Exhibit C4 - Building Exterior and Hardscape Plan.pdf

PDF 130 KB Posted

Attached to
Amendment 0001- Full Maintenance Services, VA and Treasury, Austin, Texas Federal contract opportunity
Solicitation number
47PH0220R0007
Issued by
General Services Administration Public Buildings Service Region 7

About this file

This document contains an exhibit outlining requirements for a building exterior and hardscape plan and information about a related federal contract opportunity for full maintenance services. The exhibit specifies that the contractor must submit a plan addressing goals and scope, responsible parties, guidance for implementation and resources, performance measurement, training, maintenance equipment, use of chemical concentrates and dilution systems, sustainable cleaning practices, paints and sealants used on the exterior, snow and ice removal, cleaning of the building exterior, sidewalks and other hardscape, pest control, landscape waste management, fertilizer use, and quality assurance processes.

The federal contract opportunity is a pre-solicitation for full maintenance services for two buildings in Austin, Texas requiring management, supervision, labor, materials, tools, and equipment to plan, schedule, coordinate and ensure effective performance of all described services. The NAICS code is 561210 with a size standard of $41.5M. The solicitation will be issued on February 25, 2020 via a competitive SDVOB set-aside and the anticipated start date is July 1, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0001- Full Maintenance Services, VA and Treasury, Austin, Texas, newest first.
File Type Posted
Solicitation Amendment 47PH0220R0007_0001.pdf PDF
Building Library 1 - 2019 VA Treasury Fire Extinguisher Report.pdf PDF
Figure B-2 for Comb Union AND Non Union Contracts.xlsx XLSX spreadsheet
Exhibit M1 - O_M QASP.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Building Library 6 - Austin VA_Treasury Work Orders 2018-2019 (No PMs).xlsx XLSX spreadsheet
Building Library 5 - PM Schedule TREASURY_1457641243.pdf PDF
Building Library 4 - Roof Information.xlsx XLSX spreadsheet
Attachment 1 - CBA SDS-JV.pdf PDF
Attachment 3 - Wage Determination 2015-5215.pdf PDF
Exhibit C1 - Building Information Sheets.pdf PDF
Exhibit C3 - Surveillance Forms.pdf PDF
Exhibit M9 - Preventative Maintenance Guide.pdf PDF
Exhibit C2 - Custodial QASP.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
Exhibit M5 - Smart Buildings.pdf PDF
Exhibit C6 - Recycle, Solid Water, Trash Report.pdf PDF
Building Library 5 - PM Schedule VA TX1128AT1457641243.pdf PDF
Figure B-1 for Union and Non Union Contracts.xlsx XLSX spreadsheet
Figure L-1 Management Plan Worksheet).xlsx XLSX spreadsheet
Figure L-2 Management Plan Baseline.xlsx XLSX spreadsheet
Attachment 4 - Table of Deliverables.xlsx XLSX spreadsheet
Exhibit M2 - Green Purchasing Report.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
47PH0220R0007 Generated PDF with TOC.pdf PDF
Building Library 2 - Equipment Inventory.xlsx XLSX spreadsheet
Exhibit C7 - PBS Waste Audits.pdf PDF
Attachment 2 - CBA SDS-JV Austin Mechanics.pdf PDF
Figure B-3 Pricing - Full Maintenance.xlsx XLSX spreadsheet
Exhibit M4 - Bldg Op Plan Template.pdf PDF
Exhibit M3 - Environmental Sustainable Products.pdf PDF
Exhibit C5 - Erosion and Sediment Control.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C4

BUILDING EXTERIOR AND HARDSCAPE PLAN

Used only when Contractor is required to provide pressure washing services

The Contractor shall submit to the CO a detailed Building Exterior and Hardscape Plan that addresses the listed work items. The plan helps ensure that grounds/site/building exterior management practices have the lowest environmental impact possible and that these practices preserve ecological integrity, enhance diversity and protect wildlife, while supporting building performance and integration into surrounding landscapes. At a minimum, the custodial and related services portion of the plan shall address the following items:

Goals and Scope

Responsible Party

Guidance for Resources and Implementation

Performance Measurement

Training

Maintenance Equipment

Use of Chemical Concentrates and Dilution Systems

Sustainable Building Exterior, Sidewalks, and Pavement Cleaning

Paints and Sealants Used on the Building Exterior

Snow and Ice removal (Snow and Ice Removal Plan can be substituted for this item)

Cleaning of building exterior

Cleaning equipment

Cleaning of sidewalks, pavement, and other Hardscape

Animal and vegetation pest control

Landscape waste

Fertilizer use

Quality Assurance/Quality Control Processes

File details come from the government source that posted it. Updated .