Bridge_Inspection_Report_STR_6640-001P_Big_Spring.pdf
PDF 3 MB Posted
- Attached to
- NP-OZAR 10(2), Ozark National Scenic Riverways
- Solicitation number
- 693C73-18-B-000013
About this file
Bridge_Inspection_Report_STR_6640-001P_Big_Spring_Bridge
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ROBO_-NP-OZAR_10(2).ppt | PPT presentation | |
| Amendment_0003_5.3.2018.pdf | ||
| Plans_Amendment_2.pdf | ||
| Questions-Clarifcations_Amendment_2.pdf | ||
| SCR_Amendment_2.pdf | ||
| Amendment_0002_5.1.2018.pdf | ||
| Amendment_0001,_4.26.18.pdf | ||
| NP-OZAR_10(2)_Plans.pdf | ||
| Bridge_Inspection_Report_STR_6640-005P_Alley_Spring.pdf | ||
| NEPA_EA_Big_Spring_Bridge.pdf | ||
| Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212.pdf | ||
| FP14_Eng.pdf | ||
| Soils_and_Foundations_Report.pdf | ||
| NEPA_CE_Alley_Spring_Bridge.pdf | ||
| Utility_Investigation_Report.pdf | ||
| IFB_Solicitation-NP-OZAR_10(2).pdf | ||
| NEPA_CE_SHPO_Concurrence_Alley_Spring_Bridge.pdf | ||
| SWPPP_draft.pdf | ||
| NEPA_FONSI_Big_Spring_Bridge.pdf | ||
| Subcontracting_plan.doc | DOC document | |
| Synopsis_02.08.18.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
BIG SPRING BRIDGE
ROUTE 103 OVER SPRING BRANCH
OZARK NATIONAL SCENIC RIVERWAYS
LS
STRUCTURE NO. 6640-001P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 5/11/16
ED
Report prepared by:
Federal Highway Administration
FLH Office of Bridges and Structures 21400 Ridgetop Circle Sterling, VA 20166 703-404-6201 https://bridge.flhd.fhwa.dot.gov
STRUCTURE NO. 6640 001P
BIG SPRING BRIDGE INSPECTION DATE: 5/11/16
STRUCTURE SUMMARY
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... NO. OF MAIN SPANS: .......... WOOD or TIMBER 6
MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER 0
# OF BEAMS, MAIN SPAN: .. 10 STRUCT. TOTAL LENGTH: .. 120.0 FT (36.6 M)
DECK TYPE: ......................... MAX. SPAN LENGTH: .......... 20.0 FT (6.1 M) WOOD OR TIMBER
WEARING SURFACE: .......... DECK WIDTH: ...................... 33.0 FT (10.1 M) BITUMINOUS
ABUT. FOUNDATIONS: ........ PILE BENT CURB TO CURB WIDTH: ..... 26.0 FT (7.9 M)
PIER FOUNDATION(S): ........ PILE BENT YEAR BUILT:
ABUTMENT / PIER MAT'L: ... WOOD OR TIMBER YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS:
6640-1240 / 41072
FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1990-Rehab of N. Abutment & app. 2003-7 post section of W. railing repl. 2010- Add. supports installed below sidewalk. Sidewalk and W. railing repl. & pile moist. readings taken.
1 - PRINCIPAL PARK ROAD
LOCATION
OZARK NATIONAL SCENIC RIVERWAYS MILE POINT: ..................... 0.02 (KM PT 0.03)
STATE: ................................. MISSOURI LOCATION: ADJACENT TO BIG SPRING PARKING
LOT.
FACILITY CARRIED: ............ ROUTE 103
FEATURE INTERSECTED: .. SPRING BRANCH
STRUCTURE EVALUATION SUMMARY
This glue-laminated timber bridge is in generally fair to poor condition, and is scheduled to be replaced in the near future under Project OZAR 10(2). The most serious problems at this time include extensive decay of the deck panel overhangs, particularly at the deck drain areas; and severe decay of the east curb and railing system, including numerous railing posts.
Due to the presence of an asphalt overlay, it is not possible to ascertain the full extent of the decay in the deck.
However, when repairs were made to the timber sidewalk in 2010, extensive decay was discovered in the portions of the beams, bent caps, and sidewalk support members that were exposed by the removal of the sidewalk.
It should also be noted that the timber piles are showing signs of significant decay, as indicated by visual observations and sounding, in addition to moisture readings and a boring taken during a previous inspection.
INSPECTION TEAM: N. SASS, A. KELLY (SHORT ELLIOTT HENDRICKSON INC.)
CONDITION ASSESSMENT:
NINA L. SASS, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 9/30/16
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 6640 001P
226 PRIORITY OF IMPROVEMENT B
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL :
ITEM
REHABILITATION/RECONSTRUCTION
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
NO (TYPICALLY NEEDED WITHIN 5 YEARS)
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* : ........................................... $0
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Structure is programmed for replacement in the near future under Project OZAR 10(2).
FIELD INSPECTION REPORT STRUCTURE NO. 6640 001P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 4
DECK SLAB1. P
EXPANSION JOINTS2. F
WEARING SURFACE3. P
RIDEABILITY4. F
CURBS, SIDEWALKS, AND MEDIAN5. P
PARAPETS AND/OR RAILINGS6. P
DRAINS AND DRAINAGE7. F
UTILITIES8. (SEWER LINE) F
DEFLECTION AND/OR VIBRATION9. G
OTHER10. (STRIPING) F
59. SUPERSTRUCTURE 5
BEARING DEVICES1. G
GIRDERS OR BEAMS2. F
ARCH(ES) OR SLAB(S)3. N
FLOOR BEAMS AND STRINGERS4. F
TRUSSES5. N
DIAPHRAGMS AND BRACING6. G
7. PAINT N
FASCIA(E)8. N
DEFLECTION AND/OR VIBRATION9. F
ALIGNMENT10. G
OTHER11. N
60. SUBSTRUCTURE 5
ITEM REFERENCE AND REMARKS
ABUTMENTS
58.1 GLULAM DECK PANELS. MODERATE TO SEVERE DECAY OF DECK
PANEL EDGES WITH VEGETATION GROWTH PRESENT IN SOME
LOCATIONS; WORST AREAS ARE AT DECK DRAINS. DECAY
EXTENDS THROUGHOUT OVERHANGS, AND INTO BAY #2 IN SOME
LOCATIONS.
DECK UNDERSIDE SOUNDS SLIGHTLY DAMP THROUGHOUT;
DISCOLORED AT INTERFACE WITH BEAMS AND IN SEVERAL OTHER
LOCATIONS, POSSIBLY INDICATIVE OF DECAY.
58.2 DECK JOINT AT BENT #3 FILLED WITH ASPHALT; STEEL ARMORING
TWISTED AND GOUGED FOR FULL LENGTH.
58.3,4 WIDESPREAD DETERIORATION OF BITUMINOUS WEARING
SURFACE; MODERATE TO HEAVY TRANSVERSE, LONGITUDINAL AND
MAP CRACKING THROUGHOUT. SOME CRACKS HAVE BEEN SEALED
BUT HAVE REOPENED. SEVERAL ASPHALT PATCHES THROUGHOUT.
NUMEROUS POTHOLES THROUGHOUT SPANS #4 TO #6 IN
NORTHBOUND LANE. FEWER POTHOLES ALONG SOUTHBOUND.
58.5,6 MINOR SPLITTING OF SIDEWALK DECK PLANKS. MINOR CUPPING
OF SIDEWALK PLANKS DUE TO IMPROPER INSTALLATION.
MODERATE CHECKING OF TIMBER RAILING SYSTEM ON EAST SIDE.
SEVERE DECAY AT BOTTOM OF RAIL POSTS WITH 35% OF POSTS
AFFECTED; MINOR TO MODERATE DECAY IN SEVERAL OTHER
AREAS THROUGHOUT POSTS. SEVERE DECAY AT BASE OF END
POSTS IN WINGWALL FILL LOCATIONS; POSTS ARE LOOSE.
MODERATE TO SEVERE DECAY OF EAST CURB, MAINLY TOWARD
SOUTH END, INCLUDING SECTION LOSS; WIDESPREAD MODERATE
VEGETATION GROWTH IN TIMBER CURB BOLT HOLES.
58.7 DEBRIS AND VEGETATION GROWTH ALONG CURBLINES.
1. BREASTWALLS OR COLUMNS N
2. PILE BENTS F
3. CAPS AND/OR BEARING SEATS F
4. BACKWALLS AND/OR BULKHEADS F
5. FOUNDATIONS (BURIED) N
6. WINGWALLS F
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR F
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
N13. WALLS AND/OR COLUMNS
F14. PILE BENTS
F15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS
G17. EROSION AND/OR SCOUR
G18. SETTLEMENT OR DEFLECTION
N19. OTHER
AND REMARKSITEM REFERENCE
61. CHANNEL 5
G 1. ALIGNMENT
G2. EROSION AND/OR SCOUR
N 3. CHANNEL PROTECTION
F 4. WATERWAY OBSTRUCTIONS
G 5. OTHER (FLOOD GAGE)
INSUFF ADEQUACY OF OPENING 6.
7. MEDNORMAL VELOCITY
12 FT. 8. AVERAGE CLEAR OPENING
9. STREAM BED COMPOSITION :
STONES
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
APPROACH SLABS 1. N
N
N
F
F
F
N
F
N
223. RETAINING WALL N
OTHER6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES2.
WALL1.
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 0
N
N
N
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
58.8 3" AND 12" UTILITY PIPES IN BAY #2, 4" PIPE IN BAY #3, AND 2"
UTILITY LINE ALONG SOUTH ABUTMENT CAP. MODERATE RUSTING
OF 12" UTILITY PIPE AT SOUTH END. MINOR RUSTING OF UTILITY
PIPE SUPPORT BRACKETS AND HANGERS FOR 4" AND 12" UTILITY
LINES.
58.10 MODERATE DETERIORATION OF EDGE OF LANE PAVEMENT
STRIPING.
59.1 MINOR DEFORMATION OF GALVANIZED STEEL BEARING SADDLES
AT ISOLATED LOCATIONS THROUGHOUT BENT CAPS; UP TO 1/2"
GAP BETWEEN EDGES OF PLATES AND TOP OF BENT CAPS.
59.2 MINOR CHECKING OF GLULAM TIMBER BEAMS. MINOR MOLD ON
UNDERSIDE OF SEVERAL BEAMS. SEVERAL BEAMS DISCOLORED
AT INTERFACE WITH DECK. MINOR SPOT DECAY IN SOME AREAS.
MODERATE TO SEVERE DECAY OF TOP SURFACE OF BEAMS UNDER
SIDEWALK. WORST AREAS OF DECAY ON TOP OF BEAM #1 IN SPAN
#4, EAST FACE OF BEAM #1 IN SPAN #1, AND WEST FACE OF BEAM
#2 ADJACENT TO BENT #4. REPAIRS ANTICIPATED DURING
PREVIOUS INSPECTION DO NOT APPEAR TO HAVE BEEN
PERFORMED.
59.4,6 MODERATE DECAY OF TOP AND SIDES OF ORIGINAL SIDEWALK
STRINGERS IN SEVERAL LOCATIONS. MODERATE TO SEVERE
DECAY OF ENDS OF ORIGINAL SIDEWALK CROSS BEAMS.
ADDITIONAL SUPPORT CROSS BEAMS INSTALLED BELOW
ORIGINALS; MINOR DECAY EVIDENT ON TOP OF NEW BEAMS AT
INTERFACE WITH DECK ENDS.
59.9 SIGNIFICANT VIBRATION UNDER VEHICLE LOADS.
60.2,14 MINOR TO MODERATE CHECKING OF TIMBER PILES. MINOR TO
MODERATE DECAY OF OUTER LAYERS NEAR AND BELOW
GROUNDLINE AND WATERLINE. MOISTURE CONTENT READINGS
TAKEN DURING 2010 INSPECTION AT PILE #2, SOUTH ABUTMENT,
AND PILE #4, BENT #1. READINGS INDICATED DRAMATICALLY
INCREASED DECAY SUSCEPTIBILITY IN BOTTOM PORTIONS OF
PILES AS COMPARED TO PORTIONS ABOVE NORMAL HIGH WATER
MARK. CORE SAMPLE AT PILE #4, BENT #1, SHOWED
APPROXIMATELY 1" DEEP DECAY.
MINOR TO MODERATE DECAY OF LATERAL BRACING AT WATERLINE;
SEVERE DECAY IN A FEW LOCATIONS.
ADDITIONAL ITEM REFERENCE AND REMARKS
60.3,15 MINOR TO MODERATE DECAY NOTED AT ENDS OF CAPS AND ON TOP SURFACE IN AREAS UNDER SIDEWALK. 8"
DEEP AREA OF DECAY AT EAST END OF BENT #1 CAP AND BRACING. DECAY AT NORTH ABUTMENT BENT CAP
ALONG FACE IN CONTACT WITH BULKHEAD.
BENT CAPS IN GOOD CONDITION IN AREAS PROTECTED BY DECK; MINOR CHECKING. SOIL AND DEBRIS BUILDUP
ON TOP OF CAP AT NORTH ABUTMENT AND AT PILE BENT #1.
60.4 MINOR TO MODERATE DECAY OF NORTH ABUTMENT BACKWALL IN SEVERAL LOCATIONS.
MINOR SPLITS IN BULKHEAD TIMBERS AT BOTH ABUTMENTS. SEE ALSO 60.9.
60.6 MINOR TO MODERATE DECAY OF TIMBER WINGWALLS; SEVERE LOCALIZED DECAY AT TOP OF NORTHEAST
WINGWALL END PILE. HEAVY VEGETATION GROWTH ON AND ALONG WINGWALLS IMPEDE INSPECTION.
60.9 MINOR TO MODERATE LOSS OF BACKFILL MATERIAL FROM UNDER NORTH BULKHEAD INCLUDING UP TO 4'
UNDERMINING AROUND SECOND PILE FROM WEST. SOUTH BULKHEAD IS UNDERMINED UP TO 14" FOR ENTIRE
WIDTH OF ABUTMENT. SEE ALSO 222.5.
MINOR UNDERMINING (UP TO 8") AT BASE OF NORTHWEST WINGWALL.
61.4,6 DEBRIS CAUGHT ON TOP OF CAPS AND AGAINST MOST PILES AND LATERAL BRACING DUE TO HIGH WATER
FLOW. DEBRIS ACCUMULATION AT UPSTREAM END OF PILE BENTS #2, #3, AND #4. NO DEBRIS OBSERVED AT
2016 INSPECTION; MAY BE UNDER WATER LEVEL.
61.5 FLOOD GAGE ATTACHED TO DOWNSTREAM SIDE OF BENT #3.
222.4,5,6 MINOR SETTLEMENT AT APPROACHES. MODERATE DIP (SETTLEMENT) AT SOUTH APPROACH, NORTHBOUND
LANE. PARK NOTED SINKHOLE IN SOUTH APPROACH, SOUTHBOUND LANE, SEVERAL MONTHS AFTER 2010
INSPECTION; SINKHOLE HAS NOT BEEN NOTICED DURING SUBSEQUENT INSPECTIONS. MINOR PATCHES OF
PAVEMENT AT APPROACHES. THERE IS AN 8' X 12' AREA IN THE SOUTH APPROACH WEST SHOULDER THAT WAS
FILLED WITH GRAVEL AND BARRICADED OFF FROM A POTENTIAL SINKHOLE AT TIME OF 2016 INSPECTION.
PARK OFFICIALS INDICATED, DURING PREVIOUS INSPECTIONS, THAT STRUCTURE HAS BEEN OVERTOPPED
DURING HIGH FLOOD EVENTS.
222.8 SHARP HORIZONTAL CURVE AT BOTH APPROACHES.
36.A BRIDGE RAILINGS DO NOT MEET CURRENT SAFETY STANDARDS FOR VEHICULAR BARRIERS.
STRUCTURE NO. 6640 001P
INSPECTION DATE: 5/11/16
TRUCK TYPE
TONS
INVENTORY RATING (NORMAL TRAFFIC)
METRIC TONS METRIC TONSTONS
OPERATING RATING (MAXIMUM LOAD)
H
HS
TYPE 3
TYPE 3S2
TYPE 3-3
DESIGN LOADING:
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS:
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
X
STRUCTURE LOAD RATING
BIG SPRING BRIDGE
H15 (M13.5)
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 6640 001P
STRUCTURE IDENTIFICATION
(201) PARK: OZARK NATIONAL SCENIC RIVERWAYS (1) STATE: ....................................... 297 - MISSOURI (MO)
(202) STRUCTURE NAME: .......... BIG SPRING BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 035 - CARTER
(4) CITY/PLACE CODE: ................... (204) STRUCTURE NUMBER: ..... 6640-001P
(205) NPS REGION: .................... 5 - MIDWEST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 10 (6) FEATURES INTERSECTED:....... SPRING BRANCH
(207) ROAD SECTION NO: ..........001P (7) FACILITY CARRIED: .................. ROUTE 103
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 6640001P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ ADJACENT TO BIG SPRING P
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 6640-1240 (11) MILE POINT: ............................. 0.02 (KM PT 0.03)
(212) DRAWING NUMBERS: ....... 41072 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
7 - WOOD or TIMBER
02 - STRINGER/MULTI-BEAM or GIRDER
20.0 FT (6.1 M)
120.0 FT (36.6 M)
4 - PILE BENT
4 - PILE BENT
4 - PILE BENT
4 - PILE BENT
8 - WOOD OR TIMBER
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
NO(218) IS SALT USED?:
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 27.0 TONS (24.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 36.0 TONS (33.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 5/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE:
INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 6640 001P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 26.0 FT (7.9 M) (16) LATITUDE:
(17) LONGITUDE:
(19) DETOUR LENGTH:
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ...
(42A) SERVICE ON:
(42B) SERVICE UNDER:
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ...
(38) NAVIGATION CONTROL?: ...
(39) VERTICAL CLEARANCE:
(40) HORIZ. CLEARANCE:
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
36°57'03.20"
90°59'30.00"
35 MI (56 KM)
5 - HIGHWAY-PEDESTRIAN
5 - WATERWAY
N - NONE
0.0 FT (0.0 M)
0.0 FT (0.0 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
33.0 FT (10.1 M)
30.0 FT (9.1 M)
12.0 FT (3.7 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - NO MEDIAN
0 °
NO
26.0 FT (7.9 M)
6.0 FT (1.8 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
7 - TIMBER
1 - CONTINUOUS RAIL
