Plans_Amendment_2.pdf

PDF 5 MB Posted

Attached to
NP-OZAR 10(2), Ozark National Scenic Riverways
Solicitation number
693C73-18-B-000013
Issued by

About this file

Revision/Clarification to Plans

View the file

Other files

File Type Posted
ROBO_-NP-OZAR_10(2).ppt PPT presentation
Amendment_0003_5.3.2018.pdf PDF
Questions-Clarifcations_Amendment_2.pdf PDF
SCR_Amendment_2.pdf PDF
Amendment_0002_5.1.2018.pdf PDF
Amendment_0001,_4.26.18.pdf PDF
NP-OZAR_10(2)_Plans.pdf PDF
Bridge_Inspection_Report_STR_6640-005P_Alley_Spring.pdf PDF
NEPA_EA_Big_Spring_Bridge.pdf PDF
Bidder's_Qualifications_Form.doc DOC document
VETS-4212.pdf PDF
FP14_Eng.pdf PDF
Soils_and_Foundations_Report.pdf PDF
NEPA_CE_Alley_Spring_Bridge.pdf PDF
Utility_Investigation_Report.pdf PDF
IFB_Solicitation-NP-OZAR_10(2).pdf PDF
NEPA_CE_SHPO_Concurrence_Alley_Spring_Bridge.pdf PDF
SWPPP_draft.pdf PDF
NEPA_FONSI_Big_Spring_Bridge.pdf PDF
Subcontracting_plan.doc DOC document
Bridge_Inspection_Report_STR_6640-001P_Big_Spring.pdf PDF
Synopsis_02.08.18.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 2

Plan Sheet Changes Page 1 of 1

Plan Sheet Changes

Delete Plan Sheets A01, A04, B01, B02, C04, D01, E04, E02, R04, T01 thru T15 and substitute the amended Plan Sheets A01, A04, B01, B02, D01, E04, R04, and T01 thru T14.

a) Sheet A01 (Title Sheet) updated to revise sheet number index.

b) Sheet A04 (Horizontal Alignment - Big Spring Bridge) updated to revise Peavine Road chain description information.

c) Sheets B01 & B02 [Typical Section - Big Spring Bridge (Schedule A)] updated to revise drawings, denotations, and notes.

d) Sheet C04 (Summaries and Schedules - Big Spring Bridge) updated to include power voltage description in the Utility Summary Table.

e) Sheet D01 (Plan & Profile - Big Spring Bridge) updated to correct curve and superelevation information.

f) Sheet E02 (NPS Owned Power Relocation Plan - Big Spring Bridge) updated to add power voltage note.

g) Sheet E04 (Sanitary Relocation Plan - Big Spring Bridge) updated to add sanitary sewer line pipe work note.

h) Sheet R04 (Foundation Layout - Big Spring Bridge) updated to revise casing requirements, and match soil report values.

i) Sheets T01 thru T02 (Cross Sections - Peavine Road) updated to correct roadway cross slope and revise sheet layout, and added a note to adjust fill slope.

J) Sheets T3 thru T14 (Cross Sections - Peavine Road) updated to correct roadway cross slope and revise sheet layout.

File details come from the government source that posted it.