This document is a Performance Work Statement (PWS) Attachment N providing Supplemental Packaging Instructions for the T56 Joint Follow on Contract, dated 05 November 24. The attachment specifies detailed packaging requirements for various aerospace components including torquemeters, turbine rotor assemblies, compressor modules, RGB components, fuel valves, fuel nozzles, high pressure fuel filters, and fuel pumps.

Key packaging requirements include meeting contract preservation and packaging specifications, handling packaging discrepancies through Supply Deficiency Reports, maximizing reusable containers, obtaining prior approval for special design containers, and properly tagging material condition codes. The instructions cover multiple National Stock Number (NSN) items with specific container designations, particularly emphasizing special handling for items with residual fuel, which require specific markings in accordance with Air Force instructions. The document provides guidance for contractors on packaging standards, damage reporting, container manufacturing, and handling excess materials during the repair and overhaul process for engine components.

View the file

Other files

File Type Posted
SPI9.pdf PDF
PWS_Appendix_A.pdf PDF
SPI11.pdf PDF
SPI7.pdf PDF
PWS_Attach_B.pdf PDF
SPI6.pdf PDF
PWS_Attach_J.pdf PDF
TOA.xlsx XLSX spreadsheet
Copy of Copy of BEQs_T56_3.0__3.5_Competitive__15 Nov 2024 Final.xlsx XLSX spreadsheet
T56 Follow on questions and answers.xlsx XLSX spreadsheet
GFP.xlsx XLSX spreadsheet
CAVAF_Report_Matrix.pdf PDF
4046868_ATTACH.pdf PDF
4049353_ATTACH.pdf PDF
4050303_RDL_REPORT.pdf PDF
4050282_RDL_REPORT.pdf PDF
DID_CAV.pdf PDF
4049344_ATTACH.pdf PDF
4049322_ATTACH.pdf PDF
4016528_RDL_REPORT.pdf PDF
3892939_RDL_REPORT.pdf PDF
3696751_RDL_REPORT.pdf PDF
2777369_RDL_REPORT.pdf PDF
4020186_RDL_REPORT.pdf PDF
4020219_RDL_REPORT.pdf PDF
4019057_RDL_REPORT.pdf PDF
4016854_RDL_REPORT.pdf PDF
4016842_RDL_REPORT.pdf PDF
4016819_RDL_REPORT.pdf PDF
1882344_ATTACH.pdf PDF
2386668_ATTACH.pdf PDF
2777388_RDL_REPORT.pdf PDF
1854336_ATTACH.docx DOCX document
2777418_RDL_REPORT.pdf PDF
2777022_RDL_REPORT.pdf PDF
2777002_RDL_REPORT.pdf PDF
Pricing Matrix_T56_DRAFT_Protected_2APR25.xlsx XLSX spreadsheet
FA812125R0017.docx DOCX document
QASP_ATTACH.pdf PDF
SPI4.pdf PDF
SPI12.pdf PDF
PWS_Attach_D.pdf PDF
SPI.pdf PDF
PWS_Attach_P.pdf PDF
PWS_Attach_E.pdf PDF
JFOC PWS Apr 2024 Rev 05 (1).pdf PDF
4124786_PKGRQMT_REPORT.pdf PDF
4049349_ATTACH.pdf PDF
4049346_ATTACH.pdf PDF
DID_CDM.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T56 PWS Attachment N – Supplemental Packaging Instructions

05 November 24

NSN Item Supplemental Packaging Information

2840-01-111-4765OJ Torquemeter Primary Container NSN 8115-00-953-1825. Use SPI F 01- 111-4765 for Alternate Packing method.

2840-01-294-7878 Turbine Rotor Assy. Primary Container NSN 8145-01-449-7707OJ

2840-01-338-2990 Compressor Module Contractor Container NSN 8145-01-204-7393

2840-01-487-1830 Compressor Module Contractor Container NSN 8345-01-204-7393

2840-01-487-2997OJ Turbine Rotor Assy. Primary Container NSN 8145-01-449-7707OJ

2840-01-492-9017OJ RGB Primary Container NSN 8145-00-887-1949OJ

2915-00-626-3123OJ Paralleling Valve Items with residual fuel – use SPI F WF-117-2012; ‘ZZ’ Markings IAW AFI 24-2013, 4.3.3

2915-00-655-1933OJ Fuel Nozzle Items with residual fuel – use SPI F WF-117-2012; ‘ZZ’ Markings IAW AFI 24-2013, 4.3.3

2915-00-859-2915OJ High Pressure Fuel Filter

Items with residual fuel – use SPI F WF-117-2012; ‘ZZ’ Markings IAW AFI 24-2013, 4.3.3

4320-00-654-3617OJ Fuel Pump Items with residual fuel – use SPI F WF-117-2012; ‘ZZ’ Markings IAW AFI 24-2013, 4.3.3

PRESERVATION, PACKAGING, AND PACKING FOR REPAIR CONTRACTS

1. Preservation, Packaging, and Packing Requirements: Assets shipped or received shall meet the preservation, packaging, and packing requirements stated in the contract.

The term “preservation, packaging, and packing” is to mean the entire package; this includes, but is not limited to the assets’ wraps, barriers, cushioning, blocking, bracing, and unit intermediate containers.

2. Packaging Discrepancies: If assets are received in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings) the Contractor shall initiate a Supply Deficiency Report (SDR) IAW AFJMAN 23-215, Reporting of Supply Discrepancies upon receipt of asset. The prime packaging specialist at Com (405) 739-3545 may authorize the following exceptions to these requirements.

Exceptions when no damage has occurred are as follows:

a. Items packaged before the current SPI date

b. An alternate pack may be used, provided the prime Program Office approves and issues a deviation number, which would be annotated on the exterior container

c. The next larger size fast pack, PPP-B-1672, type I or type II may be used for shipments with priorities 01-08 with approval

d. The use of the next larger standard pack container for unserviceable items

3. Asset Damages: Damages to assets or containers, attributed to negligence, will be referred to the ACO for action. Damages attributed to improper preservation, packaging, packing, or marking will also be referred to the ACO for action IAW AFJMAN 23-215, Reporting of Supply Discrepancies.

4. Reusable Containers: Contractors shall maximize the use of reusable containers by reclaiming and reusing containers marked as “Reusable Container” for the return of assets to the contract designated activity. Cost reimbursements or material replenishment associated with operation shall be negotiated as part of the contract.

5. Manufacturer/Procurement of Containers: Manufacturing or procurement of fiberboard or wood containers and the costs associated with these functions shall be IAW the terms of the contract. Special design containers or fixtures of metal or plastic construction shall not be manufactured or procured without prior approval of the program manager / item manager. Negotiation shall be conducted through the applicable ACO.

6. Excess Material: Government owned material in excess to contract fulfillment and being reclaimed by the Government should be packaged IAW contract terms. Packaging instructions for material not covered in the Contract shall be from the ACO.

7. Condition: Material condition code tags will be placed inside the package along with the repaired asset, and also attached to the outside of the shipping container.

File details come from the government source that posted it. Updated .