Exhibit C5 - Erosion and Sediment Control.pdf

PDF 150 KB Posted

Attached to
Amendment 0001- Full Maintenance Services, VA and Treasury, Austin, Texas Federal contract opportunity
Solicitation number
47PH0220R0007
Issued by
General Services Administration Public Buildings Service Region 7

About this file

This document outlines requirements for full maintenance services for two federal buildings in Austin, Texas. The General Services Administration seeks to award a competitive SDVOB set-aside contract utilizing FAR Part 15 procedures. Services will include all management, supervision, labor, materials, supplies, repair parts, tools and equipment to effectively perform maintenance at the VA Austin Information Technology Center and U.S. Treasury Building. Prospective offerors must provide these full maintenance services in accordance with the specifications. The solicitation is anticipated to be issued on or around February 25, 2020, with a start date of July 1, 2020. The NAICS code is 561210 with a size standard of $41.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0001- Full Maintenance Services, VA and Treasury, Austin, Texas, newest first.
File Type Posted
Solicitation Amendment 47PH0220R0007_0001.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Building Library 1 - 2019 VA Treasury Fire Extinguisher Report.pdf PDF
Figure B-2 for Comb Union AND Non Union Contracts.xlsx XLSX spreadsheet
Exhibit M1 - O_M QASP.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Building Library 6 - Austin VA_Treasury Work Orders 2018-2019 (No PMs).xlsx XLSX spreadsheet
Building Library 5 - PM Schedule TREASURY_1457641243.pdf PDF
Building Library 4 - Roof Information.xlsx XLSX spreadsheet
Attachment 1 - CBA SDS-JV.pdf PDF
Attachment 3 - Wage Determination 2015-5215.pdf PDF
Exhibit C1 - Building Information Sheets.pdf PDF
Exhibit C3 - Surveillance Forms.pdf PDF
Exhibit M9 - Preventative Maintenance Guide.pdf PDF
Exhibit C2 - Custodial QASP.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
Exhibit M5 - Smart Buildings.pdf PDF
Exhibit C6 - Recycle, Solid Water, Trash Report.pdf PDF
Building Library 5 - PM Schedule VA TX1128AT1457641243.pdf PDF
Figure B-1 for Union and Non Union Contracts.xlsx XLSX spreadsheet
Figure L-1 Management Plan Worksheet).xlsx XLSX spreadsheet
Figure L-2 Management Plan Baseline.xlsx XLSX spreadsheet
Attachment 4 - Table of Deliverables.xlsx XLSX spreadsheet
Exhibit M2 - Green Purchasing Report.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
47PH0220R0007 Generated PDF with TOC.pdf PDF
Building Library 2 - Equipment Inventory.xlsx XLSX spreadsheet
Exhibit C7 - PBS Waste Audits.pdf PDF
Attachment 2 - CBA SDS-JV Austin Mechanics.pdf PDF
Figure B-3 Pricing - Full Maintenance.xlsx XLSX spreadsheet
Exhibit M4 - Bldg Op Plan Template.pdf PDF
Exhibit M3 - Environmental Sustainable Products.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C5

EROSION AND SEDIMENT CONTROL

IPM, Erosion Control, Landscape Management Plan1

Used only when Contractor is required to perform activities that disturbs the existing grounds conditions

The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power of the vegetation covering the soil. The Contractor shall submit to the CO an IPM Erosion Control, Landscape Management Plan outlining how this will be accomplished. At a minimum, the custodial and related services portion of the plan shall address the following items:

Goals and Scope

Responsible Parties

Guidance for Resources and Implementation

Performance Measurement

Training

Chemical Treatment Purchasing and Application

Integrated Pest Management (IPM)

Erosion and Sediment Control

Storm-Water Management Plan

Landscape Management and Grounds Maintenance

Composting

Quality Assurance/Quality Control Processes

1 This is a sample and is not intended to be comprehensive. Excerpts are from United States Green Building Council (USGBC).

File details come from the government source that posted it. Updated .