384663 - Attach 2 Draft Contract.pdf
PDF 757 KB Posted
- Attached to
- Bulk Sodium Sampling and Analysis
- Solicitation number
- 384663
- Issued by
-
Department of Energy
About this file
This document is a draft contract for Bulk Sodium Sampling and Analysis issued by Central Plateau Cleanup Company (CPCCo), an Amereum, Fluor, Atkins LLC contractor for the U.S. Department of Energy. The contract is a Firm Fixed Price (FFP) type with a total value to be determined, covering bulk sodium sampling and analysis services. The contract will be awarded to a yet-to-be-selected contractor, with key administrative details including a Contract Specialist named Elisa Donovan and a potential contract start date that is to be determined.
The contract includes several important provisions, such as milestone-based payment schedules, detailed invoicing instructions, and specific requirements for work performance. Contractors must adhere to various regulations, including Service Contract Labor Standards, and will be subject to potential back charges for non-compliance. The contract requires careful scheduling, with notice that Hanford Site work schedules are not consistent, and includes provisions for foreign national participation, on-site work restrictions, and specific communication protocols. The contract is structured with four main parts: Statement of Work, Financial Terms, General Terms/Provisions, and Special Terms, providing comprehensive guidance for the selected contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO: TBD
TITLE: Bulk Sodium Sampling and Analysis
Page 1 of 14 Format: 1/25/2021
Text Update: 1/28/2025
Buyer:
Central Plateau Cleanup Company P.O. Box 1464 Mail Stop A7-05 Richland, WA 99352
Contractor:
<< Enter Company Name >>
<< Enter Street Address >>
<< Enter City, State Zip Code >>
Contract Specialist: Elisa Donovan
Phone Number: (509) 376-2470
Contractor Contact: << Enter Name >>
Phone Number: << Enter Phone Number >>
Start Date: TBD
Contract Type: Firm Fixed Price (FFP)
Contract Value: $TBD
End Date: <<Enter End Date>>
FOB Point: << Enter FOB Point >>
Payment Terms: << Enter Payment Terms >>
Central Plateau Cleanup Company (Buyer)
Elisa Donovan, Contract Specialist___________ Printed Name, Title
__________ (509) 376-2470 Date Signed Phone Number
Contractor Authorized Signature
Printed Name, Title
Date Signed Phone Number
SECTION B: DRAFT CONTRACT
Following is a draft of the contract contemplated as a result of this solicitation. Prospective offerors are reminded to review the draft contract to ensure they are prepared to comply. The draft contract will be updated to reflect the final agreement reached based on the proposal submitted and discussions, if any, that are held.
Page 2 of 14 Format: 1/25/2021
TABLE OF CONTENTS
PART I – STATEMENT OF WORK
PART II – FINANCIAL TERMS
1.0 CONTRACT TYPE
2.0 CONTRACT VALUE
2.1 Fully Funded
3.0 PAYMENT SCHEDULE
3.1 Milestone Payment Schedule – Fixed Price Line Items
4.0 PRICING INSTRUCTIONS FOR CHANGE
ORDERS/MODIFICATIONS
5.0 ESTIMATED BILLING
6.0 INVOICING INSTRUCTIONS
6.1 Contractor Invoices
6.2 Cost Adjustments
7.0 FINAL RELEASE AND CLOSEOUT
8.0 SPECIAL INSTRUCTIONS
8.1 Back Charges
PART III – GENERAL TERMS, CONTRACT PROVISIONS & ATTACHMENTS
1.0 ATTACHMENTS INCORPORATED
2.0 ACCEPTANCE OF PROVISIONS, TERMS AND CONDITIONS
3.0 CONTRACT PROVISIONS
3.1 General Provisions
3.2 Special Provisions, SP-12 - Government Property
3.3 Special Provisions, SP-13 - General Transportation Instructions
3.4 Special Provisions, SP-14 - Hazardous Waste Transportation and Disposal
3.5 Special Provisions, SP-16 - Representations and Certifications
PART IV – SPECIAL TERMS
1.0 ADMINISTRATION
1.1 Term of Contract
1.2 Option to Extend the Term of the Contract
1.3 Options
1.4 Contract Correspondence
1.5 Abnormal or Unusual Situations
1.6 Authorized Personnel
1.7 Contractor – Buyer Interface
1.8 Other Interfaces
1.9 Designation of Technical Representative
1.10 Packing List
1.11 Package Identification
1.12 Proprietary Data Submittals
1.13 Document Transmittals
1.14 Requests for Clarification or Information
1.15 Contract Change Request
Page 3 of 14 Format: 1/25/2021
1.16 Work Schedules and Holiday
1.17 Foreign National Notification and Approval
1.18 On Site Work Restriction
1.19 Service Contract Labor Standards
2.0 DEFINITIONS
3.0 ASSUMPTIONS
END OF CONTRACT
Page 4 of 14 Format: 1/25/2021
PART I – STATEMENT OF WORK
ATTACHMENT 1
END OF PART I – STATEMENT OF WORK
Page 5 of 14 Format: 1/25/2021
PART II – FINANCIAL TERMS
1.0 CONTRACT TYPE
This Contract is a Firm Fixed Price (FFP) contract.
2.0 CONTRACT VALUE
2.1 Fully Funded
The value of this Contract is $TBD
3.0 PAYMENT SCHEDULE
In accordance with the provision of this Contract/Release, Contractor shall be reimbursed for authorized and approved work in accordance with the following:
TBD – Contractor to Propose Milestones
3.1 Milestone Payment Schedule – Fixed Price Line Items
Subject to such other limitations and conditions as are specified in this Contract and this clause, Contractor may request milestone payments in accordance with the Milestone Payment Schedule Table (Milestone Table).
1. Buyer may reduce or suspend milestone payments, deduct the amount of milestone payments previously paid from any amounts owing to Contractor, or take a combination of these actions after any of the following conditions occurs:
a. The Contractor failed to comply with any material requirement of this Contract,
b. Performance of this Contract is endangered by the Contractor’s failure to make progress or unsatisfactory financial condition, or
c. The Contractor is delinquent in payment of any subcontractor or supplier under this Contract in the ordinary course of business, or
d. The amount of payments under this Contract exceed any limitation in this Contract
e. Contractor fails to satisfactorily remedy such condition.
2. Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent information requested by Buyer to determine that a milestone event has been successfully completed. Contractor shall provide Buyer reasonable opportunity to examine and verify the Contractor’s records and to examine and verify the Contractor’s performance. Buyer may decline one or more milestone payment requests any time the Contractor’s records or controls are determined by Buyer to be inadequate for support of the request.
3. Buyers’s rights and remedies under this clause are not exclusive, but rather are in additional to any other rights and remedies provided by law or this Contract.
Page 6 of 14 Format: 1/25/2021
4.0 PRICING INSTRUCTIONS FOR CHANGE ORDERS/MODIFICATIONS
Buyer reserves the right to request a complete pricing breakdown, including certified or uncertified cost or pricing data as applicable, for any change orders or modifications that have an impact to the established Contract pricing.
5.0 ESTIMATED BILLING
The Contractor shall provide monthly to Buyer an estimate of the total cost incurred (invoiced plus cost incurred for the current fiscal month) from inception of the Contract through the current fiscal month end. This data shall be provided for each contract or task order release until all payments are received and each contract or task order release is complete.
This data shall be provided electronically (preferred) each month, typically between the 12th and 16th of the month, through Hanford Vendor Registration, which displays a list of fiscal month end dates. Contact vendorregsupport@rl.gov with technical issues.
Alternative methods for submitting this data are email or mail and shall be received by Buyer by the 15th of each month. Use either the Microsoft® Excel® or Word version of the Monthly Contract-to-Date Cost Estimate Form found at https://cpcco.hanford.gov/page.cfm/SubmittalsFormsDocs.
Mailing Address: Email: CPCCA@rl.gov Attn: Accruals Central Plateau Cleanup Company PO Box 1464 MSIN H7-32 Richland, WA 99352
6.0 INVOICING INSTRUCTIONS
6.1 Contractor Invoices
Invoices submitted to Buyer shall be submitted as follows. Failure to submit a proper and accurate invoice may result in reduction in payment, rejection or delay of the invoice until the required documentation is provided. Address invoicing requirement questions to the Contract Specialist.
General Requirements
1. Each Contract, Task Order Release and Purchase Order shall be invoiced separately and in a timely manner with respect to the invoiced products or services.
2. The invoice shall be provided in accordance with FAR 32.905.
3. Remittance will only be made to the remittance address on file for the Contractor.
Invoices from third parties or with different remittance instructions or addresses will not be processed.
4. An Authorization for Electronic Funds Transfer (EFT) of Invoice Payments shall be on file with Buyer before EFT payments can be made.
Page 7 of 14 Format: 1/25/2021
5. Invoices will be paid according to the terms and conditions of the Contract unless substantiated evidence is obtained claiming Contractor is delinquent in payment to its subcontractors. All future payments may be reduced or suspended by the Contract Specialist until validation is received from the Contractor verifying its subcontractor payments are current.
Contracts for Services
1. Unless otherwise authorized in the Contract, service contracts shall not be invoiced more than once per calendar month.
2. The total amount due for the billing period shall be clearly identified on all invoices (this amount shall be set apart from any cumulative amounts or subtotals).
3. The billing period (beginning date and end date) shall be clearly identified on all invoices.
4. Invoiced amounts, rates, other direct charges or travel shall be specifically defined in the Contract based on the Contract type to be allowable for reimbursement.
Submittal
1. Invoices and supporting documentation may be submitted electronically in a format acceptable to Buyer (preferred).
2. Submit invoices electronically via e-mail to both Buyer’s Accounts Payable at the following e-mail address: CPCCAP@rl.gov and (in the same email) to the Contract Specialist.
Page 8 of 14 Format: 1/25/2021
a. The Contractor’s name, invoice number, and the Contract and Task Order Release number(s) shall be in the subject line of the e-mail message used to submit an electronic invoice. The suggested format for the subject line is: Contractor Name, Invoice XXXXX, Contract TBD.
3. Submit hard copy invoices including supporting documentation to Buyer’s Accounts Payable organization at the address below.
Attn: Accounts Payable Central Plateau Cleanup Company P.O. Box 1464 Mail Stop H7-32 Richland, WA 99352
6.2 Cost Adjustments
The cost(s) of this Contract are subject to adjustment based on the resolution of recommendations contained in any report of Government Audit in accordance with cost principles contained in the Department of Energy Acquisition Regulations and the Federal Acquisition Regulations.
7.0 FINAL RELEASE AND CLOSEOUT
Contractor, after completion of work and receipt of final payment under this Contract, shall promptly execute and deliver a final release discharging the Buyer, the Government and their officers, agents, and employees of and from all liabilities, obligations and claims arising out of this Contract.
8.0 SPECIAL INSTRUCTIONS
8.1 Back Charges
Buyer reserves the right to back charge the Contractor for costs incurred by Buyer that are caused by the Contractor or Contractor’s subcontractors in accordance with the Contract General Provisions. In addition to the circumstances described in the General Provisions, the back charge may also result from:
1. Services performed by Buyer, at Contractor’s request, which are within Contractor’s scope of work under the Contract.
2. Costs sustained by Buyer as a result of Contractor’s non-compliance with the provisions of this Contract or Contractor’s act of omission or negligence.
3. Costs incurred by Buyer to fix all defects, deficiencies or errors that appear in the Work during the warranty period.
4. Costs associated with Buyer support costs when work is interrupted by a Contractor-caused delay or equipment failure.
At Buyer’s sole discretion and if circumstance allow, Contractor may be offered the opportunity to propose a fix or take mitigating actions to reduce the impact and total back charge. In the event that Contractor fails to take satisfactory action, Contractor’s option to mitigate shall be withdrawn and Buyer will take appropriate action to cure the problem and back charge Contractor.
Page 9 of 14 Format: 1/25/2021
END OF PART II – FINANCIAL TERMS
PART III – GENERAL TERMS, CONTRACT PROVISIONS & ATTACHMENTS
1.0 ATTACHMENTS INCORPORATED
The terms, provisions, forms, specifications, documents and attachments listed herein are hereby incorporated into and made a part of this Contract. Contractor is responsible for downloading or obtaining a copy from the Contract Specialist and complying with the applicable documents. Where available, hyperlinks are provided for downloading the referenced document.
2.0 ACCEPTANCE OF PROVISIONS, TERMS AND CONDITIONS
Contractor, by signing this Contract, delivering the supplies, or performing the requirements indicated herein, agrees to comply with all the Contract provisions, terms, forms, attachments, specifications and other documents that this Contract incorporates by reference or attachment. Buyer hereby objects to any provisions inserted into this Contract that are different from or in addition to those set forth by Buyer in the Contract.
3.0 CONTRACT PROVISIONS
Unless specifically replaced or revised in the body of this Contract, the clauses and referenced laws, rules and regulations in the General and Special Provisions applicable for this type of contract shall have the same force and effect as if written into the body of the Contract.
Contractor is responsible for downloading, reading and complying with the applicable provision revision identified below. Provisions are posted for downloading at https://cpcco.hanford.gov/page.cfm/ContractProvisions. A copy is also available from Buyer on request.
3.1 General Provisions
Revision 3 dated January 28, 2025
3.2 Special Provisions, SP-12 - Government Property
Revision 0 dated January 25, 2021
3.3 Special Provisions, SP-13 - General Transportation Instructions
Revision 0 dated January 25, 2021
3.4 Special Provisions, SP-14 - Hazardous Waste Transportation and Disposal
Revision 0 dated January 25, 2021
3.5 Special Provisions, SP-16 - Representations and Certifications
Revision 5 dated January 23, 2024
Page 10 of 14 Format: 1/25/2021
Representations and Certifications made by the Contractor as part of the proposal and award process are hereby incorporated by reference into this Contract unless specifically excluded and agreed by Buyer in the Contract. Contractor agrees to update and resubmit a revised SP-16 if any change occurs that would nullify, change or otherwise affect said Representations and Certifications.
END OF PART III – GENERAL TERMS, CONTRACT PROVISIONS &
ATTACHMENTS
PART IV – SPECIAL TERMS
1.0 ADMINISTRATION
1.1 Term of Contract
The term of this Contract shall commence on TBD and shall end on <<Enter End Date>> unless extended by the parties or unless terminated by other provisions of this Contract.
1.2 Option to Extend the Term of the Contract
This Contract includes the option(s) to extend the term identified herein. The total period of performance of the Contract includes the base period plus the optional period(s) that may be exercised by Buyer. Byer will exercise the option(s) by providing thirty (30) day written notice to the Contractor prior to expiration of the Contractor’s current period of performance.
1.3 Options
The Contract Specialist retains the sole right to exercise the option(s) included in this Contract. The inclusion of the option(s) does not represent a commitment, financial or otherwise, on the part of Buyer to exercise any or all of the option(s) nor extend the Contract beyond the end date specified by the Contract or most current Contract amendment. Buyer may exercise one or more options by providing written notice to the Contractor prior to the most current Contract end date. Lacking written notice by Buyer, the option(s) will expire with the Contract.
1.4 Contract Correspondence
Buyer’s Mailing Address:
Attn: Elisa Donovan Central Plateau Cleanup Company PO Box 1464 Mail Stop A7-05 Richland, WA 99352
Buyer’s Street Address:
Attn: Elisa Donovan Central Plateau Cleanup Company 2620 Fermi Avenue Room B149 Richland, WA 99354
Page 11 of 14 Format: 1/25/2021
1.5 Abnormal or Unusual Situations
In the event that there is an abnormal or unusual situation associated with this Contract work scope, the Contractor is to immediately contact the designated Contract Specialist or designated Buyer’s Technical Representative (BTR). If the Contractor is unable to contact either the Contract Specialist or the BTR, the Contractor is to contact the Buyer Emergency Operations Center at (509) 376-2900, which is available 24 hours a day, seven days a week, and provide them with: Contract Number, Contract Specialist’s name, BTR’s name and a short summary of the abnormal or unusual situation. If after making contact with Buyer, the Contractor is advised to suspend activities, the Contractor is not to proceed until such direction to proceed has been expressly issued by the Contract Specialist. If there is an emergency situation, the Contactor is to make the appropriate immediate emergency call to 911 or (509) 373-0911 for cell phones and then make the notifications to Buyer as set forth herein.
1.6 Authorized Personnel
Only the following named Contract individuals are authorized to make changes to this document:
Contract Specialist, Elisa Donovan
Manager, Tina Ridge
1.7 Contractor – Buyer Interface
Buyer and the Contractor will interface only through Buyer’s Contract Specialist for clarifications and questions.
1.8 Other Interfaces
Additional Buyer contacts will be identified at the kickoff meeting.
1.9 Designation of Technical Representative
The designated Buyer’s Technical Representative (BTR) for this contract is:
<<Enter BTR Name, Phone Number, Mail Stop MSIN>>
The BTR is responsible for monitoring and providing technical guidance for this Contract and shall be contacted regarding questions or problems of a technical nature. The BTR is also responsible for appropriate oversight of Contractor’s personnel while on site and the interface between Contractor and other Buyer organizations supporting Contract performance.
Authority of the BTR and supporting organizations is limited to providing technical direction within the scope and provisions of this Contract. The BTR may not direct work or authorize any change outside of the written Contract and Contract provisions.
The BTR does not possess any explicit, apparent or implied authority to modify the Contract. When in the opinion of the Contractor, the BTR requests or directs efforts outside the existing scope of the Contract, Contractor shall promptly notify the Contract
Page 12 of 14 Format: 1/25/2021
Specialist in writing. No action outside the scope of the Contract shall be taken until the Contract Specialist makes a determination and/or modifies the Contract.
In no event, will an understanding or agreement, modification, change order, or any deviation from the terms of this Contract be effective or binding upon Buyer unless formalized by proper Contract documents executed by the Contract Specialist.
1.10 Packing List
Contractor shall enclose a packing list with each shipment referencing:
1. Name of Contractor
2. Contract number and item number
3. Date of Contract
4. Itemized list of supplies or services furnished
5. Quantity of each item
6. Date of delivery or shipment
7. Stock number (if applicable)
1.11 Package Identification
All envelopes, boxes or packages shipped to Buyer in performance of this Contract shall be clearly marked with the Contract number.
1.12 Proprietary Data Submittals
If Contractor submits any data as part of their Contract, which is considered by the Contractor to be “Proprietary Data,” the document transmitting the data or which contains the data, shall be boldly marked indicating that the data included in considered to be proprietary.
1.13 Document Transmittals
The Contractor shall utilize a document transmittal system for the exchange of data and information during the performance of work under this Contract. The transmittal shall contain:
1. A unique identification number,
2. A brief identification of the document(s) including revisions,
3. The date of the transmittal,
4. Purpose of the transmittal, including required action (if any),
5. Signature of supplier representative, and
6. Means or provisions for receipt acknowledgement by Buyer.
1.14 Requests for Clarification or Information
Where necessary, the Contractor may elect to submit formal requests for Clarification or Information as necessary to obtain technical clarifications using the Request for Clarification or Information (RCI) Form. The inquiry portion of the RCI Form shall be
Page 13 of 14 Format: 1/25/2021 completed by the Contractor, including a determination of priority and an identification of schedule delay with the issue, if applicable. RCI Form numbering shall be left blank and assigned by Buyer upon receipt. Buyer will complete an evaluation, and provide a disposition and determine additional actions required, when appropriate. The purpose of the form is to facilitate formal communications when necessary.
1.15 Contract Change Request
The Contractor shall submit formal requests for changes to the scope, schedule or cost of this contract using the Contract Change Identification Form. The appropriate portions of the Change Form shall be completed by the Contractor. A red-line mark up of the Statement of Work or Specification showing where the proposed changes fit within the scope shall be attached, if applicable. Change Form numbering shall be left blank and assigned by Buyer upon receipt. Buyer will complete an evaluation, provide a disposition and determine additional actions required, as appropriate. The purpose of the form is to facilitate formal communications.
1.16 Work Schedules and Holiday
NOTICE: Daily work schedules and facility operations are NOT consistent on the Hanford Site. Buyer and some other organizations are working a 4x10 schedule and others observe alternate Friday closures.
Accordingly, Contractor is responsible to understand and plan to support the work schedule required for this specific Contract and/or work location. BEFORE scheduling work on site and/or deliveries, the Contractor shall make specific schedule arrangements with Buyer, BTR, Facility Manager, Delivery Warehouse Manager, Building Manager, etc.
Buyer will not be liable for the cost of any delays, demurrage, layover, extra travel days, etc. which result from Contractor’s failure to plan for and obtain specific schedule concurrence in advance.
1.17 Foreign National Notification and Approval
The Contractor, regardless of work location, shall obtain Buyer’s approval prior to providing any Foreign National (non-U.S. citizen) access to any Department of Energy (DOE)/Buyer sites, programs, information and technologies under this Contract. Prior approval is also required for Contractor-hosted meetings where Foreign National(s) will be present (in person or virtually). Foreign National requests will be processed in accordance with DOE Order 142.3A Chg 1 (MinChg), Unclassified Foreign Visits and Assignments Program, and applicable Hanford Site procedures.
Furthermore, Contractor travel outside the United States for the purpose of performing work under this Contract shall be approved in advance by Buyer. Foreign travel will be reviewed and processed in accordance with DOE Order 551.1D Chg 2 (Minor Revision), Official Foreign Travel.
Page 14 of 14 Format: 1/25/2021
1.18 On Site Work Restriction
Unless authorized by the Contract Specialist for specific Contractor personnel for a specific time, location, and purpose or otherwise incorporated into the Contract by a modification, Contract work scope activities are not authorized to be performed on the Hanford Site.
1.19 Service Contract Labor Standards
This Contract is subject to Service Contract Labor Standards (formerly known as the McNamara-O’Hara Service Contract Act of 1965) as specified in FAR 22.10 . In accordance with Service Contract Labor Standards, the Contractor shall pay service employees, employed in the performance of this Contract, no less than the minimum wage and furnish fringe benefits specified by Service Contract Labor Standards or applicable Wage Determination.
The Service Contract Labor Standards Wage Determination specifically for this Contract
Attachment 9 – Wage Determination Rev 26, 07-08-2025.
A Directory of Occupations and more information about the Service Contract Act can be found on the Department of Labor website.
2.0 DEFINITIONS
There are no special definitions applicable to this Contract.
3.0 ASSUMPTIONS
There are no special assumptions applicable to this Contract.
END OF PART IV – SPECIAL TERMS
END OF CONTRACT
File details come from the government source that posted it. Updated .