580-18-111 Phase 2 Cath Lab 2 Drawings.pdf
PDF 38 MB Posted
- Solicitation number
- 36C25621R0114
About this file
This document provides details of a federal contract opportunity for site preparation construction work at the Michael E. DeBakey VA Medical Center in Houston, Texas. The solicitation number is 36C25621R0114 and seeks a contractor to furnish supervision, labor, materials and equipment to install high-tech medical equipment on the third floor of Building 100. The work includes demolition, architectural, mechanical, electrical, structural, plumbing, communications and interior finishes. The period of performance is 510 calendar days from notice to proceed. The pre-solicitation notice specifies this is a 100% Service-Disabled Veteran-Owned Small Business set-aside with a value between $1,000,000 and $2,000,000. The solicitation will be issued as a request for proposals on June 24, 2021 using NAICS code 236220. Offerors must register on Vendor Information Pages, SAM, and ORCA and have the assigned NAICS code. The agency is the Department of Veterans Affairs Veterans Health Administration VISN 16 located in Houston, Texas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25621R0114 0002.pdf | ||
| 078100 Applied Fireproofing.docx | DOCX document | |
| 36C25621R0114 0001.pdf | ||
| 2017 5YR After Backflow RnR.PDF | ||
| 014536 Schedule of Special Inspections.docx | DOCX document | |
| 134900 RadiationProtection-R1.docx | DOCX document | |
| Clarifications dated 8-5-21.pdf | ||
| Roof Pictures.pdf | ||
| 033053 (SF) CastPlace Concrete.docx | DOCX document | |
| 2017 Annual Fire Pump.pdf | ||
| 580-18-111 Site Visit Instructions.docx | DOCX document | |
| 36C25621R0114_1.docx | DOCX document | |
| 580-18-111 Phase 1 EP Lab Specifications.pdf | ||
| 580-18-111 Phase 2 Cath Lab 2 Specifications.pdf | ||
| SF24 - BID BOND.pdf | ||
| 580-18-111 Phase 1 EP Lab Drawings.pdf | ||
| DOL Wage Determinations TX20210253 dated 5-7-21.pdf | ||
| 580-18-111 Statement of Work.docx | DOCX document | |
| 36C25621R0114.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA APPROVAL
MEDICAL CENTER DIRECTOR
MEDICAL CENTER ASSOC. DIRECTOR
CHIEF OF STAFF
ASSOC. DIRECTOR OF PATIENT CARE
CHIEF FES
PROJECT SECTION SUPV.
PROJECT MANAGER
GENERAL UTILITIES FOREMAN
PATIENT CARE FOREMAN CONTRACTING OFFICER
INFECTION PREVENTION
CIO OFFICER
SAFETY OFFICE
PATIENTSAFETY MANAGER
CHIEF LOGISTICS
SUPERVISOR BIO-MED SERVICE
FIRE CHIEF
GENERAL PROPERTIES FOREMAN
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/1
/2
:4
:4
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
C a th L a b
-T X
-2
-0 e d a v is
P L
Y
G .r v t
G-001
COVER SHEET
1 5GTS
PHASE II: SITE PREP CATH
LAB #2
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-076
PHASE II: SITE PREP CATH LAB #2
2002 HOLCOMBE BLVD. HOUSTON, TX
77030
JAB
SEE PHILIPS / STRYKER FINAL SITE PREPARATION
SUPPORT
DOCUMENT REFERENCE DRAWINGS FOR SPECIFIC
EQUIPMENT REQUIRMENTS.
BLDG 100 BLDG 100
BLDG 100
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 5
G-002 GENERAL INFORMATION 2 5
G-101 GROUND AND THIRD FLOOR CONSTRUCTION ACCESS PLANS 3 5
G-102 PHASING AND ICRA PLANS 4 5
G-501 ICRA STANDARD DETAILS 5 5
STRUCTURAL
S-101 PARTIAL EXISTING CEILING FRAMING PLAN, SECTIONS & DETAILS 1 1
ARCHITECTURAL
AD100 REFERENCE PHOTOS 1 45
AD101 DEMOLITION PLAN AND REFLECTED CEILING PLAN 2 45
A-101 NEW WORK FLOOR PLAN 3 45
A-110 REFLECTED CEILING PLAN, PARTITION TYPES, ROOM SECTION, DOOR SCHEDULE AND DETAILS 4 45
QH101 STRYKER - SLD AIRFRAME 5 45
QH102 STRYKER - SLD AIRFRAME 6 45
QH103 PHILIPS - CATH LAB EQUIPMENT 7 45
QH104 PHILIPS - CATH LAB EQUIPMENT 8 45
QH105 PHILIPS - CATH LAB EQUIPMENT 9 45
QH106 PHILIPS - CATH LAB EQUIPMENT 10 45
QH107 PHILIPS - CATH LAB EQUIPMENT 11 45
QH108 PHILIPS - CATH LAB EQUIPMENT 12 45
QH109 PHILIPS - CATH LAB EQUIPMENT 13 45
QH110 PHILIPS - CATH LAB EQUIPMENT 14 45
QH111 PHILIPS - CATH LAB EQUIPMENT 15 45
QH112 PHILIPS - CATH LAB EQUIPMENT 16 45
QH113 PHILIPS - CATH LAB EQUIPMENT 17 45
QH114 PHILIPS - CATH LAB EQUIPMENT 18 45
QH115 PHILIPS - CATH LAB EQUIPMENT 19 45
QH116 PHILIPS - CATH LAB EQUIPMENT 20 45
QH117 PHILIPS - CATH LAB EQUIPMENT 21 45
QH118 PHILIPS - CATH LAB EQUIPMENT 22 45
QH119 PHILIPS - CATH LAB EQUIPMENT 23 45
QH120 PHILIPS - CATH LAB EQUIPMENT 24 45
QH121 PHILIPS - CATH LAB EQUIPMENT 25 45
QH122 PHILIPS - CATH LAB EQUIPMENT 26 45
QH123 PHILIPS - CATH LAB EQUIPMENT 27 45
QH124 PHILIPS - CATH LAB EQUIPMENT 28 45
QH125 PHILIPS - CATH LAB EQUIPMENT 29 45
QH126 PHILIPS - CATH LAB EQUIPMENT 30 45
QH127 PHILIPS - CATH LAB EQUIPMENT 31 45
QH128 PHILIPS - CATH LAB EQUIPMENT 32 45
QH129 PHILIPS - CATH LAB EQUIPMENT 33 45
QH130 PHILIPS - CATH LAB EQUIPMENT 34 45
QH131 PHILIPS - CATH LAB EQUIPMENT 35 45
QH132 PHILIPS - CATH LAB EQUIPMENT 36 45
QH133 PHILIPS - CATH LAB EQUIPMENT 37 45
QH134 PHILIPS - CATH LAB EQUIPMENT 38 45
QH135 PHILIPS - CATH LAB EQUIPMENT 39 45
QH136 PHILIPS - CATH LAB EQUIPMENT 40 45
QH137 PHILIPS - CATH LAB EQUIPMENT 41 45
QH138 PHILIPS - CATH LAB EQUIPMENT 42 45
QH139 PHILIPS - CATH LAB EQUIPMENT 43 45
QH140 PHILIPS - CATH LAB EQUIPMENT 44 45
QH141 PHILIPS - CATH LAB EQUIPMENT 45 45
INTERIORS
I-101 FIRST FLOOR FINISH PLAN AND CASEWORK ELEVATIONS 1 2
I-201 EQUIPMENT PLAN AND SCHEDULE 2 2
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX101 THIRD FLOOR FIRE SUPPRESSION PLANS 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 2
PG101 THIRD FLOOR MEDICAL GAS PLANS 2 2
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 5
MH101 THIRD FLOOR MECHANICAL PLANS 2 5
MH102 ROOF HVAC PLAN 3 5
M-501 MECHANICAL DETAILS 4 5
M-502 MECHANICAL CONTROLS & SCHEDULES 5 5
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
EP101 THIRD FLOOR POWER PLAN 2 6
EP102 THIRD FLOOR OVERALL POWER PLAN 3 6
E-501 ELECTRICAL DETAILS 4 6
E-601 POWER RISER DIAGRAM AND LUMINAIRE SCHEDULE 5 6
E-602 PANEL SCHEDULES 6 6
DocuSign Envelope ID: ABEF0954-7CF2-4FDA-A983-883A60F86D57
5/13/2021 mnorris Text Box
HOUSTON, TX 77030
mnorris Rectangle
Philips STRYKER SLD Contractor Bio Med
All ICRA responsibilities x
Demo of Existing Philips Equipment, and existing Rails excluding unit strut x
Demo of Existing Interstitial Structural Support (including channel steel support members ) x
Existing Control Room Equipment x X
Some VA owned computer monitoring Equipment x
Interstitial Enclosure Demo and Penetration x
Door from Control Room to Procedure Room x
Furnishing of Floor Plate x
Floor Plate Mounting, surface Prep incuding drilling and/or tapping of holes x
Installation of brackets for SLD system x
SLD System (Design/Fabricate/Install structure to support SLD Airframe system and all Stryker booms and lights.) x x
Philips New Unistrut channel supports x x
Provide and install SLD Airframe system incorporating mounting rails for Philips systems. x
Installation of insulation around SLD system and connect points. x
Penetrations and final ductwork connections to the Airframe system. x
Demolish existing sprinkler heads and associated branch piping, as required, back to the mains. Reuse existing piping to the maximum extent practical. Install new sprinkler heads to provide the required coverage for the new floor/ceiling plans.
x
Installation of airframe lighting x
Switching and control of airframe lighting x
Room lighting and control outside of airframe perimeter x
Mounting supports for booms x
Installation of Booms and light Suspension x
All Med gas routing and connections for all STRYKER Booms x
All Electrical routing and connections for all STRYKER Booms (Final Connection to facility for line and low voltage wiring from STRYKER
Booms) x
Interstitial Enclosure Structure and Architectural Work x
48U and 9U Rack (Wiring and Conduit by GC) x
IT racks for medical equipment and final connections x
Pathways/conduit for all equipment, low voltage, and power cabling x
Removal of existing Philips UPS Equipment (Philips does not remove existing ups or any demo of area, other existing Philips equipment will be removed. Existing wire could be cut, contractor to remove) x
Removal of existing Conduit associated with existing UPS equipment x
Furnishing and Delivery of UPS (if it is pallet jack accessible) x
Contractor responsible for wiring and final positioning of UPS x
Provide conduit, routing, and final connection for UPS x
Removal of all existing equipment not mounted to floors or walls x
In all instances, where Philips is not responsible for installing/ anchoring the wall mounted equipment x
Note: Contractor is responsible for ensuring all work that is the responsibility of others and is scheduled in sequence with the contractors portions of work.
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
PAPER TOWEL DISPENSER/
WASTE RECEPTICLE
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
TOWEL BAR
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
CLOCK & NURSE CALL DEVICESTOILET ACCESSORIES
6"
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
INTERCOM
STATION
INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
WALL PROTECTION
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNERGUARD
DRINKING FOUNTAIN
WHEELCHAIR ACCESSIBLE
(CANTILEVERED STYLE)
17" - 19"
8" MIN
9" MIN
6" MAX
M
IN
T O
P O
F S
P O
U T
' M
A X
MISC. WALL DEVICES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT
BETWEEN THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR
ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE
NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND
UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING.
WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION
OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER
QUALITY OR GREATER QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE
COR OF ANY DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS
SHALL GOVERN.
9. COORDINATE WORK OF ALL TRADES AND VENDORS PRIOR TO START OF CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN
CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK
SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR
WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
13. APOGEE'S DRAWINGS AND SPECIFICATIONS REFERENCE PHILIPS STRYKER / ZERO GRAVITY - FINAL SITE
PREPARATION SUPPORT DRAWINGS. THESE DRAWINGS SHALL BE USED IN CONCERT WITH THE
BUILDING DRAWINGS FOR A COMPLETE PROJECT SCOPE OF WORK.
14. ALL EXISTING PHILIPS X RAY EQUIPMENT AND CONTROLS SHALL BE REMOVED BY PHILIPS AS PART OF
ANOTHER PROJECT.
15. CONTRACTOR TO REFER TO PHILIPS / STRYKER DRAWINGS FOR MORE PROJECT DETAILS AND
INFORMATION.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL CENTER GROUNDS.
4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION UNLESS INDICATED
OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND
FINISHES TO MATCH EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION
REQUIRED FOR THE COMPLETION OF THE PROJECT.
7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF
ELECTRICAL SYSTEMS.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE
PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR
THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE CONTRACTING OFFICER.
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
WINDOW TYPE ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE
CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1 PHASING KEYNOTE
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:4
:4
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
C a th L a b
-T X
-2
-0 e d a v is
P L
Y
G .r v t
G-002
GENERAL INFORMATION
2 5GTS
PHASE II: SITE PREP CATH
LAB #2
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-076
JAB
GENERAL SYMBOL LEGEND
Scale: 3/8" = 1'-0"
STANDARD MOUNTING HEIGHTS
GENERAL NOTESDEMOLITION NOTES ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
RESPONSIBILITY MATRIX
DocuSign Envelope ID: ABEF0954-7CF2-4FDA-A983-883A60F86D57
5/13/2021
SERVICE DRIVE
LOADING DOCKS
RAMP UP
TRASH
SERVICE TUNNEL
MECH
BAY-8
DIETARY - 244
ELEV MACH
FIRE STAIR
ST-4
TRANSFORMER
VESTBC-412
BC-410
REFEIG # 4
CANTEEN HOLD
ELEVATOR
ELEVATOR ELEVATORELEVATOR
HAC
ELEVATORELEVATOR
SERV ELEV LOBBY
ELEVATOR
ELEVATOR
STAIR
EMS SUPERIORPROS STOR
NON-FOOD STOR
RCVG
CENTER
REFIRG # 1
SOILED WARE AND CARTS
FOOD STOR
INGRD CONT
CLEAN WARE CORR
POT WASH
ATS TERMINAL
SPECIAL DIET
ALCOVE
COMP
CATERING
STOR
MEAT REFR BREAD/EGGS REFR
FRZ
DAIRY REFR
FRZ
ICE CREAM
VEG REFR
COLD FOOD/ PREP
REFRIG # 5
FRZ
ADMIN.
