Tabulation of Bids CA BLM 2020(1).pdf
PDF 639 KB Posted
- Attached to
- CA BLM 2020(1), San Vicente Bridge
- Solicitation number
- 6982AF21B000005
About this file
This document is a bid tabulation report for the CA BLM 2020(1) project to replace two bridges along San Vicente Road. The project includes removing an out-of-service 29-foot single span steel girder bridge and replacing it with a 49-foot prefabricated steel bridge, as well as removing a second deteriorated 40-foot timber deck bridge. Three contractors submitted bids ranging from $795,520 to $1,340,850 with an engineer's estimate of $751,870. The low bid was from Pavkov Contracting Co. at $795,520. The solicitation was issued by the Department of Transportation Federal Highway Administration. The bid tabulation provides unit pricing for various construction tasks including mobilization, survey and staking, quality control testing, concrete work, and temporary traffic control devices.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 04/06/21
1 out of 6
Project No: CA BLM 2020(1)
Project Name: San Vicente Bridges
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF21B000005
Division: Central Federal Lands
State: CA County: Santa Cruz
Federal Land: Cotoni-Coast Dairies National Monument Opened at: Lakewood, CO
Opened by: Sheri Walsh
Date: 04/06/21
I certify that this Bid Tabulation accurately reflects the bids received and publically opened for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Pavkov Contracting Co., Inc. $795,520.00 55 S. Guignard Drive Sumter, SC 29150
GC Works, Inc. $991,820.86 1820 SW 3rd Avenue Miami, FL 33129
Siete, Inc. $1,340,850.00 8155 Park Road Rye, CO 81069
Engineer's Estimate $751,870.00
Contracting Officer
4/7/2021
2 out of 6
Project No: CA BLM 2020(1)
Project Name: San Vicente Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0050 15101-0000 MOBILIZATION
Pavkov Contracting Co., Inc. Lump Sum $77,800.00 GC Works, Inc. Lump Sum $86,302.50 Siete, Inc. Lump Sum $175,000.00 Engineer's Estimate ALL LPSM Lump Sum $84,500.00
A0060 15201-0000 CONSTRUCTION SURVEY AND STAKING
Pavkov Contracting Co., Inc. Lump Sum $22,230.00 GC Works, Inc. Lump Sum $10,000.00 Siete, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
A0070 15214-1000 SURVEY AND STAKING, BRIDGE
Pavkov Contracting Co., Inc. Lump Sum $9,945.00 GC Works, Inc. Lump Sum $10,000.00 Siete, Inc. Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
A0080 15301-0000 CONTRACTOR QUALITY CONTROL
Pavkov Contracting Co., Inc. Lump Sum $44,110.00 GC Works, Inc. Lump Sum $41,930.00 Siete, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $31,000.00
A0090 15401-0000 CONTRACTOR TESTING
Pavkov Contracting Co., Inc. Lump Sum $18,500.00 GC Works, Inc. Lump Sum $92,304.90 Siete, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0100 15501-0000 CONSTRUCTION SCHEDULE
Pavkov Contracting Co., Inc. Lump Sum $11,500.00 GC Works, Inc. Lump Sum $10,000.00 Siete, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00
3 out of 6
Project No: CA BLM 2020(1)
Project Name: San Vicente Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0110 15705-0100 SOIL EROSION CONTROL, SILT FENCE
Pavkov Contracting Co., Inc. $10.50 $6,825.00 GC Works, Inc. $12.00 $7,800.00 Siete, Inc. $11.00 $7,150.00 Engineer's Estimate 650 LNFT $15.00 $9,750.00
A0120 20103-0000 CLEARING AND GRUBBING
Pavkov Contracting Co., Inc. $10.50 $5,250.00 GC Works, Inc. $50.00 $25,000.00 Siete, Inc. $105.00 $52,500.00 Engineer's Estimate 500 SQYD $25.00 $12,500.00
A0130 20304-2000 REMOVAL OF BRIDGE (BRIDGE #1)
Pavkov Contracting Co., Inc. Lump Sum $81,000.00 GC Works, Inc. Lump Sum $53,250.00 Siete, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $64,000.00
A0140 20304-2000 REMOVAL OF BRIDGE (BRIDGE #2)
Pavkov Contracting Co., Inc. Lump Sum $82,400.00 GC Works, Inc. Lump Sum $73,500.00 Siete, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $82,000.00
A0150 20401-0000 ROADWAY EXCAVATION (CHANNEL)
Pavkov Contracting Co., Inc. $108.00 $6,480.00 GC Works, Inc. $50.00 $3,000.00 Siete, Inc. $210.00 $12,600.00 Engineer's Estimate 60 CUYD $115.00 $6,900.00
A0160 20420-0000 EMBANKMENT CONSTRUCTION
Pavkov Contracting Co., Inc. $216.00 $64,800.00 GC Works, Inc. $230.00 $69,000.00 Siete, Inc. $110.00 $33,000.00 Engineer's Estimate 300 CUYD $75.00 $22,500.00
4 out of 6
Project No: CA BLM 2020(1)
Project Name: San Vicente Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0170 20801-0000 STRUCTURE EXCAVATION
Pavkov Contracting Co., Inc. $80.00 $12,800.00 GC Works, Inc. $300.00 $48,000.00 Siete, Inc. $260.00 $41,600.00 Engineer's Estimate 160 CUYD $150.00 $24,000.00
A0180 20803-0000 STRUCTURAL BACKFILL
Pavkov Contracting Co., Inc. $120.00 $8,400.00 GC Works, Inc. $144.00 $10,080.00 Siete, Inc. $700.00 $49,000.00 Engineer's Estimate 70 CUYD $200.00 $14,000.00
A0190 30202-1000 ROADWAY AGGREGATE, METHOD 1
Pavkov Contracting Co., Inc. $120.00 $14,400.00 GC Works, Inc. $83.05 $9,966.00 Siete, Inc. $140.00 $16,800.00 Engineer's Estimate 120 TON $50.00 $6,000.00
A0200 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Pavkov Contracting Co., Inc. $1,820.00 $96,460.00 GC Works, Inc. $235.32 $12,471.96 Siete, Inc. $3,000.00 $159,000.00 Engineer's Estimate 53 CUYD $2,000.00 $106,000.00
A0210 55401-2000 REINFORCING STEEL, EPOXY COATED
Pavkov Contracting Co., Inc. $8.00 $40,800.00 GC Works, Inc. $3.24 $16,524.00 Siete, Inc. $6.00 $30,600.00 Engineer's Estimate 5,100 LB $3.00 $15,300.00
A0220 55504-0000 PRE-FABRICATED STEEL BRIDGE (49'-0" x 14'-0" modular steel vehicular bridge)
Pavkov Contracting Co., Inc. Lump Sum $145,000.00 GC Works, Inc. Lump Sum $380,603.08 Siete, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $200,000.00
5 out of 6
Project No: CA BLM 2020(1)
Project Name: San Vicente Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0230 60101-0000 CONCRETE
Pavkov Contracting Co., Inc. $1,300.00 $13,000.00 GC Works, Inc. $231.17 $2,311.70 Siete, Inc. $3,600.00 $36,000.00 Engineer's Estimate 10 CUYD $1,500.00 $15,000.00
A0240 62201-3000 HYDRAULIC EXCAVATOR
Pavkov Contracting Co., Inc. $200.00 $4,000.00 GC Works, Inc. $312.63 $6,252.60 Siete, Inc. $250.00 $5,000.00 Engineer's Estimate 20 HOUR $175.00 $3,500.00
A0250 62301-0000 GENERAL LABOR
Pavkov Contracting Co., Inc. $100.00 $2,000.00 GC Works, Inc. $81.80 $1,636.00 Siete, Inc. $150.00 $3,000.00 Engineer's Estimate 20 HOUR $75.00 $1,500.00
A0260 62632-0000 PLANTINGS (ROOT WAD)
Pavkov Contracting Co., Inc. Lump Sum $20,600.00 GC Works, Inc. Lump Sum $10,000.00 Siete, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0270 62901-0000 ROLLED EROSION CONTROL PRODUCT
Pavkov Contracting Co., Inc. $10.00 $5,000.00 GC Works, Inc. $20.00 $10,000.00 Siete, Inc. $20.00 $10,000.00 Engineer's Estimate 500 SQYD $15.00 $7,500.00
A0280 63301-0000 SIGN SYSTEM
Pavkov Contracting Co., Inc. $125.00 $500.00 GC Works, Inc. $272.73 $1,090.92 Siete, Inc. $2,500.00 $10,000.00 Engineer's Estimate 4 EACH $1,000.00 $4,000.00
6 out of 6
Project No: CA BLM 2020(1)
Project Name: San Vicente Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0290 63308-3000 OBJECT MARKER, TYPE 3
Pavkov Contracting Co., Inc. $125.00 $500.00 GC Works, Inc. $68.18 $272.72 Siete, Inc. $1,100.00 $4,400.00 Engineer's Estimate 4 EACH $230.00 $920.00
A0300 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
Pavkov Contracting Co., Inc. $305.00 $1,220.00 GC Works, Inc. $131.12 $524.48 Siete, Inc. $1,300.00 $5,200.00 Engineer's Estimate 4 EACH $250.00 $1,000.00
Total Schedule - All Items
Pavkov Contracting Co., Inc. $795,520.00 GC Works, Inc. $991,820.86 Siete, Inc. $1,340,850.00 Engineer's Estimate $751,870.00
File details come from the government source that posted it. Updated .