This document contains questions and answers regarding solicitation number 75H70122R00036 to replace the heating plant at Pine Ridge Hospital in Pine Ridge, South Dakota. The contractor shall demolish the existing heating plant and domestic hot water systems and install a new hydronic heating plant and domestic hot water heaters. Notable requirements include installing a new 3-inch domestic cold water line and 2.5-inch lines to the new water heaters in lieu of what is shown on the plans. The contractor shall also demolish and cap the existing cold water makeup lines to the boiler and not provide any new domestic makeup water to the new heating plant. Grooved schedule 40 carbon steel piping will be accepted for all piping 2.5 inches and larger in lieu of welded or flanged piping. Type K or L copper will be allowed for piping 2 inches and smaller.
The document provides clarification on connection points for the domestic hot water and questions regarding the makeup water lines, glycol feed system, and acceptable piping materials. It aims to ensure the successful replacement of the heating plant and domestic hot water systems at Pine Ridge Hospital in Pine Ridge, South Dakota in accordance with solicitation number 75H70122R00036.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
The reason for this amendment is to provide a list of questions/answers.
DES - SEATTLE
701 5th Ave, Suite 1600 Seattle, WA 98104
75H70122R00036
129162
1 3
06/08/2022
05/17/2022
Solicitation 75H70122R00036 Amendment 02 Project: Replace Heat Plant– Pine Ridge, SD
QUESTIONS AND RESPONSES
Q1. There is no point of connection shown for the domestic hot water near the new DHW tanks where we connect to existing. I assume that it is where the 90 elbow is shown on the right‐hand side of the right tank?
A1. Please refer to Sheet M4 Demo Plan below. The point of disconnection of the hot water is shown and circled in red below. However, this may be tricky since there is no isolation valve on the main above if that pipe must be demolished in order to get the old hot water heaters out and the new ones in. This may require a shutdown of the domestic water for the facility. This will have to be closely coordinated with hospital leadership staff during construction if that is the case.
Q2. The domestic cold water to each new DHW tank is shown as 1‐1/4” and the domestic cold leaving the DHW tanks is shown as 3”? Is this correct?
A2. Contractor shall provide a new 3‐inch domestic cold‐water line size up until it branches to each new water heater in lieu of what is shown on the plan. Contractor shall then provide a 2‐1/2‐inch line size to connect to each water heater to match the water heater connection size in lieu of what is shown on plans which is good for approximately 470 non‐flush valve fixture units or 140 GPM @ 8 Ft/sec according to the UPC. Contractor shall provide a new 3‐inch domestic hot water pipe size leaving each new water heater as shown on plan.
Solicitation 75H70122R00036 Amendment 02 Project: Replace Heat Plant– Pine Ridge, SD
Q3. There is a 1‐1/4” make‐up water line shown running across the top of the boiler? What is the intent here? I do not recommend a automatic make‐up water to the boiler system because if a leak occurs it will simply continue to fill the system and dilute the glycol.
A3. There are actually two new make up water lines shown on the drawings. Contractor shall demolish and cap both existing cold‐water lines at the point of disconnection shown on plans and not provide any new domestic makeup water to the new heating plant in lieu of what is shown on plans.
Q4. I do not see a glycol feeder shown anywhere on the plans only a pot feeder?
A4. Any new glycol feed system is not shown on the plan and is outside of the scope of this contract.
Q5. I see that grooved mechanical couplings are allowed for domestic but grooved is not mentioned in the
Hydronic Piping 23.21.13 ‐ will grooved couplings be approved on this project?
A5. Yes, grooved Schedule 40 carbon steel pipe will be accepted in lieu of welded or flanged piping called out in the specification.
Q6. The specs call for 2‐1/2” and larger hydronic piping to be butt welded or flanged welded. Can we use groove sch 40 piping in lieu of welding to match the piping we just installed in the new chiller plant?
A6. Yes, I would accept grooved Schedule 40 carbon steel for all piping 2.5 inches and larger in lieu of welded or flange welded piping that is called out in the specification.
Yes, I would accept type K or L copper for piping 2 inches and smaller in lieu of what is called out in the specification. Type M copper will not be allowed.