70Z04719RPVAJO00_Amendment_No._0004.pdf
PDF 554 KB Posted
- Solicitation number
- 70Z04719RPVALJO00
About this file
This is a solicitation for construction services to provide permanent station facilities in Vallejo, California. The solicitation seeks offers to design and construct administrative, boat maintenance, and berthing facilities at the specified location. Offerors must submit phase I proposals by May 8, 2019 and phase II proposals, if invited, by October 4, 2019. The estimated value of the base work and options is between $6 million to $9 million. The solicitation is issued by the U.S. Coast Guard Facilities Design and Construction Center. Relevant details include specifications for submitting questions, proposals, bonds, subcontracting plans, and evaluation criteria for phase I and II proposals.
70Z04719RPVAJO00 Amendment No. 0004
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PROVIDE PERMANENT STATION FACILITIES, VALLEJO, CA
AMENDMENT NO. 0004 IS ISSUED TO THOSE OFFERORS INVITED TO PHASE II ONLY.
PHASE II PROPOSALS ARE DUE BY 2:00 P.M. EST ON OCTOBER 4, 2019.
(SEE CONTINUATION PAGES)
U.S. Coast Guard Facilities Design & Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA
70Z04719RPVAJO00
1 6
08/20/2019
04/30/2019
70Z04719RPVALJO00
SOLICITATION NO. 70Z04719RPVALJO00 IS AMENDED AS FOLLOWS:
Section A - Solicitation /Contract Form - DELETE page 3 of 86, SF 1422 Solicitation, Offer, and Award issued on May 8, 2019 with Amendment No. 0001 and INSERT the attached page 3 of 86, SF 1442, Solicitation, Offer, and Award, which accompanies this amendment.
Section J, List of Attachments, DOLWage Determination: DELETE General Decision Number CA190007 Building, Heavy (Heavy and Dredging) and Highway – Modification No. 3 dated 02/22/2019 and INSERT General Decision Number CA20190007 Building, Heavy (Heavy and Dredging) and Highway – Modification No. 5 dated 07/26/2019, which accompanies this amendment.
Section L, Instructions, Conditions, and Notice to Offerors:
Paragraph L.3, Bonds: Add the following sentence to the end of the paragraph: “Offerors invited to submit proposals for Phase II of this procurement shall submit a bid guarantee with their Phase II proposal.”
Paragraph L.4, Instruction For Submitting Questions Regarding Solicitation: DELETE “The deadline for submitting questions is set as May 16, 2019.” and INSERT “The deadline for submitting questions for Phase II proposals is September 24, 2019.
Paragraph L.5, Proposal Submission Instructions: Add the following verbiage to the end of paragraph L.5(ii):
Phase II Proposal Format: Do not exceed the page limitations set forth in Section M below.
Non-Price Proposals will be 8 1/2” x 11” paper except for fold outs used for charts, tables or diagrams which may not exceed 11” x 17”. A page is defined as one face of a sheet of paper containing information. Font shall be Arial 12 Font or larger.
Paragraph L.6, Specific Phase I Instructions: Add the following verbiage to the end of the paragraph:
“SPECIFIC PHASE II INSTRUCTIONS:
Offerors are to submit proposals entitled “PROVIDE PERMANENT STATION FACILITIES, VALLEJO, CA. Phase II, Volume #2 Proposal” in three ring binders. Phase II proposals must include the following:
Executed SF1442 with acknowledgement of all amendments;
Price Proposal (Section B – Supplies or Services and Prices/Costs);
Bid guarantee;
Small Business Subcontracting Plan, if applicable; and
Documentation addressing the three (3) Phase II Evaluation Factors –Means and Method, Scheduling and Permitting, and Project Organization and Key Personnel.
Provide one original hard copy and three hard copies in binders. Tabs need to clearly identify each section of the binders. Volume # 2 shall also include a compact disc containing all the proposal files. Offerors must adhere to the Evaluation Factor page limits and requirements.
Section M, Evaluation Factors for Award: Add Paragraph M.5, Evaluation Factors for Phase II Proposals:
EVALUATION FACTORS FOR PHASE II PROPOSALS
Phase I evaluation ratings will not be carried forward into Phase II and will not be considered in the final best value determination for contract award.
