36C25819B0002-0007002.pdf
PDF 118 KB Posted
- Attached to
- LB - Remove & Replace Emergency Generator - LOCATION OF PERFORMANCE IS LONG BEACH, CA 90822 Federal contract opportunity
- Solicitation number
- 36C25819B0002
About this file
36C25819B0002 0007 S02 - RFI007_rev1 - DayTank_ANSWERED - 1 page - 02132019.pdf
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI FORM
Contractor Name: D-Square Construction
Address: 530 E 27th St., Tucson, AZ 85713
Phone/Fax: {520) 748-9371/(520) 748-9372
Send to: timothy.saffles@va.gov
RFI
(REQUEST FOR INFORMATION)
PROJECT NO.: RFI NO.:
PROJECT NAME: VA Long Beach O-B DATE REQUESTED:
Remove & Replace
Emergency
Generator
SOLICITATION NO.:
36(25819
REFERENCE:
DRAWING: SPECIFICATION
N/A SECTION:
007_rev1
12/28/18
2/12/19
N/A
Day tank
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Clarifying Question: Is it the intent of the project to supply a new 200gallon daytank with: 1.
Duplex supply pumps and duplex controls mounted on the daytank. or 2. Duplex controls only mounted on the daytank to signal an existing duplex pump controller mounted elsewhere. or
3. Duplex controller only connecting to existing duplex pumps mounted elsewhere on the property or within the existing underground storage tank.
PROJECT MANAGER'S RESPONSE
The 200 Gallon Day Tank needs to encompass duplex supply pumps and duplex controls. Most often it will come mounted to the day tank, but it does not need to be. The duplex supply pumps and duplex controls do need to be in the same room as the generator and must be incorporated into the 200 Gallon Day Tank system according to the manufacturers specifications.
TRACKING NO.: AMENDMENT NO.:
VA PROJECT ENGINEER/MANAGER: Liam Boccia DATE: 02/13/2019