Attachment 4 - Table of Deliverables.xlsx

XLSX spreadsheet 146 KB Posted

Attached to
Amendment 0001- Full Maintenance Services, VA and Treasury, Austin, Texas Federal contract opportunity
Solicitation number
47PH0220R0007
Issued by
General Services Administration Public Buildings Service Region 7

About this file

This document contains a table of deliverables for a custodial and operations and maintenance services contract and details of a related federal contract opportunity. The table of deliverables outlines over 70 reports, plans, logs, and other documents required from the contractor organized by topic and due date. These include staffing plans, green cleaning and pest control plans, safety data sheets, equipment inventories and condition assessments, preventative maintenance plans and documentation, and monthly progress reports. The federal contract opportunity is for full maintenance services for two buildings in Austin, Texas housing the VA and Treasury departments. The anticipated start date is July 2020, and the solicitation will use NAICS code 561210 with a size standard of $41.5M. The contract will be competitively set aside for SDVOB firms and procured using FAR Part 15 procedures.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0001- Full Maintenance Services, VA and Treasury, Austin, Texas, newest first.
File Type Posted
Solicitation Amendment 47PH0220R0007_0001.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Building Library 6 - Austin VA_Treasury Work Orders 2018-2019 (No PMs).xlsx XLSX spreadsheet
Building Library 5 - PM Schedule TREASURY_1457641243.pdf PDF
Building Library 4 - Roof Information.xlsx XLSX spreadsheet
Attachment 1 - CBA SDS-JV.pdf PDF
Attachment 3 - Wage Determination 2015-5215.pdf PDF
Exhibit C1 - Building Information Sheets.pdf PDF
Exhibit C3 - Surveillance Forms.pdf PDF
Exhibit M9 - Preventative Maintenance Guide.pdf PDF
Exhibit C2 - Custodial QASP.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
Exhibit M5 - Smart Buildings.pdf PDF
Exhibit C6 - Recycle, Solid Water, Trash Report.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Building Library 1 - 2019 VA Treasury Fire Extinguisher Report.pdf PDF
Figure B-2 for Comb Union AND Non Union Contracts.xlsx XLSX spreadsheet
Exhibit M1 - O_M QASP.pdf PDF
Building Library 5 - PM Schedule VA TX1128AT1457641243.pdf PDF
Figure B-1 for Union and Non Union Contracts.xlsx XLSX spreadsheet
Figure L-1 Management Plan Worksheet).xlsx XLSX spreadsheet
Figure L-2 Management Plan Baseline.xlsx XLSX spreadsheet
Exhibit M2 - Green Purchasing Report.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
47PH0220R0007 Generated PDF with TOC.pdf PDF
Building Library 2 - Equipment Inventory.xlsx XLSX spreadsheet
Exhibit C7 - PBS Waste Audits.pdf PDF
Attachment 2 - CBA SDS-JV Austin Mechanics.pdf PDF
Figure B-3 Pricing - Full Maintenance.xlsx XLSX spreadsheet
Exhibit M4 - Bldg Op Plan Template.pdf PDF
Exhibit M3 - Environmental Sustainable Products.pdf PDF
Exhibit C5 - Erosion and Sediment Control.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Custodial Deliverables

TABLE OF DELIVERABLES - CUSTODIAL AND RELATED SERVICES
DeliverableReferenceDue DateAppoving Official
Contractor Staffing Declaration (Figure B-1)B.221 calendar days prior to the contract start date and when modifications to the contract by GSA result in changes in staffingCO
Green Cleaning PlanCC.4.27 calendar days prior to start dateCOR
Floor Maintenance ScheduleCC.5.1.17 calendar days prior to start date of each year the contract is in effect.COR
Blinds and Coverings Dusting ScheduleCC.5.1.157 calendar days prior to start date of each year the contract is in effect.COR
Window Washing Safety PlanCC.5.2.210 calendar days after contract startCO or COR
Snow and Ice Removal Plan with List of Chemical ProductsCC.5.310 calendar days after contract startCOR
Tree Survey and Evaluation (includes price list for any special treatment)CC.5.4.3No later than 30 days from the start date of each year the contract is in effect OR no later than April 30th each year the contract is in effect.[choose one]COR
Soil samples and analysisCC.5.4.3When plant health problems occurCOR
Initial Deficiency List for Irrigation SystemCC.5.4.1515 calendar days prior to contract start dateCOR
Recycling and Waste ReportsCC.11.015th of each month and upon request of the CORCOR
Green Purchase Reporting – Key Sustainable Product Proof of ComplianceCC.11.2Annually, prior to the start of each contract yearCO or COR
Green Purchase Reporting – Bio-based as required by FAR 52.223-2 (https://www.sam.gov/)CC.11.2Annually by October 31COR
Initial Pest AssessmentCC.12.1Within 15 calendar days after the start of the contractCOR
Pest Control PlanCC.12.6Within 15 calendar days following the initial assessmentCOR
Chemicals used for pest controlCC.12.7Need approval prior to useCO or COR
Pest Control Log BookCC.12.9As requested, must be kept on government propertyCOR
Pesticide Control PlanCC.12.9Within 30 calendar days after contract startCOR
Child Care Health CertificationCC.13.1Prior to starting work in child care centerCO or COR
Quality Control PlanCC.1430 calendardays prior to contract startCO and COR
Cleaning SchedulesCC.157 calendardays prior to the contract start date of each year the contract is in effect.COR
Safety Data SheetsCC.17No later than 5 calendar days prior to contract start date and updated as necessaryCOR
Inventory List of ProductsCC.17No later than 5 calendar days prior to the contract start date and updated as necessaryCOR
List of telephone numbers for authorized contractor representatives (includes on-site representatives)HC.1.07 calendar days prior to contract start date.Changes shall be made when necessary.COR
Exposure Control ProgramHC.1.4As requestedCOR
Supervisory Employee ResumesHC.1.6Prior to assignmentCOR
Strike contingency plan (SCP) submission.HC.25 calendardays prior to contract start and updated annuallyCO or COR
Pandemic PlanHC.430 calendar days prior to the start of the contractCOR
Certification and Estimate of Percentage of Recovered Material Content for EPA-Designated ItemsHC.6Required certification and estimate at contract completion.COR
Interim Annual Recycled Content Product CertificationHC.6Provided by the Contractor not later than November 1 of each year, with data for the preceding 12-month period ending September 30.COR
Green Cleaning TrainingHC.6Within 60 calendardays after start of the contract.Written certification must be submitted within 5 calendardays after completion of the training.COR
Written Certification of Green Cleaning TrainingHC.6Within 5 days after completion of Green Cleaning TrainingCO or COR
Asbestos Awareness TrainingHC.7Within 60 calendar days of each employee’s commencement of employment on this contractCO or COR
Asbestos Awareness Training CertificationHC.7Within 5 days after the completion of the trainingCO or COR
Government Identification CredentialsHC.11Before the employee enters on dutyCOR
Sensitive but Unclassified Information required lists and noticesHC.15As requestedCO and COR
Collect and submit GSA Form 139, Record of Time of Arrival and Departure from BuildingHC.16Submit no later than Wednesday of the following weekCOR
Qualification of Employees (552.237-71 (May 1989)) paperworkSection IAs requestedCOR
Erosion and Sediment Control Plan (if required)Section JC, Exhibit JC5Prior to performing any activities that disturb existing groundsCOR
Solid Waste/Trash Audit ReportSection JC, Exhibit JC760 days after the start of the date.COR

O&M Deliverables

TABLE OF DELIVERABLES - OPERATIONS AND MAINTENANCE RELATED SERVICES
DELIVERABLEREFERENCEDELIVERABLE DUEAppoving Official
Qualification of employeesCM.1.1As requested.CO or designee.
State licensing – if required.CM.1.1Within 7 business days prior to that person beginning work..CO or designee.
Submission of resumes for new employees.CM.1.2.6The Contractor must submit resumes for all personnel prior to personnel beginning work.CO or designee.
Asbestos awareness training certification.CM.1.2.7.1Training within 60 calendar days after start. Certify completion within 5 days of training.CO or designee.
NCMMS
Complete NCMMS auditCM.1.9.1The Contractor shall use the Government-furnished NCMMS, to include validating and updating the equipment inventory database, including all data fields specified by the CO or designee. Complete yearly NCMMS auditCO or designee
Collection and submission of GSA Form 139, Recording Presence.CM.1.2.10Submit as requested.CO or designee.
Quality control program.CM.1.3.2Develop and submit for approval 30 calendar days of Contract start dateCO or designee
List of key personnel and emergency contact information, which may include subcontractor contacts as applicable.CM.5.2The BOP must be submitted as an electronic file (MS Word or Google.doc) with regular updates that reflect current personnel, subcontractors, equipment, systems, and operating procedures, and entered in the NCMMSCO or designee.
Radon mitigation program.CM.5.2.1.-.J.18Program must be described in the building operating plan.CO or designee.
Strike contingency plan (SCP) submission.CM.5.2.1
CM.7.260 calendar days prior to Contract start date and updated annually.CO or designee.
Equipment inventory update.CM.5.3.2

CM.5.3.3 Update equipment data when equipment is added, removed or retrofitted as part of a project, or discovered by GSA or the Contractor and log changes in accordance with provided NCMMS training.