3.08 FT (0.94 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
8 - Stable; scour above top of fo
1 - MAINTENANCE
B - MAJOR
$0
$0
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1990-Rehab of N. Abutment & app. 2003-7 post section of W. railing repl. 2010- Add. supports installed below sidewalk. Sidewalk and W. railing repl. & pile moist. readings taken.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 6640 001P
PHOTOGRAPHS STRUCTURE NO. 6640 001P
FLOW
PHOTO #1 - LOOKING SOUTH
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH; NOTE
EXTENSIVE CRACKING OF ASPHALT
PHOTO #4 - CLOSE UP OF WEARING SURFACE DETERIORATION,
NORTHBOUND LANE IN SPAN #5 SHOWN
PHOTO #5 - GENERAL VIEW OF SIDEWALK AND RAILING ON WEST
SIDE; NOTE TYPICAL GRAVEL AND VEGETATION GROWTH ALONG
CURBLINES
PHOTO #6 - TYPICAL CHECKING OF TIMBER RAILING, WEST RAILING
SHOWN
PHOTO #7 - TYPICAL CHECKING AND DECAY OF TIMBER CURB ALONG
EAST SIDE
PHOTO #8 - TYPICAL DECAY OF EAST RAILING POSTS, POST #8 FROM
NORTH END SHOWN
PHOTO #9 - ADVANCED DECAY IN POST #11 FROM NORTH END OF
EAST RAIL; ALSO NOTE FLOOD GAGE ATTACHED TO DOWNSTREAM
SIDE OF BENT #3
PHOTO #10 - TYPICAL DECAY AT BOTTOM OF EAST RAILING POSTS,
POST #2 FROM SOUTH END SHOWN; NOTE ALSO LOOSE AND ROTATED
TIMBER BRACKET
PHOTO #11 - SINKHOLE AT WEST SHOULDER OF SOUTH APPROACH
FILLED WITH GRAVEL AND BARRICADED OFF
PHOTO #12 - GENERAL UNDERSIDE VIEW LOOKING NORTH
STRUCTURE NO. 6640 001PPHOTOGRAPHS
PHOTO #13 - CLOSE UP OF DECK UNDERSIDE IN SPAN #6; NOTE AREAS
OF DECAY OF DECK PLANKS AND DEBRIS TRAPPED AT UTILITY
CONDUITS
PHOTO #14 - TYPICAL DECAY OF DECK PLANK EDGES WITH
VEGETATION GROWTH; EAST SIDE OF SPAN #1 SHOWN
PHOTO #15 - GENERAL UNDERSIDE VIEW OF SIDEWALK AT WEST SIDE
LOOKING NORTH, SPAN #1 BELOW SIDEWALK SHOWN; NOTE TYPICAL
DECAY OF DECK PLANK EDGES
PHOTO #16 - TYPICAL SPOT DECAY OF GLULAM TIMBER BEAMS, EAST
SIDE OF BEAM #2 AT NORTH ABUTMENT SHOWN AND AT NORTH
ABUTMENT BACKWALL
PHOTO #17 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE DISLODGED
TIMBER PLANK AND LOSS OF FILL FROM UNDER BULKHEAD
PHOTO #18 - CLOSE UP VIEW OF EROSION AND UNDERMINING AT
SOUTH ABUTMENT BULKHEAD NEAR EAST END
PHOTO #19 - TYPICAL DECAY OF TIMBER PILES OUTER LAYERS NEAR
AND BELOW GROUNDLINE AND WATERLINE, PILE #2 FROM EAST END
OF SOUTH ABUTMENT SHOWN
PHOTO #20 - GENERAL VIEW OF NORTH ABUTMENT; NOTE LOSS OF
BACKFILL MATERIAL FROM UNDER BULKHEAD
PHOTO #21 - TYPICAL SPLITS IN BULKHEAD TIMBERS, NORTH
ABUTMENT BELOW BAY #2 SHOWN
PHOTO #22 - DECAY AT EAST END OF TIMBER CAP AT NORTH
ABUTMENT
PHOTO #23 - UP TO 2' DEEP UNDERMINING OF NORTH ABUTMENT
BULKHEAD AND EROSION NEAR PILE #2 FROM WEST END; NOTE ALSO
EVIDENCE OF WATER LEAKAGE
PHOTO #24 - TYPICAL DECAY OF LATERAL BRACING OF PILE BENTS,
PILE BENT #2 AT DOWNSTREAM END SHOWN
PHOTO #25 - ADVANCED DECAY OF TIMBER PILE AT NORTHEAST
WINGWALL; NOTE ALSO TYPICAL VEGETATION GROWTH ON
WINGWALLS
PHOTO #26 - LOOKING UPSTREAM FROM BRIDGE
PHOTO #27 - LOOKING DOWNSTREAM FROM BRIDGE