About this file

36C25819B0002 0004 S02 - RFI 010_v2.pdf

View the file

Other files for this federal contract opportunity

Other files attached to LB - Remove & Replace Emergency Generator - LOCATION OF PERFORMANCE IS LONG BEACH, CA 90822, newest first.
File Type Posted
36C25819B0002-0008000.docx DOCX document
36C25819B0002-0007002.pdf PDF
36C25819B0002-0007001.pdf PDF
36C25819B0002-0007000.docx DOCX document
36C25819B0002-0006000.docx DOCX document
36C25819B0002-0006001.pdf PDF
36C25819B0002-0005000.docx DOCX document
36C25819B0002-0005001.pdf PDF
36C25819B0002-0004001.pdf PDF
36C25819B0002-0004004.pdf PDF
36C25819B0002-0004000.docx DOCX document
36C25819B0002-0004002.pdf PDF
36C25819B0002-0003001.pdf PDF
36C25819B0002-0003002.pdf PDF
36C25819B0002-0003000.docx DOCX document
36C25819B0002-0002000.docx DOCX document
36C25819B0002-0002001.pdf PDF
36C25819B0002_0001.docx DOCX document
S02_-_IFB_-_TB_Pre-Construction_Testing_Requirement_-_LB_-_Remove_Replace_Emergency_Generator.docx DOCX document
36C25819B0002_1.docx DOCX document
S02_-_David_Bacon_Wage_Decision_-_General_Decision_Number_CA180033_11-02-2018_CA33_-_33_Pages.docx DOCX document
S02_-_SOLICITATION_RFI_FORM_-_LB_-_Remove_Replace_Emergency_Generator.docx DOCX document
36C25819B0002-000.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI FORM

Contractor Name: D-Square Construction Address: 530 E 27th St., Tucson, AZ 85713 Phone/Fax: (520) 748-9371/(520) 748-9372 Send to: timothy.saffles@va.gov

RFI

(REQUEST FOR INFORMATION)

PROJECT NO.:

RFI NO.:

PROJECT NAME:

VA Long Beach D-B Remove & Replace

Emergency Generator

DATE REQUESTED:

12/28/18

SOLICITATION NO.:

36C25819

REFERENCE: N/A

DRAWING:

N/A

SPECIFICATION

SECTION:

Lead time for the design

DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED

There will be significant lead time for the design, submittal, and delivery of the new equipment. With regards to the Temp Generator when will the Contractor’s responsibility for the rental cost of the temporary generator begin, will it begin when the actual on-site work begins, or will it begin upon issuance of the NTP? Will the VA provide modifications to the contract for any delays not caused by the Design-Build Contractor?

PROJECT MANAGER’S RESPONSE

The VA will be responsible for maintaining the temporary generator for the duration of this project. The contractor will not assume the cost of the rental generator. All modifications will be submitted to the Contracting Officer for review.

TRACKING NO.: AMENDMENT NO.:

VA PROJECT ENGINEER/MANAGER: Liam Boccia

DATE: 01/25/2019