Annually certify that the Maintained Equipment Inventory is up-to dateCO or designee.
Equipment condition assessment.CM.5.3.3Develop and submit for approval annually
The equipment condition assessment reports shall be produced in NCMMSCO or designee.
Workplace safety plan.CM.5.4.2.130 days after award.COR or designee.
Scheduling and recordkeeping of tests, certifications, permits, safety and environmental tests, and other recordsCM.5.4.3.1Maintaincopies. Shall be scheduled in the NCMMS Work Order system and documented into NCMMSCO or designee.
Confined space entry permit system.CM.5.4.7Develop a confined space entry permit system for all permit-required confined spaces within 60 calendar days of Contract start.COR or designee.
Facility HazardsCM.5.4.8Shall take immediate action to report accident and control hazards that present imminent dangerCO or designee
Safety Data Sheets (SDS)CM.5.4.11.1Available on requestCOR or designee.
Hazardous material inventoryCM.5.4.11.2Submit as an appendix to the BOP and Hazardous Communication Plan. Inventory must be kept current and submitted annually by September 30 of each year and at the end of the ContractCOR or designee.
Labeling and signage.CM.5.4.12Labeling per OSHA standards shall be maintained throughout the Contract period.CO or designee.
Electrical safetyCM.5.4.14Any and all areas restricted to qualified personnel are secured and properly labeled. (NFPA 70 AND NFPA 70E)COR or designee.
Labeling electrical circuitsCM.5.4.15Ensure added or modified circuits are labeledCOR
Bio-Based Products ReportingCM.5.5.1All required safety and environmental tests, certifications, permits, and other procedures required in the PBWS shall be scheduled in the NCMMS Work Order systemCOR or designee
AQMD operating permits.CM.5.5.3Copies made available upon request.CO or designee.
Polychlorinated biphenyl (PCB) control transformer leaks.CM.5.5.7Immediate notification.CO or designee.
If the Contractor must disturb materials he suspects may contain ACM.CM.5.5.8The Contractor must immediately report the condition.CO or designee.
Backflow prevention devices – annual inspection certificate.CM.5.5.10Annually. Certificates must be scanned in as an attachment to the Back flow PM work order in the NCMMS and provide certification of proper operationCO or designee.
Environmental ReportingCM.5.5.12Submit required reportsCO or designee.
Energy and Water ReportingCM.5.6.3Monthly basis Contractor shall read and record all available utility and fuel meters and include in monthly report. Contractor shalll report monthly energy and water usage compared to previous year and explain usage trends. Report submitted by the 5th business day of the subsequent month.CO or designee
Fuel Usage LogCM.5.6.3Monthly basis and included in monthly progress reportCO or designee
Fire protection systems on line at all times unless approval is given during maintenance periods.CM.5.9.1dAdvance notification and approval per occurrence.CO or designee.
Fire protection and life safety equipment or systems that are in a condition that may endanger life or property.CM.5.9.1eImmediate notification of the condition. A written report detailing the hazardous condition and recommended corrective action shall be provided within 24 hours.CO or designee.
Fire alarm system Inspections, tests, maintenance, or repairs shall comply with NFPA 72.CM.5.9.2Documentation of the results of all inspections, tests, maintenance or repairs must be recorded on the applicable Inspection and Testing Form from NFPA 72.GSA Facility Manager, CO or designee.
Fire alarm system central station monitoringCM.5.9.2Provide and maintain UL-listed central station monitoring service. If central station monitoring is not operational, the contractor will provide a fire watch.Facility Manager, CO or designee
Water-based fire suppression systems inspection, maintenance, and tests.CM.5.9.3Documentation of the results of all inspections, tests, maintenance or repairs performed shall comply with NFPA25.Facility manager, CO or designee.
Inspection, testing, and maintenance of fire-rated door assemblies:CM.5.9.4All inspections, tests, and maintenance shall comply with NFPA 80 and NFPA 101.CO or designee.
Inspection, testing, and maintenance of fire damper and combination fire/smoke dampers.CM.5.9.5All inspections, tests, and maintenance shall comply with NFPA 80 and NFPA 105.CO or designee.
Inspection, testing, and maintenance of smoke door assemblies.CM.5.9.6All inspections, tests, and maintenance shall comply with NFPA 105.CO or designee
Inspection, testing, and maintenance of smoke dampers.CM.5.9.7All inspections, tests, and maintenance shall comply with NFPA 105.CO or designee.
Inspection, testing, and maintenance of portable fire extinguishersCM.5.9.8All inspections, tests, and maintenance shall comply with NFPA 10.CO or designee.
Inspections, testing, and maintenance of non-water based fire extinguishing systems.CM.5.9.9All inspections, tests, and maintenance shall comply with NFPA 12, NFPA 12A, NFPA 17, NFPA 17A, NFPA 96, or NFPA 2001, depending on the type of extinguishing system.CO or designee.
Inspections, testing, and maintenance, and repairs of smoke control systems.CM.5.9.10All inspections, tests, maintenance, and repairs shall comply with NFPA 92.CO or designee.
Inspections, testing, and maintenance, and exercising of equipment of emergency and standby power systems.CM.5.9.11All inspections, tests, maintenance, and exercising of equipment shall comply with NFPA 110 or NFPA 111 depending on type of system.CO or designee.
Inspections, testing, and preventive maintenance of emergency lighting systems, emergency lighting equipment, and exit signage.CM.5.9.12All inspections, tests, maintenance, and exercising of equipment shall comply with NFPA 101.CO or designee.
Fire Resistance Rated ConstructionCM.5.9.13All inspections, maintenance, repair or installation shall comply with the International Fire Code and NFPA 221Facility manager, CO or designee
Lightning Protection SystemsCM.5.9.14All Inspections, testing, maintenance and repair shall be in accordance with NFPA 780CO or designee
Chemical SensorsCM.5.9.15Al testing, maintenance and repair as required by manufacturers recommendations. All documentation of testing shall be documented in NCMMS within 48 hours of test conclusionCO or designee
Repairs using subcontractors.CM.5.11.1Must provide justification for subcontract need in advance.CO or designee.
Reimbursable repairs completion date.CM.5.11.2.2Mutually agreed upon by the CO or their designee and the Contractor.CO or designee.
Warranties not honored by manufacturer.CM.5.11.3Contractor must immediately notify if an installer or manufacturer fails to comply with the terms of a warranty.CO or designee.
Emergency service request or callback (after hours).CM.5.12.2.2Written accounting of any emergency callback the morning of the next working day.CO or designee.
Emergency callback (Beyond Core Coverage Hours)CM.5.12.2.2Shall provide a written account of any emergency call back; including costs incurred and a plan of permanent correction of the problem no later than the morning of the next business dayCOor designee
Urgent service requestsCM.5.12.2.3Respond to urgent service requests within 1 hour.COR
Routine service request - response extension request.CM.5.12.2.4Contractor must immediately submit a written extension request if correction will take over 120 hours after initial notification.CO or designee.
Price proposal for additional services work.CM.5.13.2Within 48 hours of the request.CO or designee
Building management support services.CM.5.14.1Assist as requested.COR or designee.
Review of design documents.CM.5.14.3Review as requested.CO or designee.
Inspection assistance for space build-outsCM.5.14.4Assist as requestedCO or designee
Monthly Progress ReportCM.5.15Shall use GSA developed reports of monthly progress or other submittal requirements, using NCMMS data, to describe the status of maintenance and operations as of the last day of the performance month.CO or designee
Refrigerant control and certification log.CM.5.15.1 iRefrigerant control logs must be updated as requiredand provided during the Monthly Progress ReportCO or designee.
Establish reference libraryCM.5.16.1OngoingCOR
Preventative maintenance system.CM.6.010 work-days prior to Contract start date.CO or designee
Boiler Inspections and TestsCM.6.2.5Boiler must be inspected annually and forms 349, 350 & 1034 completed as required. Must be annotated in the NCMMS and reported in the monthly report.CO or designee
Initial report and development of water treatment program.CM.6.6.2Within the60 daysof the Contract start date.CO or designee.
Water samples.CM.6.6.5
CM.6.6.7Water samples shall be analyzed and a monthly report submitted relative to conditions found and shall be submitted in the NCMMS as an attachment to the work order. The results will be made availablein the monthly progress report.CO or designee.
Lamps and ballasts containing mercury record.CM.6.8.3All handling, storage, labeling, reporting and disposal of mercury containing lamps shall be in compliance with Universal Waste Rule Guidelines. Waste not subject to Universal Waste Rule guidelines must be managed in accordance with 40 C.F.R. part 260CO or designee.
3 Year Electrical TestingCM.6.93 Year Electrical testing report is due 2 weeks after test is performed.COR
Periodic oil analysis.CM.6.11.4Shall be performed prior to annual maintenance requirements so that results shall be considered in performing preventative maintenance. Where reports indicate corrective action, a Work Order is created in NCMMS and corrective action taken.CO or designee.
If the Contractor must disturb materials he suspects may contain lead-based paint.CM.6.13.3The Contractor must immediately report the condition.CO or designee.
Existing deficiency inspection and ListCM.7.130 days prior to contract startCOR
Itemized estimate to correct existing deficienciesCM.7.145 days after contract startCO or designee
Building operating plan.CM.7.2Review and update with Property Management Staff within 60 days of start of contract.CO or designee.
Transition phase. Complete CMMS training during transition phase.CM.7.260days prior to contract start.CO or designee.
Phase out transition periodCM.7.2.160 prior to end of contract. On the last performance day of the Contract, Contractor must turn over keys and identification badges or cards.CO or designee.
Contract closeout inspection and listCM.7.4Mutually agreed upon dateCOR