333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf

PDF 24 MB Posted

Attached to
633 Calleguas Water Campus Staff Housing Replacement Project
Solicitation number
633
Issued by
Ventura County, California

About this file

This is a geotechnical study specification document prepared for the Lake Bard Water Treatment Plant, associated with Calleguas Municipal Water District's Project No. 633 for the Staff Housing Replacement project located at 2100 E. Olsen Rd., Thousand Oaks, Ventura County, California. The specification outlines geotechnical investigation requirements including soil boring, laboratory testing, and subsurface characterization necessary to support the design and construction of the staff housing replacement facility. The document establishes technical standards and testing protocols for evaluating soil conditions, bearing capacity, settlement potential, and other geotechnical parameters critical to foundation design and site development recommendations.

The specification details laboratory testing procedures, boring locations, sampling requirements, and analysis methodologies to be performed as part of the geotechnical investigation phase. The document serves as a basis for engineering design decisions and provides the technical framework for contractors and consultants to conduct site investigations and deliver a comprehensive geotechnical report with recommendations for construction on the campus site. This investigation is a prerequisite component for the overall housing replacement project and supports the planning and design phases of the construction initiative.

View the file

Other files

File Type Posted
587 2021 Final Geotech Report.pdf PDF
134 WR Reservoir Outlet Works ERPT 35.pdf PDF
335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
330 1991 Converse Consult. West Foundation Investigation....pdf PDF
342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
134 1964 Subsidence Study.pdf PDF
134 1970 Special Stability Investigation ERPT 45.pdf PDF
633 Bid Package.pdf PDF
633 Notice Inviting Bids.pdf PDF
114 Geotech.pdf PDF
633 Specifications.pdf PDF
115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
633 Drawings.pdf PDF
134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .