4046857_ATTACH.pdf

PDF 128 KB Posted

Attached to
T56 Series 3. 0/-15 and 3. 5/-15A Joint Follow on Contract
Solicitation number
FA812125R0017
Issued by

About this file

This document is a Data Item Description (DID) for the Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report, approved on August 9, 2022, with the identifier DI-PSSS-81534B. The document specifies the format, content, and requirements for a detailed report used when contractors are maintaining records for government property being repaired or conducting a teardown investigation.

The DID outlines comprehensive reporting requirements for documenting equipment deficiencies, including nine specific deficiency categories such as workmanship, material failure, field-induced issues, maintenance problems, design limitations, and handling/shipping concerns. The report must be text searchable, in English, and use a Microsoft Excel spreadsheet for Data Objects/Attributes and Associated Metadata (DOAM). The document emphasizes that the completed report must be compatible with a Product Lifecycle Management (PLM) solution, allowing proper tracking and linking of deficiency information to the lowest component of the end item, with any non-applicable fields marked as "NA".

View the file

Other files

File Type Posted
RQR.pdf PDF
SPI13.pdf PDF
SPI5.pdf PDF
SPI2.pdf PDF
PWS_Attach_A.pdf PDF
Skill REQ.pdf PDF
SPI8.pdf PDF
Appendix A- T56 Performance Work Statement (PWS) 12 Nov 24.pdf PDF
4046832_ATTACH - Copy.pdf PDF
4046843_ATTACH.pdf PDF
4046876_ATTACH.pdf PDF
4044211_RDL_REPORT.pdf PDF
4044211_RDL_REPORT - Copy.pdf PDF
4020233_RDL_REPORT - Copy.pdf PDF
4049320_ATTACH.pdf PDF
DID1.pdf PDF
Final Question set for USAF Pre-Solicitation FA812125R0017 051325 (002).xlsx XLSX spreadsheet
4016774_RDL_REPORT.pdf PDF
3894169_RDL_REPORT.pdf PDF
3696726_RDL_REPORT.pdf PDF
2777441_RDL_REPORT.pdf PDF
2777431_RDL_REPORT.pdf PDF
2777253_RDL_REPORT.pdf PDF
2777340_RDL_REPORT.pdf PDF
2776714_RDL_REPORT.pdf PDF
1728882_RDL_REPORT.pdf PDF
FA812125R0017.docx DOCX document
QASP_ATTACH.pdf PDF
SPI4.pdf PDF
SPI12.pdf PDF
PWS_Attach_D.pdf PDF
PWS_Attach_N.pdf PDF
SPI.pdf PDF
PWS_Attach_P.pdf PDF
PWS_Attach_E.pdf PDF
JFOC PWS Apr 2024 Rev 05 (1).pdf PDF
4124786_PKGRQMT_REPORT.pdf PDF
4049349_ATTACH.pdf PDF
4049346_ATTACH.pdf PDF
DID_CDM.pdf PDF
4049348_ATTACH.pdf PDF
4046879_ATTACH.pdf PDF
4020247_RDL_REPORT.pdf PDF
4049299_CDRL1_REPORT.pdf PDF
4020241_RDL_REPORT.pdf PDF
4046862_ATTACH - Copy.pdf PDF
4020233_RDL_REPORT.pdf PDF
DID_GFM_INV.pdf PDF
4046862_ATTACH.pdf PDF
4020241_RDL_REPORT - Copy.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report

Number: DI-PSSS-81534B Approved Date: 20220809

AMSC Number: F10348 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: 11 (AFLCMC/EZSC) Project Number: PSSS-2022-004

Applicable Forms: N/A

Use/Relationship: The Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report provides a factual narrative analysis of a deficiency which has been noted on equipment.

a. This Data Item Description (DID) is applicable when contractors are responsible for maintaining custodial records for government property being repaired, or, when detailed analysis is required for components undergoing a teardown investigation.

b. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.

c. This DID supersedes DI-PSSS-81534A.

Requirements:

1. Reference documents. None.

2. Format. The ASDP Teardown Deficiency Report shall be in a text searchable format. If a model (e.g., Cameo, CAD, etc.) is used for the analysis or resolution of problems, the model shall be embedded in its native format. The Data Objects/Attributes and Associated Metadata (DOAM) listing shall be in Microsoft Excel spreadsheet format in accordance with the template provided in the DOAM Specification attached to the contract. All data shall be in the English language.

3. Content. The Teardown Deficiency Report shall include an analysis of the deficiency which includes cause of failure, recommended corrective action and recommendations for actions to prevent recurrence of the failure/deficiency, and the applicable category of the failure defined as follows:

a. Workmanship and non-conformance. Any deficiency (e.g., physical, chemical, electrical, functional) noted in materiel which is attributed to non-conformance to applicable specifications, drawing, standards, or Technical Order (TO); or workmanship during manufacture, repair modification or maintenance.

b. Material failure. The failure of an end item which was attributable to neither the repair nor the manufacturing process, but was due to an unpredictable failure of an internal component or sub-assembly.

c. No defect found/could not duplicate: Investigation of the exhibit revealed no deficiency.

Equipment conforms to specifications and TO standards and procedures.

d. Technical data, deficiency: Technical data (including TOs, drawings, and work specifications) was deficient or inadequate so as to cause the deficiency/failure on the item.

Source: http://assist.dla.mil -- Downloaded: 2024-11-20T17:28Z Check the source to verify that this is the current version before use.

DI-PSSS-81534B

e. Field induced deficiency. Deficiency confirmed by the investigation to have been caused by operator error, i.e., wrong voltage applied, misaligned, maladjusted, mishandling, or not used for intended purpose.

f. Maintenance deficiency. An unfavorable characteristic of an item that impedes the accomplishment of maintenance operations which results in excessive maintenance operations and/or in excessive maintenance man-hour consumption.

g. Design deficiency. A condition that limits or prevents the use of material for purpose intended or required where the material meets all other specifications.

h. Handling or shipping deficiency. A deficiency induced by improper handling or shipping, i.e., improper packaging, which prohibits the use for intended purpose.

i. Packaging specifications inadequate - not complied with. Unsatisfactory conditions including item damage resulting from improper packaging.

3.1 DOAM. The completed Teardown Deficiency Report template, provided in the DOAM Specification attached to the contract, shall comply with the format requirements (see 2. above) so that it can be ingestible into a Product Lifecycle Management (PLM) solution to ensure proper tying, tracing, and linking to the lowest component of the end item to which the delivered Teardown Deficiency Report Information is applicable. Any field that is not applicable shall be marked “NA.”

End of DI-PSSS-81534B.

Source: http://assist.dla.mil -- Downloaded: 2024-11-20T17:28Z Check the source to verify that this is the current version before use.

File details come from the government source that posted it. Updated .