36C25918R0278 3RD FLOOR 100Submittal_Part1.pdf
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE MAP
VICINITY MAP
PROJECT SITE
PROJECT SITE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER/ARCHITECT:
GRAND JUNCTION VAMC
Bldg 1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
2453 N. DELAWARE ST. INDIANAPOLIS, IN. 46205
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
575-13-101
MEP Engineer
APOGEE CONSULTING GROUP
7330 Chappel Hill Road, Suite 202 Raleigh, NC 27607
Tele: 919-858-7420
Interior Design
COOVERCLARK ASSOCIATES
1936 Market Street Denver, CO 80202
Tele: 303-783-0040
JOHN BARTMAN
john.bartman@va.gov 970-263-5016
C U s e rs
\a o g rz e w a lla
\D o c u m e n ts
\1 .1
C e n tr a l F ile v G u id o n S u b s ta n d a rd
B e d s A ro g rz e w a lla
.r v t
100% CONSTRUCTION DOCUMENTS
G-001
AROUJ
TITLE SHEET
09/26/2014
13.1064ELIMINATION OF SUBSTANDARD
BEDS 3RD FLOORGrand Junction VAMC
Dept. of Veterans Affairs 2121 North Avenue Grand Junction, CO 81501
Sheet List Sheet Number Sheet Name
G-002 ABBREVIATIONS AND SYMBOLS
G-101 LIFE SAFETY PLAN
G-102 PHASING PLAN
G-200 PARTITION TYPES
A-001 OVERALL DEMO PLAN
A-002 OVERALL DEMO RCP
A-101 OVERALL PLAN
A-102 ENLARGED PLANS
A-103 ENLARGED PLANS
A-201 OVERALL REFLECTED CEILING PLAN
A-202 ENLARGED REFLECTED CEILING PLAN
A-203 ENLARGED REFLECTED CEILING PLAN
A-502 ENLARGED ROOM PLANS
A-801 SCHEDULES
A-901 RIVER WING FINISH PLAN
A-902 MESA WING FINISH PLAN
A-903 CORRIDOR INTERIOR ELEVATIONS
A-904 TYPICAL ROOM INTERIOR ELEVATIONS
A-905 CASEWORK DETAILS
A-906 CASEWORK DETAILS
A-907 CASEWORK DETAILS
A-908 WAYFINDING
P-001 PLUMBING GENERAL NOTES
PD101 SECOND FLOOR PLUMBING DEMOLITION PLANS
PD102 THIRD FLOOR PLUMBING DEMOLITION PLANS
PD103 THIRD FLOOR FIRE PROTECTION DEMOLITION
PLAN
PF101 THIRD FLOOR FIRE PROTECTION PLAN
PP101 SECOND FLOOR PLUMBING PLAN
PP102 THIRD FLOOR PLUMBING PLAN
PP103 THIRD FLOOR MEDICAL GAS PLAN
P-501 PLUMBING DETAILS
M-001 MECHANICAL GENERAL NOTES
MD101 SECOND FLOOR MECHANICAL PIPING
DEMOLITION PLAN
MD102 THIRD FLOOR MECHANICAL DUCTWORK
DEMOLITION PLAN
MD103 THIRD FLOOR MECHANICAL PIPING DEMOLITION
PLAN
MH101 THIRD FLOOR MECHANICAL DUCTWORK PLAN
MP101 THIRD FLOOR MECHANICAL PIPING PLAN
M-601 MECHANICAL SCHEDULES
E-001 ELECTRICAL NOTES, ABBREVIATIONS, AND
LEGENDS
ED101 THIRD FLOOR POWER DEMOLITION PLAN
ED102 THIRD FLOOR LIGHTING DEMOLITION PLAN
ED103 THIRD FLOOR TECHNOLOGY DEMOLITION PLAN
E-101 THIRD FLOOR ELECTRICAL POWER PLAN
E-102 THIRD FLOOR ELECTRICAL LIGHTING PLAN
E-103 THIRD FLOOR TECHNOLOGY PLAN
E-401 ELECTRICAL PLAN ENLARGEMENTS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 ELECTRICAL PANEL SCHEDULES
GRAND JUNCTION VA MEDICAL CENTER
ELIMINATION OF SUBSTANDARD BEDS
100% CONSTRUCTION DOCUMENTS
INFORMATION SECURITY OFFICER
CHIEF, FACILITIES MANAGEMENT
NAGE
CHIEF OF POLICE SERVICE
SAFETY OFFICERASSOCIATE DIRECTOR
PATIENT CARE SERVICES
DIRECTOR, MEDICAL CENTER ASSOCIATE DIRECTOR
INFECTION PREVENTION
OFFICER
CHIEF, OIT
CHIEF OF STAFF
IPT CHAIRMAN
ARCHITECTURAL ABBREVIATIONS
A/C AIR CONDITIONING
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
A&E ARCHITECT AND ENGINEERS
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITIES HAVING
JURISDICTION
AHU AIR HANDLING UNIT
ALT ALTERNATIVE
ALT TRANS ALTERNATIVE TRANSPORTATION
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AVG AVERAGE
BB BULLETIN BOARD
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BRG BEARING
CB CATCH BASIN
CBB CEMENTITIOUS BACKER
BOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISH
CONTRACTOR INSTALL
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD, CEILING
GRILLE
C & G CURB & GUTTER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNITS
CO CLEANOUT(S)
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CP CONCRETE PIPE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST STONE
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION
SPECIFICATIONS INSTITUTE
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CY CUBIC YARD
D DRYER
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION
AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATED
ETS EXPOSED TO STRUCTURE
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE FIXTURES & EQUIPMENT
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLR FLOOR
FLUOR FLUORESCENT
FO FINISH OPENING
FOS FACE OF STUD
FR FIRE RATED
FSP FIRE STANDPIPE
FT FOOT / FEET
FTG FOOTING
FURR FURRING
FV FIELD VERIFY
FVC FIRE VALVE CABINET
FWC FABRIC WALLCOVERING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GARBAGE DISPOSAL
GF CMU GROUND FACE CMU
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLACK
GLU LAM GLUE LAMINATED WOOD
GND GROUND
GT GROUT
GWB GYPSUM WALL BOARD
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCP HANDICAPPED
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR, HANDRAIL
HT HEIGHT
HVAC HEATING, VENTILATING & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IG INSULATING GLASS
IN INCH
INCAN INCANDESCENT
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
ITG INSULATED TEMPERED GLASS
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
L LONG
LAV LAVATORY
LB(S) # POUND(S)
LF LINEAL FEET
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
M & BH MOP AND BROOM HOLDER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
N NORTH
NA NOT APPLICABLE
NECY NECESSARY
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER,
OVERFLOW DRAIN
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OH OPPOSITE HAND
OPN OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PLASTIC
PARTN PARTITION
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PT CONC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTL PORCELAIN TILE
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
QT QUARRY TILE
R R-VALUE (INSULATION),
RADIUS, RISER
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFERENCE
REBAR REINFORCING BAR
REC RECESSED
RECPT RECEPTACLE
REF REFRIGERATOR
REG REGISTER
REINF REINFORCE
REQD REQUIRED
RESIL RESILIENT
REV REVISION
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RT RUBBER STAIR TREAD
S SOUTH
SAF SEAMLESS ACRYLIC FLOORING
SAP SUSPENDED ACOUSTICAL PANELS
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASHBLOCK
SC SEALED CONCRETE, SOLID CORE
SCHED SCHEDULE
SCP SCUPPER
SD SOAP DISPENSER
SEAL SEALER
SECT SECTION
SF SQUARE FOOT
SF CMU SPLIT-FACE CMU
SHR SHOWER
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SL SLOPE
SLD SOLID SURFACE
SLV SHORT LEG VERTICAL
SND SANITARY NAPKIN DISPOSER
SNV SANITARY NAPKIN VENDOR
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TB TACKBOARD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
TD TUBULAR DAYLIGHTING DEVICE
TEL TELEPHONE
TEMP TEMPERATURE
TG TEMPERED GLASS,
TONGUE & GROOVE,
TRANSFER GRILLE
THRU THROUGH
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TTD TOILET TISSUE DISPENSER
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
URN URINAL
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDP WOOD PANELING
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
WR WASTE RECEPTACLE,
WATER RESISTANT
WS WATER STOP
WSCT WAINSCOTT
WT WEIGHT
WWF WELDED WIRE FABRIC
XX-XX
XX
X
X XXXX
X
X
X XXXXX
PARTITION TYPE
IDENTIFIER
FRAME IDENTIFIER
EQUIPMENT IDENTIFIER
REVISION INDICATOR
ROOM NAME
BUILDING SECTION
REFERENCE
SECTION REFERENCE
EXTERIOR ELEVATION
REFERENCE
INTERIOR ELEVATION
REFERENCE
ELEVATION INDICATION
ARCHITECTURAL DRAWING SYMBOLS
DRAWING NUMBER
SHEET WHERE DETAIL
IS LOCATED
DRAWING NUMBER
SHEET WHERE DETAIL
IS LOCATED
DRAWING NUMBER DETAIL
SHEET WHERE DETAIL
IS LOCATED
A101
A101
.1 A101
N
NORTH ARROW
HANDICAP
SYMBOL
PROPOSED DOOR
AND DOOR NUMBER
EXISTING DOOR TO BE
REMOVED
EXISTING DOOR TO REMAIN
COLUMN GRID
IDENTIFIER
MATCH LINE
FIRE EXTINGUISHER
CABINET
AUTOMATED EXTERNAL
DEFIBRILLATOR
FEC
AED
ROOM IDENTIFIER
SHEET LOCATION
ROOM NUMBER
VIEW NUMBER
XX KEYNOTE
DETAIL REFERENCE
EXISTING COLUMN GRID
IDENTIFIER
1 View Name A101 1/8" = 1'-0"
Room name
S1
BUILDING
OBJECT
REFERENCED
FINISH FLOOR
EL. = 100'-0"
FINISH FLOOR
EL. = 100'-0"
EXISTING ELEVATION
INDICATION
8'-0" AFF SPOT ELEVATION
INDICATION
SPECIALTIES AND
EQUIPMENT IDENTIFIER
XX
OBJECT
REFERENCED
/SEE DRAWING
MATCHLINE
## X###
A101
SIM
XXXX
1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL
CONTRACTORS, SUB CONTRACTORS, MANUFACTURERS,
SUPPLIERS: CAREFULLY AND THOROUGHLY REVIEW THESE
GENERAL NOTES. IT IS YOUR RESPONSIBILITY TO KNOW AND
ADHERE TO THESE REQUIREMENTS.
2. DO NOT PRESUME THAT YOUR SCOPE OF WORK IS SINGULARLY
DEFINED. YOUR SCOPE OF WORK IS DEFINED THROUGHOUT THE
ENTIRE SET OF DRAWINGS AND SPECIFICATIONS AND IS NOT
CONTAINED IN JUST ONE SERIES OF DRAWINGS OR DIVISION OF
SPECIFICATIONS. YOU MUST REVIEW THE ENTIRE SET OF
CONTRACT DOCUMENTS TO DETERMINE YOUR SCOPE OF WORK.
3. MECHANICAL AND ELECTRICAL DRAWINGS SHOW INFORMATION IN
A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE
GENERAL CONTRACTOR IS TO COORDINATE THE LOCATIONS OF
ALL MECHANICAL AND ELECTRICAL EQUIPMENT WITH RESPECT TO
THE ARCHITECTURAL AND STRUCTURAL DETAILING OF SHAFTS,
CHASES, AND SUCH.
4. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR
WITH SITE CONDITIONS AS THEY MAY AFFECT CARRYING OUT THE
WORK AS DESCRIBED IN THESE CONTRACT DOCUMENTS. THE
CONTRACTOR SHALL INVESTIGATE, VERIFY, AND BE RESPONSIBLE
FOR ALL CONDITIONS OF THE PROJECT, AND NOTIFY THE
ARCHITECT OF ANY CONDITIONS THAT REQUIRE MODIFICATION
BEFORE PROCEEDING WITH THE WORK.
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT,
LABOR, AND SERVICES NECESSARY TO PROVIDE FULLY
OPERATIONAL ASSEMBLIES AND COMPLETE THE WORK.
6. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE
PROJECT SHALL BE FAMILIAR WITH THE RULES AND REGULATIONS
OF THE OCCUPATIONAL SAFETY AND HEALTH ACT, AND
IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
7. THE GENERAL CONTRACTOR SHALL FOLLOW AND OBEY ALL
FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS
AND HAZARDOUS WASTE LAWS, ETC.
8. CONTRACTOR SHALL SUBMIT CONFORMATION OF ORDERED
MATERIALS OR ITEMS NECESSARY TO COMPLETE THE PROJECT
WITH PROJECTED DELIVERY DATE GREATER THAN FOUR WEEKS.
9. ALL SUBCONTRACTORS SHALL SUBMIT SHOP DRAWINGS AS
REQUIRED FOR APPROVAL PRIOR TO COMMENCING ANY WORK.
10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COORDINATION OF ALL TRADES AND THE PREVENTION OF
CONFLICTS BETWEEN ALL TRADES.
GENERAL REQUIREMENTS
1. EXISTING CONDITIONS ARE DETAILED FOR EASE OF CONSTRUCTION
AND BASED OFF EXISTING DRAWINGS. CONTRACTOR TO FULLY
INVESTIGATE EXISTING CONDITIONS PRIOR TO ANY WORK.
2. THESE DRAWINGS WERE PRODUCED USING THE CONSTRUCTION
SPECIFICATIONS INSTITUTE’S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. ANY INDICATION OF PROJECT LIMITS OR LINES OF DEMARCATION ARE
SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR, AND ARE NOT
TO BE TAKEN LITERALLY. ACTUAL CONTRACT LIMITS ARE TO BE
DETERMINED BY THE CONTRACTOR AND APPROVED BY THE OWNER
BEFORE ACTUAL CONSTRUCTION WORK BEGINS.
4. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT
CONFIGURATIONS OR DETAILS OF SPECIFIC MANUFACTURES.
DIMENSIONS AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE
BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND
PRODUCTS BY OTHER MANUFACTURERS MAY ALSO BE ACCEPTABLE.
THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY
DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY
INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE
INCORPORATED IN THE WORK (INCLUDING PARTITION THICKNESSES FOR
RECESSED OR SEMI-RECESSED PRODUCTS), AND IS RESPONSIBLE
FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER
MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE
DIFFERENCES.
5. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO
DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED HEREIN ARE
USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE
AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY
PART OF THE DRAWINGS, OR THE DRAWINGS AND SPECIFICATIONS AS A
WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY
SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A
COMPLETE, INTEGRATED AND UNIFIED WHOLE.
6. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS
PREPARED BY SPECIFIC ENGINEERING DISCIPLINES (SUCH AS CIVIL,
STRUCTURAL, MECHANICAL, ELECTRICAL, ETC.) ARE COMPLEMENTARY;
ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE
CONSIDERED TO BE REQUIREMENTS OF THE CONTRACTOR FOR
CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE
DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENTS, THE
CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM
THE ARCHITECT PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT
CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR
INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL
PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
7. USE OF THE WORD “VERIFY” POINTS OUT A SITUATION WHICH MUST BE
CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF
EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE ARCHITECT OF ANY
DISCREPANCY.
8. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING
THE ARCHITECT IMMEDIATELY SHOULD ANY DISCREPANCIES BE FOUND
IN THE DRAWINGS AND SPECIFICATIONS.
9. DO NOT SCALE THE DRAWINGS. DRAWINGS SCALES AS INDICATED ARE
FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY
DEPICT ACTUAL OR DESIGNATE CONDITIONS. WRITTEN DIMENSIONS
SHALL GOVERN.
10. ALL DIMENSIONS INDICATED ARE TO FACES OF CMU/STUD/STRUCTURAL
MATERIALS OR COLUMN GRID LINES UNLESS NOTED OTHERWISE.
MASONRY DIMENSIONS ARE MODULAR IN THAT THEY INCLUDE THE
GROUT JOINT. ROUGH OPENINGS ALLOW FOR SHIM SPACE.
11. THE TERM “ALIGN” REFERS TO LOCATING DIFFERENT COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
GENERAL DRAWING AND DIMENTION NOTES
1. PROVIDE SEALANT AT ALL JOINTS OR CRACKS WHICH OCCUR WHERE
DISSIMILAR MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER,
AND THE INTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED
OTHERWISE ON THE DRAWINGS.
2. WHERE DOORS IN PARTITIONS ARE NOT DIMENSIONALLY LOCATED ON
THE PLANS, PROVIDE A MINIMUM HINGE SIDE JAMB DIMENSION OF 6”
FROM DOOR OPENING TO ADJACENT PERPENDICULAR WALL.
3. PROVIDE CONTROL JOINT IN ALL GYPSUM BOARD WALLS GREATER
THAN 30’ LONG. PLACE CONTROL JOINTS AT CORNERS OF DOORS OR
WINDOWS.
4. ALL SURFACES AND SUBSTRATES SHALL BE PREPARED FOR
INSTALLATION PER MANUFACTURES RECOMMENDED INSTRUCTIONS,
UNO.
5. PROVIDE ALL BLOCKING (WOOD OR 16 G.A. GALVANIZED SHEET METAL)
AS REQUIRED FOR THE ATTACHMENT OF MISCELLANEOUS EQUIPMENT
INCLUDING BUT NOT LIMITED TO: TOILET ACCESSORIES, DOOR
HARDWARE, ELECTRICAL DEVICES, KITCHEN EQUIPMENT, GRAB BARS,
HAND RAILS, AND CASEWORK.
6. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL CLEAN
UP FOLLOWING EACH PHASE AND UPON COMPLETION.
7. NO UTILITY SERVICE INTERRUPTION SHALL OCCUR WITHOUT THE PRIOR
WRITTEN APPROVAL OF THE OWNER. ALL REQUEST FOR UTILITY
SERVICE INTERRUPTION SHALL INCLUDE A COMPLETED “UTILITY
SYSTEMS SERVICE/OUTAGE NOTIFICATION” FORM. ALL UTILITY SERVICE
INTERRUPTIONS SHALL OCCUR AFTER NORMAL HOURS OF MEDICAL
CENTER OPERATION. ALL UTILITY SERVICES INTERRUPTION
PROCEDURES SHALL COMPLY WITH THE GENERAL REQUIREMENTS
SPECIFICATIONS.
8. CONTRACTOR TO PATCH AND REPAIR AREAS AFFECTED BY
DEMOLITION AND CONSTRUCTION ACTIVITIES. MATCH EXISTING
ADJACENT CONSTRUCTION AND FINISH. CONTRACTOR TO FIELD
VERIFY SCOPE OF WORK.
GENERAL CONSTRUCTION NOTES
MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN
ARE ONLY TO IDENTIFY CHARACTER, COLORS, FINISHES,
TEXTURES AND PATTERNS AS THE BASIS OF DESIGN.
PRODUCTS OF AUTHORIZED EQUAL MANUFACTURER'S
EQUIVALENT TO QUALITY, COLORS, FINISHES, TEXTURES AND
PATTERNS OF MANUFACTURERS LISTED THAT MEET THE
REQUIREMENTS OF TECHNICAL SPECIFICATIONS IN EVERY
RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A
COMPLETED SUBSTITUTION REQUEST CONTAINING ALL
PRODUCT DATA, TESTING AND ACTUAL SAMPLES AND UPON
APPROVAL IN WRITING BY CONTRACTING OFFICER.
RIGID INSULATION
BLOCKING OR SHIMMING
FINISH WOOD
ROUGH WOOD FRAMING CERAMIC TILE
PLYWOOD
PARTICLE BOARD
ACOUSTIC TILE
EARTH
CONCRETE
GRAVEL STEEL
CONCRETE
MASONRY UNIT
ALUMINUM
BRASS / BRONZE
BATT INSULATION
MATERIALS LEGEND
GYPSUM BOARD
SAND / MORTAR / PLASTER /
CEMENT
GYP. BD. CLG.
OPEN GRID CLG.
PRECAST CONCRETE
BRICK ACOUSTIC TILE SECTION
REFLECTED CEILING PLAN LEGEND
INCANDESCENT WALL MOUNTED LIGHTING
INCANDESCENT SURFACE MOUNT LIGHTING
SURFACE MOUNTED
FLUORESCENT
TRACK LIGHTING
RECESSED FLUORESCENT
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
PARKING LOT LIGHTING
HYDRANT
UTILITY POLE
S
D
SPEAKER
SMOKE DETECTOR
DEMOLITION LEGEND
REMOVE EXISTING
DOOR & HM FRAME.
SALVAGE DOOR &
HARDWARE FOR
REUSE AS INDICATED
REMOVE EXISTING
WALL IN ITS ENTIRETY
REMOVE EXISTING
WALL AS REQUIRED
FOR OPENING
REMOVE EXISTING
METAL STUD PARTITION
IN ITS ENTIRETY
REMOVE EXISTING
WINDOW IN ITS
ENTIRETY
REMOVE EXISTING
SLAB AS INDICATED
FOR PROPOSED WORK
RE: STRUCTURAL
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER/ARCHITECT:
GRAND JUNCTION VAMC
Bldg 1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
2453 N. DELAWARE ST. INDIANAPOLIS, IN. 46205
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
575-13-101
MEP Engineer
APOGEE CONSULTING GROUP
7330 Chappel Hill Road, Suite 202 Raleigh, NC 27607
Tele: 919-858-7420
Interior Design
COOVERCLARK ASSOCIATES
1936 Market Street Denver, CO 80202
Tele: 303-783-0040
JOHN BARTMAN
john.bartman@va.gov 970-263-5016C
:\U se rs \e de ci na \D oc um en ts
\1 3.
C en tra l F ile _v
_G ui do n_
Su bs ta nd ar d
Be ds
_e de ci na gu id on de si gn .c om .rv t
100% CONSTRUCTION DOCUMENTS
G-002AROUJ
ABBREVIATIONS
AND SYMBOLS
09/26/2014
13.1064ELIMINATION OF SUBSTANDARD
BEDS 3RD FLOORGrand Junction VAMC
Dept. of Veterans Affairs 2121 North Avenue Grand Junction, CO 81501
E
H R
F B
E
E 2 HR FB E 2 HR FB
E 2 HR FB E 2 HR FB
E
H R
F B
E
H R
F B
E
H R
F B
E
H R
F B
E
H R
F B
E 2 HR FB E 2 HR FB
E 2 HR FB
E 2 HR FB
E 2 HR FB E 2 HR FB
E
H R
F B
E
H R
F B
E 2 HR FB E 2 HR FB
E
H R
F B
E S
P E
S P
E S
P E
S P
E SP E SP
E
H R
F B
E 2 HR FB
E 2 HR FB
E 2 HR FB
E 2 HR FB
E
H R
F B
E SP
E S
P
E SP
E S
P
E S
P
E S
P E
S P
E S
P
E SP
SP SPSP
S P
S P
S P
S P
SP SPSP SP SP SP SP SP SP SP SP SP SP SP SP
S P
S P
S P
S P
S P
S P
S P
SP SPSP SP SP SP SP SP SP SP SP SP SP SP SP
S P
S P
S P
SP SP
S P
S P
SP SP
SPSP SPSPSPSPSPSP SPSPSPSPSPSPSPSPSPSPSPSPSPSPSPSPSPSPSP
H
R F
B
H R
F B
H
R F
B
1 HR FB 1 HR FB1 H
R
FB
1 H
R
FB
1 H R
FB
1 HR FB
1 H R
FB
1 HR FB
1 HR FB1 HR FB 1 HR FB
1 H R
FB
1 HR FB 1 HR FB1 HR FB
H
R F
B
H
R F
B
H R
F B
H
R F
B
1 HR FB 1 HR FB
1 HR FB1 HR FB
1 H R
FB
1 H
R
FB
H
R F
B
H R
F B
1 H R
FB
1 HR FB1 HR FB
2 HR FB
2 HR FB2 HR FB
2 H R
FB
2 H R
FB
1 H R
FB
E 2 HR FB
E SP
SP
1 HR FB
2 HR FB
Linen StorageLinen Storage Sub-Station
Sub-Station
Linen Storage Linen StorageSub-Station
Sub-Station
TOILET
3019A
PATIENT
ROOM
3019 TOILET
3018A
PATIENT
ROOM
TOILET
3017A
PATIENT
ROOM
EQUIPMENT
STORAGE
OFFICE
HOUSE-
KEEPING
STORAGE
TUB ROOM
SHWR.
3013A
DICT.
JANITOR
3420B
JANITOR
STORAGE
3420A
CLEAN
SUPPLIES
CORRIDOR
O2
CLEAN
LINEN
DATA
3030 TOILET
(E)
BIO-HAZ
IT
ISOLATION
ROOM
3401A
PATIENT
ROOM
PATIENT
ROOM
TOILET
3402A TOILET
3403A
INFUSION
ROOM
TOILET
3022A
TOILET
3021APATIENT
ROOM
TOILET
3020A
PATIENT
ROOM
PATIENT
ROOM
TRANSFORMER
DUCTWORK
3014A
ELECT.
Sub-StationMedsSub-Station
BAR.
PATIENT
ROOM
TOILET
3406A
PATIENT
ROOM
TOILET
3407A
PATIENT
ROOM
TOILET
3408A
PATIENT
ROOM
TOILET
3411A
PATIENT
ROOM
3410TOILET
3410A
PATIENT
ROOM
TOILET
3409A
DICTATION
3405 NUTRITION
MECHANICAL
TUB
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A
B
C
D
EXT.
FE
EXT.
FE
FEC
INSTALL TEMPORARY NFPA
241 TEMPORARY BARRIER
ACCORDING TO INFECTION
CONTROL RISK
ASSESSMENT GUIDELINES.
3014 3402A
NURSES
STATION
CONF/STAFF
LOUNGE
3417A
EXITEXIT
EXIT
EXIT EXIT
PHASE A PHASE B
3'- 4"
MAX DISTANCE: 50'-0"MAX TRAVEL DISTANCE: 97'-6"
M
AX
T
RA
VE
L
DI
ST
AN
CE
: 8 6'-
6"
MAX TRAVEL DISTANCE: 89'-0"
EMS
MAX DISTANCE: 108'-0"
EXT.
FE
FEC
EXISTING SMOKE PARTITION
EXISTING TWO HOUR FIRE BARRIER
NEW SMOKE PARTITION
EXISTING FIRE EXTINGUISHER
NEW FIRE EXTINGUISHER CABINET
PATH OF EGRESS
LIFE SAFETY LEGEND
TOTAL OCCUPANCY
EXITS REQUIREDOcc.
15100 1150 SF
OCCUPANCY LOAD FACTOR
SQUARE FOOTAGE
OCCUPANCY TYPE
NOT IN CONTRACT, EXISTING TO REMAIN.
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN
FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY
WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE
DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL
IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS,
INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS
ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED
CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE
RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO
ENSURE A CONSISTENCY SYSTEM WIDE.
CODE REVIEW
THE 2015 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS. FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION OF THE INTERNATIONAL
BUILDING CODE HAS BEEN USED.
PROJECT SCOPE
THE EXISTING BUILDING EAST AND WEST WINGS ON THIRD FLOOR ARE UNDERGOING A REMODEL AND WILL BE USED FOR PATIENT SUITES. THE OCCUPANCY IS A GROUP I, INSTITUTIONAL OCCUPANCY.
CODE ANALYSIS
THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT
REQUIREMENTS OF CHAPTER 5 OF THE 2015 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER
CHAPTER 6 OF THE IBC FOR TYPE I-A AND LSC 1 (332) CONSTRUCTION AS FOLLOWS:
1. OCCUPANCY TYPE: I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 18 HEALTHCARE
2. CONSTRUCTION TYPE: I-A (IBC CHAPTER 5)
3. FIRE RESISTIVE RATINGS TYPE 1-A CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:
STRUCTURAL FRAME: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 3 -HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 3-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE
FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
ROOF: NONCOMBUSTIBLE, 1.5-HOUR FIRE RESISTIVE
SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)
SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)
4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.
5. ALLOWABLE HEIGHT: UNLIMITED FT (IBC, TABLE 504.3)
6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 4 (IBC, TABLE 504.4)
7. ALLOWABLE AREA: FULLY SPRINKLED: ALLOWABLE AREA: UNLIMITED (IBC, TABLE 506.2)
8. MEANS OF EGRESS
• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 8 FEET.
• AISLES, CORRIDORS, AND RAMPS IN ADJUNCT AREAS NOT INTENDED FOR THE HOUSING, TREATMENT, OR USE OF INPATIENTS SHALL BENT LESS THAN 44 IN. CLEAR AND UNOBSTRUCTED WIDTH.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 42 INCHES FROM SLEEPING ROOMS.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES
• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.
• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)
• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 200 FEET (LSC 18.2.6.2.1)
• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 18.2.5.3)
• DEAD END CORRIDORS SHALL NOT EXCEED 30 FEET. (LSC 18.2.5.2)
• MEANS OF EGRESS SHALL BE ILLUMINATED PER 7.9. (LSC 18.2.6.2.1)
• EMERGENCY LIGHTING SHALL BE PER 7.9. (LSC 18.2.9)
• EXIT SIGNAGE SHALL BE PROVIDED 7.10. (LSC 18.2.10)
9. WHERE GENERAL ANESTHESIA OR LIFE SUPPORT EQUIPMENT IS USED AND ESSENTIAL
ELECTRICAL SYSTEM PER NFPA 99 SHALL BE PROVIDED.
10. HAZARDOUS AREAS. ANY HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH
SECTION 8.7, AND THE AREAS DESCRIBED IN TABLE 18.3.2.1.2 SHALL BE PROTECTED AS
INDICATED. (LSC 18.3.2)
TABLE 18.3.2.1.2 HAZARDOUS AREA PROTECTION
• BOILER AND FUEL-FIRED HEATER ROOMS 1 HOUR CENTRAL/BULK LAUNDRIES LARGER THAN 100
FT2 1 HOUR.
• PAINT SHOPS EMPLOYING HAZARDOUS SUBSTANCES AND MATERIALS IN QUANTITIES LESS THAN
THOSE THAT WOULD BE CLASSIFIED AS A SEVERE HAZARD 1 HOUR.
• PHYSICAL PLANT MAINTENANCE SHOPS 1 HOUR.
• ROOMS WITH SOILED LINEN IN VOLUME EXCEEDING 64 GAL 1 HOUR
• ROOMS WITH COLLECTED TRASH IN VOLUME EXCEEDING 64 GAL 1 HOUR† MINIMUM FIRE
RESISTANCE RATING.
• STORAGE ROOMS LARGER THAN 50 FT2 BUT NOT EXCEEDING 100 FT2 AND STORING
COMBUSTIBLE MATERIAL.
• STORAGE ROOMS LARGER THAN 100 FT2 AND STORING COMBUSTIBLE MATERIAL 1 HOUR.
11. INTERIOR FINISH
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2
OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)
• ꞏ CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.
• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE
CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS SERVING AS FURNISHINGS OR
DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE
REQUIREMENTS OF NFPA 701, STANDARD METHODS OF FIRE TESTS FOR FLAME-RESISTANT
TEXTILES AND FILMS.
• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES
MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA 260, NFPA 261, NFPA 266, 16 CFR
1632, ASTME E1537, AND ASTME E1590
12. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED
PER NFPA 10.
15. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)
• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)
• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)
• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.
• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION
SYSTEM PER 9.6.4. (LSC 18.3.4.3.2)
13. FIRE SUPPRESSION:
SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE
WITH NFPA 13.
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013
EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF VETERANS AFFAIRS FIRE
PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:
STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 250 GPM
ALL OTHER AREAS SHALL BE PROTECTED AS:
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 100 GPM
ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2016 EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION,
2016 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR
APPURTENANCE, 2016 EDITION.
NFPA 54 NATOINAL FUEL GAS CODE, 2015 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA PROCESSING
EQUIPMENT, 2017 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING
SYSTEMS, 2015 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION
NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION
NFPA 101, LIFE SAFETY CODE, 2015 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017 EDITION
NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000
AND NFPA 900
ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
GOVERNING CODES:CODE ANALYSIS - NFPA 101, CHAPTER 18
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
(HTTP://WWW.CFM.VA.GOV/TIL/).
VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
ENERGY SUSTAINABILITY, MAY 2014
EQUIPMENT, JANUARY 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
ELEVATOR DESIGN MANUAL, AUGUST 2016
EPA GUIDELINES CHECKLIST
VA DESIGN MANUALS PG-18-10:
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT
5/8" TYPE X GYPSUM BOARD, JOINTS
SEALED WITH FIRE TAPE, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS FASTENED
ALONG TOP AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT
POLYETHYLENE MEMBRANE. TAPE TO
STRUCTURAL DECK ABOVE AND TO
FLOOR BELOW WITH DUCT TAPE
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING
CEILING
PUBLIC
SIDE
45 MIN. FIRE RATED METAL DOOR
ASSEMBLY AND FRAME WITH SEALS,
CARD READER AND HARDWARE
TRIATEK MONITOR
HAND SANITIZER
SEAL ALL EDGES TO PROHIBIT THE
MIGRATION OF DUST, DIRT, AIR, AND
ODORS
SEAL ALL EDGES TO PROHIBIT THE
MIGRATION OF DUST, DIRT, AIR, AND
ODORS
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE
ABOVE
VA / OSHA TEMPORARY SIGNAGE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER/ARCHITECT:
GRAND JUNCTION VAMC
Bldg 1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
2453 N. DELAWARE ST. INDIANAPOLIS, IN. 46205
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
575-13-101
MEP Engineer
APOGEE CONSULTING GROUP
7330 Chappel Hill Road, Suite 202 Raleigh, NC 27607
Tele: 919-858-7420
Interior Design
COOVERCLARK ASSOCIATES
1936 Market Street Denver, CO 80202
Tele: 303-783-0040
JOHN BARTMAN
john.bartman@va.gov 970-263-5016C
:\U se rs \e de ci na \D oc um en ts
\1 3.
C en tra l F ile _v
_G ui do n_
Su bs ta nd ar d
Be ds
_e de ci na gu id on de si gn .c om .rv t
100% CONSTRUCTION DOCUMENTS
G-101AROUJ
LIFE SAFETY PLAN
09/26/2014
13.1064ELIMINATION OF SUBSTANDARD
BEDS 3RD FLOORGrand Junction VAMC
Dept. of Veterans Affairs 2121 North Avenue Grand Junction, CO 81501
1/8" = 1'-0"1 THIRD FLOOR LIFE SAFETY PLAN
N
1 1/2" = 1'-0"2 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION
1/4" = 1'-0"3 TEMPORARY WALL CONSTRUCTION TYPICAL ELEVATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A
B
C
D
Linen StorageLinen Storage Sub-Station
Sub-Station
Linen Storage Linen StorageSub-Station
Sub-Station
TOILET
3019A
PATIENT
ROOM
3019 TOILET
3018A
PATIENT
ROOM
TOILET
3017A
PATIENT
ROOM
EQUIPMENT
STORAGE
OFFICE
HOUSE-
KEEPING
STORAGE
TUB ROOM
SHWR.
3013A
DICT.
JANITOR
3420B
JANITOR
STORAGE
3420A
CLEAN
SUPPLIES
CORRIDOR
O2
CLEAN
LINEN
DATA
3030 TOILET
(E)
BIO-HAZ
IT
ISOLATION
ROOM
3401A
PATIENT
ROOM
PATIENT
ROOM
TOILET
3402A TOILET
3403A
INFUSION
ROOM
TOILET
3022A
TOILET
3021APATIENT
ROOM
TOILET
3020A
PATIENT
ROOM
PATIENT
ROOM
TRANSFORMER
DUCTWORK
3014A
ELECT.
Sub-StationMedsSub-Station
BAR.
PATIENT
ROOM
TOILET
3406A
PATIENT
ROOM
TOILET
3407A
PATIENT
ROOM
TOILET
3408A
PATIENT
ROOM
TOILET
3411A
PATIENT
ROOM
3410TOILET
3410A
PATIENT
ROOM
TOILET
3409A
DICTATION
3405 NUTRITION
MECHANICAL
TUB
EXT.
FE
EXT.
FE
FEC
INSTALL TEMPORARY
PLYWOOD WALL & DOOR
ACCORDING TO INFECTION
CONTROL RISK
ASSESSMENT GUIDELINES.
PHASE A PHASE B
PHASE A LIMIT PHASE B LIMIT
3014 3402A
CONF/STAFF
LOUNGE
3417A
NURSES
STATION
EMS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A
B
C
D
PHASE A PHASE B
2401 2402 2406 2408
2010A2010B
2007A2007B
20132015
GYM
2421 2422
GENERAL LIMITS OF
SCOPE OF WORK
NOT INCLUDED IN SCOPE
UNLESS ITEMS NOTED
OTHERWISE IN DRAWINGS
PHASING LEGEND:
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER/ARCHITECT:
GRAND JUNCTION VAMC
Bldg 1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
2453 N. DELAWARE ST. INDIANAPOLIS, IN. 46205
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
575-13-101
MEP Engineer
APOGEE CONSULTING GROUP
7330 Chappel Hill Road, Suite 202 Raleigh, NC 27607
Tele: 919-858-7420
Interior Design
COOVERCLARK ASSOCIATES
1936 Market Street Denver, CO 80202
Tele: 303-783-0040
JOHN BARTMAN
john.bartman@va.gov 970-263-5016C
:\U se rs \e de ci na \D oc um en ts
\1 3.
C en tra l F ile _v
_G ui do n_
Su bs ta nd ar d
Be ds
_e de ci na gu id on de si gn .c om .rv t
100% CONSTRUCTION DOCUMENTS
G-102AROUJ
PHASING PLAN
09/26/2014
13.1064ELIMINATION OF SUBSTANDARD
BEDS 3RD FLOORGrand Junction VAMC
Dept. of Veterans Affairs 2121 North Avenue Grand Junction, CO 81501
1/8" = 1'-0"1 THIRD FLOOR PHASING PLAN
N
1. Phase A: consists of the River Wing (East Wing) patient and support renovation. Work of this phase shall commence within 5 working days after approved Submittal Log, Schedule of Values, & Schedule.
a. A portion of the construction of this phase (primarily sanitary plumbing work and subsequent ceiling work to provide access) occurs on the floor below in Rehabilitation Therapy. All work on the 2nd Floor below must be scheduled in advance with the Contracting Officer’s Representative (COR).
b. Normal business hours for Rehabilitation Therapy are 8:00 am to 5:30 pm, Monday through Friday. Contractor may work off-hours at any time (evenings and weekends) with the understanding that all clean-up activities must occur prior to next day turnover to Owner and with prior approval of COR. No disruption of work during normal hours, UNO below.
c. The main 2nd Floor corridor must remain open at all times.
d. Under no circumstances can the entire Gymnasium be shut down at the same time, but approximately ½ of the area can be a construction work area with prior approval of the COR.
e. The Prosthetics area and Machine Shop (gypsumboard ceilings) are nearly in constant use.
Scheduling of this area in advance is critical and will likely require multiple internal phases.
1. Phase B: consists of the Mesa Wing (West Wing) patient and support renovation. Work of this phase shall commence within 3 working days after the East Wing is Substantially complete and ready for occupancy and commencement of construction of this phase.
a. A portion of the construction of this phase (primarily sanitary plumbing work and subsequent ceiling work to provide access) occurs on the floor below in Radiology. All work on the 2nd Floor below must be scheduled in advance with the Contracting Officer’s Representative
(COR).
b. Normal business hours for Radiology are 7:30 am to 5:00 pm, Monday through Friday.
Contractor may work off-hours at any time (evenings and weekends) with the understanding that all clean-up activities must occur prior to next day turnover to Owner and with prior approval of COR.
c. The main corridor must remain open at all times.
d. Under no circumstances can the General Radiography (room 2415-1) or Radiofluoroscopy
(room 2420-1) Treatment rooms be shut down at the same time. Critical scheduling must occur in advance prior to any construction activities in these rooms. Anticipate that an off-hour reconnaissance of the ceiling areas in these spaces must occur to fully understand the complexity of the ceiling spaces above these areas.
e. The current Ultrasound (room 2419-1) occupies ½ of a former film file area. Only a cubicle curtain separates Ultrasound from the remaining space. A partition wall (Type P1) must be constructed to separate the 2 areas. Construct the dust-proof barrier to the bottom of the deck in such a manner that it can remain in place upon completion of the ceiling construction.
1/8" = 1'-0"2 SECOND FLOOR PHASING PLAN
FINISHED FLOOR AND BASE.
RE: FINISH SCHEDULE
5/8" TYPE 'X' GYP BD,
BOTH SIDES
3 5/8" STEEL STUD @ 16" O.C.
BEAD OF CONT.
SEALANT, BOTH
SIDES
SOUND ATTENUATION BATT.
CEILING
RE: REFLECTED CEILING
PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
FINISHED FLOOR
AND BASE. RE:
FINISH SCHEDULE
5/8" TYPE 'X' GYP
BD, RM SIDE ONLY
3 5/8" STEEL STUD
@ 16" O.C.
BEAD OF CONT.
SEALANT EACH SIDE
SOUND
ATTENUATION BATT.
CEILING
RE: REFLECTED
CEILING PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
P1 3 5/8" STEEL STUD NON-RATED
SMOKE/SOUND PARTITION
P2 3 5/8" STEEL STUD SHAFT PARTITION
FINISHED FLOOR
AND BASE. RE:
FINISH SCHEDULE
5/8" TYPE 'X' GYP
BD, PATIENT RM
SIDE ONLY
3 5/8" STEEL STUD
@ 16" O.C.
BEAD OF CONT.
SEALANT, BOTH
SIDES
SOUND ATTENUATION BATT.
CEILING
RE: REFLECTED
CEILING PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
5/8" GLASS FACED
GYP BD, SHAFT SIDE
ONLY
FINISHED FLOOR
AND BASE. RE:
FINISH SCHEDULE
5/8" TYPE 'X' GYP
BD, RM SIDE ONLY
7/8" STEEL HAT
CHANNEL ATTACHED
TO EXT. COLUMN
BEAD OF CONT.
SEALANT EACH SIDE
CEILING
RE: REFLECTED
CEILING PLANS
P4 7/8" STEEL HAT CHANNEL PARTITION
1'- 0"
M
IN
EXISTING COLUMN
FINISHED FLOOR
AND BASE. RE:
FINISH SCHEDULE
5/8" TYPE 'X' GYP
BD, PATIENT RM
SIDE ONLY
3 5/8" STEEL STUD
@ 16" O.C.
BEAD OF CONT.
SEALANT, BOTH
SIDES
SOUND
ATTENUATION BATT.
CEILING
RE: REFLECTED
CEILING PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
P5 3 5/8" STEEL STUD PARTITION WITH TILE
FINISHED FLOOR
AND BASE. RE:
FINISH SCHEDULE
5/8" MOISTURE RESISTANT
TYPE 'X' GYP BD FROM
FLOOR TO DECK
3 5/8" STEEL STUD
@ 16" O.C.
BEAD OF CONT.
SEALANT EACH SIDE
SOUND
ATTENUATION BATT.
CEILING
RE: REFLECTED
CEILING PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
HE
IG
HT
O
F
TI
LE
/C
EM
EN
T
BD
FINISHED FLOOR
AND BASE. RE:
FINISH SCHEDULE
5/8" TYPE 'X' GYP
BD, PATIENT RM
SIDE ONLY
3 5/8" STEEL STUD
@ 16" O.C.
BEAD OF CONT.
SEALANT, BOTH
SIDES
SOUND
ATTENUATION BATT.
CEILING
RE: REFLECTED
CEILING PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
GYP BD CEILING
RE: REFLECTED CEILING PLAN
5/8" MOISTURE
RESISTANT TYPE 'X'
GYP BD FROM FLOOR
TO DECK
P3 3 5/8" STEEL STUD SHAFT PARTITIONP6 3 5/8" STEEL STUD PARTITION - SHOWER LOCATIONP7 3 5/8" STEEL STUD PARTITION - HEAD WALL
FINISHED FLOOR
AND BASE. RE:
FINISH SCHEDULE
5/8" TYPE 'X' GYP
BD, RM SIDE ONLY
2 1/2" STEEL STUD
@ 16" O.C.
BEAD OF CONT.
SEALANT EACH SIDE
SOUND
ATTENUATION BATT.
CEILING
RE: REFLECTED
CEILING PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
P8 2 1/2" STEEL STUD SHAFT PARTITION
FINISHED FLOOR AND BASE.
RE: FINISH SCHEDULE
5/8" MOISTURE RESISTANT
TYPE 'X' GYP BD ON TUB RM
SIDE ONLY
3 5/8" STEEL STUD @ 16" O.C.
BEAD OF CONT.
SEALANT, BOTH
SIDES
SOUND ATTENUATION BATT.
CEILING
RE: REFLECTED CEILING
PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
P10 3 5/8" STEEL STUD NON-RATED PARTITION
FINISHED FLOOR
AND BASE. RE:
FINISH SCHEDULE
5/8" MOISTURE
RESISTANT TYPE
'X' GYP BD, RM
SIDE ONLY
2 1/2" STEEL STUD
@ 16" O.C.
BEAD OF CONT.
SEALANT EACH SIDE
SOUND
ATTENUATION BATT.
CEILING
RE: REFLECTED
CEILING PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
P9 2 1/2" STEEL STUD SHAFT PARTITION WITH
MOIST. RESIST. GYP BD
5/8" TYPE 'X' GYP BD
ON CORRIDOR OR
DICT. RM SIDE ONLY
FINISHED FLOOR AND BASE.
RE: FINISH SCHEDULE
5/8" MOISTURE RESISTANT
TYPE 'X' GYP BD, BOTH SIDES
3 5/8" STEEL STUD @ 16" O.C.
BEAD OF CONT.
SEALANT, BOTH
SIDES
SOUND ATTENUATION BATT.
CEILING
RE: REFLECTED CEILING
PLANS
STEEL STUD
WALL BRACING
2" DEEP LEG SLIP
TRACK
P11 3 5/8" STEEL STUD NON-RATED
PARTITION WITH MOIST. RESIST. GYP BD
BOTH SIDES
P7.1 SAME AS P7 EXCEPT USE 6" STEEL STUDS @ 16" O.C. IN
LIEU OF 3 5/8" STEEL STUDS @ 16" O.C.
P5.1 SAME AS P5 EXCEPT USE 6" STEEL STUDS @ 16"
O.C. IN LIEU OF 3 5/8" STEEL STUDS @ 16" O.C.
P6.1 SAME A6 P5 EXCEPT USE 6" STEEL STUDS @ 16" O.C. IN LIEU OF
3 5/8" STEEL STUDS @ 16" O.C.
5/8" MOISTURE
RESISTANT TYPE 'X'
GYP BD FROM FLOOR
TO DECK
2" DEEP LEG SLIP TRACK
MECHANICAL FASTENERS
STEEL STUD
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER/ARCHITECT:
GRAND JUNCTION VAMC
Bldg 1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
2453 N. DELAWARE ST. INDIANAPOLIS, IN. 46205
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
575-13-101
MEP Engineer
APOGEE CONSULTING GROUP
7330 Chappel Hill Road, Suite 202 Raleigh, NC 27607
Tele: 919-858-7420
Interior Design
COOVERCLARK ASSOCIATES
1936 Market Street Denver, CO 80202
Tele: 303-783-0040
JOHN BARTMAN
john.bartman@va.gov 970-263-5016C
:\U se rs \e de ci na \D oc um en ts
\1 3.
C en tra l F ile _v
_G ui do n_
Su bs ta nd ar d
Be ds
_e de ci na gu id on de si gn .c om .rv t
100% CONSTRUCTION DOCUMENTS
G-200AROUJ
PARTITION TYPES
09/26/2014
13.1064ELIMINATION OF SUBSTANDARD
BEDS 3RD FLOORGrand Junction VAMC
Dept. of Veterans Affairs 2121 North Avenue Grand Junction, CO 81501
1 1/2" = 1'-0"1 PARTITION TYPES
6" = 1'-0"2 SLIP TRACK DETAIL
122' - 1 1/32" 18' - 10 17/32" 7' - 4 1/32" 18' - 9" 41' - 2 5/16" 80' - 10 23/32"
A
B
C
D
12'-3" 8'-2" 12'-7" 4'-1" 3'-7" 10'-2" 10'-7"
7'-8 1/4"
1'-1 3/4"
4'-0"
'-1
1/
4" 7'-
4"
'-4
/1 6"
2'- 5"
4'- 2"
8"
7"2'- 1"4'-
1" 5"
13'-6" 10'-9" 8'-0" 8'-7" 8'-2" 13'-8" 9'-1"
7"
8'- 2"
5'-
7'-
4" 5'-
6" 1'-
0" 8'-
4" 7"
20'-4" 5'-5" 2'-0" 11"
9"
9'-2" 7"
13'-5" 5'-8" 1'-9"
3'-11"
2'-3" 7'-11"
5'-9" 5'-6"
1'-3"
3'-6" 5'-7" 1'-8" 5'-10" 3'-1" 17'-2" 1'-7"
6'- 0"
8'- 8"
8"
2'-
4'- 4"
3'- 9"
'-0
7'-
4"2'- 9"
7'- 5"
3'- 7"7"
7'-
3/ 4"
7'- 3"
7'- 4"
9'- 8"
4'- 8"
6'-6" 5'-5" 3'-6" 5'-4" 5'-3" 5'-3" 30'-9"
18'-3" 8'-1" 3'-4"
3'-5" 3'-2"
3'-5" 7'-11" 9'-10"
D1
D1
D1D1
D6
D6 D6 D6D6D6
D2D2 D2
D1D1D1
D2D2
D1D1D1 D3
D3 D3
D5D5 D5D5 D5
D5D5
D2 D2D2 D2 D2
D6D6 D6 D6
D6
D6
D6D6
D4 D4
D3 D3
D4
D3
D4 D3
D4
D1
D2D2
D1 D1D1 D1 D1
D1
D1D1D1D1
D2D2D2D2
D1
D1D1
D2D2
D1D1
D1D1
D1 D2
D1D1
D1D1D1D1
D1D1
D1
D1 D1 D1
D1D1
D6D6
D6D6
D2D2D2D2
D2D2D2
D2D2
D2
D2
D2
D2
D6D6D6D6
D6D6 D1D1
D1D1
D5
D7D7D7 D7D7 D7D7D7D7 D7
D3 D3
D3D3 D3
D3
D3
D3 D3
D3
D3
D3
D3
D3
D3 D3
D4
D3
D4
B2 B1
B2
B2 B2B2
B2
B2
B3
B3
B1
B3
B3
B1B1B1
D8
D8 D8D8
D8D8 D8
D8D8 D8 D8D8 D8D8 D8
D8D8 D8D8 D8D8 D8D8
D8D8
D8 D8D8 D8
D8 D8 D8 D8
D8D8
B4
B4
D10
D10 D10
D10 D10
3014 3402ANURSES
STATION
CONF/STAFF
LOUNGE
3417A
PHASE A PHASE B
D1
A. DEMOLITION IS FROM FLOOR TO FLOOR, WALL TO WALL ENTIRE
SPACE.
B. SEE DEMOLITION DRAWINGS PREPARED BY MEP ENGINEERS
AND/OR CONSULTANTS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS FOR DEMOLITION OF ELECTRICAL, HEATING,
VENTILATING, AIR CONDITIONING, PLUMBING, VOICE/DATA, ETC. ITEMS
AS WELL AS COORDINATION OF DEMOLITION ITEMS.
C. PRIOR TO DEMOLITION AND BEFORE SUBMISSION OF PREPARED
METHODS AND SEQUENCES OF OPERATIONS, THE GENERAL
CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN FOR REFERENCE
ANY EXISTING RECORD DRAWINGS AND TO CONDUCT ANY
APPROPRIATE FIELD TESTING TO DETERMINE THE NATURE OF THE
WORK TO BE REMOVED.
D. DURING DEMOLITION, ALL STRUCTURES, FURNISHINGS, FINISHES,
ETC., WHICH ARE TO BE SALVAGED, SHOULD BE CAREFULLY
PROTECTED FROM DAMAGE. DAMAGE TO THE EXISTING ITEMS OR
SURFACES THAT REMAIN SHALL BE REFINISHED, REPAIRED OR
REPLACED TO THE SATISFACTION OF THE OWNER, BUILDING
MANAGEMENTS AND ARCHITECT AT NO ADDITIONAL COST.
E. DURING REMOVAL OF ITEMS INDICATED TO BE SALVAGED,
PROTECTION AND CAUTION SHALL BE USED TO ELIMINATE THE
POSSIBILITY OF DAMAGE TO SUCH ITEMS. ALL ITEMS OF EXISTING
EQUIPMENT, MATERIALS, FIXTURES, ETC. SHALL REMAIN THE
PROPERTY OF THE OWNER. ALL SALVAGED AND/OR REUSABLE ITEMS
SALVAGED DURING DEMOLITION OPERATIONS SHALL BE REMOVED
AND RETAINED FOR LATER REINSTALLATION. ITEMS INSPECTED AND
REJECTED BY THE OWNER OR ARCHITECT SHALL BE DISPOSED BY
THE GENERAL CONTRACTOR FOLLOWING ALL APPLICABLE LAWS.
F. PROVIDE ALL DEMOLITION REQUIRED FOR REMOVAL OF SYSTEMS,
MATERIALS AND EQUIPMENT MADE OBSOLETE BY THIS PROJECT AS
INDICATED BY THE CONTRACT DOCUMENTS.
G. FIELD VERIFY ALL CONDITIONS AND DIMENSIONS AND NOTIFY THE
ARCHITECT OF ANY DEVIATION BEFORE PROCEEDING WITH
DEMOLITION.
GENERAL DEMOLITION NOTES
H. THE GENERAL CONTRACTOR SHALL PROVIDE AS REQUIRED THE
MEANS AND METHODS TO MAINTAIN APPROPRIATE VENTILATION,
LIGHTING AND SAFETY THROUGHOUT THE DEMOLITION PROCESS.
GENERAL CONTRACTOR TO VERIFY/COORDINATE WITH BUILDING
MANAGEMENT ALL MEANS AND METHODS.
I. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN GENERAL TO
PROVIDE THE EXTENT OF DEMOLITION AND IS NOT TO BE
CONSIDERED A RECORD DRAWING OF EXISTING CONDITIONS.
J. GENERAL CONTRACTOR SHALL SUBMIT A SCHEDULE OF METHODS
AND OPERATIONS OF DEMOLITION FOR THE OWNERS REVIEW FOR
ALL DEMOLITION AND REMOVAL WORK. INCLUDE IN THE SCHEDULE
THE COORDINATION REQUIRED WITH THE BUILDING MANAGEMENT,
ALL TRADES FOR SHUTOFF, CAPPING OR RE-ROUTING OF UTILITIES,
THE CONSTRUCTION OF ANY TEMPORARY UTILITY LINES, AND
PROTECTIVE MEASURES.
K. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE ACTUAL
CONDITION OF STRUCTURES TO BE DEMOLISHED. CONDITIONS
EXISTING AT THE TIME OF INSPECTION FOR BIDDING PURPOSES WILL
BE MAINTAINED BY THE OWNER INSOFAR AS FEASIBLE. HOWEVER,
VARIATIONS WITHIN THE STRUCTURE MAY OCCUR BY THE OWNER'S
REMOVAL AND SALVAGE OPERATIONS PRIOR TO THE START OF
DEMOLITION WORK.
L. ARCHITECT SHALL NOT IN ANY WAY BE RESPONSIBLE FOR
IDENTIFYING OR DISCLOSING THE PRESENCE OF HAZARDOUS
MATERIALS OR ADVISING ON THE HANDLING REMOVAL OR DISPOSAL
OF HAZARDOUS MATERIALS AT THE PROJECT SITE. SHOULD GENERAL
CONTRACTOR OR HIS SUBCONTRACTORS ENCOUNTER, EXPOSE OR
IN ANY WAY BECOME AWARE OF THR PRESENCE OF HAZARDOUS OR
QUESTIONABLE MATERIALS ASSOCIATED WITH THIS PROJECT,
GENERAL CONTRACTOR SHALL STOP WORK IN THE IMMEDIATE AREA
OF DISCOVERY AND NOTIFY THE OWNER OF ITS FINDINGS. GENERAL
CONTRACTOR SHALL NOT DISTURB OR CONTINUE WORK ON OR NEAR
MATERIALS IN QUESTION UNTIL RECEIVING FURTHER DIRECTION FROM
OWNER.
M. AFTER DEMO OF FLOORING INSTALL SELF LEVELING COMPOUND
OR GRIND SMOOTH AS REQUIRED FOR LEVEL FLOOR INSTALLATION.
NOT IN CONTRACT, EXISTING TO REMAIN.
DEMO PLAN LEGEND:
ITEM TO BE DEMOLISHED
EXISTING TO REMAIN
DOOR TO BE DEMOLISHED
EXISTING DOOR TO REMAIN
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER/ARCHITECT:
GRAND JUNCTION VAMC
Bldg 1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
2453 N. DELAWARE ST. INDIANAPOLIS, IN. 46205
317.800.6388 WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
575-13-101
MEP Engineer
APOGEE CONSULTING GROUP
7330 Chappel Hill Road, Suite 202 Raleigh, NC 27607
Tele: 919-858-7420
Interior Design
COOVERCLARK ASSOCIATES
1936 Market Street Denver, CO 80202
Tele: 303-783-0040
JOHN BARTMAN
john.bartman@va.gov 970-263-5016C
:\U se rs \e de ci na \D oc um en ts
\1 3.
C en tra l F ile _v
_G ui do n_
Su bs ta nd ar d
Be ds
_e de ci na gu id on de si gn .c om .rv t
100% CONSTRUCTION DOCUMENTS
A-001AROUJ
OVERALL DEMO
PLAN
09/26/2014
13.1064ELIMINATION OF SUBSTANDARD
BEDS 3RD FLOORGrand Junction VAMC
Dept. of Veterans Affairs 2121 North Avenue Grand Junction, CO 81501
1/8" = 1'-0"1 EXIST LEVEL 3 DEMO PLAN
N
SPECIFIC DEMOLITION NOTES
D1 CONTRACTOR TO REMOVE…