This solicitation requests proposals for the Georgeville Wastewater System Improvements project located in Goldendale, Washington. The Indian Health Service intends to award a firm fixed price construction contract to upgrade the wastewater system owned by the Yakama Nation. Offerors must have a small business size under NAICS code 237110 with a $39.5 million standard. The scope of work includes construction activities to improve the sewer system. The period of performance is 120 calendar days with a construction magnitude between $500,000 and $1,000,000. Proposals are due by April 16, 2020 and the agency will use the lowest price technically acceptable source selection method. The solicitation instructions and documents are available on SAM.gov and potential offerors must check for amendments regularly.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00003 04/7/2020

1 4

DES Seattle Office 701 5th Ave, Suite 1600 Seattle, WA 98104

See Block 6

75H70120R00026

2/25/20

X

See continuation page.

X

PO-18-M55

X X

SF 30 Continuation Page

75H70120R00026-A00003 Page 2 of 4

Amendment A00003 – SF 30, Block 14 (Cont’d)

1. The following questions received in response to this solicitation have been answered:

NO. QUESTION ANSWER

12 Washington L&I considers any piping work connected to a pressured piping system to be classified as Pipefitter; therefore, the gravity drainfield is connected to a pressure piping system foC15:D22r supply and requires a pipefitter for the drainfield work.

Please let us know if this federal project on tribal lands would have a different determination than of

WA L&I.

This project does not include a gravity drainfield.

Further, the project’s process piping would not fall under a pipefitting classification. The U.S. Department of Labor Wage Determination, Attachment J07 applies to any resulting contract award.

13 The only apparent location CSTC is shown on the plans is below the Control Building which requires approximately 5 tons of CSTC. How was the estimated bid qty of 100 ton developed?

There are several areas within specifications that include Crushed Stone Top Course (CSTC). For example, specification 31 05 15 3.01, CSTC is to be spread to provide an access road to the controls enclosure (approx. 42 tons). Also Per 31 23 15 a minimum of 6-inches of structural fill is to be placed underneath foundations, footings, tanks, and slabs.

14 Is there a clause for variation in estimated quantities in the contract?

Section I is revised to include FAR 52.211-18 Variation in Estimated Quantity. Note, B.4. states "The quantities are provided in the price schedule are estimates for evaluation purposes only. The Government is not obligated to order the estimated amounts specified in the schedule. The estimates provided do not establish any minimum purchase limit for which the Government is obligated”. Further, Attachment J02 General

Requirements, states at Section 01 22 00, paragraph

1.02B. "The contractor shall be paid for actual quantities installed based on the quantities measured in the field. The actual amounts of work completed and materials furnished may differ from estimated quantities. The contractor shall make no claim for damages, anticipated profits, or otherwise, on account of differences between the estimated amounts and the actual amount of work performed and materials furnished."

15 Sheet CU-06 Note B, this grading work associated with the native material for windrows and drainfield subgrade prep is substantial. What bid item should this work be incorporated into as site grading (Item 8) appears to be grading for surface drainage only?

Include grading for the drip field in CLIN 0008. See modified Specification Section 01 22 00 – 2.02 –

Paragraph 8 (below). A conformed copy of the specification will be provided up on award.

16 Please confirm a specialty plumber’s license per

40 23 10-1.04.A is not required for general contractors licensed in the state of WA.

Per line 39 of the table labeled "MATERIAL

SUBMITTAL REVIEW FORM - CONSTRUCTION"

in Section J, Attachment J02, a Plumber's License is a required submittal.

17 Due to the tank lead time of up to 4 months with the caveat that this is contingent on COVID-19 restrictions, are there any inclement weather clauses in the contract should the work be performed in winter?

FAR Clause 52.249-10 Default (Fixed-Price

Construction) is included and accounts for delays caused by unusually severe weather. If found necessary, IHS may extend the Period of Performance.

75H70120R00026-A00003 Page 3 of 4

18 Items 13 and 15 both include excavation, but it appears the structural and rock excavation CLINs quantities include the excavation for these structures. Please clarify the excavation costs and associated CLINs.

Excavation costs for the equalization tank and filtration unit should be included in CLINs 6 and 7. They were referenced in error under CLINs 13 and 15 in Section

01 22 00 Unit Prices. See modified Specification

Section 01 22 00 – 2.02 – Paragraphs 13 and 15

(below). A conformed copy of the specification will be provided up on award.

19 I am unable to reach the Yakama Nation TERO

Office. How can I find out the TERO requirements for this project?

The Yakama Nation TERO office is closed due to being deemed non-essential during this time. They have provided an alternate contact for bidders. Please reach out to George_lee@yakama.com and he can provide the TERO requirements.

20 Can another site visit be held for those who were unable to attend the original site visit date?

No, another site visit will not be scheduled. Please send any and all questions regarding the site to toby.hayden@ihs.gov.

21 We have been advised by one of the principle product suppliers for the project that there will be long lead time requirements, impacting the commencement of work on the project. Please be advised that as described in Paragraph B.8 of

Section B, the Notice to Proceed for the project will likely require adjustment pending the delivery of the needed componentry.

Once award is made, the IHS will communicate with the awardee regarding submittals and lead times prior to issuance of the Notice to Proceed (NTP) which initiates the 120 day period of performance. If there are issues with lead times due to delays and closures during the pandemic, that will be taken into account and an extension will be considered.

2. Specification Section 01 22 00 – 2.02 is modified as follows. Changes are marked in RED text.

8. Site Grading

a. Measurement: By the job.

b. Basis of Payment: Includes all labor, tools, equipment, and materials required for the grading of the site to prevent water from flowing into excavation, maintain existing drainage, direct drainage away from structures to prevent ponding, removal of all objectionable materials, and all grading for drip disposal field subgrade preparation as specified.

13. Fiberglass Reinforced Plastic (FRP) Equalization Tank

a. Measurement: By the job.

b. Basis of Payment: Includes all piping, fittings, labor, tools, equipment and materials required to furnish and install the prefabricated tank, including but not limited to prefabricated concrete deadmen, anchoring system, access riser pipe, access riser lids, water tightness testing, excavation, dewatering, trenching, laying and jointing pipe, backfill and compaction, and all other incidentals required to complete the work as specified.

15. Packaged Recirculating Packed Bed Filtration Unit

a. Measurement: By the job.

mailto:toby.hayden@ihs.gov

75H70120R00026-A00003 Page 4 of 4

b. Basis of Payment: Includes all pipe, elbows, fittings, labor, tools, equipment, and materials required for the furnishing and installation of a recirculating, attached growth media textile filtration system, including but not limited to the recirculating tank, pumps, textile media filter, excavation, dewatering, trenching, backfill and compaction, integration into the control panel, training, commissioning and startup, and all other incidentals required to complete the work as specified.

3. Section I is revised to include the following clause:

CLAUSE TITLE DATE

52.211-18 Variation in Estimated Quantity Apr 1984

4. The proposal due date is hereby extended from April 9, 2020 to April 16, 2020.

5. All other terms and conditions remain unchanged.

Revised SF1442 is provided. Offerors are reminded to acknowledge all amendments when submitting proposals in accordance with the RFP requirements.

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

75H70120R00026

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Indian Health Service - Portland Area Office is issuing Request for Proposals (RFP) 75H70120R00026

Project Title: Georgeville Wastewater System Improvements

Location: Georgeville, WA; Klickitat County

Davis Bacon Act Wage Determination WA20200031, dated January 24, 2020 is applicable to this solicitation and resulting contract unless modified prior to award. The most up-to-date version of this wage determination will be incorporated at award.

This RFQ is being solicited as 100% Small Business Set Aside under NAICS 237110, Water and Sewer Line Related Structures Construction; $39.5M Size Standard.

Magnitude of Construction is $500,000 and $1,000,000.

Site Visit: March 10, 2020 at 9:30am PST; See FAR 52.236-27, Site Visit (Construction) Alt I, for details.

Proposal Due Date: April 16, 2020 no later than 2:00pm PST.

See Item 7

Toby Hayden 503-414-5524 or toby.hayden@ihs.gov

PO-18-M55

1 3602/25/2020 local time 04/16/2020

2:00pm

FAR 52.211-10

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE