About this file

This is a Soils Investigation Report prepared for Calleguas Municipal Water District regarding a proposed reservoir bypass project related to the Calleguas Water Campus Staff Housing Replacement Project (Project No. 633) located at 2100 E. Olsen Rd., Thousand Oaks, Ventura County, California. The report documents a geotechnical investigation of subsurface soil and rock conditions at the project site to support design and construction planning. The investigation includes drilling activities, soil sampling, laboratory testing, and analysis of soil properties relevant to foundation design, excavation requirements, and construction feasibility for the staff housing replacement development. The soils investigation provides essential baseline geotechnical data necessary for engineers and contractors to assess site conditions and determine appropriate construction methodologies and specifications.

The report contains detailed soil boring logs, test results, geotechnical analysis, and engineering recommendations derived from the subsurface investigation. This technical documentation serves as a supporting exhibit for the Project No. 633 bid package and is critical for contractors to understand existing ground conditions and potential challenges during construction. The soils investigation data will inform bid pricing, construction scheduling, and risk assessment for the housing replacement project, as contractors must account for actual site conditions when preparing proposals and cost estimates.

View the file

Other files

File Type Posted
587 2021 Final Geotech Report.pdf PDF
134 WR Reservoir Outlet Works ERPT 35.pdf PDF
335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
330 1991 Converse Consult. West Foundation Investigation....pdf PDF
342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
134 1964 Subsidence Study.pdf PDF
134 1970 Special Stability Investigation ERPT 45.pdf PDF
633 Bid Package.pdf PDF
633 Notice Inviting Bids.pdf PDF
114 Geotech.pdf PDF
633 Specifications.pdf PDF
333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
633 Drawings.pdf PDF
134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .