398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf

PDF 6 MB Posted

Attached to
633 Calleguas Water Campus Staff Housing Replacement Project
Solicitation number
633
Issued by
Ventura County, California

About this file

This is a Geotechnical Study specification document prepared for the Calleguas Municipal Water District in Ventura County, California, dated May 1998. The document outlines geotechnical investigation requirements for the Conejo Valley Reservoir project. The study encompasses soil boring, laboratory testing, and engineering analysis to characterize subsurface conditions at the proposed reservoir site. The scope includes drilling multiple boreholes to specified depths, collecting soil and rock samples, performing standard penetration tests, and conducting laboratory analyses including moisture content, grain size distribution, and shear strength testing. The geotechnical report must provide recommendations for foundation design, embankment construction, and site preparation. Specific deliverables include detailed boring logs, laboratory test results, cross-sections, and professional engineering conclusions regarding site suitability for reservoir construction.

The specification establishes technical requirements for subsurface investigation and laboratory testing methodologies to support engineering design for water infrastructure development. Testing protocols must comply with ASTM standards and industry best practices for geotechnical engineering. The work is fundamental to the larger Campus Staff Housing Replacement Project (Project No. 633) at the Calleguas Municipal Water District's 2100 E. Olsen Road facility in Thousand Oaks, California, as it provides critical subsurface data necessary for design development and construction planning. The geotechnical investigation serves as a prerequisite engineering study to inform structural and site development decisions for the housing replacement project.

View the file

Other files

File Type Posted
587 2021 Final Geotech Report.pdf PDF
134 WR Reservoir Outlet Works ERPT 35.pdf PDF
335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
330 1991 Converse Consult. West Foundation Investigation....pdf PDF
342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
134 1964 Subsidence Study.pdf PDF
134 1970 Special Stability Investigation ERPT 45.pdf PDF
633 Bid Package.pdf PDF
633 Notice Inviting Bids.pdf PDF
114 Geotech.pdf PDF
633 Specifications.pdf PDF
333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
633 Drawings.pdf PDF
134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .