B01 75H70122R00036 Amendment 08.pdf

PDF 317 KB Posted

Attached to
Replace Heating Plant
Solicitation number
75H70122R00036
Issued by

About this file

This document contains an amendment to a solicitation for replacing the heating plant at Pine Ridge Hospital in Pine Ridge, South Dakota. The contractor shall furnish all labor, equipment, materials, and transportation necessary to perform Project 129162 to replace the existing heat plant, in accordance with the attached scope of work, technical provisions, and drawings. Key requirements include replacing the existing expansion tank with a new 515 gallon expansion tank, providing dual arm pumps or a 100% redundant pump assembly that fits in the existing space and meets maintenance requirements, and installing pump motors with shaft grounding rings. Questions from vendors are answered regarding pump specifications, motor speed and sensorless technology options, strainer requirements, and clarification that the expansion tank replaces rather than supplements the existing system. The response due date is extended to August 12, 2022.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The reason for this amendment is to answer vendor questions and to extend the due date for proposals.

A. Change the due date for the proposals to 2:00 PM Pacific Time, Friday, 12 August 2022.

B. See attached Questions and Responses.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

DES - SEATTLE

701 5th Ave, Suite 1600 Seattle, WA 98104

75H70122R00036

129162

1 3

07/29/2022

05/17/2022

Solicitation 75H70122R00036 Amendment 08 Project: Replace Heat Plant– Pine Ridge, SD

QUESTIONS AND RESPONSES

1. MUST THE PUMPS HAVE CERTIFIED FLOW TESTS?

RESPONSE: THIS WILL NOT BE REQUIRED.

2. DO THE PUMPS NEED TO HAVE SHAFT GROUNDING RINGS?

RESPONSE: YES. THE PUMP MOTORS MUST HAVE SHAFT GROUNDING RINGS WHETHER IN THE

SPEC. OR NOT.

3. DOES SPEC. SECTION 23 21 23, 2.1, D. APPLY TO THE SECONDARY PUMPS SINCE THEY ARE SPLIT‐

COUPLED?

RESPONSE: SPEC SECTION 23 21 23, 2.1, D DOES NOT APPLY TO SPLIT COUPLED PUMPS.

4. ARE DUAL ARM PUMPS THE ONLY ACCEPTABLE OPTION? WOULD A PUMP ASSEBLY BE

ACCEPTABLE?

RESPONSE: THE SECONDARY PUMPING SYSTEM SHALL BE 100% REDUNDANT OR N+1

REDUNDANCY. A PUMP ASSEMBLY THAT IS 100% REDUNDANT OR WITH N+1 REDUNDANCY

THAT MEETS THE PLANS AND SPECIFICATIONS WOULD BE ACCEPTABLE. HOWEVER, IT MUST FIT

IN THE EXISTING SPACE AND MEET ALL CODE CLEARANCE AND MAINTENANCE REQUIREMENTS.

THE CONTRACTOR IS RESPONSIBLE FOR ADDRESSING ANY DESIGN CHANGES OR PARAMETERS

SO THAT ALL EQUIPMENT AND SYSTEMS MEET THE ORIGINAL DESIGN AND FUNCTIONAL

INTENT.

5. ARE 1800 RPM MOTORS ACCEPTABLE?

RESPONSE: 1800 RPM SPEED PUMPS ARE NOT ACCEPTABLE. THE DESIGN RPM IS 3447 RPM.

6. ARE THE PUMPS BEING PROVIDED BY THE PUMP MANUFACTURE OR THE BUILDING CONTROLS

CONTRACTOR?

RESPONSE: THE GENERAL CONTRACTOR SHALL DETERMINE WHO PROVIDES AND INSTALLS

WHAT EQUIPMENT. THE PREFERRED APPROACH IS THAT THE VFD IS MOUNTED ON THE PUMP

AS SPECIFIED.

IT IS RECOMMENDED THAT THE VFDS COME FACTORY INSTALLED DUE TO THE LIMITED ROOM

AVAILABLE IN THE EXISTING HEATING PLANT SPACE. CONTRACTOR WILL BE REQUIRED TO

PROVE AND MAINTAIN ADEQUATE INSTALLATION, CLEARANCE, AND MAITENANCE SPACE

ACCORDING TO THE LATEST NEC REQUIREMENTS FOR ANY REMOTELY MOUNTED VFD OPTION.

7. WILL THE PUMPS BE SUPPLIED BY THE CONTROLS CONTRACTOR? IF SO, HOW WILL THEY HAVE

SENSORLESS TECHNOLOGY?

RESPONSE: THE GENERAL CONTRACTOR SHALL DETERMINE WHO PROVIDES AND INSTALLS

WHAT EQUIPMENT.

SENSORLESS TECHNOLOGY IS NOT RECOMMENDED FOR THE SECONDARY PUMP INSTALLATION.

THE EXISTING LOOP PUMP PRESSURE SENSORS ARE INSTALLED AND RECOMMENDED BE USED.

ANY NEW SENSORLESS TECHNOLOGY MUST BE ADEQUATELY PROGRAMMED AND SET UP AT

EACH NEW VFD AND THE GOVERNMENT WILL HOLD THE CONTRACTOR RESPONSIBLE FOR

CONDUCTING THIS STARTUP AND SETUP OPTION SO THAT THE SYSTEM WORKS 100% WITHOUT

HUNTING OR PRESSURE/FLOW PROBLEMS AFTER FINAL COMPLETION. AGAIN, ALTHOUGH

Solicitation 75H70122R00036 Amendment 08 Project: Replace Heat Plant– Pine Ridge, SD

POSSIBLE, THIS OPTION IS NOT RECOMMENDED BECAUSE OF THE CRITICALITY OF THE

PROGRAMMING AND STARTUP PROCEDURES REQUIRED FOR SENSORLESS TECHNOLOGY TO

WORK PROPERLY.

8. IS AN INTEGRAL STRAINER REQUIRED? THE SPEC CALLS FOR A MODEL THAT DOESN’T HAVE A

STRAINER.

RESPONSE: AN ADEQUATE PUMP STRAINER THAT PROTECTS THE PUMPS WILL BE REQUIRED.

EITHER INTEGRAL OR SEPARATE UP STREAM OF THE PUMP(S) IS ACCEPTABLE. EITHER OPTION

WILL REQUIRE A STARTUP STRAINER DURING CONSTRUCTION SO THE NEW PUMPS ARE

PROTECTED. THE STARTUP STRAINER SHALL BE REMOVED AND REPLACED WITH A NORMAL

OPERATIONAL STRAINER AFTER CONSTRUCTION IS 100% COMPLETED.

9. IS THE 515 GALLON EXPANSION TANK A BUFFER TANK OR AN EXPANSION TANK?

RESPONSE: THE DESIGN INTENT AND CONSTRUCTION REQUIREMENT IS TO REPLACE THE

EXISTING EXPANSION TANK WITH A NEW EXPANSION TANK AS SCHEDULED AND SPECIFIED

ACCORDING TO THE CONTRACT DOCUMENTS. A BUFFER TANK IS NOT REQUIRED DUE TO THE

SIZE OF THE EXISTING HEATING WATER SYSTEM AND WILL NOT BE ALLOWED FOR THIS PROJECT.

NO OTHER CHANGES