE CLEARANCE AND MAINTENANCE REQUIREMENTS.
THE CONTRACTOR IS RESPONSIBLE FOR ADDRESSING ANY DESIGN CHANGES OR PARAMETERS
SO THAT ALL EQUIPMENT AND SYSTEMS MEET THE ORIGINAL DESIGN AND FUNCTIONAL
INTENT.
5. ARE 1800 RPM MOTORS ACCEPTABLE?
RESPONSE: 1800 RPM SPEED PUMPS ARE NOT ACCEPTABLE. THE DESIGN RPM IS 3447 RPM.
6. ARE THE PUMPS BEING PROVIDED BY THE PUMP MANUFACTURE OR THE BUILDING CONTROLS
CONTRACTOR?
RESPONSE: THE GENERAL CONTRACTOR SHALL DETERMINE WHO PROVIDES AND INSTALLS
WHAT EQUIPMENT. THE PREFERRED APPROACH IS THAT THE VFD IS MOUNTED ON THE PUMP
AS SPECIFIED.
IT IS RECOMMENDED THAT THE VFDS COME FACTORY INSTALLED DUE TO THE LIMITED ROOM
AVAILABLE IN THE EXISTING HEATING PLANT SPACE. CONTRACTOR WILL BE REQUIRED TO
PROVE AND MAINTAIN ADEQUATE INSTALLATION, CLEARANCE, AND MAITENANCE SPACE
ACCORDING TO THE LATEST NEC REQUIREMENTS FOR ANY REMOTELY MOUNTED VFD OPTION.
7. WILL THE PUMPS BE SUPPLIED BY THE CONTROLS CONTRACTOR? IF SO, HOW WILL THEY HAVE
SENSORLESS TECHNOLOGY?
RESPONSE: THE GENERAL CONTRACTOR SHALL DETERMINE WHO PROVIDES AND INSTALLS
WHAT EQUIPMENT.
SENSORLESS TECHNOLOGY IS NOT RECOMMENDED FOR THE SECONDARY PUMP INSTALLATION.
THE EXISTING LOOP PUMP PRESSURE SENSORS ARE INSTALLED AND RECOMMENDED BE USED.
ANY NEW SENSORLESS TECHNOLOGY MUST BE ADEQUATELY PROGRAMMED AND SET UP AT
EACH NEW VFD AND THE GOVERNMENT WILL HOLD THE CONTRACTOR RESPONSIBLE FOR
CONDUCTING THIS STARTUP AND SETUP OPTION SO THAT THE SYSTEM WORKS 100% WITHOUT
HUNTING OR PRESSURE/FLOW PROBLEMS AFTER FINAL COMPLETION. AGAIN, ALTHOUGH
Solicitation 75H70122R00036 Amendment 08 Project: Replace Heat Plant– Pine Ridge, SD
POSSIBLE, THIS OPTION IS NOT RECOMMENDED BECAUSE OF THE CRITICALITY OF THE
PROGRAMMING AND STARTUP PROCEDURES REQUIRED FOR SENSORLESS TECHNOLOGY TO
WORK PROPERLY.
8. IS AN INTEGRAL STRAINER REQUIRED? THE SPEC CALLS FOR A MODEL THAT DOESN’T HAVE A
STRAINER.
RESPONSE: AN ADEQUATE PUMP STRAINER THAT PROTECTS THE PUMPS WILL BE REQUIRED.
EITHER INTEGRAL OR SEPARATE UP STREAM OF THE PUMP(S) IS ACCEPTABLE. EITHER OPTION
WILL REQUIRE A STARTUP STRAINER DURING CONSTRUCTION SO THE NEW PUMPS ARE
PROTECTED. THE STARTUP STRAINER SHALL BE REMOVED AND REPLACED WITH A NORMAL
OPERATIONAL STRAINER AFTER CONSTRUCTION IS 100% COMPLETED.
9. IS THE 515 GALLON EXPANSION TANK A BUFFER TANK OR AN EXPANSION TANK?
RESPONSE: THE DESIGN INTENT AND CONSTRUCTION REQUIREMENT IS TO REPLACE THE
EXISTING EXPANSION TANK WITH A NEW EXPANSION TANK AS SCHEDULED AND SPECIFIED
ACCORDING TO THE CONTRACT DOCUMENTS. A BUFFER TANK IS NOT REQUIRED DUE TO THE
SIZE OF THE EXISTING HEATING WATER SYSTEM AND WILL NOT BE ALLOWED FOR THIS PROJECT.
NO OTHER CHANGES