This document provides an amendment to a solicitation for the design and construction of permanent station facilities in Vallejo, California. The solicitation is issued by the U.S. Coast Guard under number 70Z04719RPVALJO00.
The amendment extends the proposal due date from October 4, 2019 to October 11, 2019 at 2:00 PM EST. It also provides responses to twenty-three questions submitted in response to the solicitation. The responses clarify requirements around mechanical systems, exterior windows, kitchen hood specifications, roofing materials, telecommunications equipment loads, and other project details. Utility rate information from 2018-2019 is appended for reference in conducting life cycle cost analysis.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PROVIDE PERMANENT STATION FACILITIES, VALLEJO, CA
THE PROPOSAL DUE DATE FOR PHASE II HAS BEEN EXTENDED FROM OCTOBER 4, 2019 BY 2:00 PM EST TO
OCTOBER 11, 2019 BY 2:00 PM EST.
(SEE CONTINUATION PAGES)
U.S. Coast Guard Facilities Design & Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513
70Z04719RPVAJO00
1 8
10/01/2019
04/30/2019
70Z04719RPVALJO00
SOLICITATION NO. 70Z04719RPVALJO00 IS AMENDED AS FOLLOWS:
Specification Section 01800, Paragraph 1.12.1
DELETE
1.12.1 Requirements:
The mechanical design work and construction shall conform to the latest ASHRAE manuals and standards, ICC International Mechanical Code (IMC), California Title 24, SMACNA, 2007 Energy Independence and Security Act (EISA 2007), Leadership in Energy and Environmental Design for New Construction (LEED-NC), NFPA and the Energy Policy Act (EPACT) as updated in 2009. Where IMC and California Title 24 conflict, California Title 24 shall take precedence. EPACT requires a 30% energy reduction from the baseline set forth in ASHRAE
90.1. Use ASHRAE 90.1-2013 for establishing the baseline energy model. EPACT also requires advanced metering of utilities with meters that automatically transmit daily usage to a centralized data base. Outside design condition shall be based on ASHRAE’s 1% DB and corresponding WB temperature for cooling and 99% DB temperature for heating, or documented local historic condition, whichever is more stringent.
DHS and Components (like the Coast Guard) are required to include ENERGY STAR or FEMP labeled/approved products. When labeled/approved products are not available, the Representative in writing, who will need to obtain approval from DHS that said products meet the exemptions at FAR 23.204.
INSERT
1.12.1 Requirements:
The mechanical design work and construction shall conform to the latest ASHRAE manuals and standards, ICC International Mechanical Code (IMC), California Title 24, SMACNA, 2007 Energy Independence and Security Act (EISA 2007), Leadership in Energy and Environmental Design for New Construction (LEED-NC), NFPA and the Energy Policy Act (EPACT) as updated in 2009. Where conflicts are noted, federal codes/mandates/criteria shall take precedence, followed by California Title 24, then IMC and other industry codes and standards.
EPACT requires a 30% energy reduction from the baseline set forth in ASHRAE 90.1. Use ASHRAE 90.1-2013 for establishing the baseline energy model. EPACT also requires advanced metering of utilities with meters that automatically transmit daily usage to a centralized data base. Outside design condition shall be based on ASHRAE’s 1% DB and corresponding WB temperature for cooling and 99% DB temperature for heating, or documented local historic condition, whichever is more stringent
DHS and Components (like the Coast Guard) are required to include ENERGY STAR or FEMP labeled/approved products. When labeled/approved products are not available, the Representative in writing, who will need to obtain approval from DHS that said products meet the exemptions at FAR 23.204.
Specification Section 01800, Paragraph 1.12.1.10
DELETE
1.12.1.10 Provide specialized ventilation systems in accordance with OSHA, IMC, or the Industrial Ventilation Handbook. Utilize explosion proof exhaust fans when noted.
Supplemental make-up air shall be provided as required. Welding and battery charging systems shall be interlocked with the exhaust systems such that the equipment cannot be energized until air flow is proven.
INSERT
1.12.1.10 Provide specialized ventilation systems in accordance with OSHA, IMC, or the Industrial Ventilation Handbook. Utilize explosion proof exhaust fans when noted.
Supplemental make-up air shall be provided as required. Welding systems shall be interlocked with the exhaust systems such that the equipment cannot be energized until air flow is proven.
Specification Section 01800, Paragraph 1.12.1.12
DELETE
1.12.1.12 Provide a UL listed, stainless steel, wash-down galley exhaust hood IAW NFPA 96 for the Food Prep & Cooking areas. Provide hood fire extinguishing equipment IAW NFPA 96. Make-up air for the hood shall be integrated with the HVAC system for the kitchen area. Kitchen area shall be maintained at a space temperature heating set point of 68 degrees F and a cooling set point of 76 degrees F.
INSERT
1.12.1.12 See section 1.7.5.7 for kitchen hood requirements.
Specification Section 1800, Paragraph 1.7.2.2.1, Bullet number 2
DELETE
Face Sheet: Zinc Metallic Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, SS Grade 37, G90 (Z275), with minimum 22 gage uncoated thickness.
INSERT
Face Sheet: Zinc Metallic Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, SS Grade 37, G90 (Z275), with minimum 22 gage uncoated thickness; or Aluminum-zinc alloy-coated steel sheet complying with ASTM A 792/A 792M, Class AZ50 (Class AZM150) coating designation; structural quality. Prepainted by the coil-coating process to comply with ASTM A 755/A 755M. Thickness must be 22 gauge (.034 inch) or thicker.
Specification Section 1800, Paragraph 1.7.4.4.2
DELETE
1.7.4.4.2 Exterior windows shall be operable. Window configuration (arrangement of additional mullions) shall be coordinated and compatible with the Contractor’s exterior design proposal.
All exterior windows, storefront and curtainwall frames shall be thermally broken extruded aluminum. Finish shall either be heavy anodized Architectural Class I (0.7mil or thicker AA- M10-C22-A41) or a 20 year “Kynar” color finish. Windows shall meet AAMA/NWWDW 101/I.S. 2-97 Structural Performance testing for AW class windows. Window and other exterior glass shall be low “E” meet the requirements of the Large Missile Test of ASTM E 1996 as well as IBC/ASCE 7-10 requirements for the given wind speed/pressure. Laminated glass used to make up the insulating glass units (and spandrel glass that might be used) shall consist of not less than two 1/8” thick panes of glass bonded together with a minimum 0.09 inch thick polyvinyl-butyral (PVB) interlayer. Insulating glass units shall be installed in frames using structural silicone sealant.
INSERT
1.7.4.4.2 Exterior windows must be operable, with the exception of clerestories and round windows. Window configuration (arrangement of additional mullions) shall be coordinated and compatible with the Contractor’s exterior design proposal.
All exterior windows, storefront and curtainwall frames shall be thermally broken extruded aluminum. Finish shall either be heavy anodized Architectural Class I (0.7mil or thicker AA- M10-C22-A41) or a 20 year “Kynar” color finish. Windows shall meet AAMA/NWWDW 101/I.S. 2-97 Structural Performance testing for AW class windows. Window and other exterior glass shall be tinted, low “E” (Solarban 60 or similar product by another manufacturer), and meet the requirements of the Large Missile Test of ASTM E 1996 as well as IBC/ASCE 7-10 requirements for the given wind speed/pressure. Laminated glass used to make up the insulating glass units (and spandrel glass that might be used) shall consist of not less than two 1/8” thick panes of glass bonded together with a minimum 0.09 inch thick polyvinyl-butyral (PVB) interlayer. Insulating glass units shall be installed in frames using structural silicone sealant.
THE FOLLOWING QUESTIONS WERE RECEIVED IN RESPONSE TO THE
SOLICITATION:
1. Section 1800-1.3.2.4f -In order to provide a Life Cycle Cost Analysis, please provide the utility rates for gas and electricity.
Answer: See enclosed utility rates.
2. Section 1800-1.12.13 states the telecom rooms shall be conditioned to 70-75 degrees F, and maintain 30-50% relative humidity. The minimum 30% humidity would indicate that humidification is required. Please verify if humidification is required for the telecom rooms.
Answer: See Amendment No. 0007, Question 1.
3. Section 1.12.1.8 indicates that Boat Maintenance Bay shall be heated to maintain 65F. Section
1.12.1.7 Provide ventilation for the Boat Bay in accordance with ASHRAE 62.1 and IMC.
Please indicated if there is a temperature differential similar to mechanical and electrical rooms that the room is allow to be at in relation to the outdoor dry bulb temperature.
Answer: There is no temperature differential requirement for the Boat Bay. RFP Sections 01800-1.12.1.7 and 01800-1.12.1.8 remain unchanged.
4. 1.12.1.10 indicates Welding and battery charging systems shall be interlocked with the exhaust systems such that the equipment cannot be energized until air flow is proven.
Please indicate if there will be any battery storage in the building and if any exhaust will be required for the storage area. Please indicate the type of batteries utilized.
Answer: The requirement for battery charging stations does not exist at Station Vallejo.
See amended Specification Section 01800, Paragraph 1.12.1.10 above.
5. Section 1.12.1.3 states that the telecom room requires a dedicated system to handle the internal equipment loads If the room internal equipment loads do no warrant a dedicated system then the telecommunication room shall be conditioned by positive air flow from an air-conditioned space at a minimum of 10 air changes per hour. Please indicate loads.
Answer: Refer to section 01800-1.16.8 for estimated telecom equipment loads.
6. 1.12.1.12 Provide a UL listed, stainless steel, wash-down galley exhaust hood IAW NFPA96 for the Food Prep & Cooking areas. Provide hood fire extinguishing equipment IAW NFPA 96.
Make-up air for the hood shall be integrated with the HVAC system for the kitchen area. The plans provided indicate that the galley is only 275 sq feet and is t be provided with a microwave w/range vent. Indicating a residential type exhaust vent. Please confirm kitchen hood exhaust requirements.
Answer: A residential type exhaust vent hood w/microwave described in 1800-1.7.5.7 is required. See amended Specification Section 01800, Paragrarph 1.12.1.12 above.
7. 1.12.1.18 Mechanical equipment shall be located inside dedicated mechanical rooms or along the west exterior fence. In general, roof mounted equipment is not acceptable. The site plans provided indicate that the west fence is less than 20’ from the building. This would not be adequate room for a condensing unit, chiller, cooling tower, or packaged unit with required clearances. Please verify where equipment can be placed with adequate clearances.
Answer: The Coast Guard has provided the mechanical requirements and a preliminary site layout. It is the responsibility of the Design/Build contractor to determine mechanical systems, types of equipment, etc. and suggest a suitable location within the available site area. The Coast Guard will work with the Designer of Record during the design stage to explore alternatives for equipment locations when systems are selected and site areas are further defined.
8. 1.12.1.2 All areas of the building, with the exception of the boat maintenance bay, maintenance equipment room, Janitor’s closet, and the mechanical/electrical room, shall be conditioned to meet ASHRAE 55 standards, to 70F in the winter and 76F in the summer in accordance with standard practices of the area Please confirm if the Boatswain Workstation, Flam Storage, and Boatswain Workstation are required to be conditioned to maintain 76F in the summer. The rooms are a distance away from the other climate controlled areas, and would require a separate system. If conditioning is required, can rooms be located close to main building to minimize separate mechanical systems.
Answer: The Boatswain Workstation, Flam Storage, and Boatswain Storage cannot be relocated to the opposite side of the Boat Bay and do require conditioning. The Design/Build Contractor is responsible for providing a mechanical solution that meets RFP requirements.
9. Section 1.1.3 states several codes and standards the construction should comply with including California Title 24. Title 24 has conflicts with several of the requirement listed such. Please indicate which code or standard takes precedent. Please confirm if the building is to meet Title 24 standards.
Answer: Station Vallejo is located on property owned by the City of Vallejo and it is our intent that all construction at this site comply with California Title 24 standards to the maximum extent possible so long as those standards do not conflict with the federal standards applicable to this solicitation.
10. Section 1.1.3 states only a few UFCs that are required to be complied with. Please confirm if these are the only UFCs in the project requirements. Please confirm that all other UFCs such as UFC 3-401-01 Mechanical Engineering are not in the project requirements.
Answer: UFC 3-401-01 Mechanical Engineering is not listed in the RFP and is not applicable to this project. You are required to comply with all UFCs referenced throughout the RFP including but not limited to those listed in section 1.1.3. It is your obligation to review the RFP in its entirety and to be in compliance with all UFCs which are referenced in the RFP including the UFCs referenced in paragraphs 1.1.1.2., 1.1.3, 1.4.8, 1.8.1 and 1.10.2 of Section 01800 as well as any other UFCs referenced in the documents released with this solicitation.
11. In section 1.7.2.2.1 states provide 16" standing seam metal roofing in 22 gauge galvanized steel. This project being on the water, galvanized steel will rust before 20 years and can not warrant within 1/2 mile of saltwater. Can .040 aluminum be substituted?
Answer: The following roofing is acceptable in addition to galvanized steel roofing:
"Aluminum-zinc alloy-coated steel sheet complying with ASTM A 792/A 792M, Class AZ50 (Class AZM150) coating designation; structural quality. Prepainted by the coil-coating process to comply with ASTM A 755/A 755M. Thickness must be 22 gauge (.034 inch) or thicker." See amended Specification Section 01800, Paragraph 1.7.2.2.1 above.
12. Is enhanced commissioning required for this project?
Answer: As listed in RFP Section 1800-1.3.2.5, enhanced commissioning is highly desirable but not required.
13. On sheets A-1 & A-2, construction note #9 referring to a recessed metal grid floor cannot be located on either sheet identifying the location of this flooring. Please confirm if this is to be an access flooring system and provide specifications.
Answer: See RFP Section 1800-1.7.3.4.1(f) for walk-off grating (metal grid floor) requirements. This provides the sizes and locations that note #9 on sheets A1 and A2 reference.