CD FD PDSVC
TIME KEEPER
CONF/CL ROOM
STUDY COOK SUP
REFRIG # 6
FREEZER # 4
FREEZER # 8
HOLD
DEIT COM
SOILED WARE
MAIL HOLD
STOR
BC-252C
BC-250C
BC-200
S-9
S-8
ST-9
BC-251
S-10 FUT
CBC-201
S-7 S-6
BC-220
BC-210
BC-250F
CBC-206
BC-220B
BC-220A
BC-230
BC-250E
BC-250D
CBC-208
BC-230A
CBC-207
BC-250S
CBC-200
BC-240
BC-252B
BC-252A
BC-250U
BC-270J
BC-272
BC-250G BC-250J
BC-250H
BC-250L
BC-250NBC-250K
BC-250R
BC-250M
BC-250P
BC-270C
BC-270D
BC-270B
BC-270E
BC-270G
BC-270F
BC-270H
BC-250T
T-4
T-3
BC-207
BC-209
UP
SUMP
PIT
SAND
PIT
CAN WASH
TRASH COLL
CONTAM WASTE
STOR
MAIL HOLD
LOADING DOCK
TRANSFORMER &
SWITCHGEAR
SILVER
COLL
CORRIDOR
ELEC
MECHANICAL BAY-8
DOCK
LEVELER
CORR
STAIR
STAIR
ELEVATOR
ELEVATOR
R A
M P
D
O W
N
BC-201
BC-203
BC-205
BC-209
BC-207
CBC-100
BC-100A
ST-14
BA-101
CBC-205
ST-10
BC-100B
BC-100
CBC-204
S-9
S-8
AREAWAY
CORR
FRZ FRZ
CONF/CLRM
STUDY
STOR
COOK SUP COMP
COLL
SILVER
FEC
CBA-100
BC-250H BC-250P
BC-270E
BC-270F
BC-270G
BC-270H BC-270J
BA-101
Z3L02
Z3L03
Z3H09
Z3H11
Z3H06
Z3H01H
Z3H04
T22E
CSWK 27
CSWK 26
4" CONC. PAD
FD
FD
FD FD
FD
1AA7 <BL>
1AA2 <BL>
1AA19 <BL>
1A101
6A12
1D
1A1
1N5
1A102
1D
1D
1A125 <A>
1A125 <A>
1D
6B12
1A1
1H2
1P1 <A>
2G12 <F>
1D
1D
1D
1AC
6B45
6B41
6B45
9C2 <A>
6B87
1D
2G5 <E>2G1 <E>
1A11A1
6B48
1R2
8R1
1D
ST-14
VEST
FLUOR
DIAG
CORR
RECVY
C LIN
HD NUR
STR STOR
FAM WAIT
BED CUB
BED CUB
BED CUB
FAMILY CONSULT
NOUR STA
ROOM
CORR
CORR
CORR
NUR STA
GAMMA CAM
M/F TOILET
FIRE STAIR
ENGR
W/C REP
MECHANICAL BAY-8
F
LK
R S
FT
LNG
TELEMETRY
WARD CL
EQUIP STORAGE
MECHANICAL BAY-8
BATH
EDUCATION ROOM
ECHO
ECHO ECHO ECHO
STORAGE
ECHO
ECHO
CORRIDOR
OFFICE
ADMIN
PS
CORR
ADMIN
STRESS
CORR
CORR
EQUIPMENT
WAITING
CATH LAB
CORR
CONTROL
COMP
CATH ROOMCATH ROOM
CORR
HS & STUDY CUB
SECY
CH CLIN
PUL LAB
PHYS
MT
M LKRS
LNG
FT
CORR
ELEVATOR ELEVATOR ELEVATOR
ELEVATOR
SERV ELEV LOBBY
ELEVATOR ELEVATOR
MACH STOR
X-RAY
STOR
CORR
F LKRS
BMS
CORR
STAIR
ELEVATOR
ELEVATOR
STAIR
MT
M LKR
ENGR
W/C REP
F LKR
CORR
FT
MT ATS TERMINAL
FT
CORR
VEST
CORR
ST-14
BAY 6BAY 4 BAY 5
PASSAGE
STAFF TOIL
OFFICE
OFFICE
CHIEF'S OFFICE
AO'S OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
CORR
NIDL
DL
CM
CORRIDOR
EX ROOM
#4
EX ROOM
#3
EX ROOM
#2
EX ROOM
#1
MEN DRESS WOMEN
REGISTER
REGISTER
RECEPTION
PASSAGE
SHOWER
DRESS
VEST
EQUIP
EXAM
ST TLT
EXAM
ROOM
EXAM
ROOM
BAY 8
EX ROOM
EX ROOM EX ROOM
OFFICE
PAT TLT
PAT TLT
EX ROOMEX ROOMEX ROOMEX ROOMEX ROOM
EX ROOM
ECHO
M LKR
OFFICE
OFFICE
OFFICE
HALL
OFFICE
OFFICE
CHANGING
PAT EDUC
BAY 3
3C-418
3C-444
3C-420
C3C-400
3C-440
3C-438
3C-436
3C-412
3C-430
3C-454
3C-452
3C-450
3C-439 3C-437
C3C-409
C3C-411
C3C-410
C3C-415
C3C-414
3C-442
3C-414
3C-400D
3C-400E
2C-418A
C
C
3C-416D
3C-416
3C-433
2C-418A
3C-310C
3C-310A
3C-333
3C-330C 3C-330B 3C-330A
3C-338 3C-336
C3C-312
3C-304
3C-302
3C-306A
C3C-315
3C-306
3C-337
C3C-303
3C-375
C3C-313
3C-370B
3C-371
3C-370A
C3C-301
3C-370
3C-352B
3C-3523C-344
C3C-311
3C-381
3C-383
3C-385
3C-387
3C-416A
3C-416B
3C-416
3C-416D
C3C-214
S-9 S-10 FUT
S-8
C3C-200
S-7 S-6
C3C-202
3C-201
C3C-300
3C-416C
C3C-201
3C-340
ST-10
3C-400B
3C-400C
3C-400D
3C-400E
C3B-201
3C-211D
3C-414
C3C-400 3C-418
C3C-401
3C-359
3C-310B
3C-310D
3C-310E
3C-310F
3C-320D
3C-320C
3C-320B
3C-320A
C3C-311
C3C-314
3C-300A
3C-300B
3C-300C
C3C-315
3C-301B3C-301A
3C-303B
3C-303A
Z3H05 Z3H08
Z3H14 Z3H15
Z3H17
Z3H17
Z3H12
3C-367 3C365
3C-373
3C-371A
3C-362
C3C-201
3C-335A
3C-335 3C-305
3C-301F
3C-303C 3C-303D 3C361A
3C361
3C360
3C301J3C301H3C301E3C301D3C301C
3C-301G
3C-334
3C-332C
3C-332D
3C-332E
3C-332
3C-332B
3C-332A
3C-337A
3C-331
Z3H14
G
H
H.5
G.2
J
22 21
K
L
M
N
2425 20 19
G
H
H.5
G.2
J
22 21
K
L
M
2425 20
CATH
LAB #2
3C-344
COMP
3C-352B
MECHANICAL
BAY - 8
2C-418A
PROPOSED
CONSTRUCTION
ACCESS ROUTE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:4
:5
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
C a th L a b
-T X
-2
-0 e d a v is
P L
Y
G .r v t
G-101
GROUND AND THIRD FLOOR
CONSTRUCTION ACCESS PLANS
3 5GTS
PHASE II: SITE PREP CATH
LAB #2
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-076
JAB
N
KEY PLAN
AREA OF WORK
L
H
D C
G F
B
K J
E
A
Scale: 1/16" = 1'-0"
PARTIAL GROUND FLOOR CONSTRUCTION ACCESS PLAN
Scale: 1/16" = 1'-0"
PARTITAL THIRD FLOOR CONSTRUCTION ACCESS PLAN
A. LIFE SAFETY WILL NOT BE AFFECTED DUE TO NO
CHANGES IN BUILDING USE, OCCUPANCY OR
EGRESS.
B. CONSTRUCTION ROUTE ACCESS PATH SHOWN AS
AN OPTION FOR REFERENCE ONLY. FINAL PATH
SEQUENCE AND SCHEDULE TO BE COORDINATED
WITH VA COR PRIOR TO CONSTRUCTION AND
EQUIPMENT DELIVERIES.
NORTH
0 8 16 32
NORTH
0 8 16 32
1 FOR EMERGENCY ACCESS DURING
CONSTRUCTION. WORKERS CAN BRING
LIGHT CONSTRUCTION MATERIAL THROUGH
STAIRS.
ACCESS LEGEND
S
S
S SS
S S
S S S S S
S
S S
S SS
S S
S S S S S
S
S S
S SS
S S
S S S S S
UP
UP
UP
S S
S S
S SS
S S
S SS S S S
S SS S
S S
S S
S S
S
S S
S SS
S S
S S S S S
S
S S
S SS
S S
S S S S S H
H.5
J
3C-344
CATH LAB #2
3C-352B
COMP
Z3H05
EXAM
Z3H08
EXAM
CATH
ROOM #1
3C-352
NO WORK
NO WORK NO WORK
CLR
48"
C L R
H
H.5
J
CATH
LAB #2
3C-344
EQUIP
3C-344A
CATH
ROOM #1
3C-352
COMP
3C-352B
EXAM
Z3H05
EXAM
Z3H08
NO WORK
NO WORK NO WORK
H
H.5
J
CATH
LAB #2
3C-344
EQUIP
3C-344A
CATH
ROOM #1
3C-352
COMP
3C-352B
EXAM
Z3H05
EXAM
Z3H08
NO WORK
NO WORK NO WORK
G
H
H.5
G.2
J
22 21
3C-344
CATH LAB #2
3C-344A
EQUIP
3C-352B
COMP
Z3H05
EXAM
CATH
ROOM #1
3C-352
Z3H08
EXAM
Room
Z3H04
STAIR
MECHANICAL
BAY - 8
2C-418A
VESTIBULE
3C-418
CORRIDOR
C3C-401
ECHO
3C-330A
ECHO
3C-330B
ECHO
3C-330C
NO WORK
NO WORK NO WORK
OPEN ENTRY ONLY AT THE
DIRECTION OF THE VA.
COR.
NO WORK
NO WORKNO WORKNO WORK
H
H.5
J
CATH
LAB #2
3C-344
3C-352B
COMP
Z3H05
EXAM
Z3H08
EXAM
CATH
ROOM #1
3C-352
NO WORK
NO WORK NO WORK
H
H.5
J
CATH
LAB #2
3C-344
EQUIP
3C-344A
CATH
ROOM #1
3C-352
COMP
3C-352B
EXAM
Z3H05
EXAM
Z3H08
NO WORK
NO WORK NO WORK
1'-0" TYP
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:4
:5
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
C a th L a b
-T X
-2
-0 e d a v is
P L
Y
G .r v t
G-102
PHASING AND ICRA PLANS
4 5GTS
PHASE II: SITE PREP CATH
LAB #2
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-076
JAB
Scale: 1/8" = 1'-0"
ICRA PHASE 1 & 2 - DEMOLITION OF EXISTING
INFRASTRUCTURE
Scale: 1/8" = 1'-0"
ICRA PHASE 4 - REMODEL
CATH LAB #2 SPACE
PHASE 1:
PRIOR TO THE START OF DESTRUCTIVE DEMOLITION ACTIVITIES, THE VA COR SHALL
ORGANIZE A PRE-DEMOLITION MEETING WITH THE GC, THE PHILIPS EQUIPMENT REP AND
THE STRYKER REP TO DETERMINE THE OWNERSHIP/RESPONSIBILITY TO DISCONNECT
AND REMOVE ALL EQUIPMENT FROM THE SPACE. ALL EXISTING PLUMBING, MECHANICAL,
ELECTRICAL, MED GAS, IT, AND ANY OTHER EXISTING BUILDING UTILITY SHALL BE
TERMINATED IN PLACE AND CAPPED TO THE APPROVAL OF THE COR.
Scale: 1/8" = 1'-0"
ICRA PHASE 5 - EQUIPMENT INSTALLATION AND
COMPLETE REMAINING FINISHES
Scale: 1/8" = 1'-0"
THIRD FLOOR OVERALL AREA OF WORK PLAN FOR CATH LAB #2
NORTH
0 4 8 16
NORTH
0 4 8 16
NORTH
0 4 8 16
NORTH
0 4 8 16
A. SEE SHEET G-501 FOR ICRA DETAILS, NOTES AND
INTERSTITIAL ICRA NOTES.
B. KEY NOTES AND DRAWINGS ARE INTENDED TO
GRAPHICALLY REPRESENT GENERAL WORK AND DO
NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
C. REMOVE EXISTING CONSTRUCTION AS DESIGNATED
HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
D. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY
DISPOSED OFF MEDICAL CENTER GROUNDS.
E. PATCHED WALL OPENING SHALL MATCH THE
INTEGRITY OF ADJACENT CONSTRUCTION UNLESS
INDICATED OTHERWISE.
F. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT
INDICATED FOR INSTALLATION OF ELECTRICAL OR
DATA ITEMS. AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND
FINISHES TO MATCH EXISTING.
G. THE INFORMATION CONTAINED IN THESE DEMOLITION
DOCUMENTS DEFINES GENERAL SCOPE ONLY AND
DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION
REQUIRED FOR THE COMPLETION OF THE PROJECT.
H. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER
INFORMATION REGARDING DEMOLITION OF
ELECTRICAL SYSTEMS.
I. BEFORE THE START OF WORK, IDENTIFY ANY
REQUIRED DEMOLITION BEYOND THE IDENTIFIED
PROJECT SCOPE WHETHER ABOVE, BELOW OR
OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE
WITH THE COR, PROVIDE DEMOLITION OF THESE
AREAS AND PATCH THE SAME AS A PART OF THE
SCOPE OF THE PROJECT.
J. ALL DEMOLITION WORK SHALL BE PERFORMED WITH
DUE CARE AND DILIGENCE IN ORDER TO PREVENT
ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE
OR CONCEALED UTILITIES INTENDED TO REMAIN IN
SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS
LOCATED DIFFERENTLY FROM THAT INDICATED OR
THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO
THE CONTRACTING OFFICER.
Scale: 1/8" = 1'-0"
ICRA PHASE 3 - DEMOLITION
OF INTERSTITIAL SLAB
Scale: 1/8" = 1'-0"
ICRA PHASE 3A - REBUILD
OF INTERSTITIAL SLAB
1. PROVIDE CONSTRUCTION SIGN ON THIS SIDE OF
ROOM. THIS ENTRY WILL BE TEMPORARILY SEALED
OFF AROUND DOOR FRAME FOR THE DURATION OF
THE PROJECT. PROVIDE DUST PROTECTION AT DOOR
LOCATION THROUGHOUT DURATION OF
CONSTRUCTION.
2. THIS ENTRY WILL SERVE AS THE CONTRACTOR
ENTRANCE TO THE SPACE FOR THE DURATION OF
THE PROJECT.
3. ICRA WALL TYPE B, SEE DETAIL 6/G-501.
4. TEMPORARY PLASTIC BARRIER WITH ZIPPER ENTRY.
5. TEMPORARY HARD DOOR. MAINTAIN SMOKE
PARTITION RATING.
6. PROVIDE STICKY MAT.
7. REMOVE COUNTERTOP ONLY ON THIS SIDE OF THE
ROOM. PROVIDE TEMPORARY DUST PROTECTION
DURING DEMOLITION PROCESS.
