This solicitation describes a design-build contract opportunity to correct water infiltration issues at three buildings at the Dallas VA Medical Center. The contractor will inspect basements for all points of water intrusion, develop a phasing plan, seal all building penetrations, divert water from exteriors and adjacent buildings to storm drains, remediate interior damage from water at two buildings, and provide all necessary labor, materials and equipment. The solicitation will be issued as a request for proposal on July 10, 2019, with a period of performance of approximately 270 calendar days. The magnitude of construction is estimated between $1,000,000 to $2,000,000. The solicitation is a total SDVOSB set-aside to be evaluated using LPTA procedures.
36E77619R0085 0001 36E77619R0085 - Phase II Technical Solution Revision 7-25-2019.pdf
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36E77619R0085 - Amendment 0001 25 July 2019
CON-100 INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS OFFERORS
Proposal Requirements (2.7) Phase II Proposal Evaluations (C) Evaluation Factors (2) Factor 1, Technical Solution (i)
C. Phase II Proposal Format and Evaluation:
2. Evaluation Factors:
i. Factor 1, Technical Solution: Based on the solicitation documents, site visit, and the Offeror’s Phase I Technical Approach provide a detailed narrative (page limitation: eight
(8) pages for detailed narrative) describing the Offeror’s technical solution to the project to achieve design and construction design objectives as described in the solicitation. If the page limits are exceeded, the pages in excess of the limit will not be read or considered.
The Offeror’s narratives shall include, at minimum, the following technical areas:
a. Phasing
b. Infection Control
c. Structural
d. Earthwork
e. Exterior Improvements
f. Electrical
g. Concrete
h. Masonry
i. Asbestos removal
j. QC management and solutions
k. Safety management
The Offeror shall address areas of concern and describe how they will minimize risk in conjunction with the identified areas of concern. The narrative shall indicate that the Design-Build team understands the complexities of the project and address how their approach offers constructability in an operational hospital setting.