This solicitation is for boom, lighting, and video systems with full integration services. The Department of Veterans Affairs is seeking quotes for new boom, lighting, and video equipment to be delivered and installed at the Southern Arizona VA Health Care System located in Tucson, Arizona. Interested Service-Disabled Veteran-Owned Small Businesses shall provide pricing for the required supplies and services. A site visit will be held on January 11, 2023, with an RSVP due by January 9. Questions about the solicitation are due by January 16 and quotes are due by January 27 via email. The solicitation is set aside for SDVOSBs and associated with NAICS code 339113 with a small business size standard of 750 employees. The awarded firm will deliver and install the new equipment upon contract award.

View the file

Other files

File Type Posted
SF30.pdf PDF
Amendment List.pdf PDF
Vendor Questions and Answers 36C26223Q0326.pdf PDF
36C26223Q0326 0001_1.docx DOCX document
36C26223Q0326_2.docx DOCX document
S02 - 36C26223Q0326.pdf PDF
Past Performance Sheet.docx DOCX document
36C26223Q0326_1.docx DOCX document
Salient Characteristics Sheet.docx DOCX document
Experience Narrative Sheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

678-23-1-071-0001

36C26223Q0326 01-03-2023

Alvizar, Edgar 562-766-2244 02-22-2023

08:00 PST

36C262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

X 100

X

339113

750 Employees

N/A

36C678

Department of Veterans Affairs Southern Arizona Healthcare System

3601 S 6th Ave Tucson AZ 85723

36C262

Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815

Department of Veterans Affairs Financial Services Center

See CONTINUATION Page

This is the solicitation for Boom and Surgical Lights with Full integration service.

COR: To be Determined (TBD)

SEE SECTION E.5 - ADDENDUM INSTRUCTIONS TO OFFERORS - FOR

FULL INSTRUCTIONS ON HOW TO PROPERLY SUBMIT YOUR OFFER.

See CONTINUATION Page

X 1

Cecil S Nichols Contracting Officer

36C26223Q0326

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 STATEMENT OF WORK

Boom System Requirements and Salient Characteristics:

Lighting System Requirements and Salient Characteristics:

Video Integration System Requirements and Salient Characteristics:

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

B.4 DELIVERY SCHEDULE

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (DEC 2022)

C.2 52.217-6 OPTION FOR INCREASED QUANTITY (MAR 1989)

C.3 SUPPLEMENTAL INSURANCE REQUIREMENTS

C.4 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

C.5 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA

ACQUISITION OF COMMERCIAL ITEMS (APR 2020)

C.6 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND

COMPLIANCE (JUL 2018)

C.7 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021)

(DEVIATION)

C.8 VAAR 852.219-78 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SUPPLIES AND PRODUCTS (SEP 2021)

(DEVIATION)

C.9 VAAR 852.247-71 DELIVERY LOCATION (OCT 2018)

C.10 VAAR 852.247-72 MARKING DELIVERABLES (OCT 2018)

C.11 VAAR 852.247-73 PACKING FOR DOMESTIC SHIPMENT (OCT 2018)

C.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.13 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (DEC 2022)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

D.1 WAGE DETERMINATION RATE SCA 2015-5473 REV #18

D.2 SALIENT CHARACTERISTIC SHEET

D.3 EXPERIENCE NARRATIVE SHEET

D.4 Past Performance Sheet

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2021)

ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES

E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

E.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

E.4 52.216-1 TYPE OF CONTRACT (APR 1984)

E.5 52.233-2 SERVICE OF PROTEST (SEP 2006)

E.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

E.7 52.211-6 BRAND NAME OR EQUAL (AUG 1999)

E.8 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2021)

E.9 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C262

Network Contracting Office 22

4811 Airport Plaza Drive

Suite 600

Long Beach CA 90815

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[X] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [X] Invoice for Supplies and Services – Upon delivery and acceptance of Supplies and Services

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

5. INVOICES: Invoices shall be submitted in arrears in accordance with 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) upon acceptance of items.

a. In order to comply with the Improper Payment Elimination and Recovery Act of 2010 (IPERA), the VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with OB10 e-Invoicing network, for submissions of all electronic invoices to VA. OB10 electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with OB10 by submitting an email to VA.Registration@ob10.com or calling 1-877-752-0900 option 2 for Enrollment.

b. For assistance setting up e-Invoice, the below information is provided:

OB10 e-Invoice Setup Information: 1-877-489-6135 OB10 e-Invoice email: VA.Registration@ob10.com <http://VA.Registration@ob10.com/> FSC e-Invoice Contact Information: 1-877-353-9791 FSC e-invoice email: vafsccshd@va.gov <http://va.gov/

c. FACSIMILE, E-MAIL, AND SCANNED DOCUMENTS ARE NOT ACCEPTABLE

FORMS OF SUBMISSION FOR PAYMENT REQUESTS.

d. All invoices shall reference the Contractor’s name and address, customer name, contract number, appropriate obligation/funding order number, description of services provided, quantity, unit price, and total invoice amount (any additional info). Invoices shall also include any payment discount terms.

f. For questions regarding invoice receipt or payment, please call VAFSC directly at 1- 877-353-9791 or email vafsccshd@va.gov.

6. ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

mailto:VA.Registration@ob10.com mailto:VA.Registration@ob10.com http://ob10.com/ mailto:vafsccshd@va.gov http://va.gov/ mailto:vafsccshd@va.gov

B.2 STATEMENT OF WORK

Background:

The equipment booms, surgical lights and OR integration in Buildings 57 and 50 at Southern Arizona VA Healthcare System (SAVAHCS) needs to be updated. The existing equipment is over 10 years old and beginning to fail. The addition of the 4k 32’’ technology is putting additional strain on the aging equipment, as it was not designed to accommodate monitors of this size.

Scope:

The scope of this contract is to provide a set of specified supplies and services. The specified supplies and services shall be provided are categorized as follows:

• Building 57. Operation Room (OR): 1, 3, 5

• Building 57. OR: 7, 8

• Building 57. OR: 9

• Building 57. OR: 2

• Building 57. OR: 10, 11, 12, 13

• Building 57. OR: 4

• Building 50. Bronchoscopy – Room 356

• Building 50. Cysto Suites – Room 344, 346

• Building 50. GI Suites – Room 350, 351, 353

• Building 50. GI Suite with Lights – Room 348

• Building 50. ERCP Suite – Room 357

General Requirements:

The contractor shall provide all personnel, equipment, tools, material, vehicles and fuel, supervision, supplies and services necessary to perform tasks and functions as defined in this Statement of Work (SOW). All services requested under this SOW are non-personal in nature. The contractor shall meet all requirements and responsibilities in this SOW, focusing on facility’ need and consistently providing responsive flexible service. The contractor shall ensure quality work performance in accordance with applicable standards, guidelines, and directives in all areas.

The desired outcomes of the contractor’s efforts for this requirement are:

• All required work shall be performed during night and weekend hours.

• No Construction work.

• Existing mounts and bolt patterns will be utilized by the Contractor to install new equipment.

• Use of existing in-place conduit (new conduit installation is not in-scope).

• Use of existing ceiling panels.

• Ensure the integrity of the existing boom and light mounts.

• Minor touch-up of damages incurred during installation (Drywall, paint work, ceiling panel work, and any work classified as Construction work is out of scope).

• No environmental violations or regulatory actions.

• Services shall be provided by properly trained and/or certified personnel

• Basic Audio is not required.

• Room 6 is not in the scope of this requirement.

• OR # 4 will have the only in-light camera.

• Contractor must use and Original Equipment Manufacturer (OEM) certified installer with required access.

• No DaVinci robot integration in Robotic Rooms.

Boom System Requirements and Salient Characteristics:

• A Boom arm assembly shall be provided to allow positioning of the Equipment Carrier to the patient shoulder area of both sides of the Operating Table. The Boom arm assembly should utilize Active Assist positioning and braking which will function automatically. Boom system shall not utilize a direct input (button or handle) to activate or disengage the Active Assist braking system.

Soft Stop braking is required to avoid sudden stops and strain on the user and equipment.

• The complete Boom arm assembly must have two articulating arms, one upper arm and one lower arm. The Equipment Carrier must also articulate. All articulation points must rotate 360° minimum and secondary arms up to 360°.

• Center-Aligned carriers must be utilized to minimize the rotational footprint of the carrier in the room and evenly distribute carrier weight directly under the support tube.

• Each arm should “nest” within the arm above it so it does not impede rotation.

• Simulation testing must be completed for structural verification of the current boom mounts showing that the mounting plate does not deflect more than specified for each configuration.

• The booms should have a physical barrier between the "wet" (suction, gases) and "dry" (electrical and communications) side.

• The equipment boom should have a minimum reach of 101.5" from center of the hub to the center of vertical tube that supports the equipment carrier.

• The monitor boom should have a minimum reach of 93” from center of the boom hub to the center of the vertical tube that supports the monitor bracket.

• Braking system for the Booms (equipment carriers and perfusion boom) shall be active assist (friction) only.

Lighting System Requirements and Salient Characteristics:

• Lights must be able to be controlled via an RS232 connection via the Operation Room (OR) integration system and be able to control intensity and color temperature as well as power.

• Surgical lights will have multiple color temperature options.

• Surgical lights must have the ability to control intensity from both the wall control and via the in-light handle.

• The control handle shall be located within each lighthead and shall be easily removable for sterilization.

• The surgical lights should be able to accommodate non-proprietary, third-party rigid screw-in disposable handles as well as flexible condom-style covers over non-sterile rigid handles. .

• The light system will have intensity control from 0-100% from the surgical light and wall unit.

• The Surgical Lighthead shall have non-sterile control focus control on the side of the Surgical Lighthead for the benefit of the circulating nurse.

• The lighthead shall include a variable focus feature that will manipulate overlapping beams of light on the vertical plane via center sterile handle or camera cover without adjusting the lighthead position vertically.

• Each unit shall be readily removable from its wall box for servicing or replacement.

• The lower arm member shall pivot vertically to permit raising and lowering the lighthead with a range of 110°.

• The lighthead shall attach to the lower arm assembly through a system that allows lighthead rotation in all directions 360°continuously without the need to rotate the suspension arms. All rotational points in the light system must have 360° continuous rotation with no stops.

• All rotational points in the lighthead pitch and roll must have infinite rotation.

• The surgical light system must have the ability to be positioned at a 90° angle below the vertical adjustment point.

Video Integration System Requirements and Salient Characteristics:

• Vendor Neutral / Open Architecture: The Integrated OR system must give the hospital the flexibility to support any video or imaging vendor. System must work with medical imaging equipment, endoscopic cameras, PACS systems, Robotic imaging, C-Arms, navigation, physiological monitors, ultrasound, microscope, surgical light cameras, etc.

• The proposed integration system is not to be housed or installed in the Operating Room. Vendor must use existing electrical room 2217 for location of the integration racks.

• Must be able to locate the integration racks 300’ way from the OR/clinical areas.

• Integration system must have RS232 connectivity for the purpose of controlling up to 4 infield surgical lights, Lighthead intensity - individually and simultaneously, must be able to change the color temperature.

• Sources and display devices shall be connected via all-fiber optic cabling.

• The source faceplates accommodate video signals compliant with Video Electronics Standards Association (VESA) standards. Each modality connects to the faceplate via the native device output format. The faceplate has on board technology that converts the electrical video signal to light for transmission over fiber optic cable. Must offer standard format faceplates, universal and multi-format faceplates. Each faceplate needs to have two LED’s, the green LED indicates power to the faceplate and the amber LED indicates the connected modality is received by the system.

• Presets shall be easily changed or created. Current production software provides 16 presets that staff can use to quickly route the preset routing path as well as color preferences on any display.

• Provide up to 32 presets that are not limited in text length. This allows for better description of the preset that can include specific details related to the clinical team and procedure. Clinical users of the integration system should have ability to create or edit presets by selecting the presets button on the touch panel. Then selecting the desired preset to be edited or created. Editing should allow staff to rename the preset and select the routed source paths for the preset. Once a preset is established, users only need to press the preset button and then press the desired preset in the pop up window. This will then route the desired modalities to the displays for that preset.

• The creation or editing of presets should be done by clinical staff and should not require technical support or clinical engineering involvement to perform the preset process.

• Source detection at faceplate and integration touch panel.

• All source inputs and outputs must display on one screen for ease of routing images without having to scroll through different screens.

• Need to provide a keyboard mouse switch to control PCs located inside the integration rack.

• System must have the ability to add additional 4k sources as the VA acquires new technology to improve patient care.

• Hold for off and 1 touch wake up feature must be included.

• Integration system includes as a standard with no additional cost a built in Signal test pattern generator and green technology Uninterruptable Power supply. These components must be internal not external to the integration system.

• The integrated OR system shall accommodate source device changes by changing the source input faceplate and / or changing the button name on the user interface.

• The integration system user interface will “grey” out inactive sources on the user touch panel interface to provide a more user-friendly control.

• Commercial grade is required for Display Monitors Integration equipment is not required to meet Risk Management Framework requirements for technology and cybersecurity similar to the Department of Defense.

• Minimum input/output count required for integration systems are Current Minimum output is 4/Most input is 10. Maximum input/output up to 12- to 16.

Equipment Replacement Plan Per Room:

Building 57:

OR: 1, 3, 5 (Please refer to Line Item 0001 - 0003 at the Price Schedule) – (2) Dual Surgical lights, Foot, and head mount locations. (See lighting system requirements and Salient Characteristics for additional detail)

SOW:

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical and Plumbing Utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Final electrical utility connections after installation of new fixtures.

5. De-installation of ICRA

6. De-install and dispose of existing surgical lights and related appurtenances.

OR: 7, 8 (Please refer to Line Item 0004-0005 at the Price Schedule) –– Dual Surgical lights, centered over surgical table. (See lighting system requirements and Salient Characteristics for additional detail)

SOW:

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical and Plumbing Utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Final electrical utility connections after installation of new fixtures.

5. De-installation of ICRA.

6. De-install and dispose of existing surgical lights and related appurtenances.

OR: 9 (Please refer to Line Item 0006 at the Price Schedule) –– Dual surgical lights with 4k 27” Monitor (See lighting system requirements and Salient Characteristics for additional detail)

• The Primary Upper arm supporting the monitor assembly must be 50.5” in length.

The Primary Lower arm assembly must be 39.5” in length and provide a bracket that will support up to a 27” monitor with a minimum of 42” of vertical travel.

• The Secondary Upper arm assembly must be 43” in length and provide a 13” VST landing the light arm BOM at 81”

• The Third Upper arm assembly must be 35” in length and provide a 8” VST landing the light arm BOM at 80”

• Monitor

SOW:

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical and Plumbing Utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Final electrical utility connections after installation of new fixtures.

5. De-install and dispose of existing surgical lights and related appurtenances.

6. Install one (1) 27” (4K commercial grade) monitor.

OR: 2 – (Please refer to Line Item 0007 at the Price Schedule) (See Lighting and Boom system requirements and Salient Characteristics for additional detail)

• Mount A: Equipment Carrier, 4k Monitor, Light

• The Primary Upper arm equipment carrier assembly must be 61” in length.

The Primary Lower arm assembly must be 40” in length.

All articulating arms must be fixed and not height adjustable.

• The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

• A 13” vertical support tube (VST) will be provided to ensure a 36” finished floor to bottom of Equipment Carrier.

Carrier provided Utilities and accessories:

• (5) 22” adjustable shelves

• (6) Decora Plus, or equal, Duplex Receptacle, or equal, Hospital Grade, 20 Amp, 125 Volt

• (1) Front carrier positioning handles

• (1) Rear carrier positioning handles

• (2) Vacuum Slide clamps

• (1) extendable carrier mounted IV-pole

• (1) carrier mounted CO2 Bottle holder

• (1) 10” Equipment Rail

• The secondary Upper arm supporting the monitor assembly must be 50” in length.

The secondary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

• The Third Upper arm assembly must be 35” in length and provide an 8” VST landing the light arm BOM at 80”

• Mount B: 4k Monitor and Dual Lights

• The Primary Upper arm supporting the monitor assembly must be 50” in length.

The Primary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

• The Secondary Upper arm assembly must be 43” in length and provide a 14” VST landing the light arm BOM at 81”

• The Third Upper arm assembly must be 35” in length and provide a 9” VST landing the light arm BOM at 80”

• Update OR video Routers in OR to 4k Vendor Neutral system (See Video Integration system requirements for additional detail.

• No work required at OR 2. Contractor shall delivery required supplies only.

• Will supply and install two (2) 32” (viewable distance 31.5) infield monitors (4K commercial grade) and one (1) 55” wall monitor (4K commercial grade).

OR: 10, 11, 12, 13 – (Please refer to Line Item 0008-0011 at the Price Schedule) (See Lighting and Boom system requirements for additional detail)

• Mount A: Equipment Carrier, 4k Monitor, Light o The Primary Upper arm equipment carrier assembly must be 61” in length.

The Primary Lower arm assembly must be 40” in length.

All articulating arms must be fixed and not height adjustable.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 13” vertical support tube (VST) will be provided to ensure a 36” finished floor to bottom of Equipment Carrier.

o Compact 37" Center-Aligned Vert. Utility column, with 28 outlets

1. Carrier provided Utilities and accessories:

• (5) 22” adjustable shelves

• (6) Decora Plus, or equal, Duplex Receptacle, or equal, Hospital Grade, 20 Amp, 125 Volt

• (1) Front carrier positioning handles

• (1) Rear carrier positioning handles

• (2) Vacuum Slide clamps

• (1) extendable carrier mounted IV-pole

• (1) carrier mounted CO2 Bottle holder

• (1) 10” Equipment Rail o The secondary Upper arm supporting the monitor assembly must be 50” in length.

The secondary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

o The Third Upper arm assembly must be 35” in length and provide a 8” VST landing the light arm BOM at 80”

• Mount B: 4k Monitor and Dual Lights o The Primary Upper arm supporting the monitor assembly must be 50” in length.

The Primary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

o The Secondary Upper arm assembly must be 43” in length and provide a 14” VST landing the light arm BOM at 81” o The Third Upper arm assembly must be 35” in length and provide a 9” VST landing the light arm BOM at 80”

• Monitors: Will supply and install at each room o two (2) 32” (viewable distance 31.5) infield monitors (4K commercial grade) and o one (1) 55” wall monitor (4K commercial grade).

• Update OR video Routers in ORs to 4k Vendor Neutral system (See Video Integration system requirements for additional detail.

SOW

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical Plumbing utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Tie into current circuit to power braking system and provide shut off switch for service.

5. Add CAT5 from integration room to the wall control using the current ladder racks in the hallway and existing conduit in wall and above ceiling.

6. Final Electrical utility connections after installation of new fixtures.

7. Final Plumbing utility connections after installation of new fixtures.

8. De-installation of ICRA.

9. De-install and dispose of existing equipment booms, surgical lights, and related appurtenances.

10. De-install, decommission, and dispose of existing video integration system including related appurtenances. ( If there is not a current video integration system then this can be ignored )

OR: 4 – (Please refer to Line Item 0012 at the Price Schedule) (See Lighting and Boom system requirements for additional detail)

• Mount A: Equipment Carrier, 4k Monitor, Light o The Primary Upper arm equipment carrier assembly must be 61” in length.

The Primary Lower arm assembly must be 40” in length.

All articulating arms must be fixed and not height adjustable.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 13” vertical support tube (VST) will be provided to ensure a 36” finished floor to bottom of Equipment Carrier.

Compact 37" Center-Aligned Vert. Utility column, with 28 outlets

1. Carrier provided Utilities and accessories:

• (5) 22” adjustable shelves

• (6) Decora Plus, or equal, Duplex Receptacle, or equal, Hospital Grade, 20 Amp, 125 Volt

• (1) Front carrier positioning handles

• (1) Rear carrier positioning handles

• (2) Vacuum Slide clamps

• (1) extendable carrier mounted IV-pole

• (1) carrier mounted CO2 Bottle holder

• (1) 10” Equipment Rail o The secondary Upper arm supporting the monitor assembly must be 50” in length.

The secondary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

o The Third Upper arm assembly must be 35” in length and provide a 9” VST landing the light arm BOM at 80”

• Mount B: 4k Monitor and Dual Lights with in-light camera o The Primary Upper arm supporting the monitor assembly must be 50” in length.

The Primary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

o The Secondary Upper arm assembly must be 43” in length and provide a 14” VST landing the light arm BOM at 81” o The Third Upper arm assembly must be 35” in length and provide a 9” VST landing the light arm BOM at 80”

• Mount C: Perfusion Boom o The Primary Upper arm equipment carrier assembly must be 40.5” in length.

The Primary Lower arm assembly must be 40.5” in length.

All articulating arms must be fixed and not height adjustable.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 31” vertical support tube (VST) will be provided to ensure a 24.5” finished floor to bottom of Utility Carrier.

o Compact 37" Vertical Utility column, with 28 outlets

1. Carrier provided Utilities and accessories:

• (6) Decora Plus, or equal, Duplex Receptacle, or equal, Hospital Grade, 20 Amp, 125 Volt

• (3) VACUUM OUTLET DISS

• (2) MEDICAL AIR OUTLET DISS

• (2) OXYGEN OUTLET DISS

• (1) 20" Equipment rail

• (1) New Style VHM-P with 8" Extension, Standard Monitor VESA Plate

- Load Range: 15 - 30 lbs.

• Will supply and install three (3) 32” (viewable distance 31.5) infield monitors (4K commercial grade) and one (1) 55” wall monitor (4K commercial grade).

• Update OR video routers in OR to 4k Vendor Natural system (See Video Integration system requirements and Salient Characteristics for additional detail).

SOW

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical and Plumbing utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Tie into current circuit to power braking system and provide shut off switch for service.

5. Add CAT5 from integration room to the wall control using the current ladder racks in the hallway and existing conduit in wall and above ceiling.

6. Final Electrical utility connections after installation of new fixtures.

7. Final Plumbing utility connections after installation of new fixtures.

8. De-installation of ICRA

Building 50:

Bronchoscopy – Room 356 – (Please refer to Line Item 0013 at the Price Schedule) (See Lighting and Boom system requirements for additional detail)

• Mount A: Equipment Carrier, Dual Monitor, Light o The Primary Upper arm equipment carrier assembly must be 54” in length.

The Primary Lower arm assembly must be 40” in length.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 9” vertical support tube (VST) will be provided to ensure a 21.5” finished floor to bottom of Equipment Carrier.

Compact 49" Center-Aligned Vert. Utility column, with 36 outlets

1. Carrier provided Utilities and accessories:

• (1) Cable Faceplate with Decora, or equal, brush pass-through

• (3) 22” adjustable shelves

• (1) Premium drawer 22" includes 22" shelf

• (7) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt – White

• (4) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt - Red

• (1) VACUUM OUTLET DISS

• (2) MEDICAL AIR OUTLET DISS

• (2) OXYGEN OUTLET DISS

• (1) WAGD OUTLET DISS

The secondary Upper arm supporting the monitor assembly must be 43” in length.

o The secondary Lower arm assembly must be 43” in length and provide a bracket that will support up to (2) 32” monitors with a minimum of 46” of vertical travel.

o The Third Upper arm assembly must be 35.25” in length and provide a 14” VST landing the light arm BOM at 80”

• Mount B: Equipment Carrier and Dual Monitors (See lighting and boom system requirements for additional detail) o The Primary Upper arm equipment carrier assembly must be 54” in length.

The Primary Lower arm assembly must be 40” in length.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 9” vertical support tube (VST) will be provided to ensure a 21.5” finished floor to bottom of Equipment Carrier.

Compact 49" Center-Aligned Vert. Utility column, with 28 outlets

1. Carrier provided Utilities and accessories:

• (2) Cable Faceplate with Decora, or equal, brush pass-through

• (3) 22” adjustable shelves

• (1) Premium drawer 22" includes 22" shelf

• (1) Carrier Support 22" Top Beam

• (1) Carrier Support 49" Sidebar Set with handles

• (7) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt – White

• (4) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt - Red

• (1) extendable carrier mounted IV-pole

• (1) NEW STYLE MONITOR/KEYBOARD COMBOMOUNT WITH

HEIGHT ADJUSTABLE ARMAMD FOLDING KEYBOARD TRAY.

• (1) 10” Equipment Rail o The secondary Upper arm supporting the monitor assembly must be 43” in length.

The secondary Lower arm assembly must be 43” in length and provide a bracket that will support (2) 32” monitors with a minimum of 46” of vertical travel.

• Update/Add video Routers in Bronchoscopy suite to 4k Vendor Neutral system (See Video Integration system requirements for additional detail.)

SOW

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. De-installation and disposal of existing equipment.

3. Electrical and Plumbing utility disconnections on existing fixtures at time of de installation.

4. Pull new 12-gauge stranded wire from wall control to light mount.

5. Tie into current circuit to power braking system and provide shut off switch for service.

6. Add CAT5 from integration room to the wall control using the current ladder racks in the hallway and existing conduit in wall and above ceiling.

7. Final Electrical utility connections after installation of new fixtures.

8. Final Plumbing utility connections after installation of new fixtures.

9. De-installation of ICRA

Cysto Suites – Rooms 344, 346 – (Please refer to Line Item 0014-0015 at the Price Schedule) (See lighting and boom system requirements for additional detail)

• Mount: Equipment Carrier, 4k Monitor, Light o The Primary Upper arm equipment carrier assembly must be 54” in length.