8. USE HEPA CART FOR ABOVE CEILING WORK IN SUITE
CORRIDOR AREA 3C-352B. COORDINATE SCHEDULE
AS TO NOT INTERFERE WITH CATH LAB #1
OPERATION.
9. TEMPORARILY REMOVE AND STORE EXISTING
CEILING TILES IN THIS AREA AS REQUIRED. RETURN
TILES TO THEIR ORIGINAL LOCATION IN THE CEILING
PRIOR TO LEAVING THE CONSTRUCTION SITE EACH
DAY. REPAIR DAMAGE HARD CEILING FINISH TO
MATCH EXISTING.
10. INTERSTITIAL SLAB AREA TO BE DEMOLISHED.
11. NEW RAISED INTERSTITIAL SLAB TO BE
CONSTRUCTED.
12. PROVIDE ICRA PLASTIC BARRIER, FROM TOP SIDE OF
INTERSTITIAL FLOOR SLAB TO THE UNDERSIDE OF
THE STRUCTURAL FLOOR OR STRUCTURAL
MEMBERS ABOVE, OFFSET 12" AROUND THE AREA OF
THE INTERSTITIAL SLAB DEMOLITION. THE PLASTIC
BARRIER SHALL WRAP AROUND ALL HVAC &
ELECTRICAL DUCTS, EQUIPMENT, STEEL
STRUCTURE, PIPING, ETC. TO PROVIDE A COMPLETE
DUST FREE BARRIER TO THE SURROUNDING
INTERSTITIAL FLOOR AREA.
13. INSTALL NEW COUNTERTOP DURING THIS PHASE.
PROVIDE TEMPORARY DUST PROTECTION DURING
INSTALLATION.
14. EXISTING DOOR PANEL TO BE REMOVED AND
REPLACED AT THE COMPLETION OF CONSTRUCTION.
15. NEW DOOR PANELS TO BE INSTALLED AT THE
COMPLETION OF CONSTRUCTION.
16. MEP WORK PERFORMED IN MECHANICAL BAY-8 TO
BE COORDINATED WITH DRAWINGS AND COR TO
ENSURE HOSPITAL REMAINS OPERATIONAL.SEE
ELECTRICAL AND MECHANICAL DWGS FOR NEW UPS
EQUIPMENT
NORTH
0 4 8 16
NORTH
0 4 8 16
PHASE 4:
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES, THE VA COR SHALL ORGANIZE A
PRE-CONSTRUCTION MEETING WITH THE GC, THE PHILIPS EQUIPMENT REP AND THE
STRYKER REP TO VERIFY LOCATIONS AND SIZE REQUIREMENTS FOR ALL NEW
EQUIPMENT ARE MET. ALL PLUMBING, MECHANICAL, ELECTRICAL, MED GAS, IT, AND ANY
OTHER BUILDING UTILITIES SHALL BE COORDINATED WITH THE VENDORS AND BID SET.
PHASE 5:
PRIOR TO THE START OF INSTALLATION ACTIVITIES, THE VA COR SHALL ORGANIZE A
PRE-INSTALLATION MEETING WITH THE GC, THE PHILIPS EQUIPMENT REP AND THE
STRYKER REP TO DETERMINE THE OWNERSHIP/RESPONSIBILITY TO CONNECT AND
INSTALL ALL EQUIPMENT WITHIN THE SPACE. ALL PLUMBING, MECHANICAL, ELECTRICAL,
MED GAS, IT, AND ANY OTHER BUILDING UTILITIES SHALL BE COORDINATED WITH THE
VENDORS AND BID SET.
# KEY NOTES:
N
KEY PLAN
AREA OF WORK
L
H
D C
G F
B
K J
E
A
PHASE 3:
PRIOR TO THE START OF INTERSTITIAL SLAB DEMOLITION ACTIVITIES, CONTRACTOR
SHALL PROVIDE TEMPORARY WALLS, AS REQUIRED, AROUND THE PERIMETER OF THE
OPENING. ICRA BARRIERS SHALL BE PLACED IN THE INTERSTITIAL FLOOR AREA TO
PREVENT DUST AND DEBRIS FROM SPREADING IN THE SURROUNDING INTERSTITIAL
FLOOR AREA. SEE OTHER ICRA MEASURES REQUIRED FOR INTERSTITIAL FLOOR
REMOVAL AND RE-CONSTRUCTION. SEE STRUCTURAL DWGS. FOR STRUCTURAL
DEMOLITION/RE-CONSTRUCTION REQUIREMENTS OF INTERSTITIAL SLAB WORK.
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM TEMPORARY BARRIER TAG
4" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16"
O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
INTERSTITIAL SLAB
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING LAY-IN CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
INTERSTITIAL SLAB
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4" 16 GAUGE METAL STUDS
@ 16" O.C. WALL TO EXTEND
TO UNDERSIDE OF DECK
A B
4" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16"
O.C. (2) LAYERS 5/8" GYPSUM
BOARD EACH SIDE. WALL TO
EXTEND TO UNDERSIDE OF
DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
INTERSTITIAL SLAB
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING INTERSTITIAL CEILING
FLEX DUCT
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
CONNECT TO NEAREST EXHAUST DUCT THAT
LEADS TO AN OUTDOOR EXHAUST VENT.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
F L E
X D
U C
T
A P
P R
O X
A .F
.F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
CATH LAB #2 SITE PREP
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
GENERAL
A. SEE SPECIFICATION SECTION 01 00 00 FOR PRE-
CONSTRUCTION RISK ASSESSMENT FORMS AND
INFECTION CONTROL PRECAUTIONS.
B. SEE SHEET G-102 FOR PHASING PLANS AND
DESCRIPTION.
C. ALL APPLICABLE PERMITS AND COR APPROVALS
SHALL BE COMPLETED PRIOR TO BEGINNING ANY
WORK FOR EACH PHASE. PERMITS INCLUDE: ICRA,
ILSM, ABOVE CEILING FIRE/SMOKE WALL, UTILITY,
FIRE ALARM SYSTEM, MEDICAL GASES, AND
CONFINED SPACES.
D. WORK REQUIRED BY INFECTION CONTROL SHALL
BE PERFORMED FOR EACH PHASE OF THE
PROJECT.
E. CONTRACTOR SHALL EXHAUST ALL AIR FROM
SPACES WHERE WORK IS BEING PREFORMED
DIRECTLY TO THE EXTERIOR OF THE BUILDING.
ENSURE EXHAUST POINTS ARE LOCATED AWAY
FROM INTAKE POINTS FOR THE BUILDING.
EXHAUST LOCATIONS TO BE APPROVED BY COR.
F. GENERAL CONTRACTOR AND ALL SUB-
CONTRACTORS SHALL REVIEW SPECIFICATION
SECTION 01 00 00 THOROUGHLY FOR ALL GENERAL
ICRA CONDITIONS AND VA STATION
REQUIREMENTS FOR THIS PROJECT.
INTERSTITIAL ICRA NOTES
A. PROVIDE ICRA PLASTIC BARRIER, FROM TOP SIDE
OF INTERSTITIAL SLAB TO THE UNDERSIDE OF THE
STRUCTURAL FLOOR OR STRUCTURAL MEMBERS
ABOVE, AROUND THE AREA OF THE INTERSTITIAL
SLAB DEMOLITION. THE PLASTIC BARRIER SHALL
WRAP AROUND ALL HVAC & ELECTRICAL DUCTS,
EQUIPMENT, STEEL STRUCTURE, PIPING, ETC. TO
PROVIDE A COMPLETE DUST FREE BARRIER TO
THE SURROUNDING INTERSTITIAL FLOOR AREA.
B. THE GC SHALL CLEAN THE PLASTIC TENTED AREA
PRIOR TO ANY HOT WORK BEING PERFORMED.
C. THE GC SHALL OBTAIN A HOT WORK PERMIT FROM
THE VA SAFETY PERSONNEL PRIOR TO THE START
OF ANY INTERSTITIAL WORK.
D. THE VA SAFETY PERSONNEL SHALL INSPECT THE
CLEANED AREA, REVIEW THE CONTRACTORS
DEMOLITION PLAN FOR THE INTERSTITIAL SLAB,
AND ISSUE THE PERMIT.
E. DURING ANY HOT WORK ACTIVITIES, THE
CONTRACTOR SHALL USE FIRE BLANKETS TO
COVER UP ANY COMBUSTIBLE MATERIALS LIKE
INSULATION, DUCT WORK, ETC. TO INSURE THAT
OPEN FLAMES DO NOT SPREAD TO SURROUNDING
SURFACES.
F. THE GC SHALL PROVIDE A FIRE WATCH
(DEDICATED OBSERVER) DURING ALL INTERSTITIAL
AREA WELDING OPERATIONS.
SHEET NOTES:
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:4
:5
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
C a th L a b
-T X
-2
-0 e d a v is
P L
Y
G .r v t
G-501
ICRA STANDARD DETAILS
5 5GTS
PHASE II: SITE PREP CATH
LAB #2
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-076
JAB
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
MOBILE CONTAINMENT CART
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3/4" = 1'-0"
ROOM ELEVATION
Scale: 6" = 1'-0"
ISLM SIGNAGE
1/4" = 1'-0"
INTERSTITIAL CEILING FRAMING PLAN
CATH LAB - PARTIAL EXISTING
J
H
H.5
2121.5
S101
TYP.
S101
S101
S101
S101
1/4" = 1'-0"
FRAMING PLAN ABOVE INTERSTITIAL CEILING
CATH LAB - PARTIAL EXISTING 4th FLOOR
J
H
H.5
2121.5
S101
TYP.
5.1. ·
S101
INTERSTITIAL SLAB 'TOP HAT'
SECTION - TYP. NEW RAISED
1 1/2" = 1'-0"
S101
INTERSTITIAL SLAB TRANSITION
SECTION - TYP. EXIST. / NEW
1 1/2" = 1'-0"
S101
SIM.
S101
INTERSTITIAL SLAB TRANSITION
SECTION - TYP. EXIST. / NEW
1 1/2" = 1'-0"
S101
INTERSTITIAL SLAB TRANSITION
SECTION - TYP. EXIST. / NEW
1 1/2" = 1'-0"
S101
SIM.
S101
PURLIN-TO-PURLIN FIELD SPLICE CONN.
DETAIL - TYP. INTERSTITIAL
1 1/2" = 1'-0" 5 S101
SUPPORT BEAMS ATTACHMENT TO EXIST. BEAM
SECTION - TYP. INTERSTITIAL SLAB HANGER ABOVE
N.T.S.
S101
DETAIL - TYP. HSS FIELD SPLICE
1 1/2" = 1'-0"
S101
INTERSTITIAL SLAB SUPPORT
SECTION - TYP. EXIST.
1 1/2" = 1'-0"
S101
ATTACH. TO EXIST. CONC. FLR. SLAB
PLAN DETAIL - TYP. FLR. PLATE
1" = 1'-0"
Revisions: Date
Drawing Title Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
PHASE II: SITE
PREP CATH LAB #2
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
580-18-10820-076
RPA ENGINEERING, P.A.
Structural Engineering Solutions
102 Regency Blvd.
Suite A1 Greenville, NC 27834
Engineering License Certificate No. C-2734
RPA Project No.:
Phone : 252-321-6027 Fax : 252-355-2179
2020229 MBMMSR
N
KEY PLAN
AREA OF WORK
L
H
D C
G F
B
K J
E
A
2002 HOLCOMBE STREET
HOUSTON, TEXAS 77030
Approved Project Director: Stephen Yu, P.E.
S-101
PARTIAL EXISTING CEILING FRAMING
PLAN, SECTIONS & DETAILS
1 1
X:
\2
0\
A po ge e
- 2 0-
- V A
H ou st on
S ite
P re p fo r C at h La b, T
X\ St ru ct ur al
\2
CE
IL
.d w g, S
1, /1
2/
0:
:1
AM
, m ik em cg lo ho n, D W
G To
P D
F.
pc
3, A
RC
H fu ll bl ee d E1
(3 0.
x
2.
In ch es
1:
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
6" CLR.
AutoCAD SHX Text
6" CLR.
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
NEW BOOM MOUNT
AutoCAD SHX Text
EXIST. INTERSTITIAL PURLINS, TYP.
AutoCAD SHX Text
HANGER ROD LOCATION FOR AIR FRAME TO SLAB, TYP. - SEE PLAN NOTE 5
AutoCAD SHX Text
INTERSTITIAL SLAB BLOCK-OUT FOR S.A. DUCT FOR AIR FRAME - SEE MECH. DWGS.
AutoCAD SHX Text
EDGE OF NEW RAISED INTERSTITIAL CEILING
AutoCAD SHX Text NEW WT6 x 11 w/ CONT. " x 38" x 0'-6", TYP.
AutoCAD SHX Text
NEW AIR-FRAME - SEE MFR. DWGS.
AutoCAD SHX Text HSS 6 x 4 x (LSV)14 (LSV)
AutoCAD SHX Text
NEW INTERSTITIAL SLAB - SEE PLAN NOTE 4
AutoCAD SHX Text
EXIST. INTERSTITIAL SLAB
AutoCAD SHX Text HSS 6 x 4 x 14(LSV)
AutoCAD SHX Text ROOF FRAMING PLAN NOTES: 1. SEE SHEET THIS SHEET FOR GENERAL STRUCTURAL SEE SHEET THIS SHEET FOR GENERAL STRUCTURAL NOTES. 2. DIMENSIONS SHOWN WITH '±' ARE EXISTING AND ARE DIMENSIONS SHOWN WITH '±' ARE EXISTING AND ARE SUBJECT TO FIELD VERIFICATION PRIOR TO ACCEPTANCE AS VALID. 3. TOP OF STEEL ELEVATIONS ARE REFERENCED FROM TOP OF STEEL ELEVATIONS ARE REFERENCED FROM FINISHED FLOOR REFERENCE ELEVATION 0'-0". SEE ARCHITECTURAL DRAWINGS FOR ACTUAL FINISHED FLOOR ELEVATION. 4. NEW INTERSTITIAL SLAB IS 4 " TOTAL THICKNESS (3" NEW INTERSTITIAL SLAB IS 4 " TOTAL THICKNESS (3" 12" TOTAL THICKNESS (3" CONCRETE OVER 1 ", 20 GAUGE METAL CONFORM FLOOR 12", 20 GAUGE METAL CONFORM FLOOR DECK. SEE GENERAL STRUCTURAL NOTES FOR ADDITIONAL INFORMATION. 5. AIR FRAME ATTACHMENT TO NEW INSTERSTITIAL SLAB AIR FRAME ATTACHMENT TO NEW INSTERSTITIAL SLAB SHALL BE DETERMINED BY 'SLD' VENDOR (HANGER SIZES, LOCATIONS, ETCETERA).
AutoCAD SHX Text
ROOF FRAMING PLAN LEGEND
AutoCAD SHX Text
DENOTES DIRECTION OF DECK SPAN
AutoCAD SHX Text W14 x 22 (+12'-4")
AutoCAD SHX Text
DENOTES STEEL BEAM WITH SIZE DESIGNATION AND TOP OF STEEL REFERENCE ELEVATION
AutoCAD SHX Text
DENOTES EXISTING BEAM FIELD SPLICE LOCATION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DENOTES 'UNLESS OTHERWISE NOTED'
AutoCAD SHX Text U.O.N.
AutoCAD SHX Text
DENOTES 'LONG SIDE VERTICAL'
AutoCAD SHX Text
LSV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text EX. W21 x 57
AutoCAD SHX Text EX. W16 x 26
AutoCAD SHX Text EX. W16 x 26
AutoCAD SHX Text EX. W16 x 26
AutoCAD SHX Text EX. W21 x 62
AutoCAD SHX Text EX. W18 x 35
AutoCAD SHX Text EX. W21 x 57
AutoCAD SHX Text EX. W18 x 35
AutoCAD SHX Text EX. W18 x 35
AutoCAD SHX Text EX. W21 x 62
AutoCAD SHX Text 4'-6"±
AutoCAD SHX Text 4'-6"±
AutoCAD SHX Text 4'-6"±
AutoCAD SHX Text 4'-6"±
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text EX. HG4: W33 x 130; W18 x 76; W33 x 130
AutoCAD SHX Text EX. W8 x 18
AutoCAD SHX Text EX. W8 x 18
AutoCAD SHX Text EX. W8 x 18
AutoCAD SHX Text EX. W8 x 18
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text EX. HG3: W33 x 118; W18 x 76; W33 x 118
AutoCAD SHX Text
S.A. DUCT FOR AIR FRAME - SEE MECH. DWGS.
AutoCAD SHX Text EX. HG2: W33 x 118; W18 x 65; W33 x 118
AutoCAD SHX Text
NEW RAISED INTERSTITIAL CEILING BELOW
AutoCAD SHX Text
EXIST. 3" INSUL.PIPE, TYP.
AutoCAD SHX Text
NEW BOOM MOUNT
AutoCAD SHX Text HSS 6 x 4 x , 14, TYP. U.O.N.
AutoCAD SHX Text GENERAL STRUCTURAL NOTES: 1. GENERAL NOTES GENERAL NOTES 1.1. METHODS, PROCEDURES AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. METHODS, PROCEDURES AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN AND INSURE THE INTEGRITY OF THE STRUCTURE AT ALL STAGES OF CONSTRUCTION. 1.2. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR SLEEVES, CURBS, INSERTS OR OPENINGS NOT HEREIN INDICATED. 1.3. COORDINATE THESE DRAWINGS WITH THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND CIVIL COORDINATE THESE DRAWINGS WITH THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND CIVIL DRAWINGS. 1.4. VERIFY ALL FLOOR AND ROOF OPENING SIZES AND LOCATIONS, EQUIPMENT PAD SIZES AND LOCATIONS, VERIFY ALL FLOOR AND ROOF OPENING SIZES AND LOCATIONS, EQUIPMENT PAD SIZES AND LOCATIONS, ANCHOR BOLT LAYOUTS, ETCETERA, WITH EQUIPMENT SELECTED. 1.5. CONTRACTOR SHALL VERIFY ALL EXISTING CONSTRUCTION DIMENSIONS WHICH IMPACT NEW CONSTRUCTION CONTRACTOR SHALL VERIFY ALL EXISTING CONSTRUCTION DIMENSIONS WHICH IMPACT NEW CONSTRUCTION PRIOR TO FABRICATING ANY ITEMS. 1.6. DO NOT CUT, NOTCH, OR OTHERWISE MODIFY ANY STRUCTURAL MEMBERS UNLESS SPECIFICALLY INDICATED DO NOT CUT, NOTCH, OR OTHERWISE MODIFY ANY STRUCTURAL MEMBERS UNLESS SPECIFICALLY INDICATED ON THE DRAWINGS WITHOUT APPROVAL OF THE ENGINEER OF RECORD. 1.7. CUTTING OF STEEL MEMBERS AND INSTALLATION OF HOLES IN STEEL MEMBERS SHALL BE DONE BY CUTTING CUTTING OF STEEL MEMBERS AND INSTALLATION OF HOLES IN STEEL MEMBERS SHALL BE DONE BY CUTTING OR DRILLING. DO NOT USE TORCHES FOR CUTTING UNLESS APPROVED BY THE ENGINEER OF RECORD. 1.8. CONTRACTOR IS RESPONSIBLE FOR DESIGN AND INSTALLATION OF ALL SHORING REQUIRED TO SUPPORT NEW CONTRACTOR IS RESPONSIBLE FOR DESIGN AND INSTALLATION OF ALL SHORING REQUIRED TO SUPPORT NEW AND EXISTING STRUCTURAL ELEMENTS. 2. CONCRETE CONCRETE 2.1. ALL PLACED CONCRETE, SHALL HAVE NORMAL WEIGHT COARSE AGGREGATES, AND SHALL HAVE A MINIMUM ALL PLACED CONCRETE, SHALL HAVE NORMAL WEIGHT COARSE AGGREGATES, AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH (f'c) AT 28 DAYS AS SHOWN ON THE CONCRETE MATERIALS SCHEDULE. 2.2. SEE MECHANICAL, ELECTRICAL, PLUMBING AND CIVIL DRAWINGS FOR ADDITIONAL WALL / SLAB OPENINGS SEE MECHANICAL, ELECTRICAL, PLUMBING AND CIVIL DRAWINGS FOR ADDITIONAL WALL / SLAB OPENINGS NOT SHOWN ON THE STRUCTURAL DRAWINGS. 2.3. CONCRETE MATERIALS SHALL BE AS FOLLOWS: CONCRETE MATERIALS SHALL BE AS FOLLOWS: 2.3.1. USE TYPE I/II PORTLAND CEMENT CONFORMING TO ASTM C150 USE TYPE I/II PORTLAND CEMENT CONFORMING TO ASTM C150 2.3.2. AGGREGATE SHALL BE LIGHT WEIGHT AND SHALLCONFORM TO ASTM C33 (FINE AND COURSE AGGREGATE SHALL BE LIGHT WEIGHT AND SHALLCONFORM TO ASTM C33 (FINE AND COURSE AGGREGATES) 2.3.3. AIR ENTRAINING ADMIXTURE SHALL CONFORM TO ASTM C260 AIR ENTRAINING ADMIXTURE SHALL CONFORM TO ASTM C260 2.3.4. PLASTICIZER CAN BE USED TO IMPROVE WORKABILITY IF REQUIRED PLASTICIZER CAN BE USED TO IMPROVE WORKABILITY IF REQUIRED 2.4. CONCRETE MIX DESIGN: CONCRETE MIX DESIGN: 2.4.1. MAXIMUM WATER/CEMENT RATIO - 0.50 MAXIMUM WATER/CEMENT RATIO - 0.50 2.4.2. SLUMP SHALL BE 4 INCHES TO 6 INCHES (WITHOUT PLASTICIZER) SLUMP SHALL BE 4 INCHES TO 6 INCHES (WITHOUT PLASTICIZER) 2.4.3. AIR ENTRAINMENT SHALL BE 4% TO 6% (EXTERIOR CONCRETE) AIR ENTRAINMENT SHALL BE 4% TO 6% (EXTERIOR CONCRETE) 2.5. CONDUCT SLUMP, AIR, AND STRENGTH TESTS OF CONCRETE IN ACCORDANCE WITH THE FOLLOWING CONDUCT SLUMP, AIR, AND STRENGTH TESTS OF CONCRETE IN ACCORDANCE WITH THE FOLLOWING PROCEDURES: 2.5.1. SECURE SAMPLES IN ACCORDANCE WITH "METHOD OF SAMPLING FRESH CONCRETE" (ASTM C 172). SECURE SAMPLES IN ACCORDANCE WITH "METHOD OF SAMPLING FRESH CONCRETE" (ASTM C 172). MOLD AND CURE FIVE SPECIMENS FROM EACH SAMPLE IN ACCORDANCE WITH "METHOD OF MAKING ANS CURING CONCRETE COMPRESSION AND FLEXURE SPECIMENS IN THE FIELD" (ASTM C 31). FIVE SPECIMENS COMPRISE ONE TEST. TEST TWO SPECIMENS AT 7 DAYS (ASTM C 39). TEST TWO SPECIMENS AT 28 DAYS IN ACCORDANCE WITH "METHOD OF TEST FOR COMPRESSIVE STRENGTH OF MOLDED CONCRETE CYLINDERS" (ASTM C 39). TEST EVALUATION SHALL BE CONDUCTED IN ACCORDANCE WITH PROVISIONS OF ACI 318-05. KEEP ONE SPECIMEN IN RESERVE. 4.5.2. MAKE ONE STRENGTH TEST FOR EACH 100 CUBIC YARDS OR FRACTION THEREOF FOR EACH MIX DESIGN MAKE ONE STRENGTH TEST FOR EACH 100 CUBIC YARDS OR FRACTION THEREOF FOR EACH MIX DESIGN OF CONCRETE PLACED IN ONE DAY, EXCEPT THAT IN NO CASE SHALL A GIVEN MIX DESIGN BE REPRESENTED BY LESS THAN THREE TESTS. 4. STRUCTURAL STEEL STRUCTURAL STEEL 4.1. DETAILING OF STRUCTURAL STEEL CONNECTIONS, MUST BE CONSISTENT WITH RECOGNIZED, PUBLISHED DETAILING OF STRUCTURAL STEEL CONNECTIONS, MUST BE CONSISTENT WITH RECOGNIZED, PUBLISHED METHODS, SUCH AS THE "AISC STEEL CONSTRUCTION MANUAL, 13TH EDITION", "DETAILING FOR STEEL CONSTRUCTION", OR "VOLUME ll CONNECTIONS MANUAL OF STEEL CONSTRUCTION". 4.2. STRUCTURAL STEEL DETAILING, FABRICATION AND ERECTION, SHALL CONFORM TO THE "AISC SPECIFICATION STRUCTURAL STEEL DETAILING, FABRICATION AND ERECTION, SHALL CONFORM TO THE "AISC SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" (MARCH 9, 2005), AND THE "AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES" (MARCH 18, 2005). 4.3. WELDING SHALL CONFORM TO THE AMERICAN WELDING SOCIETY STRUCTURAL WELDING CODE, AWS D1.1. WELDING SHALL CONFORM TO THE AMERICAN WELDING SOCIETY STRUCTURAL WELDING CODE, AWS D1.1. ELECTRODES FOR SHOP AND FIELD WELDS, SHALL BE CLASS E70XX. ALL WELDING SHALL BE DONE BY QUALIFIED, CERTIFIED WELDERS, PER THE ABOVE STANDARD. 4.4. SHOP AND FIELD TESTING OF WELDS AND BOLTS, SHALL BE PERFORMED AS OUTLINED IN THE SHOP AND FIELD TESTING OF WELDS AND BOLTS, SHALL BE PERFORMED AS OUTLINED IN THE SPECIFICATIONS. 4.5. ALL FILLET WELDS SHALL BE A MINIMUM OF INCH, UNLESS OTHERWISE NOTED. ALL FILLET WELDS SHALL BE A MINIMUM OF INCH, UNLESS OTHERWISE NOTED. 14 INCH, UNLESS OTHERWISE NOTED. 4.6. THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS, FOR THE WORK OF OTHER TRADES, THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS, FOR THE WORK OF OTHER TRADES, WITHOUT PRIOR WRITTEN APPROVAL OF THE ENGINEER. 4.7. ALL STRUCTURAL STEEL SHAPES USED, SHALL BE IN ACCORDANCE WITH ASTM A992 SPECIFICATIONS (Fy = ALL STRUCTURAL STEEL SHAPES USED, SHALL BE IN ACCORDANCE WITH ASTM A992 SPECIFICATIONS (Fy = 50 KSI). ALL STRUCTURAL TUBING USED, SHALL BE IN ACCORDANCE WITH ASTM A500, GRADE B (Fy = 46 KSI). ALL PIPE USED, SHALL BE IN ACCORDANCE WITH ASTM A53 (Fy = 35 KSI). ALL MISCELLANEOUS STEEL USED, SHALL BE IN ACCORDANCE WITH ASTM A36 (Fy = 36 KSI). 4.8. ALL FIELD BOLTED CONNECTIONS, SHALL BE BEARING TYPE CONNECTIONS (THREADS INCLUDED IN THE ALL FIELD BOLTED CONNECTIONS, SHALL BE BEARING TYPE CONNECTIONS (THREADS INCLUDED IN THE SHEAR PLANE), WITH " DIAMETER, ASTM A325 HIGH STRENGTH BOLTS, UNLESS OTHERWISE NOTED ON THE 34" DIAMETER, ASTM A325 HIGH STRENGTH BOLTS, UNLESS OTHERWISE NOTED ON THE DRAWING. ALL BOLTS SHALL BE TIGHTENED TO A "SNUG-TIGHT" CONDITION, UNLESS OTHERWISE NOTED. 4.9. FOR ALL FLOOR AND ROOF OPENINGS, THE CONTRACTOR SHALL VERIFY OPENING LOCATIONS WITH FOR ALL FLOOR AND ROOF OPENINGS, THE CONTRACTOR SHALL VERIFY OPENING LOCATIONS WITH EQUIPMENT SELECTED, AND MAKE ANY NECESSARY MODIFICATIONS AT NO ADDITIONAL COST. IT IS THE RESPONSIBILITY OF FABRICATOR, TO RECEIVE ALL NECESSARY INFORMATION, PRIOR TO FABRICATION OF ANY STEEL. 4.10. ALL STRUCTURAL STEEL WHICH IS TO BE SPRAYED WITH FIREPROOFING SHALL NOT BE PRIMED OR PAINTED. ALL STRUCTURAL STEEL WHICH IS TO BE SPRAYED WITH FIREPROOFING SHALL NOT BE PRIMED OR PAINTED. STEEL WHICH IS NOT SPRAYED WITH FIREPROOFING SHALL BE PRIMED AND PAINTED. DO NOT PAINT SURFACES TO BE EMBEDDED IN CONCRETE. 4.11. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY GUYING AND BRACING REQUIRED, TO ERECT AND HOLD THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY GUYING AND BRACING REQUIRED, TO ERECT AND HOLD THE STRUCTURE IN PROPER ALIGNMENT, UNTIL ALL PERMANENT BRACING, ROOF & WALL SHEATHING, OR METAL ROOF DECK ARE IN PLACE, TO RESIST LATERAL MOVEMENT OF THE FRAME. 5. NON-COMPOSITE METAL FLOOR DECK NON-COMPOSITE METAL FLOOR DECK 5.1. STEEL FLOOR DECK SHALL BE 1.5C20, 20 GAGE, GALVANIZED, NON-COMPOSITE FORM DECK AS PER STEEL STEEL FLOOR DECK SHALL BE 1.5C20, 20 GAGE, GALVANIZED, NON-COMPOSITE FORM DECK AS PER STEEL DECK INSTITUTE (SDI) SPECIFICATIONS. 5.2.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .