Exhibit C5 - Erosion and Sediment Control.pdf
PDF 150 KB Posted
- Attached to
- Amendment 0001- Full Maintenance Services, VA and Treasury, Austin, Texas Federal contract opportunity
- Solicitation number
- 47PH0220R0007
About this file
This document outlines requirements for full maintenance services for two federal buildings in Austin, Texas. The General Services Administration seeks to award a competitive SDVOB set-aside contract utilizing FAR Part 15 procedures. Services will include all management, supervision, labor, materials, supplies, repair parts, tools and equipment to effectively perform maintenance at the VA Austin Information Technology Center and U.S. Treasury Building. Prospective offerors must provide these full maintenance services in accordance with the specifications. The solicitation is anticipated to be issued on or around February 25, 2020, with a start date of July 1, 2020. The NAICS code is 561210 with a size standard of $41.5 million.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C5
EROSION AND SEDIMENT CONTROL
IPM, Erosion Control, Landscape Management Plan1
Used only when Contractor is required to perform activities that disturbs the existing grounds conditions
The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power of the vegetation covering the soil. The Contractor shall submit to the CO an IPM Erosion Control, Landscape Management Plan outlining how this will be accomplished. At a minimum, the custodial and related services portion of the plan shall address the following items:
Goals and Scope
Responsible Parties
Guidance for Resources and Implementation
Performance Measurement
Training
Chemical Treatment Purchasing and Application
Integrated Pest Management (IPM)
Erosion and Sediment Control
Storm-Water Management Plan
Landscape Management and Grounds Maintenance
Composting
Quality Assurance/Quality Control Processes
1 This is a sample and is not intended to be comprehensive. Excerpts are from United States Green Building Council (USGBC).
File details come from the government source that posted it. Updated .