36E77619R0009-008.pdf

PDF Posted

Attached to
ESPC IDIQ (VA-19-00001743) Federal contract opportunity
Solicitation number
36E77619R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document outlines deliverables and reporting requirements for an indefinite delivery indefinite quantity energy savings performance contract between the Department of Veterans Affairs and energy service companies. Key deliverables for ESCOs include preliminary assessments, investment grade audits at 30%, 60%, and 95% completion, and a final investment grade audit and proposal. Post-award deliverables consist of operation and maintenance manuals, measurement and verification reports, notice of utility interruptions, and warranty documentation. The solicitation number is 36E77619R0009 and seeks proposals from service disabled veteran owned small businesses for energy conservation measures to reduce energy costs and improve operations at VA facilities. Proposals are due on the VA Vendor Portal in January 2019. The contract type is an IDIQ and the estimated value is unspecified.

36E77619R0009 S02 ATTACHMENT J-4 - Deliverables.pdf

View the file

Other files for this federal contract opportunity

Other files attached to ESPC IDIQ (VA-19-00001743), newest first.
File Type Posted
36E77619R0009 0009.docx DOCX document
36E77619R0009-0006000.docx DOCX document
36E77619R0009-0006000.docx DOCX document
36E77619R0009-0005001.docx DOCX document
36E77619R0009-0005001.docx DOCX document
36E77619R0009-0003003.zip ZIP file
36E77619R0009-0003001.docx DOCX document
36E77619R0009-0003000.docx DOCX document
36E77619R0009-0003005.pdf PDF
36E77619R0009-0003005.pdf PDF
36E77619R0009-0003000.docx DOCX document
36E77619R0009-0003002.pdf PDF
36E77619R0009-0003001.docx DOCX document
36E77619R0009-0003003.zip ZIP file
36E77619R0009-0002003.pdf PDF
36E77619R0009-0002004.pdf PDF
36E77619R0009-0002001.docx DOCX document
36E77619R0009-0002002.pdf PDF
36E77619R0009-0002003.pdf PDF
36E77619R0009-0001001.docx DOCX document
36E77619R0009-025.pdf PDF
36E77619R0009-024.pdf PDF
36E77619R0009-017.pdf PDF
36E77619R0009-016.pdf PDF
36E77619R0009-012.pdf PDF
36E77619R0009-009.pdf PDF
36E77619R0009-015.pdf PDF
36E77619R0009-006.pdf PDF
36E77619R0009-020.pdf PDF
36E77619R0009-028.pdf PDF
36E77619R0009-022.pdf PDF
36E77619R0009-014.pdf PDF
36E77619R0009-011.pdf PDF
36E77619R0009-016.pdf PDF
36E77619R0009-017.pdf PDF
36E77619R0009-014.pdf PDF
36E77619R0009-026.pdf PDF
36E77619R0009-023.pdf PDF
36E77619R0009-022.pdf PDF
36E77619R0009-024.pdf PDF
36E77619R0009-015.pdf PDF
36E77619R0009-021.pdf PDF
36E77619R0009-018.docx DOCX document
36E77619R0009-027.docx DOCX document
36E77619R0009-009.pdf PDF
36E77619R0009-007.pdf PDF
36E77619R0009-028.pdf PDF
36E77619R0009-025.pdf PDF
36E77619R0009-003.docx DOCX document
Vendor_Portal_Vendors_Guide.pdf PDF
Show all 50

ESPC IDIQ (VA-19-00001743) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-4

DELIVERABLES

Pre-award Deliverables Sample:

Item Deliverable Frequency Due

1 Preliminary Assessment One time Per contractor schedule

2 30% IGA One time Per contractor schedule

3 60% IGA One time Per contractor schedule

4 95% IGA One time Per contractor schedule

Final

IGA/

Proposal

One time Per contractor schedule

Post-award Deliverables:

Item Deliverable Frequency Due

Signed Contract One time Upon Receipt from agency

2 OPM Data One Time Upon contract award

Certificate of Insurance One time 15 days after award

4 Performance Bond One time 30 days after award

5 Payment Bond One time 30 days after award

6 Project Schedule (CPM) Bi-Weekly Award Kick-off meeting and subsequent project calls.

Completed SF1413 and Subcontract Signed Agreements

One Time Per 52.222-11 – completed SF1413 within 14 days of awarded subcontract

8 Submittal Log Quarterly Update Initial Due at Award Kick-off.

9 Work Schedule Monthly 10 days before work start

10 Work Outside Normal Hours Per occurrence 5 days before work start

Design and Construction Package

Per ECM/Facility Due date based on proposal and negotiations days after award

ECM

Installation Quality control Inspection Program

One time Due date based on proposal and negotiations days after award

Commissioning Plan One time After Approval of item 11 above

Safety and Health Plan One time

Due date based on proposal and negotiations days after award

Notification of Utility Interruption

Per occurrence 15 working days prior to outage

16 Payrolls Weekly Due date based on proposal and negotiations days after award

17 Daily Logs Daily Due date based on proposal and negotiations days after award

18 Incident Reports As-Required.

Due date based on proposal and negotiations days after award

19 RFI Log As-Required, Monthly Updates

Due date based on proposal and negotiations days after award

Operation Work Procedure

As-Required With training class

Maintenance Work Procedure and Maintenance Work Requirements and Checklist

One time With training class

O&M Manuals and Spare Parts Lists

One time Prior to agency acceptance of project

Warranty Log and a copy of each Warranty

One time Prior to agency acceptance of project

Commissioning Report One time Upon ECM installation and commissioning

Post- Installation Report

One time Prior to Government’s acceptance

As-built Drawings Per ECM Prior to Government’s acceptance

27 First Year - M&V Reports Quarterly Due date based on proposal and negotiations days after award

Annual M&V Report on ECM Performance

Annual As agreed upon in the IGA

29 Modifications Per modification Upon receipt of signed modification