The Primary Lower arm assembly must be 40” in length.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 5” vertical support tube (VST) will be provided to ensure a 24” finished floor to bottom of Equipment Carrier.

Compact 49" Center-Aligned Vert. Utility column, with 36 outlets

1. Carrier provided Utilities and accessories:

• (2) 22” adjustable shelves

• (1) Premium drawer 22" includes 22" shelf

• (7) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt – White

• (4) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt - Red

• (1) VACUUM OUTLET DISS

• (2) MEDICAL AIR OUTLET DISS

• (2) OXYGEN OUTLET DISS

• (1) WAGD OUTLET DISS

• (1) extendable carrier mounted IV-pole

• (1) NEW STYLE MONITOR/KEYBOARD COMBOMOUNT WITH

HEIGHT ADJUSTABLE ARMAMD FOLDING KEYBOARD TRAY.

• (1) 10” Equipment Rail

• (1) Vacuum slide clamp o The secondary Upper arm supporting the monitor assembly must be 43” in length.

The secondary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

o The Third Upper arm assembly must be 35.25” in length and provide a 14” VST landing the light arm BOM at 80”

SOW

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical and Plumbing utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Tie into current circuit to power braking system and provide shut off switch for service.

5. Final Electrical utility connections after installation of new fixtures.

6. Final Plumbing utility connections after installation of new fixtures.

7. De-installation of ICRA.

8. De-install and dispose of existing equipment booms, surgical lights, and related appurtenances.

9. De-install, decommission, and dispose of any existing video integration system including related appurtenances.

GI Suites – Rooms 350, 351, 353 – (Please refer to Line Item 0016-0018 at the Price Schedule) (See lighting and boom system requirements for additional detail)

• Mount: Equipment Carrier, 4k Monitor o The Primary Upper arm equipment carrier assembly must be 54” in length.

The Primary Lower arm assembly must be 40” in length.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 19” vertical support tube (VST) will be provided to ensure a 36” finished floor to bottom of Equipment Carrier.

Compact 49" Center-Aligned Vert. Utility column, with 36 outlets

1. Carrier provided Utilities and accessories:

• (2) 22” adjustable shelves

• (1) Premium drawer 22" includes 22" shelf

• (6) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt – White

• (4) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt - Red

• (1) NEW STYLE MONITOR/KEYBOARD COMBOMOUNT WITH

HEIGHT ADJUSTABLE ARMAMD FOLDING KEYBOARD TRAY.

• (1) 10” Equipment Rail

• (1) Vacuum slide clamp o The secondary Upper arm supporting the monitor assembly must be 43” in length.

The secondary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

SOW

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical and Plumbing utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Tie into current circuit to power braking system and provide shut off switch for service.

5. Final Electrical utility connections after installation of new fixtures.

6. Final Plumbing utility connections after installation of new fixtures.

7. De-installation of ICRA.

8. De-install and dispose of existing equipment booms and related appurtenances.

9. De-install, decommission, and dispose of any existing video integration system including related appurtenances.

GI Suite with Lights – Room 348 – (Please refer to Line Item 0019 at the Price Schedule) (See lighting and boom system requirements for additional detail)

• Mount: Equipment Carrier, 4k Monitor, Light o The Primary Upper arm equipment carrier assembly must be 54” in length.

The Primary Lower arm assembly must be 40” in length.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 19” vertical support tube (VST) will be provided to ensure a 36” finished floor to bottom of Equipment Carrier.

Compact 49" Center-Aligned Vert. Utility column, with 36 outlets

1. Carrier provided Utilities and accessories:

• (2) 22” adjustable shelves

• (1) Premium drawer 22" includes 22" shelf

• (6) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt – White

• (4) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt - Red

• (1) NEW STYLE MONITOR/KEYBOARD COMBOMOUNT WITH

HEIGHT ADJUSTABLE ARMAMD FOLDING KEYBOARD TRAY.

• (1) 10” Equipment Rail

• (1) Vacuum slide clamp o The secondary Upper arm supporting the monitor assembly must be 43” in length.

The secondary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

o The Third Upper arm assembly must be 35.25” in length and provide a 14” VST landing the light arm BOM at 80”

SOW

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical and Plumbing utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Tie into current circuit to power braking system and provide shut off switch for service.

5. Final Electrical utility connections after installation of new fixtures.

6. Final Plumbing utility connections after installation of new fixtures.

7. De-installation of ICRA.

8. De-install and dispose of existing equipment booms, surgical lights, and related appurtenances.

9. De-install, decommission, and dispose of any existing video integration system including related appurtenances.

ERCP Suite – Room 357 – Ceiling Heights 120” - (Please refer to Line Item 0020 at the Price Schedule) (See lighting and boom system requirements for additional detail)

• Mount A: Equipment Carrier, 4k Monitor, Light o The Primary Upper arm equipment carrier assembly must be 54” in length.

The Primary Lower arm assembly must be 40” in length.

o The Primary Arm assembly must be set at an elevation of 4.5” from the finished ceiling upon installation. A ceiling cover will be provided to span this exact measurement and ensure a complete seal between the Boom assembly hub and the finished ceiling. This will ensure rotational clearance with all ceiling mounted equipment.

o A 19” vertical support tube (VST) will be provided to ensure a 36” finished floor to bottom of Equipment Carrier.

Compact 49" Center-Aligned Vert. Utility column, with 36 outlets

1. Carrier provided Utilities and accessories:

• (2) 22” adjustable shelves

• (1) Premium drawer 22" includes 22" shelf

• (7) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt – White

• (4) Decora Plus, or equal, Duplex Receptacle, Hospital Grade, 20 Amp, 125 Volt - Red

• (1) NEW STYLE MONITOR/KEYBOARD COMBOMOUNT WITH

HEIGHT ADJUSTABLE ARMAMD FOLDING KEYBOARD TRAY.

• (1) 10” Equipment Rail

• (1) Vacuum slide clamp

• (1) VACUUM OUTLET DISS

• (2) MEDICAL AIR OUTLET DISS

• (2) OXYGEN OUTLET DISS

• (1) WAGD OUTLET DISS

o The secondary Upper arm supporting the monitor assembly must be 43” in length.

The secondary Lower arm assembly must be 43” in length and provide a bracket that will support up to a 37” monitor with a minimum of 46” of vertical travel.

o The Third Upper arm assembly must be 35.25” in length and provide a 14” VST landing the light arm BOM at 80”

SOW

1. ICRA - Provide containment via Zipper door and tape off all vents and additional access points.

2. Electrical and Plumbing utility disconnections on existing fixtures at time of de installation.

3. Pull new 12-gauge stranded wire from wall control to light mount.

4. Tie into current circuit to power braking system and provide shut off switch for service.

5. Final Electrical utility connections after installation of new fixtures.

6. Final Plumbing utility connections after installation of new fixtures.

7. De-installation of ICRA.

8. De-install and dispose of existing equipment booms, surgical lights, and related appurtenances.

9. De-install, decommission, and dispose of any existing video integration system including related appurtenances.

Schedule:

• Delivery and services to be performed no later than 90 days upon receipt of award.

• Delivery Hours: Normal duty hours are 7:30 a.m. through 5:00 p.m., Monday through Friday, not including federal holidays.

• Performance Hours: work performance is required outside of normal duty hours (night and weekend hours only), the Contractor shall coordinate these times with the designated COR.

• In accordance with 5 U.S.C. 6103, Executive Order 11582 and Public Law 94-97 the following national holidays are observed and for the purpose of this contract are defined as “Legal Federal official holidays”

New Year’s Day January 1st

Martin Luther King’s Birthday Third Monday in January

President’s Day Last Monday in January

Memorial Day Last Monday in January

Juneteenth June 19th

Independence Day July 4th

Labor Day First Monday in September

Columbus Day Second Monday in October

Veteran’s Day November 11th

Thanksgiving Day Fourth Thursday in November

Christmas Day December 25th

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB __________________ __________________

Building 57, OR 1. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Equipment, and Supplies Brand Name or Equal.

Building 57, OR 3. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 5. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 7. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 8. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 9. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 2. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 10. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 11. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 12. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 13. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 57, OR 4. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 50, Bronchoscopy - Room 356. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 50, Cysto Suites, Room 344. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 50, Cysto Suites, Room 346. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 50, GI Suites - Room 350. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 50, GI Suites - Room 351. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 50, GI Suites - Room 353. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Building 50, GI Suite with Lights - Room 348. Supplies and Services as stated in Statement of Work.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .