Amendment A004.pdf
PDF 1 MB Posted
- Attached to
- CA BLM 2020(1), San Vicente Bridge
- Solicitation number
- 6982AF21B000005
About this file
This document provides an amendment to a solicitation for a bridge replacement project on federal lands in California. The project includes replacing a 29-foot single span steel girder bridge with a 49-foot single span prefabricated steel bridge with a steel deck and aggregate fill on spread footing foundations. A second out of service bridge approximately one mile north will also be removed. Both bridges span San Vicente Creek and access to the project sites is along a single lane gravel road in natural resource sensitive areas. Timely completion is important to minimize disruptions to the Bureau of Land Management employees and partner agencies. The amendment updates various sections and appendices of the solicitation including special contract requirements, insurance requirements, the use of an online construction management system, and the special use permit for the project area.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
TABLE OF CONTENTS
Notice to Bidders ............................................................................................................. A-i
Solicitation, Offer, and Award ........................................................................................ A-1
Basis for Award and Bid Schedule ................................................................................ A-3
Solicitation Provisions .....................................................................................................B-7
Contract Clauses ..............................................................................................................C-1
Construction Wage Rate Requirement ............................................................................ D-1
Division 100 ..................................................................................................................... E-2 Division 150 ................................................................................................................... E-18 Division 200 ................................................................................................................... E-27 Division 300 ................................................................................................................... E-30 Division 400 .......................................................................................................... See FP-14 Division 500 ................................................................................................................... E-31 Division 600 ................................................................................................................... E-37 Division 700 ................................................................................................................... E-43
APPENDICES
Appendix A ................................................................................ Water Quality Certification
Appendix B ................................................................................... Army Nationwide Permit
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
Amendment A004 03/29/2021
Appendix C...........................................................San Vicente Redwoods Special Use Permit
NOTICE TO BIDDERS
A-iv
Email Address to submit modifications to bids for this project is cflcontracts@dot.gov
II. POST AWARD INFORMATION
CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.
Insurance requirements - See Subsection 107.05 of the FP-14.
EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).
The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.
The Contractor shall be required to submit a user account form to gain access to the EEBACS system.
See Subsection 108.01.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at https://highways.dot.gov/federal-lands/estimates/eebacs-guide
Amendment A004
C-5
(2) For supplies (other than procurement from a nonmanufacturer of such supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, on the concern or other HUBZone small business concerns;
3) For general construction, at least 15 percent of the cost of the contract performance to be incurred for personnel on its own employees; or
(4) For construction by special trade contractors, at least 25 percent of the cost of the contract performance to be incurred for personnel on its own employees
(e) A HUBZone joint venture agrees that the aggregate of the HUBZone small business concerns to the joint venture, not each concern separately, will perform the applicable percentage of work requirements.
(f) Notice. The HUBZone small business offeror acknowledges that a prospective HUBZone awardee must be a HUBZone small business concern at the time of award of this contract. The HUBZone offeror shall provide the Contracting Officer a copy of the notice required by 13 CFR 126.501 if material changes occur before contract award that could affect its HUBZone eligibility. If the apparently successful HUBZone offeror is not a HUBZone small business concern at the time of award of this contract, the Contracting Officer will proceed to award to the next otherwise successful HUBZone small business concern or other offeror.
(End of clause)
52.219-8 Utilization of Small Business Concerns. (OCT 2018)
52.219-28 Post-Award Small Business Program Rerepresentation. (OCT 2020)
52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)
52.222-3 Convict Labor. (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2014)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (AUG 2018)
52.222-9 Apprentices and Trainees. (JUL 2005)
Appendix C:
San Vicente Redwoods
Special Use PermitPermit
Application
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| SVR SUP Government Example.pdf |
| SVR Permit CA Geol Survey Nov 2020.pdf |
| EXHIBIT A to SUP.pdf |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 5 |
| Text3: |
| 0: A004 |
| 1: 03/29/2021 |
| 2: |
| 0: |
| 1: CA BLM 2020(1), San Vicente |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: Eric Grosskreuz 1:
| 1: |
| 0: |
| Text6: |
| 0: 6982AF21B000005 |
| 1: 03/03/2021 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: INVITATION FOR BID- A-Section |
Delete Table of Contents Page and replace with Amendment A004 Table of Contents Page. Replace page A-iv with Amendment A004 Page A-iv, delete page A-v.
INVITATION FOR BID- C-Section
Delete page C-5 and replace with Amendment A004 Page C-5. (Removing Clauses 52.219-9 & 52.219-16)
APPENDICES
Delete Appendix C Sample Subcontracting Plan and replace with Amendment A004 Appendix C: San Vicente Redwoods Special Use PermitPermit Application
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .