342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf

PDF 8 MB Posted

Attached to
633 Calleguas Water Campus Staff Housing Replacement Project
Solicitation number
633
Issued by
Ventura County, California

About this file

Summary: 342.1 Geo Findings Power Generation Building Conejo PS May 1992

This is a geotechnical findings report for a power generation building project at Conejo prepared in May 1992, related to the Calleguas Water Campus Staff Housing Replacement Project (Project No. 633) located at Calleguas Municipal Water District's facility at 2100 E. Olsen Road, Thousand Oaks, Ventura County, California. The document provides geotechnical investigation results and engineering findings for foundation design and construction considerations for the proposed building structure. The report includes subsurface soil analysis, geological assessments, and recommendations for construction methodology based on site-specific conditions identified during the geotechnical exploration and testing phases.

The findings document establishes the geotechnical baseline for the project site, including soil composition, bearing capacity, and potential ground stability issues that would inform design requirements and construction specifications. The report serves as a critical reference document for contractors, engineers, and project managers involved in the Calleguas Water Campus Staff Housing Replacement Project, ensuring that foundation design and construction practices align with the site's subsurface conditions and geological characteristics as documented in this May 1992 assessment.

View the file

Other files

File Type Posted
587 2021 Final Geotech Report.pdf PDF
134 WR Reservoir Outlet Works ERPT 35.pdf PDF
335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
330 1991 Converse Consult. West Foundation Investigation....pdf PDF
398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
134 1964 Subsidence Study.pdf PDF
134 1970 Special Stability Investigation ERPT 45.pdf PDF
633 Bid Package.pdf PDF
633 Notice Inviting Bids.pdf PDF
114 Geotech.pdf PDF
633 Specifications.pdf PDF
333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
633 Drawings.pdf PDF
134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .