36C25918R0278-00004020.docx

DOCX document 8 MB Posted

Attached to
Renovate 3rd Floor at MC - Construction Federal contract opportunity
Solicitation number
36C25918R0278
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25918R0278 00004 Pictures Samples.docx

View the file

Other files for this federal contract opportunity

Other files attached to Renovate 3rd Floor at MC - Construction, newest first.
File Type Posted
36C25918R0278-00004021.xls XLS spreadsheet
36C25918R0278-00004009.pdf PDF
36C25918R0278-00004001.pdf PDF
36C25918R0278-00004005.pdf PDF
36C25918R0278-00004018.pdf PDF
36C25918R0278-00004002.pdf PDF
36C25918R0278-00004016.doc DOC document
36C25918R0278-00004004.pdf PDF
36C25918R0278-00004003.pdf PDF
36C25918R0278-00004015.doc DOC document
36C25918R0278-00004006.pdf PDF
36C25918R0278-00004014.pdf PDF
36C25918R0278-00004011.pdf PDF
36C25918R0278-00004013.pdf PDF
36C25918R0278-00004010.pdf PDF
36C25918R0278-00004008.pdf PDF
36C25918R0278-00004000.docx DOCX document
36C25918R0278-00004007.pdf PDF
36C25918R0278-00004017.pdf PDF
36C25918R0278-00004012.pdf PDF
36C25918R0278-00004019.pdf PDF
36C25918R0278-00003000.docx DOCX document
36C25918R0278-00002000.docx DOCX document
36C25918R0278-00002001.pdf PDF
36C25918R0278-00001000.docx DOCX document
36C25918R0278-006.pdf PDF
36C25918R0278-004.pdf PDF
36C25918R0278-007.pdf PDF
36C25918R0278-013.pdf PDF
36C25918R0278-014.pdf PDF
36C25918R0278-003.pdf PDF
36C25918R0278-008.pdf PDF
36C25918R0278-010.pdf PDF
36C25918R0278-001.docx DOCX document
36C25918R0278-012.pdf PDF
36C25918R0278-002.docx DOCX document
36C25918R0278-005.pdf PDF
36C25918R0278-011.pdf PDF
36C25918R0278-009.pdf PDF
36C25918R0278-000.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Steel window frame 7th floor-Sample #9,10,11

Window Frame 1st and 2nd floors-Sample #4

Stairwell Risers Basement-Sample #6

Steel pipes 7th floor-Sample#13,16

Painted yellow pipes in the building-Sample #17

Radiator –Sample #9

Painted yellow locker-Sample #15

Crawlspace Door Basement-Sample #8,9

Yellow paint on loading docks, bollards, and curbs- Outside Building 7

Cooler Door 3rd floor-Sample #2

Cooler Door 3rd floor-Sample #3

Cooler Door 3rd floor-Sample #4

Lt blue door – was also painted Lt green and Gray-Sample #19,20,21,22,23

Beige Tile 3rd floor- Samples #6,7,8,9,11,13,14

Green Tile 6th floor-Sample #16,17,18

Handrail Stairwell 3 4th floor Sample #4

Handrail Stairwell 2 5th floor-Sample #20

Handrail Stairwell 3 6th floor-Sample #9 image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image1.png image2.png image3.png image4.png image5.png image6.png

File details come from the government source that posted it.