2017 Annual Fire Pump.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25621R0114
About this file
This document includes a federal contract opportunity notice and a related fire pump performance test report. The contract opportunity is for site preparation work for a new Cath Lab and EP Lab at the Michael E. DeBakey VA Medical Center in Houston, Texas. The work includes demolition, construction, mechanical, electrical and other trades with a period of performance of 510 calendar days from notice to proceed. The estimated value is between $1,000,000 and $2,000,000. The solicitation will be issued as a Request for Proposals on or around June 24, 2021. The opportunity is only available to service-disabled veteran-owned small businesses.
The fire pump test report documents the results of a performance test conducted on April 17, 2017. It includes pump specifications and test data showing the pump met performance requirements. Sections document compliance with NFPA 20 checklist items including nameplates, valves, piping, gauges, temperature and other installation and operational components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25621R0114 0002.pdf | ||
| 078100 Applied Fireproofing.docx | DOCX document | |
| 36C25621R0114 0001.pdf | ||
| 2017 5YR After Backflow RnR.PDF | ||
| 014536 Schedule of Special Inspections.docx | DOCX document | |
| 134900 RadiationProtection-R1.docx | DOCX document | |
| Clarifications dated 8-5-21.pdf | ||
| Roof Pictures.pdf | ||
| 033053 (SF) CastPlace Concrete.docx | DOCX document | |
| 580-18-111 Site Visit Instructions.docx | DOCX document | |
| 36C25621R0114_1.docx | DOCX document | |
| 580-18-111 Phase 1 EP Lab Specifications.pdf | ||
| 580-18-111 Phase 2 Cath Lab 2 Drawings.pdf | ||
| 580-18-111 Phase 2 Cath Lab 2 Specifications.pdf | ||
| SF24 - BID BOND.pdf | ||
| 580-18-111 Phase 1 EP Lab Drawings.pdf | ||
| DOL Wage Determinations TX20210253 dated 5-7-21.pdf | ||
| 580-18-111 Statement of Work.docx | DOCX document | |
| 36C25621R0114.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SinplGr1nn.3 VA MS#100-SP.WET.DRV.2nd OTt Annull ntp.138019324 4-3.2017 3323 EIdrdg* Pkwy St, 120
HCLISt0flIX 77041 miL—
FULL FLOW
FIRE PUMP PERFORMANCE TEST
Task Number 38008824 Date of Test: 4/17/17
Customer Name: Michael e Debakey VA Med Cemter Location Inspected: Bldg 114 pump house Street 2002 Holcomb St Inspectors Name: George Smiley
City: Houston State: tx Zip: 77030 Also present Able Salazar Attn: John Debi bar
Phone: 281-725-7847 Fax: Pump Designation: pump house Page 1 of 2
Shaft Manufacturer Approved Shop or Serial No. Model Number x 'Horizontal SSP X 'Yes
I USA-01-11-2141 TB15F I Vertical Pump Information INo
Gallons/Minute Rated PSI I Net Rated RPM I City Supply Size Conn. Tank Supply Tank Height
PM 1 106 PSI N/A I PSI 3550 I RPM I NO Yes I N/A I Inch YES I Yes 25 I Feet Manufacturer Approved Shop or Serial No. Model Number
Horse Power Rated RPM
WEG
X Yes
04AG0101008738 404/5TS Driver No 125 I H.P. 3560 I RPM
________________ Information Elec. Motor? I Rated Volts Oper. Volts Rated Amps Amps @150 Phase Cycles Service Factor
X Yes 460 A.C. 478 I A.C. 137 Amps 100 lAmps 3 IPhase 60 Hz 1.15 Manufacturer Approved Start Pressure: 65 1 psi Stop Jockey Pump
X Yes X Manual X Manual On N/A PSI Controller METRON I
INo X PSI Drop N/A Auto Off N/A PSI
Information Shop or Serial No. Model Number Auto Waterfiow
DE-889211 M435-125-460C
Revolutions Per Discharge Suction Net Pressures
Streams GPM % Volts Amps
Minute Pressures Pressures Size Pitot 1 Pitot 2 Pitot 3 Pitot 4 Pitot 5 Pitot 6 3574 RPM 140 Psi 8 Psi 132 Psi Churn 0 0 0 0 0 0 0 Churn 476 64 3560 RPM 111 Psi 6 Psi 105 Psi 20 20 1516 101.1 475 96 3557 RPM 90 Psi 4 Psi 86 Psi 20 20 18 2224 148.3 474 97 3556 RPM Psi Psi Psi
RPM Psi Psi Psi RPM Psi PSI Psi 0 RPM Psi Psi psi 0
Fire Pump Performance Test 4—Discharge Pressure
—U—Suction
Pressure
—a—Boost i~
Pressure
—4-- 90
Pressure 80 —t— 86
61)
40 ---------" ---- - -- -
20 -- ---- —U—S —U-6 - -
0 -
0 1516 2224
Gallons Per Minute
Additional Comments: N/A Did Pump Pass?I yes I
Signature of owner or owners representative: Date: 17-Apr-17
ME
SimplexGrinnell
8323 Eldridge Pkwy Ste 120
Houston, TX 77041
VA Med#100-SP-WET-DRY-2nd .QTR. Annual lnsp.#38019324 4-3-2017
Fire Pump NFPA 20 Checklist
Customer Name: VA IVIED CENTER Pump Designation: PUMP HOUSE Task Number: 38019324
Serial Number: TRI c1
I Is nameplate installed and Legible? YES
2 Is the circulation relief valve installed and working properly? YES
3 Is suction piping the correct size? YES
4 Is fire pump suction valve correct type? YES
5 Is jockey pump suction valve correct type? N/A
6 Is a vortex plate installed in suction piping inside storage tank? N/A
Is fire pump discharge check valve and discharge control valve installed correctly? YES
8 Is jockey pump discharge check valve and discharge control valve installed correctly?
N/A jockey Are pressure sensing lines for fire pump and/or pump installed correctly? YES
10 Is shutoff valve present in sensing lines? NO
11 Are sensing lines correct type and size? YES
Are unions and/or check valves installed in12 sensing lines? YES
13 Are test valves installed in sensing lines? YES
14 Is coupling guard in place and in good condition? YES
15 Is Fire Pump base filled with concrete? YES
16 Is suction gauge present and working properly? YES
17 Is discharge gauge present and working properly? YES
- 140
Is pump room temperature maintained at or above degrees fahrenheit? YES
19 Is a water measuring device installed? YES
20 Are packing gland drip cups piped to a drain? YES
21 Are controllers UL listed and FM approved? YES
| Page 1 |
| Page 2 |
File details come from the government source that posted it. Updated .