47QFAA24R0004_T10_08d_Attachment 5 Task Order 01 Pricing Spreadsheet for Evaluation_2024-06-10.xlsx
XLSX spreadsheet 89 KB Posted
- Attached to
- Budget Department Management System (BDMS) Implementation & Support Services for PBGC Federal contract opportunity
- Solicitation number
- 47QFAA24R0004
About this file
This document is a pricing spreadsheet template for a federal contract opportunity for Budget Department Management System (BDMS) Implementation & Support Services for the Pension Benefit Guaranty Corporation (PBGC).
The template requires offerors to provide fully burdened labor rates, travel rates, other direct costs, and G&A/M&H rates for various labor categories over a base year and nine option years. The labor categories include roles such as SCRUM Master, Project Manager, Business Analyst, Trainer, and various levels of Subject Matter Experts and Developers. Offerors must also provide rationale for any additional labor categories proposed. The total evaluated price and total price for award are calculated based on the labor, travel, and ODC amounts entered. This template will be used as part of the pricing submission for Solicitation Number 47QFAA24R0004 for the BDMS Implementation & Support Services contract.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Cover Sheet
| 47QFAA24R0004 |
| Attachment 3 Part 1 (Pricing Cover Sheet) |
| Offeror to complete responses within the yellow fields. |
| 1 | Company Name: |
| 2 | Address: |
| 4 | DUNS Number: |
| UEI Number: | |
| 6 | Pricing good for 150 days? |
| 7 | Proposed hourly rates are fully burdened? (yes/no) |
| 9 | Proposed G&A/M&H rate is fixed for the life of the order? (yes/no) |
| 10 | Proposed Travel Mark-up rate is fixed for the life of the order? (yes/no) |
Sign and Date Here:
Please complete this form, sign, print, and include in PDF Portfolio 4
Pricing Summary
| Directions: Only fill in Labor Totals in Yellow Boxes. These totals come from the tabs in this worksheet. Fill in proposed percentage amounts for Travel, Travel Mark-Up, ODCs, and G&A/M&H rates in Yellow Boxes (D6:L15). | |||||||||
| Year | Labor Total | Travel | Travel with Mark-Up | Other Direct Costs (ODCs) | ODCs with Mark-Up | Total Evaluated Price | Total Proposed Price | Travel Mark-Up | G&A/M&H Rate (Indirect) |
| Base Year | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 6 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 7 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Option Year 9 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6-Month Option (FAR 52.217-8) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Total Evaluated Price | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Total Price for Award | $0.00 | $0.00 | $0.00 | $0.00 |
Prompt Payment Terms
Base Year
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Base) | Labor Rate | Total (Base) | Travel | Other Direct Costs | Total (Base) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 1
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 1) | Labor Rate | Total (Option Year 1) | Travel | Other Direct Costs | Total (Option Year 1) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 2
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 2) | Labor Rate | Total (Option Year 2) | Travel | Other Direct Costs | Total (Option Year 2) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 3
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 3) | Labor Rate | Total (Option Year 3) | Travel | Other Direct Costs | Total (Option Year 3) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 4
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 4) | Labor Rate | Total (Option Year 4) | Travel | Other Direct Costs | Total (Option Year 4) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 5
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 5) | Labor Rate | Total (Option Year 5) | Travel | Other Direct Costs | Total (Option Year 5) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 6
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 6) | Labor Rate | Total (Option Year 6) | Travel | Other Direct Costs | Total (Option Year 6) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 7
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 7) | Labor Rate | Total (Option Year 7) | Travel | Other Direct Costs | Total (Option Year 7) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 8
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 8) | Labor Rate | Total (Option Year 8) | Travel | Other Direct Costs | Total (Option Year 8) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
Option Year 9
| Directions: Input the total Number of Positions needed for each Labor Category (Column C), Hours per Person (Column D), and provide a labor rate for each Labor Category (Column F). The Total Estimated Direct Labor Dollars in cell G22 is the total Labor Price that will be automatically inputed on the Pricing Summary Sheet for this Period of Performance. | ||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option Year 9) | Labor Rate | Total (Option Year 9) | Travel | Other Direct Costs | Total (Option Year 9) |
| SCRUM Master | 0 | $0.00 | ||||||
| Project Manager - Level III | 0 | |||||||
| Business Analyst - Level III | 0 | |||||||
| Trainer | 0 | |||||||
| Organizational Change Manager | 0 | |||||||
| Technical Lead | 0 | |||||||
| System Administrator | 0 | |||||||
| Developer - SME II | 0 | |||||||
| Developer - SME I | 0 | |||||||
| Enterprise Architect | 0 | |||||||
| Subject Matter Expert I | 0 | |||||||
| Subject Matter Expert II | 0 | |||||||
| Subject Matter Expert III | 0 | |||||||
| Technical Writer | 0 | |||||||
| Training Specialist Level I | 0 | |||||||
| Training Specialist Level II | 0 | |||||||
| Total Estimated Direct Labor Hours | 0 | |||||||
| Total Estimated Direct Labor Dollars | $0.00 | $0.00 | $0.00 | $0.00 |
ESRI_MAPINFO_SHEET
DO NOT EDIT
For Esri use only
Additional Labor Categories
| Directions: Provide any additional necessary Labor Categories in Column B, number of positions in Column C, number of Hours per Person in Column D, and Labor Rate in Column F. The Total Estimated Direct Labor Dollars for each Additional Labor Category, per Period of Performance, if deemed appropriate to this effort, will be added to the labor totals calculated in each Period of Performance on those pages by the CO prior to award. Below the chart, please input the Additional Labor Category name again and complete the rationale for its inclusion in this task order (currently at B45-C:49). | |||||||||||||||||||||
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Base) | Labor Rate | Base Labor Total | Hours per Person | Total Hours (Option 1) | Labor Rate | Option 1 Labor Total | Hours per Person | Total Hours (Option 2) | Labor Rate | Option 2 Labor Total | Hours per Person | Total Hours (Option 3) | Labor Rate | Option 3 Labor Total | Hours per Person | Total Hours (Option 4) | Labor Rate | Option 4 Labor Total |
| Additional Labor Category 1 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 2 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 3 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 4 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 5 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 6 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 7 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 8 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 9 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 10 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Total Estimated Direct Labor Hours | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| Labor Category Description | Number of Positions | Hours per Person | Total Hours (Option 5) | Labor Rate | Option 5 Labor Total | Hours per Person | Total Hours (Option 6) | Labor Rate | Option 6 Labor Total | Hours per Person | Total Hours (Option 7) | Labor Rate | Option 7 Labor Total | Hours per Person | Total Hours (Option 8) | Labor Rate | Option 8 Labor Total | Hours per Person | Total Hours (Option 9) | Labor Rate | Option 9 Labor Total |
| Additional Labor Category 1 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 2 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 3 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 4 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 5 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 6 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 7 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 8 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 9 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Additional Labor Category 10 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Total Estimated Direct Labor Hours | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | |||||||||||
| Labor Category | Rationale for why this labor category is necessary (what role will it play in the overall effort, how does its work play into the overall effort, what specific sections and tasks of the PWS does this labor category support and tie into, how will these hours and costs be minimized and tracked to ensure they stay within the defined scope of this project?) | ||||||||||||||||||||
| Labor Category 1 | |||||||||||||||||||||
| Labor Category 2 | |||||||||||||||||||||
| Labor Category 3 | |||||||||||||||||||||
| Labor Category 4 | |||||||||||||||||||||
| Labor Category 5 | |||||||||||||||||||||
| Labor Category 6 | |||||||||||||||||||||
| Labor Category 7 | |||||||||||||||||||||
| Labor Category 8 | |||||||||||||||||||||
| Labor Category 9 | |||||||||||||||||||||
| Labor Category 10 |
Cross-Walk of LCATS This Crosswalk of PBGC LCATS to OFFEROR'S LCATS is provided for proposal use.
| TO LCAT Name | Offeror's LCAT Name |
| SCRUM Master | |
| Project Manager - Level III | |
| Business Analyst - Level III | |
| Trainer | |
| Organizational Change Manager | |
| Technical Lead | |
| System Administrator | |
| Developer - SME II | |
| Developer - SME I | |
| Enterprise Architect | |
| Subject Matter Expert I | |
| Subject Matter Expert II | |
| Subject Matter Expert III | |
| Technical Writer | |
| Training Specialist Level I | |
| Training Specialist Level II |
File details come from the government source that posted it. Updated .