333 Geotech Study Use of Onsite Materials for Slope Fill Spec 333 12-22-92.pdf

PDF 249 KB Posted

Attached to
633 Calleguas Water Campus Staff Housing Replacement Project
Solicitation number
633
Issued by
Ventura County, California

About this file

This is a Geotechnical Study Specification document prepared by Calleguas Municipal Water District for the Campus Staff Housing Replacement Project (Project No. 633) located at 2100 E. Olsen Road, Thousand Oaks, Ventura County, California. The specification outlines requirements for geotechnical investigation and analysis related to the use of onsite materials for slope fill construction. The document establishes technical standards and procedures for soil testing, material characterization, and engineering analysis necessary to determine the suitability of onsite soils for slope fill applications. The specification was dated December 22, 1992, and defines the scope of geotechnical services required to support the housing replacement project's construction planning and design phases.

The specification details testing protocols, soil classification requirements, compaction standards, and quality assurance procedures that contractors and geotechnical engineers must follow when evaluating onsite materials. The document serves as the technical basis for determining which excavated soils can be reused as fill material on slopes, thereby optimizing construction costs and material management. By establishing clear geotechnical requirements upfront, the specification enables the project to proceed with informed decisions regarding material sourcing, slope stability, and construction feasibility while ensuring compliance with engineering standards and safety requirements applicable to the water district's facilities in California.

View the file

Other files

File Type Posted
587 2021 Final Geotech Report.pdf PDF
134 WR Reservoir Outlet Works ERPT 35.pdf PDF
335, 325R Geo Reconnaissance 4 MG Reservoir Pipe Dec 1991.pdf PDF
342.1 Supplemental Exploration Standby Generation Bldg Conejo PS June 1992.pdf PDF
330 1991 Converse Consult. West Foundation Investigation....pdf PDF
342.1 Geo Findings Power Generation Building Conejo PS May 1992.pdf PDF
398 Geotech Study Conejo Valley Res. Spec 398 May 1998.pdf PDF
134 1966 Const Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
134 1962 WR Reservoir Basis for Design Report ERPT 40.pdf PDF
134 1962 Soil Geo Wood Ranch Reservoir Appendices.pdf PDF
134 1964 Subsidence Study.pdf PDF
134 1970 Special Stability Investigation ERPT 45.pdf PDF
633 Bid Package.pdf PDF
633 Notice Inviting Bids.pdf PDF
114 Geotech.pdf PDF
633 Specifications.pdf PDF
333 Geotech Study Lake Bard Water Treatment Plant spec 333 4-92 .pdf PDF
115-Soils Investigation Proposed Reservoir Bypass CVF1.pdf PDF
134 1962 Soil Geo Inv Wood Ranch Reservoir.pdf PDF
412 2002 Geotech Study Lake Bard Water Filtration Spec 412 1-23-02.pdf PDF
134 1977 Stability Inv Lake Bard Dike No.1.pdf PDF
603 2022 FINAL SUPPLEMENTAL ADDENDUM.pdf PDF
633 Drawings.pdf PDF
134 1962 Design Engr Rpt-Lake Bard Reservoir -WR Dam No 1027.pdf PDF
342.1 Foundation Inv Standby Power Generation Bldg Conejo PS June 1992.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .