This is a preliminary bid tabulation document for an Invitation for Bids (IFB) issued by the City of South Jordan, Utah, for storm drain installation along Summer Stone Drive. The project involves the installation of approximately 155 linear feet of 15-inch HDPE storm drain pipe along with one inlet box, with the new system connecting to an existing combo box and/or a new cleanout box. The contractor is responsible for providing all labor, equipment, materials, excavation, installation, backfill, compaction, and restoration work in compliance with South Jordan City standards and specifications. The project quantities and layout are approximate, with potential field modifications based on existing conditions and City direction. Bids were submitted electronically through the State of Utah's Bonfire procurement website, with all work required to meet municipal standards.
Three bids were received for the project with the following amounts: Cliff Johnson Excavating at $132,302.00, Lyndon Jones Construction at $90,499.00 (low bid), and RDJ Construction at $171,019.60. The tabulation is preliminary, with the notation that formal award has not occurred and the City has not yet determined whether the submitted bids are responsive, responsible, or correct. The results may change pending the City's evaluation and final award determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-IFB project description Storm Drain Box Installation Summer Stone Dr.docx | DOCX document | |
| 3-Bid Schedule Storm Drain Installation.docx | DOCX document | |
| 5-Bid Tabulation AWARDED Storm Drain Installation Summer Stone Dr.pdf | ||
| 2-Summer Stone Drive Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of South Jordan
IFB - Storm Drain Installation Summer Stone Drive
Preliminary Bid Tabulation
15-Sep-26 low bid
Cliff Johnson
Excavating
Lyndon Jones
Construction
RDJ
Construction
Response Notes
Install approximately 155 linear feet of 15-inch HDPE storm drain pipe along with one inlet box. Connect system to existing combo box and/or a new cleanout box.
$ 132,302.00 $ 90,499.00 $ 171,019.60
NOTE: Bid has not been formally awarded. The City has not determined if the submitted bids are responsive, responsible, or correct. Results may change.