14. Section 1.12.1 Outside design condition shall be based on ASHRAE's 1% DB and corresponding WB temperature for cooling and 99% DB temperature for heating, or documented local historic condition, whichever is more stringent. Section 1.1.3 states to utilize UFC-3-400- 02 weather data. Please provide access to UFC-3-400-02 weather data for this location to determine outside air conditions.
Answer: All UFCs are available at the Whole Building Design Guide website, which is open to the public. A link specific to UFC 3-400-02 is https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-400-02.
15. Section 4.1 under the utility analysis does not any domestic water pressures available on site.
Please provide domestic water pressure available and indicate if a domestic water booster pump will be needed.
Answer: The Appendix E utility study/fire flow test and RFP sections provide all utility information the Coast Guard has available. Contractors can utilize the data provided or contact the POC listed in Appendix E for additional information.
16. 1.11.2.2 indicates all distribution water piping to be protected from freezing. Please confirm this is required based on the location of the project in Vallejo, CA
Answer: Yes, it is a project requirement to protect from water piping from freezing.
17. 1.11.2.5 Indicates that designs shall not create (and in renovations shall eliminate) "deadlegs" in the domestic hot water system. Non-recirculating domestic hot water supply pipes shall not exceed six (6) feet from the circulating main pipe. Please confirm if the dead leg is horizontal distance only, or if this includes the vertical drop to fixture or equipment.
Answer: See Amendment No. 0006, Question 4.
18. Is there a Title 24 report? For the low E glass, provide spec of Solarban and is the glass to be tinted? The exterior windows on sheet A-1 & A-2 appear to be fixed, section 01800-1.7 states they should be operable, do these windows need to be operable?
Answer: A Title 24 Report has not been performed for this project. Low E glass is to be similar to Solarban 60 or similar product by another manufacturer. Glazing to be tinted, color to be selected from manufacturer's standard colors and to be coordinated with COR.
All windows, with the exception of clerestories and round windows, must be operable. See amended Specification Section 01800, Paragraph 1.7.4.4.2 above.
19. 1.11.9.1 indicates to accommodate the number of drops required but does not state how many compressed air reels or drops will be required in the building. Please verify the quantity of compressed air reels required.
Answer: See drawing A4, which shows air reel drops in 125 Boat Bay (2x) and 127 Boatswain Storage.
20. The geotechnical report recommends drilled piers & caps due to the young bay mud in the soils. Can driven pilings be substituted in lieu of the recommended piers?
Answer: The Geotech report in Appendix D is for reference only, largely to provide preliminary information for bidding purposes. Section 1800-1.5 requires the successful contractor to conduct their own geotechnical investigation (See Section 1800, paragraph 1.5.1) and determine the appropriate foundation type based upon their findings (See Section 1800, paragraph 1.5.2)
21. There is no page limit mentioned in regards to the Organization Chart requirement. Will you please confirm the organization chart is not included in the 5 Page limit for this factor?
Answer: Confirmed, the organization chart is not included in the 5 Page limit for this factor.
22. In the interior on plan page A-1, there are two (2) sidelites in the mess/recreational room and one (1) sidelite in the fitness room on the first floor. On plan page A-2 there is one sidelite in the training room on the second floor. Will demountable frames be used in the interior? What is the height of the sidelite? Is there any areas needing fire-treated glass?
Answer: Sidelites shall be full height of the door they are adjacent to. Demountable frames are not a requirement for this project. Determination of fire treated glass is the responsibility of the Design/Build Contractor and shall comply with section 1800 1.10 and applicable codes and criteria.
23. Does the Government have any reason to believe California Environmental Quality Act (CEQA) review is to not be required for this project?
Answer: CEQA is not required because NEPA has been completed. See Environmental Documentation in Appendix K.
NOTE
Failure to acknowledge amendments may be cause for rejection of your offer.
Utilities 2018 Account # Rate Bill for Aug 18 Rate Changes
Electric A6 ‐ On peak $.56 per KWH ‐ Part Peak $.26 per KWH, Off peak .19 per KWH $2,865.97 Changes for Summer and Winter
Gas GNR1 ‐ $.92 per therm After 4K therms Rate is .67 $30.79 Changes every month
Water $4.17 per 748 Gallons $219.11, $113.12
Sewer Unable to provide rate information at this time. Call back in 1‐2 weeks. $72.88
Utilities 2019 Account # Rate Bill for Aug 19 Rate Changes
Electric A6 ‐ On peak $.58 per KWH ‐ Part Peak $.28 per KWH, Off peak .21 per KWH $318.01 Changes for Summer and Winter
Gas GNR1 ‐ $.90 per therm $9.59 Changes every month
Water $4.47 per 748 Gallons After 4K therms Rate is .67 $222.19
Sewer $46.35 Monthly Usage Charge for Medium Strength Comerical Is billed with our Property Tax