REQUEST FOR PROPOSAL
(RFP)
U.S. GENERAL SERVICES ADMINISTRATION
National Capital Region
301 7th Street, SW, Room 6663
Washington DC 20407
PROJECT: Consolidated Facilities Maintenance (CFM) for the
Postal Square Building
SOLICITATION NO: 47PM0717R0002
FOR A SINGLE AWARD OF A FIRM FIXED PRICED
IDIQ CONTRACT
ISSUE DATE: August 4, 2017
CLOSING DATE & TIME: October 02, 2017@ 4:00 PM (EST)
Cut-off date for Receipt of Questions: 2:00 PM Eastern Standard Time on August 21, 2017
Site Visit Dates: Wednesday, August 16, 2017 @ 9:00 am (EST) and 1:00 pm (EST); or
Thursday, August 17, 2017 @ 9:00 am (EST)
Please see attached “Site Visit Information” Document
PROPOSAL DUE TO: ELECTRONIC SUBMISSION via email at foluke.tate@gsa.gov/olivia.flowers@gsa.gov
Attention: Foluké J. Tate, Contract Specialist/Olivia Clark-Flowers, Contract Specialist
SOLICITATION NUMBER: 47PM0717R0002
SERVICE: CONSOLIDATED FACILITIES MANAGEMENT
Operations and Maintenance, Custodial, Vertical Transportation and Related Services
LOCATION(S): 2 Massachusetts Avenue, N.E Washington, DC 20212
THIS PROCUREMENT HAS BEEN SET-ASIDE FOR
8(a) Business Development Program ONLY.
mailto:foluke.tate@gsa.gov mailto:olivia.flowers@gsa.gov
SOLICITATION TABLE OF CONTENTS
General
Information……………………………………………………………………………...11
Section I
Standard Form 1449 Solicitation/Contract/Order for Commercial Items(a)………12
Section II
Statement of Objectives/Ordering Procedures……………………………..……...…13
DESCRIPTION OF SERVICES
II.1 General Summary
II.2 Travel
II.3 Contract Effective Period
II.4 Place of Performance
II.5 Firm-Fixed Price
II.6 Additional Services
II.7 Pricing Sheets (Summary, Base, Options and Additional Services)
Section III
Statement of Work………………………………………...24
III.1 SCOPE OF WORK
III.1.1 OPERATIONS AND MAINTENANCE (O & M) SCOPE OF WORK
III.1.1.1 Contractor responsibility for Equipment and Systems
III.1.1.2 Contractor Responsibilities for Management and Communication
III.1.1.3 Exclusions
III.1.2 DEFINITIONS
III.1.2.1 Acceptance
III.1.2.2 Acts of God
III.1.2.3 Additional services
III.1.2.4 Advanced Meters
III.1.2.5 Advanced Metering Systems
III.1.2.6 Approval
III.1.2.7 Architectural and Structural
III.1.2.8 Basic Services
III.1.2.8.1 Above Basic Services
III.1.2.9 Building
III.1.2.10 Building Automation System (BAS)
III.1.2.11 Building Operating Plan
III.1.2.12 Cleanable Square Feet
III.1.2.13 Commissioning
III.1.2.14 Ongoing Commissioning
III.1.2.15 Computerized Maintenance Management System (CMMS)
III.1.2.16 Consumable Parts
III.1.2.17 Contracting Officer (CO)
III.1.2.18 Contracting Officer Representative (COR)
III.1.2.19 Contractor
III.1.2.20 Contractor’s Other Than Normal Working/Duty Hours
III.1.2.21 Controls and Control System
III.1.2.22 Custodial
III.1.2.23 Defective Service
III.1.2.24 Electrical
III.1.2.25 Elevator
III.1.2.26 Emergency
III.1.2.27 Emergency Callback
III.1.2.28 Environmentally Sustainable
III.1.2.29 Equipment Inventory
III.1.2.29.1 Partial Inventory
III.1.2.29.2 Preventive Maintenance (PM) Inventory
III.1.2.29.3 Component Level Inventory
III.1.2.29.4 Complete Inventory
III.1.2.30 Existing Deficiency List Report
III.1.2.31 Exterior
III.1.2.32 Federally Equipped Food Service
III.1.2.33 Federal Holidays
III.1.2.34 Federal Executive Holidays, Unanticipated
III.1.2.35 Fire Protection and Life Safety Systems
III.1.2.36 Furnishings
III.1.2.37 General Program
III.1.2.38 Green Cleaning
III.1.2.39 Guiding Principles for Sustainable Existing Buildings
III.1.2.40 GSAlink
III.1.2.41 GSA Green Purchasing Program (GPP)
III.1.2.42 Heating, Ventilation and Air -Conditioning (HVAC)
III.1.2.43 HVAC Operations Manual
III.1.2.44 Indefinite Quantity
III.1.2.45 Landscape Irrigation Systems
III.1.2.46 LEED-EB
III.1.2.47 Maintenance Repair
III.1.2.48 Mechanical
III.1.2.49 Miscellaneous Work
III.1.2.50 Modification of Contract
III.1.2.51 Monthly Progress Report
III.1.2.52 Negligence
III.1.2.53 Non-reimbursable Repairs
III.1.2.54 Normal Working Hours
III.1.2.55 Occupant Emergency Plan (OEP)
III.1.2.56 Open Systems
III.1.2.57 Operations
III.1.2.58 Ordering Official
III.1.2.59 Performance-Based Statement of Work (PBSOW)
III.1.2.60 Police Outside Areas
III.1.2.61 Predictive Maintenance
III.1.2.62 Preventive Maintenance (Scheduled and Unscheduled)
III.1.2.63 Product Preference
III.1.2.64 Punch List
III.1.2.65 Quality Assurance Surveillance Plan (QASP)
III.1.2.66 Quality Control Plan
III.1.2.67 Repair
III.1.2.68 Reimbursable Repair
III.1.2.69 Sanitize
III.1.2.70 Security Systems
III.1.2.71 Sequence of Operations
III.1.2.72 Service Calls
III.1.2.73 Service Request
III.1.2.74 Stewardship
III.1.2.75 Supervisor, On-Site
III.1.2.76 Tour
III.1.2.77 Vertical Transportation Systems
III.1.2.78 Watch
III.1.3 REFERENCES
III.1.4 EXISTING DEFICIENCY INSPECTION/INITIAL DEFICIENCY LIST
III.1.4.1 Initial Inspections
III.1.4.2 Initial Deficiency List
III.1.5 TRANSITION PHASE
III.1.5.1 RESERVED
III.1.5.1.2 Transition Phase Startup
III.1.5.2 (RESERVED)
III.1.5.3 Adjustments and Corrections
III.1.6 PHASE-OUT TRANSITION PERIOD
III.1.7 DEFICIENCY LIST COMPLETION AND WITHHOLDING OF FINAL PAYMENT
III.1.8 GENERAL AND ADMINISTRATIVE REQUIREMENTS
III.1.8.1 Minimum Staffing and Ability to Contact and Communicate with CO or designee
III.1.8.2 Communication Equipment
III.1.8.3 Onsite Records
III.1.8.4 Service Request and Administrative Support
III.1.8.5 Use of CMMS
III.1.8.6 Quality Control Program
III.1.8.7 Government Quality Assurance Surveillance Program
III.1.8.7.1 Contract Performance
III.1.8.7.2 Methods
III.1.8.7.3 Records and Files
III.1.8.7.4 Cooperation - Inspections
III.1.8.7.5 Contractor Performance System (CPARS)
III.1.9 BUILDING OPERATING PLAN (BOP)
III.1.9.1 Building Operation Plan Purpose
III.1.9.2 Components of the Building Operation Plan
III.1.10 EQUIPMENT INVENTORY
III.1.10.1 Specifications for NCR Regional CMMS Program
III.1.11 MONTHLY PROGRESS REPORT
III.1.11.1 No Bundling of Defective Equipment
III.1.12 PERFORMANCE REVIEW MEETINGS
III.1.13 EQUIPMENT CONDITION ASSESSMENT
III.1.14 OCCUPANT FEEDBACK PROGRAM
III.1.15 REFERENCE LIBRARY
III.1.16 REVIEW OF DESIGN DOCUMENTS
III.1.17 BUILDING MANAGEMENT SUPPORT SERVICES
III.1.18 INSPECTION ASSISTANCE FOR SPACE BUILD OUTS
III.1.19 EMERGENCY SHUTDOWN INSTRUCTIONS AND TOUR CHECKLISTS
III.1.20 LABELING OF ELECTRICAL CIRCUITS
III.1.21 OPERATIONAL REQUIREMENTS
III.1.21.1 General
III.1.21.2 Extended Operating Hours
III.1.21.3 Continuity of Operations (COOP)
III.1.21.4 Emergency Operations Plan
III.1.21.5 Tenant Environment
III.1.21.6 Energy and Water Efficiency
III.1.22 SYSTEM PERFORMANCE STANDARDS OR PROCEDURES
III.1.23 SERVICE REQUESTS
III.1.23.1 General
III.1.23.2 Emergency Service Request
III.1.23.3 Emergency Call Back (after hours)
III.1.23.4 Urgent Service Request Response
III.1.23.5 Routine Service Request Response
III.1.23.6 Inspection of Mechanical, Electrical, Fire Protection and Control Systems
III.1.23.7 Posting Operating Instructions
III.1.23.8 Customer Feedback
III.1.24 TOURS
III.1.24.1 General
III.1.24.2 Operating Logs and Tour Check Sheets
III.1.24.3 Tour Frequencies
III.1.24.4 Condensate Pans
III.1.24.5 Monitoring of Central Plant Equipment
III.1.24.6 Leak Testing
III.1.25 DEMAND RESPONSE PROGRAMS
III.1.26 CURTAILMENT PLAN
III.1.27 BAS ALARM RESPONSE
III.1.28 ADVANCED METERING PROGRAM
III.1.28.1 Verification and Calibration
III.1.29 PROTECTION AND DAMAGE
III.1.30 NEGLIGENCE
III.1.31 KEY CONTROL
III.1.32 DISRUPTIVE OR HAZARDOUS TOOLS
III.1.33 SCHEDULED DISRUPTION TO UTILITIES, LIGHTING, OR SPACE
CONDITIONING
III.1.34 PLUMBING AND RESTROOMS
III.1.35 MAINTENANCE PROGRAM
III.1.35.1 General
III.1.35.2 Maintenance Standard
III.1.35.3 Application of Diagnostic Software
III.1.35.4 BAS Control Systems
III.1.35.4.1 BAS and AMS Operating Standards
III.1.35.4.1.1 (RESERVED)
III.1.35.4.1.2 Accepted Systems Requirements (not hosted on GSA’s system infrastructure)
III.1.35.4.2 Reporting
III.1.35.5 Smart Building Technology
III.1.35.6 Ongoing Commissioning/Re-Tuning
III.1.36 WATER TREATMENT
III.1.36.1 General
III.1.36.2 Tolerances
III.1.36.3 Initial Report and Development of Program
III.1.36.4 Cooling Tower Water Management Plan
III.1.36.5 Corrosion Monitoring
III.1.36.6 Monthly Testing
III.1.36.7 Water Treatment Monitoring
III.1.36.8 Domestic Water Testing
III.1.36.9 Periodic Eddy Current test on Chiller Tubes
III.1.37 OIL ANALYSIS AND OIL CHANGES
III.1.37.1 Periodic Oil Analysis
III.1.37.2 Oil and Refrigerant Additives
III.1.37.3 Oil Changes
III.1.38 LAMPS AND BALLASTS
III.1.39 ARCHITECTURAL AND STRUCTURAL SYSTEMS MAINTENANCE
III.1.39.1 General
III.1.39.2 Maintenance and Repair
III.1.39.3 Repair and Replacement Work
III.1.39.4 Painting
III.1.39.5 Interior Signage and Directories
III.1.39.6 Finishes Maintenance
III.1.39.7 Historic Building Preservation
III.1.39.8 Vertical Transportation and Associated Equipment
III.1.39.9 Flag Procedures
III.1.40 REPAIRS
III.1.40.1 (RESERVED)
III.1.40.2 Non-reimbursable Repairs
III.1.40.3 Reimbursable Repairs
III.1.40.4 Miscellaneous Work
III.1.40.5 Repair Shared Liability Example
III.1.40.6 Approval of Work
III.1.40.7 Invoicing
III.1.40.8 Ordering Repairs from Outside Source
III.1.40.9 Force Majeure (Uncontrollable events)
III.1.40.10 Warranties
III.1.40.11 Quality of Materials and Replacement Parts
III.1.41 SAFETY & ENVIRONMENTAL MANAGEMENT
III.1.41.1 General
III.1.41.2 Scheduling and Recordkeeping
III.1.41.3 Refrigerants
III.1.41.3.1 Control and Certification
III.1.41.3.2 Certified Handlers
III.1.41.4 AQMD Operating Permits
III.1.41.5 Underground Storage Tanks
III.1.41.6 Solid Waste Audit
III.1.41.7 Polychlorinated Biphenyl (PCB) Control
III.1.41.8 Facility Hazards
III.1.41.9 Workplace Safety
III.1.41.10 Electrical Safety
III.1.41.11 Fall Protection
III.1.41.12 Powered Platforms
III.1.41.13 Lock Out / Tag Out
III.1.41.14 Confined Spaces
III.1.41.15 Asbestos Management
III.1.41.16 Hazardous Materials
III.1.41.16.1Materials Safety Data Sheets (MSDS)
III.1.41.16.2 Disposition of Hazardous Waste
III.1.41.16.3 Environmental Report
III.1.41.16.4 Recycled Content Product Purchase Annual Reporting
III.1.41.16.5 Non-Bio-based Products
III.1.41.16.6 Bio-Based Products
III.1.41.16.7 (RESERVED)
III.1.41.16.8 Refrigerant Monitor Testing
III.1.41.17 Boiler/Pressure Vessel Operation and Inspection Standards
III.1.41.17.1 Boiler Operation and Inspections
III.1.41.17.2 Inspections and Tests
III.1.41.17.3 Backflow Prevention Devices
III.1.41.17.4 Potable Water Systems
III.1.41.18 Labeling and Signage
III.1.41.19 Roof Anchorage Points
III.1.42 FIRE PROTECTION AND LIFE SAFETY EQUIPMENT AND SYSTEMS
III.1.42.1 General
III.1.42.2 Fire Alarm System Services
III.1.42.3 Fire Alarm System Testing
III.1.42.4 Fire Alarm System Maintenance
III.1.42.5 Fire Alarm System Central Station Monitoring
III.1.42.6 Water Based Fire Suppression Systems
III.1.42.7 Fire Doors and Other Opening Protective
III.1.42.8 Fire and Combination Fire/Smoke Dampers
III.1.42.9 Smoke Doors and Other Opening Protective
III.1.42.10 Smoke Dampers
III.1.42.11 Portable Fire Extinguishers
III.1.42.12 Non-Water-Based Fire Extinguishing Systems
III.1.42.13 Smoke Control Systems
III.1.42.14 Emergency and Standby Power Systems
III.1.42.15 Emergency Lighting and Exit Signage
III.1.42.16 Fire Alarm Central Station Monitoring
III.1.42.17 Fire Drills
III.1.42.18 Emergency Generator Testing and Reporting Requirements
III.1.42.19 Miscellaneous Work
III.1.43 MAINTENANCE AND REPAIR OF VERTICAL TRANSPORTATION SYSTEMS (See
Section III.3)
III.1.44 CONTRACTOR SUBMITTALS/DELIVERABLES CHART (O&M)
III.1.44.1 Milestone Chart For Contractor Deliverables
III.1.45 CRITERIA FOR NON-COMPLIANCE EVENTS
III.1.46 FEDERAL REQUIREMENTS
III.2 CUSTODIAL PERFORMANCE-BASED SCOPE OF WORK
III.2.1 OBJECTIVES AND SCOPE
III.2.1.2 The Contractor’s Responsibilities
III.2.1.3 Cleaning Hours
III.2.1.4 Building Information Data Sheet Estimates
III.2.1.5 Support Services
III.2.2 GREEN CLEANING
III.2.3 GREEN PURCHASING PLAN
III.2.3.1 Sustainable Products
III.2.3.2 Exemptions
III.2.3.3 Proof of Compliance
III.2.4 BASIC SERVICES
III.2.4.1 Interior Surfaces
III.2.4.2 Performance Standards
III.2.4.3 Floor Care
III.2.4.4 Carpets and Rugs
III.2.4.5 Floor Mats and Runners
III.2.4.6 Restrooms, Shower Rooms, Locker Rooms, Holding Cells
III.2.4.7 Fixtures
III.2.4.8 Surfaces
III.2.4.9 Walls
III.2.4.10 High Cleaning
III.2.4.11 Dusting
III.2.4.12 Trash, Wastebaskets and Ash Receptacles
III.2.4.13 Recyclables
III.2.4.14 Elevators, Escalators and Stairways
III.2.4.15 Plate Glass
III.2.4.16 Window Washing
III.2.4.17 Blinds and Coverings
III.2.4.18 (RESERVED)
III.2.4.19 Policing Inside Areas
III.2.4.20 Interior and Atrium Plants
III.2.4.21 Concessions
III.2.4.22 (RESERVED)
III.2.4.23 Fitness Centers, Health Units and Laboratories
III.2.4.24 Warehouse Space
III.2.5 EXTERIOR SURFACES
III.2.5.1 Performance Standards
III.2.5.2 Plate Glass
III.2.5.3 Window Washing
III.2.5.4 (RESERVED)
III.2.5.5 Hard Surface Areas
III.2.5.6 Ash Receptacles and Trash Containers
III.2.5.7 Surfaces
III.2.5.8 Graffiti Removal
III.2.5.9 Excrement Removal
III.2.5.10 Policing Outside Areas
III.2.5.11 Snow and Ice Removal
III.2.6 SPACE REDUCTION
III.2.7 SUSPENSION OF WORK
III.2.8 UNSATIFACTORY PERFORMANCE / REDUCTION IN PAYMENT
III.2.9 (RESERVED)
III.2.10 ABOVE BASIC SERVICES
III.2.10.1 Carpet Extraction
III.2.10.2 Window Washing
III.2.10.3 (RESERVED)
III.2.10.4 Washing Blinds and Coverings
III.2.10.5 Pressure Washing and Steam Cleaning
III.2.10.6 (RESERVED)
III.2.10.7 Government Furnished Trees and Plants
III.2.10.8 Snow and Ice Removal for Areas Requiring Heavy Equipment
III.2.11 SERVICE CALLS
III.2.12 COMMUNICATION PLAN
III.2.13 PROTECTION AND DAMAGE
III.2.14 SOLID WASTE / TRASH / RECYCLING MANAGEMENT
III.2.14.1 Solid Waste and Trash Audits
III.2.14.2 Extent of work
III.2.14.3 Solid Waste / Trash Removal / and Disposal
III.2.14.4 Solid Waste / Trash / Records and Reports
III.2.14.5 Pick-ups on Call
III.2.14.6 Recycling
III.2.14.7 Extent of Work
III.2.14.8 Recyclable Materials Disposition
III.2.14.9 Recyclables
III.2.14.10 Pick-ups on Call
III.2.14.11 Recycling Containers
III.2.14.12 Restriction on Use
III.2.14.13 Recycling Proceeds
III.2.14.14 Recycling Records and Reports
III.2.15 EVIRONMENTAL REPORTING
III.2.15.1 Recycling and Waste Reports
III.2.15.2 Report Calculation
III.2.15.3 Green Purchase Reports
III.2.15.4 (RESERVED)
III.2.16 INTERGRATED PEST MAINTENANCE
III.2.16.1 Preventative Pest Management
III.2.17 (RESERVED)
III.2.18 QUAILITY CONTROL PLAN
III.2.19 CLEANING SCHEDULES
III.2.20 COMMUNICATION REQUIREMENTS
III.2.21 FEDERAL REQUIREMENTS
III.2.22 CONTRACTOR SUBMITTALS / DELIVERABLE CHART
III.3 VERTICAL TRANSPORTATION
Section IV
Contract Clauses(c)……………………………………………………………
52.252-2 Clauses Incorporated by Reference
52.203-17 Contractor Employee Whistleblower Rights
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
52.204-9 Personal Identity Verification of Contractor Personnel
52.212-4 Contract Terms and Conditions—Commercial Items (May 2015)
52.223-1 Bio-based Product Certification.
52.223-2 Affirmative Procurement of Bio-based Products under Service and Construction Contracts
52.223-3 Hazardous Material Identification and Material Safety Data
52.223-5 Pollution Prevention and Right-to-Know Information
52.223-7 Notice of Radioactive Materials.
52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items.
52.223-10 Waste Reduction Program (May 2011)
52.223-11 Ozone-Depleting Substances.
52.223-15 Energy Efficiency in Energy-Consuming Products.
52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts
52.223-19 Compliance with Environmental Management Systems
52.228-5 Insurance – Work on a Government Installation (Jan 1997)
GSAM 552.228-5 – Government as Additional Insured (May 2009)
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—
Commercial Items (Jan 2017)
Section V
Contract Documents, Exhibits, and Attachments (d)….…………….……………123
LIST OF ATTACHMENTS
Attachment A: SF 1449
Attachment B Special Contract Requirements
Attachment C: Site Visit Information
Attachment D: Security Clause-HSPD 12 Standard Language
Attachment E: Past Performance Questionnaire
Attachment F: Wages
Attachment G: GSA 527 – Contractor’s Qualifications And Financial Information
Attachment H: PSB SEIU LOCAL 32BJ CBA
Attachment I: PSB IUOE LOCAL 99 CBA
Attachment J: Postal Square List of Assets
LIST OF V-1 EXHIBITS – OPERATION AND MAINTENANCE
V-1.1 Operation and Maintenance Contract Deliverables
V-1.2 Quality Assurance Plan (QASP)
V-1.3 Green Purchasing Report
Non Bio-Based Report
Bio-Based Report
V-1.4 Solid Waste Audit Report
V-1.5 Summary of Environmentally Sustainable Product Attributes and Offerings
V-1.6 Building Information Sheet
V-1.7 Monthly Report Template
V-1.8 Building Operating Plan Template
V-1.9 Smart Building
V-1.10 Water Treatment
V-1.11 Energy & Water Operational Performance Targets
V-1.12 Energy and Water Efficiency Use Plan
V-1.13 Energy and Water Efficiency Monthly Report
V-1.14 Annual Energy & Water Efficiency Report
V-1.15 Qualifications of Electrical Testing Technicians (ETT)
V-1.16 Miscellaneous Best Practices
V-1.17 Inventory/CMMS
V-1.18 Preventive Maintenance Guides
V-1.19 Solid Waste and Recycling Report
V-1.20 Requirements and Submittal Reports
LIST OF J-2 EXHIBITS – CUSTODIAL AND RELATED SERVICES
V-2.1 Custodial Deliverables
V-2.2 Building Information Sheet
V-2.3 Quality Assurance Surveillance Plan (QASP)
V-2.4 Surveillance Forms
V-2.5 Building Exterior and Hardscape Plan
V-2.6 Erosion and Sediment Control
V-2.7 Green Purchase Report (Bio-based)
V-2.8 Green Purchase Report (Non Bio-based)
V-2.9 Recycling / Solid Waste / Trash Report
V-2.10 Examples of Environmentally Sustainable Product Attributes and Offerings
V-2.11 PBS Waste Audits
V-2.12 Custodial Sq. Ft. Tool
J-3 LIST OF EXHIBITS – VERTICAL TRANSPORTATION
Section VI
Solicitation Provisions (e)……………………………………………………………..278
Section VII
Instructions, Conditions and Notices to Offerors…………...……………………
Section VIII
Basis for Award/ Evaluation Factors for Award………………….……………
Section IX
Offeror Representations and Certifications………………..………………………..286
General Information
This solicitation contains a Consolidated Facilities Management (CFM) work statement for a performance-based service. The CFM approach combines facilities related contracts into a single contract designed to reduce administrative costs and simplify the management of various building services. The performance-based service means that the Government has described WHAT is to be accomplished, NOT HOW to accomplish it, and states a basis for determining whether finished work meets the Government quality requirements. It does not state detailed procedures for accomplishing the work unless there are safety, security or communication requirements.
It is the responsibility of the Contractor to ensure that they build into their bid/proposal price, the necessary hours that it will take to meet the performance standards specified. The Contractor will be required to maintain a quality control program to ensure that the requirements of this contract are met.
The Contractor shall provide the management, administrative, supervision, labor, sub-contractors, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate, and assure effective completion of Preventive Maintenance services, repair of building operating equipment and systems as described in this contract. The Contractor shall be responsible for needed engineering services and reimbursable building alterations of building equipment including, but not limited to: All elevators on the premises, custodial and trash/debris removal services and all miscellaneous work associated with complete building facility management at the building. The Contractor will determine how much labor is needed to perform the tasks, what methods will be used to complete the job and which supplies, materials and equipment are needed.
AUTHORIZED REPRESENTATIVES
The following individuals are designated as the authorized GSA representatives under this Solicitation:
Contracting Specialists
Name: Foluké J. Tate. Olivia Clark-Flowers
Address: 7th & D Streets, SW #6663 7th & D Streets, SW #6663
Washington, DC 20407 Washington, DC 20407
Telephone: 202-969-5619 202-604-8489
Email: foluke.tate@gsa.gov olivia.flowers@gsa.gov
Contracting Officer
Name: Elaina Walker
Address: 7th & D Streets, SW #7719
Washington, DC 20407
Telephone: 202-260-4388
Email: Elaina.Walker@gsa.gov mailto:foluke.tate@gsa.gov mailto:olivia.flowers@gsa.gov mailto:Elaina.Walker@gsa.gov
Section I
Standard Form 1449 – Solicitation/Contract/Order for
Commercial Items (a)
RESERVED
Section II
Services, Ordering and Prices
DESCRIPTION OF SERVICES
II.1 GENERAL SUMMARY
The Contractor shall provide all management, administrative, supervision, labor, subcontractors, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate, and assure effective performance of all services described herein. The Contractor shall be responsible for needed operation and maintenance services and reimbursable building alterations of building equipment.
The Contractor is also responsible for all elevators on the premises, custodial and trash/debris removal services and all miscellaneous work associated with complete building facility management at the building.
Materials, supplies, and equipment should be selected and used in a manner that reduces exposure of hazardous materials, chemicals, airborne particles, etc., that reduce the impact on the environment as compared to other products and services used for the same purpose, in accordance with Executive Order
13101 (http://www.epa.gov/docs/fedrgstr/eo/eo/13101.htm) and RCRA Section 6002: Comprehensive
Procurement Guidelines (http://www.epa.gov/cop/products/tissue.htm). The Contractor will determine how much labor is needed to perform the tasks, what methods will be used to complete the contract and which supplies, materials and equipment are needed.
II.2 TRAVEL
Travel shall not be reimbursable, except as provided in the following paragraphs: The services required by this contract are expected to be within the geographic boundaries of the GSA National Capital Region
(NCR). The NCR includes the District of Columbia; the city of Baltimore, the counties of Montgomery, Prince Georges, Howard, Anne Arundel, and Baltimore in Maryland; the cities of Alexandria, Falls Church and Fairfax and Manassas, and the counties of Arlington, Fairfax, Prince William and Loudoun in Virginia.
There will be no reimbursement for travel within the GSA NCR.
Any reimbursable travel to be allowed must be authorized by the Contracting Officer (CO) in advance as a contract change order. The Contracting Officer’s Representative (COR) and the Contractor shall establish, through bilateral contract modification, the allowable travel reimbursement per visit to sites in cities or locations outside of the GSA NCR. In negotiating the fixed price for such travel, the allowable per diem cost shall not exceed the rates set forth in the Federal Travel Regulations in effect at the time that the work order is negotiated. In addition, and to the extent the CO authorizes reimbursable travel, all travel by privately owned vehicles outside of the GSA NCR will be reimbursed on Federal Travel Regulations mileage rates.
No travel reimbursement outside of GSA NCR will be allowed unless the Contractor provides sufficient written evidence of costs incurred, including receipts, registers or other information as may be required by the COR.
II.3 CONTRACT EFFECTIVE PERIOD
Base Period: 365 days after date of award and notice to proceed.
Option 1: 365 days after date of option exercise and notice to proceed.
Option 2: 365 days after date of option exercise and notice to proceed.
Option 3: 365 days after date of option exercise and notice to proceed.
Option 4: 365 days after date of option exercise and notice to proceed.
http://www.epa.gov/docs/
II.4 PLACE OF PERFORMANCE
Postal Square Building
2 Mass Avenue, NE
Washington, DC 20212
II.5 FIRM FIXED PRICE
Contractors shall quote a price for all contract line items in order to be considered for award. See Schedule
B for the complete scope of services.
For the price evaluation, the Government will evaluate price proposals of offerors for award purposes by adding the total price for all options and Additional services to the total price for the Base Contract. Award of options will not obligate the Government to exercise them.
II.6 ADDITIONAL SERVICES
a. Maximum Total Amount for Additional Services: The additional work under the base year and each of the option years will each have a Minimum Order Amount of $1,000.00 and Maximum
Order Limit (MOL) of $2,000,000.00.
b. Additional services will be procured through the issuance of contract task orders as requirements occur. Contract task orders will be issued using the GSA Form 300, titled “Order for Supplies and
Services.” A GSA Form 300-A may be used for continuation sheets when necessary. Attachments forming part of each contract work order may also be used for lengthy statements of work, etc. All contract task orders will be priced with an appropriate fixed dollar value and indicate a performance period for the required services. The task order performance period may extend beyond the expiration date of the current contract effective period (The end date for either the base year or exercised option years whichever is latest). Task orders, and associated modifications, must be signed by the Contracting Officer or a designated Contracting Officer’s Representative
(COR) to be valid. (The Contracting Officer will designated COR’s in writing.) The GSA Form
300 or SF30 will also be used to modify issued task orders when necessary.
c. The hourly contract man-hour rates shall be used for pricing the level of effort in each contract task order. Rates for disciplines not included in the initial contract must be priced and incorporated by modification to the basic contract before being used in contract task orders unless adequate cost and pricing data is available to demonstrate the reasonableness of the rate/cost.
d. When authorized or requested by the Government, reimbursable incidental expenses required in connection with the work scope shall be included as part of the cost breakdown in the proposal.
The firm fixed price for each contract task order will be based on fixed hourly rates established in the contract for the effective period(s) when they will be performed, the negotiated level of effort for each required discipline, travel (if authorized), miscellaneous items, reproduction costs, deliverables, and all other terms agreed upon by the parties.
e. II.6.1 Hourly Rates for II.5 and II.6
f. The estimated hours provided on the attached spreadsheets are for evaluation purposes only. They are not intended to provide any indication of the amount of additional work that the government may or may not request under the contract.
g. The hourly rates proposed by the Contractor and accepted at contract award for each respective performance period, i.e., the base year or one of the four option years, are to be fixed for the duration of that period, including any short term extensions to the last option period not exceeding six (6) months.
h. In developing the required hourly rates, the Contractor shall include all allowable profit, overhead, applicable taxes, and general condition costs to include home office support, anticipated company-wide increases, fringe benefits, individual employee promotions, all direct labor costs, computer time, data entry, carrier/messenger services, local travel, supplies, equipment and communication services associated with this contract.
i. The hourly rates listed and accepted at contract award will be the rates that will be used as the basis for pricing future task orders issued under this contract. The base year and each option period are to be separately priced.
II.7 PRICING SHEETS
II.7.1 Summary
Period Fire Fixed Price Total
Base $
Option I $
Option II $
Option III $
Option IV $
Total Evaluated Price $
II.7.2 Base Period
Item No. Supplies/Services Unit Firm Fixed Price
0001 Facilities Management 12 months $
0002 Operations and Maintenance and Related
Services
12 months $
0003 Elevator Maintenance 12 months $
0004 Custodial Services 12 months $
0005 TRANSITION-IN SERVICES (See
Section III.1.5)
NTE 30 days $
Subtotal $
II.7.3 Option 1
1001 Facilities Management 12 months $
1002 Operations and Maintenance and Related
Services
12 months $
1003 Elevator Maintenance 12 months $
1004 Custodial Services 12 months $
II.7.4 Option 2
2001 Facilities Management 12 months $
2002 Operations and Maintenances and Related
Services
12 months $
20034 Elevator Maintenance 12 months $
2006 Custodial Services 12 months $
II.7.5 Option 3
3001 Facilities Management 12 months $
3002 Operations and Maintenance and Related
Services
12 months $
3003 Elevator Maintenance 12 months $
3004 Custodial Services 12 months $
II.7.6 Option 4
4001 Facilities Management 12 months $
4002 Operations and Maintenance and Related
Services
12 months $
4003 Elevator Maintenance 12 months $
4004 Custodial Services 12 months $
4005 Transition –Out Services NTE 30 days $
II.7.7 Additional Services
II.7.7.1 Additional Services: Base Period
Labor Category Estimated Hrs./Year Unit Total
Reimbursable Operations
And Maintenance At Other
Than Occupant Work
Hours
200 Hourly Rate $
Reimbursable Repairs
During Occupant Work
Hours
300 Hourly Rate $
Reimbursable Repairs At
Other Than Occupant
Work Hours
150 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Team)
120 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Single
Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Team)
100 Hourly Rate $
Reimbursable Emergency
Callbacks for Elevator
Maintenance Repairs
(Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Operations
(Single Journeyman)
40 Hourly Rate $
Reimbursable
Miscellaneous Work
During Occupant Work
1800 Hourly Rate $
Hours
Reimbursable
Miscellaneous Work At
Other Than Occupant
Work Hours
300 Hourly Rate $
Reimbursable Window
Washing
Entire Building $
Reimbursable Window
Blind Cleaning
Per Blind $
Reimbursable Carpet
Shampooing
Rate Per Square
Foot
Reimbursable Floor
Stripping and Finishing
Rate Per Square
Foot
Reimbursable Laborer w/ shovel (Snow Removal)
20 Hourly Rate $
Reimbursable Laborer w/ snow blower (Snow
Removal)
10 Hourly Rate $
Reimbursable
Plow/Spreader Truck
(Snow Removal)
10 Hourly Rate $
Reimbursable Plow Truck
4 x 4 10 Hourly Rate $
Moving Equipment into
Site.
10 Hourly Rate $
Moving Equipment off
Site.
10 Hourly Rate $
Reimbursable “Bobcat” 10 Hourly Rate $
Reimbursable Ice/Snow
Melt (50 lb. bag) 10 Per Bag $
Reimbursable Urea (50 lb.
bag
Per Bag $
Sand Per Ton $
Total NA NA $H
II.7.7.2 Additional Services: Option 1
And Maintenance At Other
Than Occupant Work
Hours
200 Hourly Rate $
Reimbursable Repairs
During Occupant Work
Hours
300 Hourly Rate $
Reimbursable Repairs At
Other Than Occupant
Work Hours
150 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs 120 Hourly Rate $
During Occupant Work
Hours (Team)
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Single
Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Team)
100 Hourly Rate $
Reimbursable Emergency
Callbacks for Elevator
Maintenance Repairs
(Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Operations
(Single Journeyman)
40 Hourly Rate $
Reimbursable
Miscellaneous Work
During Occupant Work
Hours
1800 Hourly Rate $
Reimbursable
Miscellaneous Work At
Other Than Occupant
Work Hours
300 Hourly Rate $
Reimbursable Window
Washing Entire Building $
Reimbursable Window
Blind Cleaning Per Blind $
Reimbursable Carpet
Shampooing Rate Per Square
Foot
Reimbursable Floor
Stripping and Finishing Rate Per Square
Foot
Reimbursable Laborer w/ shovel (Snow Removal) 20 Hourly Rate $
Reimbursable Laborer w/ snow blower (Snow
Removal)
10 Hourly Rate $
Reimbursable
Plow/Spreader Truck
(Snow Removal)
10 Hourly Rate $
Reimbursable Plow Truck
4 x 4 10 Hourly Rate $
Moving Equipment into
Site.
10 Hourly Rate $
Moving Equip. off Site. 10 Hourly Rate $
Reimbursable “Bobcat” 10 Hourly Rate $
Reimbursable Ice/Snow
Melt (50 lb. bag) 10 Per Bag $
Reimbursable Urea (50 lb.
bag Per Bag $
Total NA NA $
II.7.7.3 Additional Services: Option 2
And Maintenance At Other
Than Occupant Work
Hours
200 Hourly Rate $
Reimbursable Repairs
During Occupant Work
Hours
300 Hourly Rate $
Reimbursable Repairs At
Other Than Occupant
Work Hours
150 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Team)
120 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Single
Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Team)
100 Hourly Rate $
Reimbursable Emergency
Callbacks for Elevator
Maintenance Repairs
(Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Operations
(Single Journeyman)
40 Hourly Rate $
Reimbursable
Miscellaneous Work
During Occupant Work
Hours
1800 Hourly Rate $
Reimbursable
Miscellaneous Work At
Other Than Occupant
Work Hours
300 Hourly Rate $
Reimbursable Window
Washing Entire Building $
Reimbursable Window
Blind Cleaning Per Blind $
Reimbursable Carpet
Shampooing Rate Per Square
Foot
Reimbursable Floor
Stripping and Finishing Rate Per Square
Foot
Reimbursable Laborer w/ shovel (Snow Removal) 20 Hourly Rate $
Reimbursable Laborer w/ snow blower (Snow
Removal)
10 Hourly Rate $
Reimbursable
Plow/Spreader Truck
(Snow Removal)
10 Hourly Rate $
Reimbursable Plow Truck
4 x 4 10 Hourly Rate $
Moving Equipment into
Site.
10 Hourly Rate $
Moving Equipment off
Site.
10 Hourly Rate $
Reimbursable “Bobcat” 10 Hourly Rate $
Reimbursable Ice/Snow
Melt (50 lb. bag) 10 Per Bag $
Reimbursable Urea (50 lb.
bag Per Bag $
II.7.7.4 Additional Services: Option 3
And Maintenance At Other
Than Occupant Work
Hours
200 Hourly Rate $
Reimbursable Repairs
During Occupant Work
Hours
300 Hourly Rate $
Reimbursable Repairs At
Other Than Occupant
Work Hours
150 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Team)
120 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Single
40 Hourly Rate $
Journeyman)
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Team)
100 Hourly Rate $
Reimbursable Emergency
Callbacks for Elevator
Maintenance Repairs
(Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Operations
(Single Journeyman)
40 Hourly Rate $
Reimbursable
Miscellaneous Work
During Occupant Work
Hours
1800 Hourly Rate $
Reimbursable
Miscellaneous Work At
Other Than Occupant
Work Hours
300 Hourly Rate $
Reimbursable Window
Washing Entire Building $
Reimbursable Window
Blind Cleaning Per Blind $
Reimbursable Carpet
Shampooing Rate Per Square
Foot
Reimbursable Floor
Stripping and Finishing Rate Per Square
Foot
Reimbursable Laborer w/ shovel (Snow Removal) 20 Hourly Rate $
Reimbursable Laborer w/ snow blower (Snow
Removal)
10 Hourly Rate $
Reimbursable
Plow/Spreader Truck
(Snow Removal)
10 Hourly Rate $
Reimbursable Plow Truck
4 x 4 10 Hourly Rate $
Moving Equipment into
Site.
10 Hourly Rate $
Moving Equipment off
Site.
10 Hourly Rate $
Reimbursable “Bobcat” 10 Hourly Rate $
Reimbursable Ice/Snow
Melt (50 lb. bag) 10 Per Bag $
Reimbursable Urea (50 lb.
bag Per Bag $
II.7.7.5 Additional Services: Option 4
And Maintenance At Other
Than Occupant Work
Hours
200 Hourly Rate $
Reimbursable Repairs
During Occupant Work
Hours
300 Hourly Rate $
Reimbursable Repairs At
Other Than Occupant
Work Hours
150 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs
During Occupant Work
Hours (Team)
120 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Single
Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Repairs At
Other Than Occupant
Work Hours (Team)
100 Hourly Rate $
Reimbursable Emergency
Callbacks for Elevator
Maintenance Repairs
(Single Journeyman)
40 Hourly Rate $
Reimbursable Elevator
Maintenance Operations
(Single Journeyman)
40 Hourly Rate $
Reimbursable
Miscellaneous Work
During Occupant Work
Hours
1800 Hourly Rate $
Reimbursable
Miscellaneous Work At
Other Than Occupant
Work Hours
300 Hourly Rate $
Reimbursable Window
Washing Entire Building $
Reimbursable Window
Blind Cleaning Per Blind $
Reimbursable Carpet
Shampooing Rate Per Square
Foot
Reimbursable Floor
Stripping and Finishing Rate Per Square
Foot
Reimbursable Laborer w/ shovel (Snow Removal) 20 Hourly Rate $
Reimbursable Laborer w/ snow blower (Snow
Removal)
10 Hourly Rate $
Reimbursable
Plow/Spreader Truck
(Snow Removal)
10 Hourly Rate $
Reimbursable Plow Truck
4 x 4 10 Hourly Rate $
Moving Equipment into
Site.
10 Hourly Rate $
Moving Equipment off
Site.
10 Hourly Rate $
Reimbursable “Bobcat” 10 Hourly Rate $
Reimbursable Ice/Snow
Melt (50 lb. bag) 10 Per Bag $
Reimbursable Urea (50 lb.
bag Per Bag $
Total NA NA $
Section III
Statement of Work
Introduction
This is a Performance Based Service Contract and the success of the Contract depends on the satisfaction of the requirements, but also the satisfaction of our shared customer. Rather than a mere list of activities, this is a written expression of the GSA’s expectation of the service to be performed by the Contractor. A higher level of effective communication between the Government and Contractor is essential for partnering and performance based service contract to succeed. The success of this Contract is shared between the
Government and the Contractor.
With some exceptions, as a performance-based contract, the requirements are stated in terms of desired results with associated quality standards.
In this Contract, more emphasis is placed on the Contractor’s self-management of quality, rather than an external inspection by Government Inspectors, although that is a part of this Contract as well. All parties should act proactively to reduce service cost, therein providing an incentive for the Contractor.
The Contractor, through innovation, technology, or other means, shall perform the required maintenance of these facilities by following our Guiding Principles for Sustainable Existing Buildings:
I. Employ Integrated Assessment, Operation and Management Principles
a. In conjunction with the Contract Officer (CO) or designee establish operational performance goals for energy, water, material use and recycling, and indoor environmental quality, and ensure incorporation of these goals throughout the lifecycle of this Contract.
b. Ensure that operating decisions are carried out with regard to sustainable operations.
c. Meet ASHRAE standards as noted throughout the SOW for thermal comfort and indoor air quality.
d. Use low emitting materials VOC (Volatile organic compounds) or other for maintenance. In particular, use products that have low pollutant emissions, adhesives, sealants, and solvents.
e. Use products meeting or exceeding EPA’s recycled content recommendations for building maintenance. For other products such as ceiling tiles, use materials with recycled content. For more information, see EPA’s Comprehensive Procurement Guideline website.
f. Use materials with the highest content level per USDA’s bio-based content recommendations for maintenance of or use in the building.
g. Use environmentally sustainable products that have a lesser or reduced effect on human health and the environment. See the Green Products Compilation.
h. Provide salvage, reuse and recycling services for waste generated from building operations, maintenance, and repair and discarded equipment.
i. Eliminate the use of ozone depleting compounds where alternative environmentally sustainable products are available consistent with the Clean Air Act.
II. Optimize Energy Performance – GSA is in the process of optimizing energy performance through many means and processes. Operate all equipment to optimize efficiency to reduce energy use and otherwise seek operating costs reductions wherever possible.
III. Protect and Conserve Water where possible inside and outside. Metering systems may be already installed or will be installed in government buildings to aid in reducing consumption. Where available, use
EPA’s Water Sense-labeled products or other water conserving products.
IV. Be aware that the building and management involved with this Contract may be in the process of establishing processes, instituting plans, and operational procedures to meet energy efficiency goals either through receiving an ENERGY STAR rating, Smart Building/GSAlink technology, or comparable programs. The Contractor will play an integral part of obtaining these goals and should be aware of the programs and processes.
V. The purpose of partnering is to adopt procedures wherein the Contract and Government work together in achieving Contract objectives. Partnering involves the development of a cooperative management team that seeks to identify compatible interests, and common goals and objectives.
VI. This is a fixed-price Contract and while working with the Government in obtaining goals the Contractor is motivated to find improved methods of performance in order to increase its profits. Results of an effective partnership should reflect a “mutual win” situation.
III.1 OPERATION AND MAINTENANCE
III.1.1 OPERATION AND MAINTENANACE (O&M) PERFORMANCE BASED STATEMENT OF
WORK (PBSOW)
III.1.1.1 Contractor Responsibility for Equipment and Systems
The Contractor shall provide management, supervision, labor, materials, equipment and supplies, administrative, subcontracts, reimbursable building alterations, and is responsible for the efficient, effective, economical, and satisfactory operation, scheduled and unscheduled maintenance, and repair of equipment and systems located within the property line of the Postal Square Building, to include the following:
a. Electrical systems and equipment. (Required parts identified on the manufacturer’s parts list and all products and components installed as part of the system).
b. Mechanical systems and equipment (which includes all functional and moving parts that make the system work), plumbing, Building Automation System (BAS) where applicable (where BAS/
ECMS systems are connected to the GSA network, the Contractor’s employees will need to obtain a GSA ENT account to access systems) and heating, ventilation, exhaust systems and air conditioning (HVAC) systems and equipment.
c. Fire protection and life safety systems and equipment.
d. All control systems that are within the scope of this Contract. All Building Automation Systems
(BAS), Public Address Systems, and Computerized Lighting Systems that are within the scope of this Contract (BAS, and Computerized software maintenance is excluded).
e. Architectural and structural systems, fixtures, and equipment within the site (to the property line).
f. Service request desk operations as identified in Section III.1.8.4 to include record keeping using a computerized maintenance management system (CMMS) if available or by other means as well as other administrative functions.
g. RESERVED
h. RESERVED
i. Locks, and related keying systems.
j. RESERVED
k. Elevator and Elevator Maintenance systems.
l. RESERVED
m. Storm drainage systems - reduce storm water pollution by minimizing discharges and runoff to the storm sewer system and environment.
n. The Contractor shall complete roofing system investigations and repairs not covered under warranty.
o. The Contractor shall maintain and repair U.S. flag pole, lighting and pulley system.
p. The Contractor shall maintain kitchen/concessions area drains.
q. RESERVED
r. Custodial and related services.
III.1.1.2 Contractor Responsibilities for Management and Communication
The Contractor Shall:
a. Be responsible to make the management and operational decisions to meet the quality standards required under this contract.
b. Use innovation, technology and other means and methods to develop and perform the most efficient services for the building.
c. Implement an effective Quality Control Plan (QCP).
d. Implement an effective service call system, as specified under the Special Requirements section of this contract that results in prompt, professional, and courteous resolution of tenant concerns.
e. Keep the Contracting Officer (CO) or designee informed of current status of the work being performed, provide work schedules, provide a major equipment and critical system break down or impairment form, and provide other pertinent information needed by the CO or designee.
f. Reduce the environmental impacts of work performed under this contract by using, to the maximum extent, environmentally sound practices, processes, and products.
g. Provide training to their employees that will stress stewardship in maintenance practices i.e., the proper use, disposal, recycling of chemicals, dispensing equipment and packaging. Provide documentation that their employees are completing training in the core competences and participating in continual educational training according to the Federal Building Personnel
Training Act. Ensure that their employees are properly licensed and/or certified to operate necessary building systems or equipment for which licensed and/or certified personnel are required by federal, state or local law, codes or ordinances (H.15. Personnel Qualifications).
h. Federal Requirements: the Contractor shall comply with all applicable Federal, state and local laws, regulations and codes, including any supplements or revisions. The Contractor shall obtain all applicable licenses training, and permits. If a change in law or regulation requires the
Contractor to implement an action that will result in an increase or decrease in Contract price, the
Contractor shall implement the required action and within 30 calendar days submit to the CO or their designee a price proposal for such change. If the CO or their designee determines an equitable adjustment is substantiated a modification to the Contract will be issued.
III.1.1.3 Exclusions
Excluded from this scope are:
a. RESERVED
b. Security systems (does not include mechanical components of the door, closers, keepers, hinges, etc)
c. Telecommunication systems.
d. Equipment owned and operated by tenant agencies. (Except as requested by agencies on a reimbursable basis.)
e. Furnishings (not installed as fixtures).
f. Kitchen appliances and equipment (but grease traps with associated piping are included in the scope).
g. Equipment owned by servicing public utilities.
h. Upgrade of software or software licenses (to include building automation systems (BAS) and
CMMS
i. Fitness center equipment.
j. RESERVED
III.1.2 DEFINITIONS
III.1.2.1 Acceptance
“Acceptance” means an authorized representative of the Government has inspected and agreed that the work meets all requirements of this contract, to include documentation requirements.
III.1.2.2 Acts of God
These are unanticipated grave natural disasters or other natural phenomenon of an exceptional, inevitable, and irresistible character; the effects of which could not have been prevented or avoided by the exercise of due care or foresight.
III.1.2.3 Additional Services “Additional services” are indefinite quantity requirements that are outside of the Basic Services and that the
Contractor will provide at an additional cost to the Government. The cost will, include all labor, supervision, supplies and materials. The CO or their designee will issue a separate task order before work may proceed.
III.1.2.4 Advanced Meters Advanced meters are those that have the capability to measure and record interval data (at least hourly for electricity), and communicate the data to a remote location in a format that can be easily integrated into an advanced metering system.
III.1.2.5 Advanced Metering Systems
A system that collects time-differentiated energy usage data from advanced meters via a network system on either an on-request or defined schedule basis. The system shall have the capability to read real and lapsed time power usage, trend data (KW usage), and cost reporting (KWH readings) data, and power factor. This collected information will support energy use management, procurement, and operations, U.S. Department of Energy, EERE: Guidance for Electric Metering in Federal Buildings, (February 3, 2006).
III.1.2.6 Approval
“Approval” means the Government has reviewed submittals, deliverables, and administrative documents
(e.g., insurance certificates, installation schedules, planned utility interruptions, etc.) and has determined the documents conform to contract requirements. Government approval shall not relieve the Contractor of responsibility for complying with Federal, State, and local laws and regulations.
III.1.2.7 Architectural and Structural
“Architectural and structural” systems include all building structure, envelope, building improvements and finishes, and site improvements (e.g., paving, walkways, asphalt, etc.) to the property line.
III.1.2.8 Basic Services
The Basic Services of the contract consist of the contract requirements for which the Contractor is paid as a base price, i.e., the requirements established by the Performance-Based Statement of Work (PBSOW) and related general and administrative requirements.
III.1.2.8.1 Above Basic Services
Above Basic Services are services not covered in the monthly price of the contract. Contractor prices include all applicable labor, materials, supplies, training/certifications, equipment (except as otherwise provided), supervision, and management.
III.1.2.9 Building
A reference to ‘facility’ and ‘site’ is interchangeable with ‘building.’ A man-made structure or edifice which services are performed within or on the exterior of the formation and is intended to support or shelter any use or continuous occupancy.
III.1.2.10 Building Automation System (BAS)
The “building automation system” is a system controlling and monitoring building HVAC, and possibly other systems, to include all device, field, and global controllers, instrumentation, networking infrastructure, computers and peripherals, software,…
This is the start of the file's text. The full file is on GovTribe.