5-Bid Tabulation AWARDED Storm Drain Installation Summer Stone Dr.pdf
PDF 190 KB Posted
- Solicitation number
- 2026-026
- Issued by
- Salt Lake County, Utah
About this file
This is a bid tabulation document for an Invitation for Bid (IFB) issued by the City of South Jordan, Utah for storm drain installation along Summer Stone Drive. The project involves the installation of approximately 155 linear feet of 15-inch HDPE storm drain pipe along with two inlet/combo boxes approximately 4 feet deep. The new storm drain system will connect to existing infrastructure, including a combo box and/or a new cleanout box. The contractor is responsible for providing all labor, equipment, materials, excavation, installation, backfill, compaction, and restoration work necessary to complete the project in compliance with South Jordan City standards and specifications. The contract was awarded on September 15, 2026, to Cliff Johnson Excavating for $132,302.00.
Two competing bids were received in response to the solicitation. Lyndon Jones Construction submitted a bid of $90,499.00, which was the lowest responsive bid, while RDJ Construction bid $171,019.60. The bid tabulation document indicates that Cliff Johnson Excavating was selected as the awardee, despite submitting the higher bid of $132,302.00. Bids were submitted through Bonfire, the State of Utah's online procurement platform, with all bidders required to be pre-qualified contractors of South Jordan City. The project scope included the flexibility for field modifications based on existing conditions and as directed or approved by the City.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-IFB project description Storm Drain Box Installation Summer Stone Dr.docx | DOCX document | |
| 3-Bid Schedule Storm Drain Installation.docx | DOCX document | |
| 2-Summer Stone Drive Plan.pdf | ||
| 4-Preliminary Bid Tabulation Storm Drain Installation Summer Stone Dr.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of South Jordan
IFB - Storm Drain Installation Summer Stone Drive
Bid Tabulation - AWARDED
15-Sep-26
AWARDED
Cliff Johnson
Excavating
Lyndon Jones
Construction
RDJ
Construction
Response Notes
Install approximately 155 linear feet of 15-inch HDPE storm drain pipe along with one inlet box. Connect system to existing combo box and/or a new cleanout box.
$ 132,302.00 $ 90,499.00 $ 171,019.60