Phase II Technical Factors are listed below, in descending order of importance:
Factor 5, Means and Methods Factor 6, Scheduling and Permitting Factor 7, Project Organization and Key Personnel
Offerors will receive an overall technical rating based on the assessment of ratings for each individual factor. The overall technical rating is approximately equal to price.
Technical Evaluation Factor 5 – Means & Methods
Page Limit: No more than 20 pages
Technical Approach. Provide a narrative that describes how the Offeror plans to accomplish the design and construction effort as required by the specification. Clearly address architectural/structural/mechanical/ electrical design, utilities, weather resistant features, and associated site work to display full understanding of project scope. The plan should address critical construction elements such as labor, materials and equipment. Discuss innovative, creative, or cost saving technical proposals (without identifying actual costs in the technical proposal). Betterments will not be accepted. All innovative, creative, or cost savings technical approaches are to be included as part of the total price.
Site Logistics. Provide a narrative that describes the Offeror’s site logistics plan, particularly related to any items which pose risks to schedule, quality of work, and USCG continuity of operations. Include approach for risks associated with logistics of material delivery (availability or lead time, etc.), sequencing of activities within the given site boundary, and protection of construction equipment and materials once on site.
Basis of Evaluation:
The contractor’s proposal will be evaluated based on the contractor’s identification and understanding demonstrated in response to the proposal requirements. The proposal will be evaluated based on, capability for reliable construction in the project location; durability and maintenance; and resistance to extreme weather/natural disasters (ex. heat, wind, or earthquake) common to the region. A higher rating may be given to an Offeror that demonstrates innovative, creative, or cost saving technical proposals (without identifying actual costs in the technical proposal).
Technical Evaluation Factor 6: Scheduling and Permitting
Page Limit: No more than 10 Pages
Schedule and Phasing. Provide a preliminary Critical Path Method (CPM) schedule from contract award, through design, construction, contract completion, and warranty period. Provide sufficient detail in the schedule to clearly show stages of design and construction, including any work restriction windows. The schedule should clearly show the logic and sequence of events necessary for the successful execution of the project. Identify any limitations/challenges to the schedule and how they will be addressed. Include a discussion of how the schedule will be monitored and controlled and updates communicated.
Permitting. Demonstrate the identification of and strategy for obtaining all required, local, state, and federal permits and environmental requirements (Specifications Section 1800-1.18 and Appendix K CATEX and BCDC Consultation) to ensure compliance, as well as the strategy for obtaining those permits. Proposal shall identify types of applicable permits (USACE, SWPP, SPCC, etc.) and associated schedule milestones.
Basis of Evaluation:
The contractor’s schedule will be evaluated based on realism in identification of critical activities, and conformance with contract specified durations and sequencing. The schedule logic will be evaluated for sequence of events necessary for the successful execution of the project milestones, and target durations from contract award, through design, construction, and warranty period. A schedule which shows an unreasonable amount of activities condensed into one duration and places additional cost or schedule risk on the Government may receive a lower rating. The Government will award the contract with the performance period in the RFP. Higher ratings may be given for identifying applicable permits outside of those identified in the RFP and explaining why they are required.
Technical Evaluation Factor 7: Project Organization and Key Personnel
Provide a narrative that includes information sufficient for the Government to evaluate the project organization, its management capabilities, its commitment to the project requirements, and its ability to execute a quality control plan. Describe the proposed key personnel’s management and quality control experience on two projects of similar size and complexity.
Similar scope and complexity means projects of similar building area and volume, construction type, functional use (e.g. administrative, boat maintenance, and berthing facilities). Submit location, owner, dollar value of performed work, and contact information. – Page Limit - No more than 5 pages.
Organizational Chart: The organizational chart shall be of sufficient detail to provide a clear picture of the project organization, showing all key personnel and their relationships to one another. Organization chart shall validate the QAM lines of authority in compliance with RFP section 01450-1.3.2, avoiding conflicts of interest.
Resumes: Provide current resumes (with dates) for the key personnel which include the contractor project manager, on-site superintendent, QA/QC manager, and Design Team Lead demonstrating each individual’s specific knowledge, experience and capability to perform the role assigned, including experience in relevant past projects. – Limit 2 pages per resume.
Basis of Evaluation:
The Government will evaluate the Offeror’s proposal related to the quality and depth of the management and experience of the proposed key personnel relative to their assigned duties, and on the ability of the Offeror to provide an integrated approach to project execution, while providing the highest quality product to the Coast Guard.
The narrative will be evaluated on the quality and depth of experience, as it relates to the size, scope, and complexity of this project, as well as against industry practice and RFP requirements.
The organizational chart will be evaluated for lines of authority, span of control, and risk.
Resumes will be evaluated as to the quality and depth of experience of the proposed key personnel, relative to the size, scope, and complexity of this project. A higher rating may be given to an Offer that clearly delineates that the proposed construction and design teams have successfully worked together on past projects.
Non-Technical Factor: Price
Submit the price in accordance with Section B - Supplies or Services and Prices/Costs.
Basis of Evaluation:
The total evaluated price will be calculated by summing the total for the base item and all options. The Government may use various price analysis techniques and procedures to evaluate the overall price. Examples of such techniques include, but are not limited to the following:
(i) Comparison of proposed prices received in response to the solicitation.
(ii) Comparison of proposed prices with the independent Government cost estimate.
(iii) Comparison of proposed pricing obtained through market research, parametric estimating methods, or historical information.
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
70Z04719RPVAJO00
U.S. Coast Guard Facilities Design & Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513
PROVIDE PERMANENT STATION FACILITIES, VALLEJO, CA
Provide all materials, labor, equipment, services, and all operations necessary to perform all work in accordance with applicable clauses, provisions, special contract requirements, specifications and drawings, as set forth in Section C.
NAICS CODE: 236220 Size Standard: $36.5M
Disclosure of Magnitude of Construction for the project is between $6,000,000 and $9,000,000 for the Base Item and all Option Items.
Phase II written proposals are due by 2:00 P.M. EST on October 4, 2019.
U.S. Coast Guard Facilities Design & Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513
Cheryl P. Allen 757-852-3415
3 8604/30/2019
10/04/2019
2:00 PM
See Section F
"General Decision Number: CA20190007 07/26/2019
Superseded General Decision Number: CA20180009
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California.
BUILDING CONSTRUCTION PROJECTS (excluding Amador County only);
DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the
Page 1 of 79beta.SAM.gov
8/6/2019https://beta.sam.gov/wage-determination/CA20190007/5/document contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 02/01/2019 2 02/15/2019 3 02/22/2019 4 05/03/2019 5 07/26/2019
ASBE0016-001 01/01/2019
AREA 1: MARIN, NAPA, SAN BENITO, SAN FRANCISCO, SOLANO, &
SONOMA COUNTIES
AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, Page 2 of 79beta.SAM.gov
Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 68.11 23.32 Area 2......................$ 43.81 31.22
ASBE0016-007 01/01/2019
AREA 1 : ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,
SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO
& YUBA COUNTIES
AREA 2: MARIN & NAPA COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
AREA 1......................$ 28.20 9.27
AREA 2......................$ 36.53 9.27
BOIL0549-002 10/01/2016
Rates Fringes
BOILERMAKER
(1) Marin & Solano Counties.$ 43.28 37.91
Page 3 of 79beta.SAM.gov
(2) Remaining Counties......$ 39.68 35.71
BRCA0003-001 08/01/2017
Rates Fringes
MARBLE FINISHER..................$ 32.60 15.31
BRCA0003-004 05/01/2017
AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,
SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES
AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY
COUNTIES
Rates Fringes
BRICKLAYER
AREA 1......................$ 39.66 20.76
AREA 2......................$ 42.34 25.83
SPECIALTY PAY:
(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.
(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.
(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.
BRCA0003-008 09/01/2017
Page 4 of 79beta.SAM.gov
Rates Fringes
TERRAZZO FINISHER................$ 35.14 16.87
TERRAZZO WORKER/SETTER...........$ 44.11 26.36
BRCA0003-010 04/01/2018
Rates Fringes
TILE FINISHER
Area 1......................$ 26.04 13.75 Area 2......................$ 26.36 15.97 Area 3......................$ 28.56 15.87 Area 4......................$ 26.69 15.31 Tile Layer Area 1......................$ 43.36 16.79 Area 2......................$ 43.02 18.19 Area 3......................$ 47.77 18.29 Area 4......................$ 44.64 18.21
AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba AREA 2: Alpine, Amador AREA 3: Marin, Napa, Solano, Siskiyou AREA 4: Sonoma
BRCA0003-014 08/01/2017
Rates Fringes
MARBLE MASON.....................$ 44.60 26.83
CARP0034-001 07/01/2018
Page 5 of 79beta.SAM.gov
Diver Assistant Tender, ROV Tender/Technician...........$ 47.65 32.52 Diver standby...............$ 52.61 32.52 Diver Tender................$ 51.82 32.52 Diver wet...................$ 97.17 32.52 Manifold Operator (mixed gas)........................$ 56.82 32.52 Manifold Operator (Standby).$ 51.82 32.52
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for
Page 6 of 79beta.SAM.gov that shift.
CARP0034-003 07/01/2017
Rates Fringes
Piledriver.......................$ 46.65 31.91
CARP0035-001 08/01/2018
AREA 1: MARIN, NAPA, SOLANO & SONOMA
AREA 3: SACRAMENTO, WESTERN EL DORADO (Territory west of an including highway 49 and the territory inside the city limits of Placerville), WESTERN PLACER (Territory west of and including highway 49), & YOLO
AREA 4: ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, & YUBA
Rates Fringes
Drywall Installers/Lathers:
Area 1......................$ 48.40 29.76 Area 3......................$ 43.02 29.76 Area 4......................$ 41.67 29.76 Drywall Stocker/Scrapper Area 1......................$ 24.20 17.29 Area 3......................$ 21.51 17.51 Area 4......................$ 20.84 17.29
CARP0035-009 07/01/2018
Marin County
Page 7 of 79beta.SAM.gov
CARPENTER
Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91
CARP0035-010 07/01/2017
AREA 1: Marin, Napa, Solano & Sonoma Counties
AREA 2: Monterey, San Benito and Santa Cruz
AREA 3: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba counties
Rates Fringes
Modular Furniture Installer Area 1 Installer I................$ 24.91 19.63 Installer II...............$ 22.18 20.42 Lead Installer.............$ 29.06 20.92 Master Installer...........$ 33.28 20.92 Area 2 Installer I................$ 22.96 20.42 Installer II...............$ 20.01 20.42 Lead Installer.............$ 25.93 20.92
Page 8 of 79beta.SAM.gov
Master Installer...........$ 29.56 20.92 Area 3 Installer I................$ 22.01 20.42 Installer II...............$ 19.24 20.42 Lead Installer.............$ 24.81 20.92 Master Installer...........$ 31.83 20.92
CARP0046-001 07/01/2018
El Dorado (West), Placer (West), Sacramento and Yolo Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.67 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91
Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.
CARP0046-002 07/01/2018
Alpine, Colusa, El Dorado (East), Nevada, Placer (East), Sierra, Sutter and Yuba Counties
Rates Fringes
Page 9 of 79beta.SAM.gov
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 40.17 29.32 Millwright..................$ 43.67 30.91
CARP0152-003 07/01/2018
Amador County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 41.17 29.32 Millwright..................$ 43.67 30.91
CARP0180-001 07/01/2018
Solano County
Rates Fringes
Carpenters Bridge Builder/Highway
Page 10 of 79beta.SAM.gov
Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91
CARP0751-001 07/01/2018
Napa and Sonoma Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.50 29.32 Millwright..................$ 48.50 30.91
CARP1599-001 07/01/2018
Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32
Page 11 of 79beta.SAM.gov
Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 41.17 29.32 Millwright..................$ 43.67 30.91
ELEC0180-001 06/01/2017
NAPA AND SOLANO COUNTIES
Rates Fringes
CABLE SPLICER....................$ 50.97 3%+20.13
ELECTRICIAN......................$ 47.31 23.05
ELEC0180-003 12/01/2018
NAPA AND SOLANO COUNTIES
Rates Fringes
Sound & Communications Installer...................$ 38.42 19.70 Technician..................$ 44.18 19.88
SCOPE OF WORK INCLUDES-
SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS
SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.
Page 12 of 79beta.SAM.gov
EXCLUDES-
Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.
ELEC0340-002 02/01/2018
ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,
NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES
Rates Fringes
Communications System Sound & Communications Installer...................$ 29.35 3%+15.35 Sound & Communications Technician..................$ 33.75 3%+15.35
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
Page 13 of 79beta.SAM.gov
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide.
B. FIRE ALARM SYSTEMS
Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems VSAT Data Systems Data Communication Systems RF and Remote Control Systems Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
Page 14 of 79beta.SAM.gov
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0340-003 08/01/2018
ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA (West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES
Rates Fringes
ELECTRICIAN
Remaining area..............$ 40.06 28.54 Sierra Army Depot, Herlong..$ 48.83 18.54 Tunnel work.................$ 41.01 18.54
CABLE SPLICER: Receives 110% of the Electrician basic hourly rate.
* ELEC0401-005 07/01/2019
ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and SIERRA (east of the main watershed divide) COUNTIES:
Rates Fringes
Page 15 of 79beta.SAM.gov
ELECTRICIAN......................$ 40.50 19.39
* ELEC0551-004 06/01/2019
MARIN AND SONOMA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 51.40 22.83
ELEC0551-005 12/01/2018
MARIN & SONOMA COUNTIES
Rates Fringes
Sound & Communications Installer...................$ 38.42 20.11 Technician..................$ 44.18 20.29
SCOPE OF WORK INCLUDES-
SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS
SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.
EXCLUDES-
Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management
Page 16 of 79beta.SAM.gov systems.
ELEC0659-006 01/01/2019
DEL NORTE, MODOC and SISKIYOU COUNTIES
Rates Fringes
ELECTRICIAN......................$ 35.19 16.80
ELEC0659-008 02/01/2018
DEL NORTE, MODOC & SISKIYOU COUNTIES
Rates Fringes
Line Construction
(1) Cable Splicer...........$ 57.94 18.27
(2) Lineman, Pole Sprayer, Heavy Line Equipment Man....$ 51.73 18.02
(3) Tree Trimmer............$ 31.10 11.32
(4) Line Equipment Man......$ 51.73 18.02
(5) Powdermen, Jackhammermen...............$ 33.80 13.35
(6) Groundman...............$ 33.11 13.17
ELEC1245-004 01/01/2019
ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 56.79 17.41
(2) Equipment specialist (operates crawler
Page 17 of 79beta.SAM.gov tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 45.36 16.24
(3) Groundman...............$ 34.68 15.86
(4) Powderman...............$ 49.55 3%+17.65
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0008-001 01/01/2019
Rates Fringes
ELEVATOR MECHANIC................$ 67.56 34.125+a+b
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0003-008 07/01/2017
Rates Fringes
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
Page 18 of 79beta.SAM.gov
(1) Leverman...............$ 44.77 31.25
(2) Dredge Dozer; Heavy duty repairman.............$ 39.81 31.25
(3) Booster Pump Operator; Deck Engineer; Deck mate;
Dredge Tender; Winch Operator...................$ 38.69 31.25
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 35.39 31.25
AREA 2:
(1) Leverman...............$ 46.77 31.25
(2) Dredge Dozer; Heavy duty repairman.............$ 41.81 31.25
(3) Booster Pump Operator; Deck Engineer; Deck mate;
Dredge Tender; Winch Operator...................$ 40.69 31.25
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 37.39 31.25
AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2
AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part Area 2: Remainder
Page 19 of 79beta.SAM.gov
CALAVERAS COUNTY:
Area 1: Remainder Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part Area 2: Remainder
FRESNO COUNTY:
Area 1: Remainder Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder
MADERA COUNTY:
Area 1: Except Eastern part Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Except Eastern part Area 2: Eastern part
MONTERREY COUNTY
Area 1: Except Southwestern part Area 2: Southwestern part
Page 20 of 79beta.SAM.gov
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder
PLACER COUNTY:
Area 1: Al but the Central portion Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity Counties Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeastern border with
Page 21 of 79beta.SAM.gov
Shasta County Area 2: Remainder
TUOLUMNE COUNTY:
Area 1: Except Eastern part Area 2: Eastern part
ENGI0003-018 06/26/2017
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DEFINITIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 44.67 30.39
GROUP 2.....................$ 43.14 30.39
GROUP 3.....................$ 41.66 30.39
GROUP 4.....................$ 40.28 30.39
GROUP 5.....................$ 39.01 30.39
GROUP 6.....................$ 37.69 30.39
GROUP 7.....................$ 36.55 30.39
GROUP 8.....................$ 35.41 30.39
GROUP 8-A...................$ 33.20 30.39
OPERATOR: Power Equipment (Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 46.30 30.39 Oiler......................$ 36.63 30.39
Page 22 of 79beta.SAM.gov
Truck crane oiler..........$ 39.20 30.39
GROUP 2
Cranes.....................$ 43.79 30.39 Oiler......................$ 36.36 30.39 Truck crane oiler..........$ 38.98 30.39
GROUP 3
Cranes.....................$ 42.05 30.39 Hydraulic..................$ 38.32 30.39 Oiler......................$ 36.14 30.39 Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Cranes.....................$ 39.01 30.39 OPERATOR: Power Equipment (Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 45.89 30.39 Oiler......................$ 36.63 30.39 Truck crane oiler..........$ 39.20 30.39
GROUP 2
Lifting devices............$ 44.07 30.39 Oiler......................$ 36.36 30.39 Truck Crane Oiler..........$ 38.98 30.39
GROUP 3
Lifting devices............$ 42.39 30.39 Oiler......................$ 36.14 30.39 Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Lifting devices............$ 40.62 30.39
GROUP 5
Lifting devices............$ 39.32 30.39
GROUP 6
Lifting devices............$ 37.98 30.39 OPERATOR: Power Equipment (Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 46.30 30.39 Oiler......................$ 36.63 30.39
Page 23 of 79beta.SAM.gov
Truck Crane Oiler..........$ 39.20 30.39
GROUP 2
Cranes.....................$ 43.79 30.39 Oiler......................$ 36.36 30.39 Truck Crane Oiler..........$ 38.98 30.39
GROUP 3
Cranes.....................$ 42.05 30.39 Hydraulic..................$ 38.32 30.39 Oiler......................$ 36.14 30.39 Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Cranes.....................$ 39.01 30.39
GROUP 5
Cranes.....................$ 35.13 30.39 OPERATOR: Power Equipment (Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 40.77 30.39
GROUP 1-A..................$ 43.24 30.39
GROUP 2....................$ 39.51 30.39
GROUP 3....................$ 38.18 30.39
GROUP 4....................$ 37.04 30.39
GROUP 5....................$ 35.90 30.39
UNDERGROUND:
GROUP 1....................$ 40.67 30.39
GROUP 1-A..................$ 43.14 30.39
GROUP 2....................$ 39.41 30.39
GROUP 3....................$ 38.08 30.39
GROUP 4....................$ 36.94 30.39
GROUP 5....................$ 35.80 30.39
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
Page 24 of 79beta.SAM.gov
GROUP 1: Operator of helicopter (when used in erection work);
Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu.
yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply;
Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2
cu. yds.; Loader 4 cu. yds. and over; Long reach excavator;
Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom;
Combination backhoe and loader up to and including 3/4 cu.
yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar;
Heavy-duty repairperson and/or welder; Lime spreader;
Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, Page 25 of 79beta.SAM.gov asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller;
Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types);
Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper;
Boom- type backfilling machine; Assistant plant engineer;
Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft.
m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with
Page 26 of 79beta.SAM.gov attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Tractor;
Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant);
Grouting machine operator; Highline cableway signalperson;
Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer); Signalperson;
Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader
GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self-propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar;
Self-propelled power sweeper operator (includes vacuum
Page 27 of 79beta.SAM.gov sweeper); Slusher operator; Surface heater; Switchperson;
Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tons;
Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu.
yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;
Page 28 of 79beta.SAM.gov
PILEDRIVERS
GROUP 1: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu.
yds.; Self-propelled boom-type lifting device over 45 tons;
Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig
GROUP 3: Derrick barge pedestal mounted under 45 tons; Self-propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under
GROUP 4: Assistant operator in lieu of assistant to engineer;
Forklift, 10 tons and over; Heavy-duty repairperson/welder
GROUP 5: Deck engineer
GROUP 6: Deckhand; Fire tender
STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self-propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane
Page 29 of 79beta.SAM.gov
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder
GROUP 5: Boom cat
TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more
GROUP 1: Heading shield operator; Heavy-duty repairperson;
Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman
GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator
AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND
UNDERGROUND [These areas do not apply to Piledrivers and
Page 30 of 79beta.SAM.gov
Steel Erectors]
AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MARIN, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO,
SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA,
TRINITY, YOLO, YUBA
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part Area 2: Remainder
COLUSA COUNTY:
Area 1: Eastern part Area 2: Remainder
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part Area 2: Remainder
GLENN COUNTY:
Area 1: Eastern part Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .