580-18-111 Phase 1 EP Lab Drawings.pdf
PDF 41 MB Posted
- Solicitation number
- 36C25621R0114
About this file
This notice provides details for a federal construction contract opportunity for site preparation work at the Michael E. DeBakey VA Medical Center in Houston, Texas. The contract is a 100% Service-Disabled Veteran-Owned Small Business set-aside to furnish supervision, labor, materials and equipment for demolition, architectural, mechanical, electrical and other construction work. The solicitation will be issued as a request for proposals on or around June 24, 2021 for a firm-fixed-price contract valued between $1,000,000 and $2,000,000. The period of performance is 510 calendar days from notice to proceed. Interested parties must register on the Vendor Information Pages and SAM database to receive notifications including the solicitation amendment postings. Offerors shall be registered under NAICS code 236220, with a size standard of $39.5 million in average annual receipts for the past three years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25621R0114 0002.pdf | ||
| 078100 Applied Fireproofing.docx | DOCX document | |
| 36C25621R0114 0001.pdf | ||
| 2017 5YR After Backflow RnR.PDF | ||
| 014536 Schedule of Special Inspections.docx | DOCX document | |
| 134900 RadiationProtection-R1.docx | DOCX document | |
| Clarifications dated 8-5-21.pdf | ||
| Roof Pictures.pdf | ||
| 033053 (SF) CastPlace Concrete.docx | DOCX document | |
| 2017 Annual Fire Pump.pdf | ||
| 580-18-111 Site Visit Instructions.docx | DOCX document | |
| 36C25621R0114_1.docx | DOCX document | |
| 580-18-111 Phase 1 EP Lab Specifications.pdf | ||
| 580-18-111 Phase 2 Cath Lab 2 Drawings.pdf | ||
| 580-18-111 Phase 2 Cath Lab 2 Specifications.pdf | ||
| SF24 - BID BOND.pdf | ||
| DOL Wage Determinations TX20210253 dated 5-7-21.pdf | ||
| 580-18-111 Statement of Work.docx | DOCX document | |
| 36C25621R0114.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA APPROVAL
MEDICAL CENTER DIRECTOR
MEDICAL CENTER ASSOC. DIRECTOR
CHIEF OF STAFF
ASSOC. DIRECTOR OF PATIENT CARE
CHIEF FES
PROJECT SECTION SUPV.
PROJECT MANAGER
GENERAL UTILITIES FOREMAN
PATIENT CARE FOREMAN CONTRACTING OFFICER
INFECTION PREVENTION
CIO OFFICER
SAFETY OFFICE
PATIENTSAFETY MANAGER
CHIEF LOGISTICS
SUPERVISOR BIO-MED SERVICE
FIRE CHIEF
GENERAL PROPERTIES FOREMAN
1. Base Bid - All work for Phase I EP Lab and Phase II Cath Lab #2
2. Deduct Alternate #1 - All work except Phase II - Cath Lab #2 casework under viewing window. Please refer to Sheet I-101-Phase II - Cath Lab #2
3. Deduct Alternate #2 - All work except deduct #1 and reuse the existing doors and door hardware in Phase I - EP Lab and Phase II - Cath Lab #2. Please refer to
Sheet A-601
4. Deduct Alternate #3 - All work except deduct #1 and #2, and provide welded sheet flooring in lieu of epoxy resinous flooring in both Phase 1 - EP Lab and Phase II -
Cath Lab #2. Please refer to I-101, Finish Schedule, for designated spaces.
5. Deduct Alternate #4 - All work except deduct #1, #2, #3, and eliminate Phase II - Site Prep Cath Lab #2 in its entirety.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/1
/2
:1
:4
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
E P
L a b -T
X
-0 e d a v is
P L
Y
G .r v t
GM001
MASTER COVER SHEET
1 6GTS
PHASE I: SITE PREP EP LAB
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-075
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
JAB
SITE PREP EP LAB - DRAWING LIST
GENERAL
GM001 MASTER COVER SHEET 1 6
G-001 COVER SHEET 2 6
G-002 GENERAL INFORMATION 3 6
G-101 GROUND AND THIRD FLOOR CONSTRUCTION ACCESS PLANS 4 6
G-102 PHASING AND ICRA PLANS 5 6
G-501 ICRA STANDARD DETAILS 6 6
STRUCTURAL
S-101 PARTIAL EXISTING CEILING FRAMING PLAN, SECTIONS & DETAILS 1 1
ARCHITECTURAL
AD100 REFERENCE PHOTOS 1 43
AD101 DEMOLITION PLAN AND REFLECTED CEILING PLAN 2 43
A-100 OVERALL SCOPE PLAN 3 43
A-101 NEW WORK PLAN AND REFLECTED CEILING PLAN 4 43
A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 5 43
QH101 STRYKER - SLD AIRFRAME 6 43
QH102 STRYKER - SLD AIRFRAME 7 43
QH103 PHILIPS - EP EQUIPMENT 8 43
QH104 PHILIPS - EP EQUIPMENT 9 43
QH105 PHILIPS - EP EQUIPMENT 10 43
QH106 PHILIPS - EP EQUIPMENT 11 43
QH107 PHILIPS - EP EQUIPMENT 12 43
QH108 PHILIPS - EP EQUIPMENT 13 43
QH109 PHILIPS - EP EQUIPMENT 14 43
QH110 PHILIPS - EP EQUIPMENT 15 43
QH111 PHILIPS - EP EQUIPMENT 16 43
QH112 PHILIPS - EP EQUIPMENT 17 43
QH113 PHILIPS - EP EQUIPMENT 18 43
QH114 PHILIPS - EP EQUIPMENT 19 43
QH115 PHILIPS - EP EQUIPMENT 20 43
QH116 PHILIPS - EP EQUIPMENT 21 43
QH117 PHILIPS - EP EQUIPMENT 22 43
QH118 PHILIPS - EP EQUIPMENT 23 43
QH119 PHILIPS - EP EQUIPMENT 24 43
QH120 PHILIPS - EP EQUIPMENT 25 43
QH121 PHILIPS - EP EQUIPMENT 26 43
QH122 PHILIPS - EP EQUIPMENT 27 43
QH123 PHILIPS - EP EQUIPMENT 28 43
QH124 PHILIPS - EP EQUIPMENT 29 43
QH125 PHILIPS - EP EQUIPMENT 30 43
QH126 PHILIPS - EP EQUIPMENT 31 43
QH127 PHILIPS - EP EQUIPMENT 32 43
QH128 PHILIPS - EP EQUIPMENT 33 43
QH129 PHILIPS - EP EQUIPMENT 34 43
QH130 PHILIPS - EP EQUIPMENT 35 43
QH131 PHILIPS - EP EQUIPMENT 36 43
QH132 PHILIPS - EP EQUIPMENT 37 43
QH133 PHILIPS - EP EQUIPMENT 38 43
QH134 PHILIPS - EP EQUIPMENT 39 43
QH135 PHILIPS - EP EQUIPMENT 40 43
QH136 PHILIPS - EP EQUIPMENT 41 43
QH137 PHILIPS - EP EQUIPMENT 42 43
QH138 PHILIPS - EP EQUIPMENT 43 43
INTERIORS
I-101 FLOOR FINISH PLAN AND CASEWORK ELEVATIONS 1 2
I-201 EQUIPMENT PLAN AND SCHEDULE 2 2
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX101 THIRD FLOOR FIRE SUPPRESSION PLANS 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 4
PW101 THIRD FLOOR DRAIN, WASTE, AND VENT PLANS 2 4
PP101 THIRD FLOOR DOMESTIC WATER PLANS 3 4
PG101 THIRD FLOOR MEDICAL GAS PLANS 4 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 7
MD101 THIRD FLOOR MECHANICAL DEMOLITION PLAN 2 7
MH101 THIRD FLOOR MECHANICAL PLANS 3 7
MH102 ROOF HVAC PLAN 4 7
M-501 MECHANICAL DETAILS 5 7
M-502 MECHANICAL CONTROLS 6 7
M-601 MECHANICAL SCHEDULES 7 7
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
EP101 THIRD FLOOR DEMOLITION AND NEW WORK PLANS 2 6
EP102 MECHANICAL SERVICE BAY POWER PLAN 3 6
E-501 ELECTRICAL DETAILS 4 6
E-601 POWER RISER DIAGRAM AND LUMINAIRE SCHEDULE 5 6
E-602 PANEL SCHEDULES 6 6
SEE PHILIPS/STRYKER FINAL SITE PREPARATION
SUPPORT DOCUMENT REFERENCE DRAWINGS FOR
SPECIFIC EQUIPMENT REQUIRMENTS AND
COORDINATION.
BLDG 100 BLDG 100
BLDG 100
PHASE I: SITE PREP EP LAB &
PHASE II: SITE PREP CATH LAB #2
PHASE I: SITE PREP EP LAB
& PHASE II: SITE PREP CATH
LAB #2
580-18-111
BID DEDUCT ALTERNATES FOR EP LAB AND CATH LAB #2 PROJECT
SITE PREP CATH LAB #2 - DRAWING LIST
GENERAL
G-001 COVER SHEET 1 5
G-002 GENERAL INFORMATION 2 5
G-101 GROUND AND THIRD FLOOR CONSTRUCTION ACCESS PLANS 3 5
G-102 PHASING AND ICRA PLANS 4 5
G-501 ICRA STANDARD DETAILS 5 5
STRUCTURAL
S-101 PARTIAL EXISTING CEILING FRAMING PLAN, SECTIONS & DETAILS 1 1
ARCHITECTURAL
AD100 REFERENCE PHOTOS 1 45
AD101 DEMOLITION PLAN AND REFLECTED CEILING PLAN 2 45
A-101 NEW WORK FLOOR PLAN 3 45
A-110 REFLECTED CEILING PLAN, PARTITION TYPES, ROOM SECTION, DOOR
SCHEDULE AND DETAILS
4 45
QH101 STRYKER - SLD AIRFRAME 5 45
QH102 STRYKER - SLD AIRFRAME 6 45
QH103 PHILIPS - CATH LAB EQUIPMENT 7 45
QH104 PHILIPS - CATH LAB EQUIPMENT 8 45
QH105 PHILIPS - CATH LAB EQUIPMENT 9 45
QH106 PHILIPS - CATH LAB EQUIPMENT 10 45
QH107 PHILIPS - CATH LAB EQUIPMENT 11 45
QH108 PHILIPS - CATH LAB EQUIPMENT 12 45
QH109 PHILIPS - CATH LAB EQUIPMENT 13 45
QH110 PHILIPS - CATH LAB EQUIPMENT 14 45
QH111 PHILIPS - CATH LAB EQUIPMENT 15 45
QH112 PHILIPS - CATH LAB EQUIPMENT 16 45
QH113 PHILIPS - CATH LAB EQUIPMENT 17 45
QH114 PHILIPS - CATH LAB EQUIPMENT 18 45
QH115 PHILIPS - CATH LAB EQUIPMENT 19 45
QH116 PHILIPS - CATH LAB EQUIPMENT 20 45
QH117 PHILIPS - CATH LAB EQUIPMENT 21 45
QH118 PHILIPS - CATH LAB EQUIPMENT 22 45
QH119 PHILIPS - CATH LAB EQUIPMENT 23 45
QH120 PHILIPS - CATH LAB EQUIPMENT 24 45
QH121 PHILIPS - CATH LAB EQUIPMENT 25 45
QH122 PHILIPS - CATH LAB EQUIPMENT 26 45
QH123 PHILIPS - CATH LAB EQUIPMENT 27 45
QH124 PHILIPS - CATH LAB EQUIPMENT 28 45
QH125 PHILIPS - CATH LAB EQUIPMENT 29 45
QH126 PHILIPS - CATH LAB EQUIPMENT 30 45
QH127 PHILIPS - CATH LAB EQUIPMENT 31 45
QH128 PHILIPS - CATH LAB EQUIPMENT 32 45
QH129 PHILIPS - CATH LAB EQUIPMENT 33 45
QH130 PHILIPS - CATH LAB EQUIPMENT 34 45
QH131 PHILIPS - CATH LAB EQUIPMENT 35 45
QH132 PHILIPS - CATH LAB EQUIPMENT 36 45
QH133 PHILIPS - CATH LAB EQUIPMENT 37 45
QH134 PHILIPS - CATH LAB EQUIPMENT 38 45
QH135 PHILIPS - CATH LAB EQUIPMENT 39 45
QH136 PHILIPS - CATH LAB EQUIPMENT 40 45
QH137 PHILIPS - CATH LAB EQUIPMENT 41 45
QH138 PHILIPS - CATH LAB EQUIPMENT 42 45
QH139 PHILIPS - CATH LAB EQUIPMENT 43 45
QH140 PHILIPS - CATH LAB EQUIPMENT 44 45
QH141 PHILIPS - CATH LAB EQUIPMENT 45 45
INTERIORS
I-101 FIRST FLOOR FINISH PLAN AND CASEWORK ELEVATIONS 1 2
I-201 EQUIPMENT PLAN AND SCHEDULE 2 2
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX101 THIRD FLOOR FIRE SUPPRESSION PLANS 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 2
PG101 THIRD FLOOR MEDICAL GAS PLANS 2 2
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 5
MH101 THIRD FLOOR MECHANICAL PLANS 2 5
MH102 ROOF HVAC PLAN 3 5
M-501 MECHANICAL DETAILS 4 5
M-502 MECHANICAL CONTROLS & SCHEDULES 5 5
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
EP101 THIRD FLOOR POWER PLAN 2 6
EP102 THIRD FLOOR OVERALL POWER PLAN 3 6
E-501 ELECTRICAL DETAILS 4 6
E-601 POWER RISER DIAGRAM AND LUMINAIRE SCHEDULE 5 6
E-602 PANEL SCHEDULES 6 6
VA PROJECT NUMBER #: 580-18-111
DocuSign Envelope ID: 2263CFD5-4CE2-4D7C-9A4E-10CC026B4C3E
5/13/2021
VA APPROVAL
MEDICAL CENTER DIRECTOR
MEDICAL CENTER ASSOC. DIRECTOR
CHIEF OF STAFF
ASSOC. DIRECTOR OF PATIENT CARE
CHIEF FES
PROJECT SECTION SUPV.
PROJECT MANAGER
GENERAL UTILITIES FOREMAN
PATIENT CARE FOREMAN CONTRACTING OFFICER
INFECTION PREVENTION
CIO OFFICER
SAFETY OFFICE
PATIENTSAFETY MANAGER
CHIEF LOGISTICS
SUPERVISOR BIO-MED SERVICE
FIRE CHIEF
GENERAL PROPERTIES FOREMAN
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/1
/2
:1
:3
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
E P
L a b -T
X
-0 e d a v is
P L
Y
G .r v t
G-001
COVER SHEET
2 6GTS
PHASE I: SITE PREP EP LAB
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-075
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
JAB
BLDG 100 BLDG 100
BLDG 100
PHASE I: SITE PREP EP LAB
SITE PREP EP LAB - DRAWING LIST
GENERAL
GM001 MASTER COVER SHEET 1 6
G-001 COVER SHEET 2 6
G-002 GENERAL INFORMATION 3 6
G-101 GROUND AND THIRD FLOOR CONSTRUCTION ACCESS PLANS 4 6
G-102 PHASING AND ICRA PLANS 5 6
G-501 ICRA STANDARD DETAILS 6 6
STRUCTURAL
S-101 PARTIAL EXISTING CEILING FRAMING PLAN, SECTIONS & DETAILS 1 1
ARCHITECTURAL
AD100 REFERENCE PHOTOS 1 43
AD101 DEMOLITION PLAN AND REFLECTED CEILING PLAN 2 43
A-100 OVERALL SCOPE PLAN 3 43
A-101 NEW WORK PLAN AND REFLECTED CEILING PLAN 4 43
A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 5 43
QH101 STRYKER - SLD AIRFRAME 6 43
QH102 STRYKER - SLD AIRFRAME 7 43
QH103 PHILIPS - EP EQUIPMENT 8 43
QH104 PHILIPS - EP EQUIPMENT 9 43
QH105 PHILIPS - EP EQUIPMENT 10 43
QH106 PHILIPS - EP EQUIPMENT 11 43
QH107 PHILIPS - EP EQUIPMENT 12 43
QH108 PHILIPS - EP EQUIPMENT 13 43
QH109 PHILIPS - EP EQUIPMENT 14 43
QH110 PHILIPS - EP EQUIPMENT 15 43
QH111 PHILIPS - EP EQUIPMENT 16 43
QH112 PHILIPS - EP EQUIPMENT 17 43
QH113 PHILIPS - EP EQUIPMENT 18 43
QH114 PHILIPS - EP EQUIPMENT 19 43
QH115 PHILIPS - EP EQUIPMENT 20 43
QH116 PHILIPS - EP EQUIPMENT 21 43
QH117 PHILIPS - EP EQUIPMENT 22 43
QH118 PHILIPS - EP EQUIPMENT 23 43
QH119 PHILIPS - EP EQUIPMENT 24 43
QH120 PHILIPS - EP EQUIPMENT 25 43
QH121 PHILIPS - EP EQUIPMENT 26 43
QH122 PHILIPS - EP EQUIPMENT 27 43
QH123 PHILIPS - EP EQUIPMENT 28 43
QH124 PHILIPS - EP EQUIPMENT 29 43
QH125 PHILIPS - EP EQUIPMENT 30 43
QH126 PHILIPS - EP EQUIPMENT 31 43
QH127 PHILIPS - EP EQUIPMENT 32 43
QH128 PHILIPS - EP EQUIPMENT 33 43
QH129 PHILIPS - EP EQUIPMENT 34 43
QH130 PHILIPS - EP EQUIPMENT 35 43
QH131 PHILIPS - EP EQUIPMENT 36 43
QH132 PHILIPS - EP EQUIPMENT 37 43
QH133 PHILIPS - EP EQUIPMENT 38 43
QH134 PHILIPS - EP EQUIPMENT 39 43
QH135 PHILIPS - EP EQUIPMENT 40 43
QH136 PHILIPS - EP EQUIPMENT 41 43
QH137 PHILIPS - EP EQUIPMENT 42 43
QH138 PHILIPS - EP EQUIPMENT 43 43
INTERIORS
I-101 FLOOR FINISH PLAN AND CASEWORK ELEVATIONS 1 2
I-201 EQUIPMENT PLAN AND SCHEDULE 2 2
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX101 THIRD FLOOR FIRE SUPPRESSION PLANS 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 4
PW101 THIRD FLOOR DRAIN, WASTE, AND VENT PLANS 2 4
PP101 THIRD FLOOR DOMESTIC WATER PLANS 3 4
PG101 THIRD FLOOR MEDICAL GAS PLANS 4 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 7
MD101 THIRD FLOOR MECHANICAL DEMOLITION PLAN 2 7
MH101 THIRD FLOOR MECHANICAL PLANS 3 7
MH102 ROOF HVAC PLAN 4 7
M-501 MECHANICAL DETAILS 5 7
M-502 MECHANICAL CONTROLS 6 7
M-601 MECHANICAL SCHEDULES 7 7
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
EP101 THIRD FLOOR DEMOLITION AND NEW WORK PLANS 2 6
EP102 MECHANICAL SERVICE BAY POWER PLAN 3 6
E-501 ELECTRICAL DETAILS 4 6
E-601 POWER RISER DIAGRAM AND LUMINAIRE SCHEDULE 5 6
E-602 PANEL SCHEDULES 6 6
SEE PHILIPS/STRYKER FINAL SITE PREPARATION
SUPPORT DOCUMENT REFERENCE DRAWINGS FOR
SPECIFIC EQUIPMENT REQUIRMENTS AND
COORDINATION.
Philips STRYKER SLD Contractor Bio Med
All ICRA responsibilities x
Demo of Existing Philips Equipment, and existing Rails excluding unit strut x
Demo of Existing Interstitial Structural Support (including channel steel support members ) x
Existing Control Room Equipment x X
Some VA owned computer monitoring Equipment x
Interstitial Enclosure Demo and Penetration x
Door from Control Room to Procedure Room x
Furnishing of Floor Plate x
Floor Plate Mounting, surface Prep incuding drilling and/or tapping of holes x
Installation of brackets for SLD system x
SLD System (Design/Fabricate/Install structure to support SLD Airframe system and all Stryker booms and lights.) x x
Philips New Unistrut channel supports x x
Provide and install SLD Airframe system incorporating mounting rails for Philips systems. x
Installation of insulation around SLD system and connect points. x
Penetrations and final ductwork connections to the Airframe system. x
Demolish existing sprinkler heads and associated branch piping, as required, back to the mains. Reuse existing piping to the maximum extent practical. Install new sprinkler heads to provide the required coverage for the new floor/ceiling plans.
x
Installation of airframe lighting x
Switching and control of airframe lighting x
Room lighting and control outside of airframe perimeter x
Mounting supports for booms x
Installation of Booms and light Suspension x
All Med gas routing and connections for all STRYKER Booms x
All Electrical routing and connections for all STRYKER Booms (Final Connection to facility for line and low voltage wiring from STRYKER
Booms) x
Interstitial Enclosure Structure and Architectural Work x
48U and 9U Rack (Wiring and Conduit by GC) x
IT racks for medical equipment and final connections x
Pathways/conduit for all equipment, low voltage, and power cabling x
Removal of existing Philips UPS Equipment (Philips does not remove existing ups or any demo of area, other existing Philips equipment will be removed. Existing wire could be cut, contractor to remove) x
Removal of existing Conduit associated with existing UPS equipment x
Furnishing and Delivery of UPS (if it is pallet jack accessible) x
Contractor responsible for wiring and final positioning of UPS x
Provide conduit, routing, and final connection for UPS x
Removal of all existing equipment not mounted to floors or walls x
In all instances, where Philips is not responsible for installing/ anchoring the wall mounted equipment x
Note: Contractor is responsible for ensuring all work that is the responsibility of others and is scheduled in sequence with the contractors portions of work.
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
PAPER TOWEL DISPENSER/
WASTE RECEPTICLE
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
TOWEL BAR
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
CLOCK & NURSE CALL DEVICESTOILET ACCESSORIES
6"
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
INTERCOM
STATION
INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
WALL PROTECTION
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNERGUARD
DRINKING FOUNTAIN
WHEELCHAIR ACCESSIBLE
(CANTILEVERED STYLE)
17" - 19"
8" MIN
9" MIN
6" MAX
M
IN
T O
P O
F S
P O
U T
' M
A X
MISC. WALL DEVICES
M A
T C
H E
X
IS
T
IN
G
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL CENTER GROUNDS.
4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION UNLESS INDICATED
OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND
FINISHES TO MATCH EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION
REQUIRED FOR THE COMPLETION OF THE PROJECT.
7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF
ELECTRICAL SYSTEMS.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE
PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR
THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE CONTRACTING OFFICER.
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT
BETWEEN THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR
ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE
NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND
UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING.
WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION
OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER
QUALITY OR GREATER QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE
COR OF ANY DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS
SHALL GOVERN.
9. COORDINATE WORK OF ALL TRADES AND VENDORS PRIOR TO START OF CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN
CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK
SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR
WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
13. APOGEE'S DRAWINGS AND SPECIFICATIONS REFERENCE PHILIPS STRYKER / ZERO GRAVITY - FINAL SITE
PREPARATION SUPPORT DRAWINGS. THESE DRAWINGS SHALL BE USED IN CONCERT WITH THE
BUILDING DRAWINGS FOR A COMPLETE PROJECT SCOPE OF WORK.
14. ALL EXISTING PHILIPS X RAY EQUIPMENT AND CONTROLS SHALL BE REMOVED BY PHILIPS AS PART OF
ANOTHER PROJECT.
15. CONTRACTOR TO REFER TO PHILIPS STRYKER / ZERO GRAVITY DRAWINGS FOR MORE PROJECT DETAILS
AND INFORMATION.
DEMOLITION KEYNOTE
WINDOW TYPE ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE
CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1 PHASING KEYNOTE
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:3
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
E P
L a b -T
X
-0 e d a v is
P L
Y
G .r v t
G-002
GENERAL INFORMATION
3 6GKS
PHASE I: SITE PREP EP LAB
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-075
JAB
GENERAL SYMBOL LEGEND
Scale: 3/8" = 1'-0"
STANDARD MOUNTING HEIGHTS
DEMOLITION NOTES GENERAL NOTES
ARCHITECTURAL SYMBOL LEGEND
ABBREVIATIONS
RESPONSIBILITY MATRIX
DN
ELEV MACH
FIRE STAIR
ST-4
BC-408
TRANSFORMER
VESTBC-412
BC-410
REFEIG # 4
CANTEEN HOLD
ELEVATOR
ELEVATOR ELEVATORELEVATOR
HAC
ELEVATORELEVATOR
SERV ELEV LOBBY
ELEVATOR
ELEVATOR
STAIR
EMS SUPERIORPROS STOR
NON-FOOD STOR
RCVG
CENTER
REFIRG # 1
SOILED WARE AND CARTS
FOOD STOR
INGRD CONT
CLEAN WARE CORR
POT WASH
ATS TERMINAL
SPECIAL DIET
FOOD SERV COORD CTR
ALCOVE
COMP
CATERING
STOR
MEAT REFR BREAD/EGGS REFR
FRZ
DAIRY REFR
FRZ
ICE CREAM
VEG REFR
COLD FOOD/ PREP
REFRIG # 5
FRZ
ADMIN.
CD FD PDSVC
TIME KEEPER
CONF/CL ROOM
STUDY
COOK SUP
REFRIG # 6
DCC
FREEZER # 4
FREEZER # 8
HOLD
DEIT COM
SOILED WARE
MAIL HOLD
STOR
BC-252C
BC-250C
BC-200
S-9
S-8
ST-9
BC-251
S-10 FUT
CBC-201
S-7 S-6
BC-220
BC-210
BC-250F
CBC-206
BC-220B
BC-220A
BC-230
BC-250E
BC-250D
CBC-208
BC-230A
CBC-207
BC-250S
CBC-200
BC-240
BC-252B
BC-252A
BC-250B
BC-250U
BC-270J
BC-272
BC-250G BC-250J
BC-250H
BC-250L
BC-250NBC-250K
BC-250R
BC-250M
BC-250P
BC-270C
BC-270D
BC-270B
BC-270E
BC-270G
BC-270F
BC-270H
BC-250T
BC-270
T-4
T-3
BC-207
BC-209
UP
SUMP
PIT
SAND
PIT
CAN WASH
TRASH COLL
CONTAM WASTE
STOR
MAIL HOLD
LOADING DOCK
TRANSFORMER &
SWITCHGEAR
SILVER
COLL
CORRIDOR
ELEC
MECHANICAL BAY-8
DOCK
LEVELER
CORR
STAIR
STAIR
ELEVATOR
ELEVATOR
R A M P
D O W N
BC-201
BC-203
BC-205
BC-209
BC-207
CBC-100
BC-100A
ST-14
BA-101
CBC-205
ST-10
BC-100B
BC-100
CBC-204
S-9
S-8
AREAWAY
CORR
MECHANICAL BAY-11
TRANSFORMER
UNEXCAVATED
AREAWAY
AREAWAY
FRZ FRZ
CONF/CLRM
STUDY
STOR
COOK SUP COMP
COLL
SILVER
FEC
CBA-100
BA-100
BA-150A
BC-250H BC-250P
BC-270E
BC-270F
BC-270G
BC-270H BC-270J
BA-101
Z3L03
Z3H09
Z3H11
Z3H06
Z3H01H
Z3H04
ABOVE
GMA031
4" CONC PAD
T22E
CSWK 27
CSWK 26
T18C3
T6A T8A
T18C3
FD FD FD
FD
FD
FD FD
FD
1AA7 <BL>
1AA2 <BL>
1AA19 <BL>
1AA2 <BL>
1AA7 <BL>
1AA19 <BL>
1AA2 <BL>
1AA7 <BL>
4F1
2F1 1W5 <T>
1A1
1AA7 <B>
1D
1P1 <A>
1A102
6B29 6B30
1A101
1D
6A12
1D
1A1
1N5
1D
1D
1H2
1P1 <A>
1P1 <A>
1D
1A102
1P1 <A>
1A1
6B29
1AA2 <BL>
2G12 <F>
2G12 <F>
6B18
6B17
1D
1D
1D
1AC
6B45
6B41
6B45
9C2 <A>
6B87
1D
2G5 <E>2G1 <E>
1A11A1
6B48
1R2
8R1
1D
ST-14
CORR
FAM WAIT
MANAGER
HD NUR
C LIN
B
BED CUB
ISOL
BED CUB
BED CUB
BED CUB
BED CUB
BED CUB
BED CUB
BED CUB
BED CUB
RM
SU
MED
PATIENT RM PATIENT RM
SU
MED
CU
FAMILY CONSULT
NOUR STA
ROOM
CORR
CORR
CORR
CORR
ANTEHAC
VEST
MECHANICAL BAY-11
NUR STA
CORR CORR
M/F TOILET
HAC
LNG
UNIT OFFICE
FIRE STAIR
ENGR
W/C REP
REP & DEVEL
RCVG & CLEAN/
MECHANICAL BAY-8
F L
K R
S
FT
LNG
TELEMETRY
WARD CL
TEAM
CCU
RM
TEAM
MICU
EQUIP STORAGE
MECHANICAL BAY-8
BATH
EDUCATION ROOM
ECHO
ECHO ECHO ECHO
STORAGE
ECHO
ECHO
CORRIDOR
OFFICE
ADMIN
PS
CORR
ADMIN
STRESS
CORR
CORR
EQUIPMENT
WAITING
CATH LAB
CORR
CONTROL
COMP
CATH ROOMCATH ROOM
CORR
HS & STUDY CUB
SECY
CH CLIN
PUL LAB
PHYS
MT
M LKRS
LNG
FT
CORR
ELEVATOR ELEVATOR ELEVATOR
ELEVATOR
SERV ELEV LOBBY
ELEVATOR ELEVATOR
MACH STOR
X-RAY
STOR
CORR
F LKRS
BMS
CORR
STAIR
ELEVATOR
ELEVATOR
STAIR
MT
M LKR
ENGR
W/C REP
F LKR
CORR
FT
MT
CORR
VEST
CORR
BAY 6BAY 4 BAY 5
PASSAGE
STAFF TOIL
OFFICE
OFFICE
CHIEF'S OFFICE
AO'S OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
CORR
NIDL
DL
CM
CORRIDOR
EX ROOM
#4
EX ROOM
#3
EX ROOM
#2
EX ROOM
#1
MEN DRESS WOMEN
REGISTER
REGISTER
RECEPTION
PASSAGE
SHOWER
DRESS
VEST
EQUIP
EXAM
ST TLT
EXAM
ROOM
EXAM
ROOM
BAY 8
EX ROOM
EX ROOM EX ROOM
OFFICE
PAT TLT
PAT TLT
EX ROOMEX ROOMEX ROOMEX ROOMEX ROOM
EX ROOM
ECHO
M LKR
OFFICE
OFFICE
OFFICE
HALL
OFFICE
OFFICE
CHANGING
PAT EDUC
BAY 3
C3C-400
3C-430
3C-409
3C-431
3C-479
C
-4
A
3C-472
3C-470A
3C-464
3C-462
3C-460
3C-458
3C-456
3C-454
3C-452
3C-450
3C-463
3C-465
3C-461 3C-475
3C-471
3C-473
3C-477 3C-439
3C-437
C3C-409
C3C-411
C3C-408
C3C-410
C3C-415
3C-4703C-466A
3C-466
3C-466B
C3C-414
C3C-415 C3C-402
3C-414
3C-412 3C-410
3C-400D
3C-400E
3C-400
2C-418A
C
-4
C
3C-416D
3C-416
3C-467 3C-468
3C-433
2C-418A
3C-310C
3C-310A
3C-333
3C-330C 3C-330B 3C-330A
3C-338 3C-336
C3C-312
3C-304
3C-302
3C-306A
C3C-315
3C-306
3C-337
C3C-303
3C-375
C3C-313
3C-370B
3C-371
3C-370A
C3C-301
3C-370
3C-352B
3C-3523C-344
C3C-311
3C-381
3C-383
3C-385
3C-387
3C-416A
3C-416B
3C-416
3C-416D
C3C-214
S-9 S-10 FUT
S-8
C3C-200
S-7 S-6
C3C-202
3C-201
C3C-300
3C-416C
C3C-201
3C-340
ST-10
3C-400B
3C-400C
3C-400D
3C-400E
C3B-201
C3C-400
3C-418
C3C-401
3C-359
3C-310B
3C-310D
3C-310E
3C-310F
3C-320D
3C-320C
3C-320B
3C-320A
C3C-311
C3C-314
3C-300A
3C-300B
3C-300C
C3C-315
3C-301B3C-301A
3C-303B
3C-303A
Z3H05 Z3H08
Z3H14 Z3H15
Z3H17
Z3H17
Z3H12
3C-367 3C365
3C-373
3C-371A
3C-362
C3C-201
3C-335A
3C-335 3C-305
3C-301F
3C-303C 3C-303D 3C361A
3C361
3C360
3C301J3C301H3C301E3C301D3C301C
3C-301G
3C-334
3C-332C
3C-332D
3C-332E
3C-332
3C-332B
3C-332A
3C-337A
3C-331
Z3H14
H
G.2
G
F.8
F.5
F
E.5
E
D.2
D
22 21.5 21 20.5 20.1 20 19 18.9
I
J
K
L
M
232425
LOADING DOCK
H
G.2
G
F.8
F.5
F
E.5
E
D.2
D
22 21.5 21 20.5 20.1 20 19 18.9
I
J
K
L
232425
OFFICE
3C-442
EP LAB
3C-420
HD
NURSE
3C-436
C LIN
3C-438
CONTROL
ROOM
3C-421
S T
O R
A G
E
C
-4
ANTE
ROOM
3C-419
PROPOSED
CONSTRUCTION
ACCESS ROUTE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:1
:3
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
E P
L a b -T
X
-0 e d a v is
P L
Y
G .r v t
G-101
GROUND AND THIRD FLOOR
CONSTRUCTION ACCESS PLANS
4 6GTS
PHASE I: SITE PREP EP LAB
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-075
JAB
N
KEY PLAN
AREA OF WORK
L
H
D C
G F
B
K J
E
A
Scale: 1/16" = 1'-0"
PARTIAL GROUND FLOOR CONSTRUCTION ACCESS PLAN
Scale: 1/16" = 1'-0"
PARTIAL THIRD FLOOR CONSTRUCTION ACCESS PLAN
A. LIFE SAFETY WILL NOT BE AFFECTED DUE TO NO
CHANGES IN BUILDING USE, OCCUPANCY OR
EGRESS.
B. CONSTRUCTION ROUTE ACCESS PATH SHOWN AS
AN OPTION FOR REFERENCE ONLY. FINAL PATH
SEQUENCE AND SCHEDULE TO BE COORDINATED
WITH VA COR PRIOR TO CONSTRUCTION AND
EQUIPMENT DELIVERIES.
NORTH
0 8 16 32
NORTH
0 8 16 32
1 FOR EMERGENCY ACCESS DURING
CONSTRUCTION. WORKERS CAN BRING LIGHT
CONSTRUCTION MATERIAL THROUGH STAIRS.
ACCCESS LEGEND
CONTROL
ROOM
3C-421
HD
NURSE
3C-436
OFFICE
3C-442
C LIN
3C-438
EP LAB
3C-420
STORAGE
3C-444
H
G.2
G
F.8
21.5 21 20.5 20.1 20
ANTE
ROOM
3C-419
C L R
2 4
5 1
NO WORK
NO WORK
NO WORK
CONTROL
ROOM
3C-421
HD
NURSE
3C-436
OFFICE
3C-442
C LIN
3C-438
EP LAB
3C-420
STORAGE
3C-444
3C-443
NEW EQUIP
H
G.2
G
F.8
21.5 21 20.5 20.1 20
ANTE
ROOM
3C-419
NURSE
STATION
C3C-414
CORRIDOR
C3C-415
C L R
2 4
5 1
NO WORK
H
G.2
G
F.8
21.5 21 20.5 20.1 20
C LIN
3C-438
NURSE
STATION
C3C-414
EP LAB
3C-420
HD
NURSE
3C-436
CONTROL
ROOM
3C-421
STORAGE
3C-444
OFFICE
3C-442
CORRIDOR
C3C-415
3C-443
NEW EQUIP
ANTE
ROOM
3C-419
C L R
2 4
15 1
NO WORK
NO WORK
NO WORK
NO WORK
H
G.2
G
F.8
21.5 21 20.5 20.1 20
CONTROL
ROOM
3C-421
HD
NURSE
3C-436
OFFICE
3C-442
C LIN
3C-438
EP LAB
3C-420
STORAGE
3C-444
ANTE
ROOM
3C-419
NO WORK
NO WORK
NO WORK
TYP
1'-0"
H
G.2
G
F.8
21.5 21 20.5 20.1 20
CONTROL
ROOM
3C-421
HD
NURSE
3C-436
OFFICE
3C-442
C LIN
3C-438
EP LAB
3C-420
STORAGE
3C-444
3C-443
NEW EQUIP
ANTE
ROOM
3C-419
NO WORK
NO WORK
NO WORK
TYP
1'-0"
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:1
:4
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
E P
L a b -T
X
-0 e d a v is
P L
Y
G .r v t
G-102
PHASING AND ICRA PLANS
5 6GTS
PHASE I: SITE PREP EP LAB
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-075
JAB
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
ICRA PHASE 1 - DEMOLITION OF EXISTING
INFRASTRUCTURE
N
KEY PLAN
AREA OF WORK
L
H
D C
G F
B
K J
E
A
Scale: 1/8" = 1'-0"
ICRA PHASE 4 - REMODEL EP LAB SPACES
Scale: 1/8" = 1'-0"
ICRA PHASE 5 - EQUIPMENT INSTALLATION AND
COMPLETE REMAINING FINISHES
NORTH
0 4 8 16
NORTH
0 4 8 16
PHASE 1:
PRIOR TO THE START OF DESTRUCTIVE DEMOLITION ACTIVITIES, THE VA COR SHALL
ORGANIZE A PRE-DEMOLITION MEETING WITH THE GC, THE PHILIPS EQUIPMENT REP AND
THE STRYKER REP TO DETERMINE THE OWNERSHIP/RESPONSIBILITY TO DISCONNECT
AND REMOVE ALL EQUIPMENT FROM THE SPACE. ALL EXISTING PLUMBING, MECHANICAL,
ELECTRICAL, MED GAS, IT, AND ANY OTHER EXISTING BUILDING UTILITY SHALL BE
TERMINATED IN PLACE AND CAPPED TO THE APPROVAL OF THE COR.
A. SEE SHEET G-501 FOR ICRA DETAILS, NOTES AND
INTERSTITIAL ICRA NOTES.
B. KEY NOTES AND DRAWINGS ARE INTENDED TO
GRAPHICALLY REPRESENT GENERAL WORK AND DO
NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
C. REMOVE EXISTING CONSTRUCTION AS DESIGNATED
HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
D. EXISTING EQUIPMENT REMOVED SHALL BE
PROPERLY DISPOSED OFF MEDICAL CENTER
GROUNDS.
E. PATCH WALL OPENING SHALL MATCH THE INTEGRITY
OF ADJACENT CONSTRUCTION UNLESS INDICATED
OTHERWISE.
F. NOTIFY COR OF ANY DEMOLITION REQUIRED AND
NOT INDICATED FOR INSTALLATION OF ELECTRICAL
OR DATA ITEMS. AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND
FINISHES TO MATCH EXISTING.
G. THE INFORMATION CONTAINED IN THESE
DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE
ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF
THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION
REQUIRED FOR THE COMPLETION OF THE PROJECT.
H. REFER TO THE ELECTRICAL DRAWINGS FOR
FURTHER INFORMATION REGARDING DEMOLITION OF
ELECTRICAL SYSTEMS.
I. BEFORE THE START OF WORK, IDENTIFY ANY
REQUIRED DEMOLITION BEYOND THE IDENTIFIED
PROJECT SCOPE WHETHER ABOVE, BELOW OR
OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE
WITH THE COR, PROVIDE DEMOLITION OF THESE
AREAS AND PATCH THE SAME AS A PART OF THE
SCOPE OF THE PROJECT.
J. ALL DEMOLITION WORK SHALL BE PERFORMED WITH
DUE CARE AND DILIGENCE IN ORDER TO PREVENT
ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE
OR CONCEALED UTILITIES INTENDED TO REMAIN IN
SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS
LOCATED DIFFERENTLY FROM THAT INDICATED OR
THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO
THE CONTRACTING OFFICER.
KEY NOTES:
Scale: 1/8" = 1'-0"
ICRA PHASE 2 - DEMOLITION OF INTERSTITIAL SLAB
Scale: 1/8" = 1'-0"
ICRA PHASE 3 - REBUILD OF INTERSTITIAL SLAB
1. PROVIDE DUST PROTECTION AT DOOR LOCATION
THROUGHOUT DURATION OF CONSTRUCTION.
PROVIDE CONSTRUCTION SIGN OUTSIDE OF ROOM.
2. THIS ENTRY WILL SERVE AS CONTRACTOR
ENTRANCE TO THE SPACE FOR THE DURATION OF
THE PROJECT.
3. ICRA WALL TYPE B, SEE DETAIL 6/G-501.
4. TEMPORARY PLASTIC BARRIER WITH ZIPPER ENTRY.
5. TEMPORARY HARD DOOR.
6. PROVIDE STICKY MAT.
7. VA TO REMOVE AND STORE CONTENTS OF STORAGE
ROOM PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL COORDINATE REQUIRED WORK IN ROOM
WITH VA COR TO MINIMIZE DISRUPTION TO THE
HOSPITAL.
8. USE HEPA CART FOR ABOVE CEILING WORK IN
CORRIDORS AS NECESSARY. TEMPORARILY REMOVE
AND STORE EXISTING CEILING TILES AS REQUIRED.
RETURN TILES TO THEIR ORIGINAL LOCATION IN THE
CEILING PRIOR TO LEAVING THE CONSTRUCTION
SITE EACH DAY. REPAIR DAMAGE HARD CEILING
FINISH TO MATCH EXISTING. COORDINATE
SCHEDULE AS TO NOT INTERFERE WITH HOSPITAL
OPERATIONS.
9. EXISTING CEILING GRID IN ROOM TO REMAIN.
MODIFY GRID AND PANELS TO NEW PERIMETER OF
ROOM.
10. INTERSTITIAL SLAB AREA TO BE DEMOLISHED.
11. NEW RAISED INTERSTITIAL SLAB TO BE
CONSTRUCTED.
12. PROVIDE ICRA PLASTIC BARRIER FROM TOP SIDE OF
INTERSTITIAL FLOOR SLAB TO THE UNDERSIDE OF
THE STRUCTURAL FLOOR OR STRUCTURAL
MEMBERS ABOVE, OFFSET 12" AROUND THE AREA
OF THE INTERSTITIAL SLAB DEMOLITION. THE
PLASTIC BARRIER SHALL WRAP AROUND ALL HVAC &
ELECTRICAL DUCTS, EQUIPMENT, STEEL
STRUCTURE, PIPING, ETC. TO PROVIDE A COMPLETE
DUST FREE BARRIER TO THE SURROUNDING
INTERSTITIAL AREA.
13. DEMOLISH HANDRAILS AND CRASH RAILS AS
NECESSARY FOR EXTENTS OF NEW WORK. GC TO
PROVIDE NEW HAND RAIL AND CRASH RAIL TO
MATCH SALIENT CHARACTERISTICS OF EXISTING
SYSTEM AND TERMINATE 6" FROM NEW DOOR
FRAME.
14. PROVIDE TEMPORARY ICRA DOOR FOR ACCESS
FROM CONSTRUCTION AREA TO INTERSTITIAL
FLOOR AREA. REMOVE BARRIER AND DOOR AT
COMPLETION OF THE PROJECT.
15. NEW DOOR PANELS TO BE INSTALLED AT THE
COMPLETION OF CONSTRUCTION.
PHASE 2:
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES, THE VA COR SHALL ORGANIZE A
PRE-CONSTRUCTION MEETING WITH THE GC, THE PHILIPS STRYKER / ZERO GRAVITY
EQUIPMENT REP TO VERIFY LOCATIONS AND SIZE REQUIREMENTS FOR ALL NEW
EQUIPMENT. ALL PLUMBING, MECHANICAL, ELECTRICAL, MED GAS, IT, AND ANY OTHER
BUILDING UTILITIES SHALL BE COORDINATED WITH THE VENDORS AND BID SET.
PHASE 3:
PRIOR TO THE START OF INSTALLATION ACTIVITIES, THE VA COR SHALL ORGANIZE A
PRE-INSTALLATION MEETING WITH THE GC, THE PHILIPS EQUIPMENT REP AND THE
STRYKER REP TO DETERMINE THE OWNERSHIP/RESPONSIBILITY TO CONNECT AND
INSTALL ALL EQUIPMENT WITHIN THE SPACE. ALL PLUMBING, MECHANICAL, ELECTRICAL,
MED GAS, IT, AND ANY OTHER BUILDING UTILITIES SHALL BE COORDINATED WITH THE
VENDORS AND BID SET.
PRIOR TO THE START OF INTERSTITIAL SLAB DEMOLITION ACTIVITIES, CONTRACTOR SHALL PROVIDE
TEMPORARY WALLS, AS REQUIRED, AROUND THE PERIMETER OF THE OPENING. ICRA BARRIERS
SHALL BE PLACED IN THE INTERSTITIAL FLOOR AREA TO PREVENT DUST AND DEBRIS FROM
SPREADING IN THE SURROUNDING INTERSTITIAL FLOOR AREA. SEE OTHER ICRA MEASURES
REQUIRED FOR INTERSTITIAL FLOOR REMOVAL AND RE-CONSTRUCTION. SEE STRUCTURAL DWGS.
FOR STRUCTURAL DEMOLITION/RE-CONSTRUCTION REQUIREMENTS OF INTERSTITIAL SLAB WORK
NORTH
0 4 8 16
PHASE 4:
GENERAL
A. SEE SPECIFICATION SECTION 01 00 00 FOR PRE-
CONSTRUCTION RISK ASSESSMENT FORMS AND
INFECTION CONTROL PRECAUTIONS.
B. SEE SHEET G-101 FOR PHASING PLANS AND
DESCRIPTION.
C. ALL APPLICABLE PERMITS AND COR APPROVALS
SHALL BE COMPLETED PRIOR TO BEGINNING ANY
WORK FOR EACH PHASE. PERMITS INCLUDE: ICRA,
ILSM, ABOVE CEILING FIRE/SMOKE WALL, UTILITY,
FIRE ALARM SYSTEM, MEDICAL GASES, AND
CONFINED SPACES.
D. WORK REQUIRED BY INFECTION CONTROL SHALL
BE PERFORMED FOR EACH PHASE OF THE
PROJECT.
E. CONTRACTOR SHALL EXHAUST ALL AIR FROM
SPACES WHERE WORK IS BEING PREFORMED
DIRECTLY TO THE EXTERIOR OF THE BUILDING.
ENSURE EXHAUST POINTS ARE LOCATED AWAY
FROM INTAKE POINTS FOR THE BUILDING.
EXHAUST LOCATIONS TO BE APPROVED BY COR.
F. GENERAL CONTRACTOR AND ALL SUB-
CONTRACTORS SHALL REVIEW SPECIFICATION
SECTION 01 00 00 THOROUGHLY FOR ALL GENERAL
ICRA CONDITIONS AND VA STATION
REQUIREMENTS FOR THIS PROJECT.
INTERSTITIAL ICRA NOTES
A. PROVIDE ICRA PLASTIC BARRIER, FROM TOP SIDE
OF INTERSTITIAL SLAB TO THE UNDERSIDE OF THE
STRUCTURAL FLOOR OR STRUCTURAL MEMBERS
ABOVE, AROUND THE AREA OF THE INTERSTITIAL
SLAB DEMOLITION. THE PLASTIC BARRIER SHALL
WRAP AROUND ALL HVAC & ELECTRICAL DUCTS,
EQUIPMENT, STEEL STRUCTURE, PIPING, ETC. TO
PROVIDE A COMPLETE DUST FREE BARRIER TO
THE SURROUNDING INTERSTITIAL FLOOR AREA.
B. THE GC SHALL CLEAN THE PLASTIC TENTED AREA
PRIOR TO ANY HOT WORK BEING PERFORMED.
C. THE GC SHALL OBTAIN A HOT WORK PERMIT FROM
THE VA SAFETY PERSONNEL PRIOR TO THE START
OF ANY INTERSTITIAL WORK.
D. THE VA SAFETY PERSONNEL SHALL INSPECT THE
CLEANED AREA, REVIEW THE CONTRACTORS
DEMOLITION PLAN FOR THE INTERSTITIAL SLAB,
AND ISSUE THE PERMIT.
E. DURING ANY HOT WORK ACTIVITIES, THE
CONTRACTOR SHALL USE FIRE BLANKETS TO
COVER UP ANY COMBUSTIBLE MATERIALS LIKE
INSULATION, DUCT WORK, ETC. TO INSURE THAT
OPEN FLAMES DO NOT SPREAD TO SURROUNDING
SURFACES.
F. THE GC SHALL PROVIDE A FIRE WATCH
(DEDICATED OBSERVER) DURING ALL INTERSTITIAL
AREA WELDING OPERATIONS.
SHEET NOTES:
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ISLM TEMPORARY BARRIER TAG
4" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16"
O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
INTERSTITIAL SLAB
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
INSTERSTITIAL SLAB
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4" 16 GAUGE METAL STUDS
@ 16" O.C. WALL TO EXTEND
TO UNDERSIDE OF DECK
A B
4" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16"
O.C. (2) LAYERS 5/8" GYPSUM
BOARD EACH SIDE. WALL TO
EXTEND TO UNDERSIDE OF
DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
INTERSTITIAL SLAB
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING INTERSTITIAL CEILING
FLEX DUCT
A P
P R
O X
A .F
.F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
EP LAB SITE PREP PROJECT
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
CONNECT TO NEAREST EXHAUST DUCT THAT
LEADS TO AN OUTDOOR EXHAUST VENT.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM,
FIRE INSPECTION
SHEETS VISIBLE
TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:4
A
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
E P
L a b -T
X
-0 e d a v is
P L
Y
G .r v t
G-501
ICRA STANDARD DETAILS
6 6GTS
PHASE I: SITE PREP EP LAB
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-075
JAB
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ROOM ELEVATION
Scale: 6" = 1'-0"
ISLM SIGNAGE
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT1
21 2020.1
G
H
1/4" = 1'-0"
INTERSTITIAL CEILING FRAMING PLAN
EP LAB - PARTIAL EXISTING
S101
TYP.
S101
S101
S101
S101
21 2020.1
G
H
1/4" = 1'-0"
FRAMING PLAN ABOVE INTERSTITIAL CEILING
EP LAB - PARTIAL EXISTING 4th FLOOR
S101
TYP.
5.1. ·
S101
INTERSTITIAL SLAB 'TOP HAT'
SECTION - TYP. NEW RAISED
1 1/2" = 1'-0"
S101
SUPPORT BEAMS ATTACHMENT TO EXIST. BEAM
SECTION - TYP. INTERSTITIAL SLAB HANGER ABOVE
N.T.S.
S101
INTERSTITIAL SLAB TRANSITION
SECTION - TYP. EXIST. / NEW
1 1/2" = 1'-0"
S101
INTERSTITIAL SLAB TRANSITION
SECTION - TYP. EXIST. / NEW
1 1/2" = 1'-0"
S101
S101
PURLIN-TO-PURLIN FIELD SPLICE CONN.
DETAIL - TYP. INTERSTITIAL
1 1/2" = 1'-0"
S101
DETAIL - TYP. HSS FIELD SPLICE
1 1/2" = 1'-0"
S101
INTERSTITIAL SLAB SUPPORT
SECTION - TYP. EXIST.
1 1/2" = 1'-0"
S101
ATTACH. TO EXIST. CONC. FLR. SLAB
PLAN DETAIL - TYP. FLR. PLATE
1" = 1'-0"
Revisions: Date
Drawing Title
Approved Project Director: Stephen Yu, P.E.
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
PHASE I: SITE PREP EP LAB
2002 HOLCOMBE STREET
HOUSTON, TEXAS 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
580-18-11120-075
RPA ENGINEERING, P.A.
Structural Engineering Solutions
102 Regency Blvd.
Suite A1 Greenville, NC 27834
Engineering License Certificate No. C-2734
RPA Project No.:
Phone : 252-321-6027 Fax : 252-355-2179
2020228 MBMMSR
N
KEY PLAN
AREA OF WORK
L
H
D C
G F
B
K J
E
A
S-101
PARTIAL EXISTING CEILING FRAMING
PLAN, SECTIONS & DETAILS
1 1
X:
\2
0\
A po ge e
- 2 0-
- V A
H ou st on
S ite
P re p fo r E P
La b, T X\
St ru ct ur al \2
CE
IL
.d w g, S
1, /1 2/
0:
:3
AM
, m ik em cg lo ho n, D
W G
To P
D F.
pc 3, A
RC
H fu ll bl ee d
E1 (3
0.
x
2.
In ch es
1:
G.2
F.8
21.5 21 20.5 20.1 20
## PHOTO KEY NOTES
## PHOTO VANTAGE POINT REFER
TO DETAIL 1 THIS SHEET
IMAGES 13-16 ARE OF THE INTERSTITIAL SPACE
ABOVE THE EP LAB
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:2
P
M C
U s e rs
\e d a v is
\D o c u m e n ts
\A
V A
H o u s to n -S it e P re p f o r
E P
L a b -T
X
-0 e d a v is
P L
Y
G .r v t
AD100
REFERENCE PHOTOS
1 43GTS
PHASE I: SITE PREP EP LAB
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
MAY 14, 2021
100% CONSTRUCTION DOCUMENTS
20-075
JAB
N
KEY PLAN
AREA OF WORK
L
H
D C
G F
B
K J
E
A
Scale: No Scale
REFERENCE PHOTO
Scale: 1/8" = 1'-0"
REFERENCE PHOTO LOCATION PLAN
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
Scale: 1/32" = 1'-0"
REFERENCE PHOTO -
INTERSTITIAL SPACE
Scale: No Scale
REFERENCE PHOTO
Scale: No Scale
REFERENCE PHOTO
1. SALVAGE WALL & CEILING MOUNTED FIRE ALARM
EQUIPMENT – DELIVER TO VA.
2. EQUIPMENT REMOVED BY VA
3. X-RAY EQUIPMENT, BOOMS, MONITORS, AND
ACCESSORIES TO BE REMOVED BY PHILIPS, UNDER
A SEPARATE CONTRACT, PRIOR TO THE START OF
ANY DEMOLITION WORK.
4. ALL PHILIPS COMPUTER HARDWARE AND CABINETS
SHALL BE REMOVED BY PHILIPS, UNDER A SEPARATE
CONTRACT, PRIOR TO THE START OF ANY
DEMOLITION WORK.
5. GC TO REMOVE EXISTING ACT CEILING SYSTEM.
6. REMOVE EXISTING UNI-STRUT CEILING CHANNEL.
ALSO SEE NOTE 30.
7. SALVAGE WALL MOUNTED EQUIPMENT. DELIVER TO
VA.
8. ELECTRICAL PANEL TO BE RELOCATED. (SEE
ELECTRICAL) REFER TO FLOOR PLAN FOR NEW
FURRED OUT WALL.
9. GC TO REMOVE EXISTING FLOORING. PREP FOR NEW
FINISH FLOOR.
10. GC TO REMOVE BUILT-IN BASE AND WALL MOUNTED
CASEWORK.
11. REMOVE ALL EXISTING COUNTERTOPS.
12. OFFICE WORKSTATIONS, PRINTERS, AND FILING
CABINETS SHALL BE REMOVED BY THE VA PRIOR TO
THE START OF DEMOLITION ACTIVITIES.
13. VA TO SALVAGE SIGNAGE, TO BE RE-INSTALLED.
14. LIGHTED “X-RAY IN USE” SIGN TO BE REMOVED AND
STORED FOR LATER RE-USE.
15. UNI-STRUT HANGERS, THREADED ROD, BRACES,
AND ALL OTHER UNI-STRUT ACCESSORIES FOR
EXISTING X-RAY MACHINE, AND EXISTING BOOMS TO
BE DEMOLISHED BY THE GC.
16. 4” THICK INTERSTITIAL FLOOR/CEILING SLAB,
STRUCTURAL SUPPORT FRAMING AND ASSOCIATED
TIE RODS SHALL BE DEMOLISHED TO LIMITS
INDICATED ON THE FLOOR PLAN.
17. EXISTING DOOR FRAME TO REMAIN. PROTECT
DURING CONSTRUCTION ACTIVITIES.
18. GC TO REPLACE DOOR AND DOOR HARDWARE
ONCE THE NEW X-RAY EQUIPMENT HAS BEEN
INSTALLED.
19. PARTIALLY REMOVE THE WALL TO LIMITS SHOWN ON
THE FLOOR PLAN.
20. RELOCATE ELECTRICAL CONDUIT. SEE ELECTRICAL
DRAWINGS.
21. PLUMBING LINES INCLUDING: HOT AND COLD WATER,
MED GAS(ES), OXYGEN SHALL BE
REMOVED/RELOCATED TO SUPPORT THE NEW
DESIGN. SEE PLUMBING, TECHNOLOGY AND
REFERENCED PHILIPS EQUIPMENT DRAWINGS FOR
MORE INFORMATION.
22. PARTIALLY REMOVE HANDRAIL, RUBBER BASE, AND
VINYL WALL PROTECTION TO ALLOW FOR NEW
EQUIPMENT ROOM DOUBLE DOORS.
23. EXISTING DUCT WORK TO BE RE-CONFIGURED FOR
NEW ROOM LAYOUT. SEE MECHANICAL DRAWINGS.
24. ELECTRICAL/DATA BUSWAY AND BUS DUCT TO
REMAIN IN PLACE. SEE ELECTRICAL AND IT
DRAWINGS FOR MORE INFORMATION.
25. VA TO REMOVE ALL FURNISHINGS, MOVABLE
EQUIPMENT, CARTS, MOVABLE STORAGE UNITS, AND
WALL MOUNTED SANITATION DEVICES PRIOR TO
STARTING DEMOLITION ACTIVITIES. STORE FOR
POSSIBLE RE-INSTALL.
26. CEILING MOUNTED DEVICES TO BE REMOVED BY THE
GC. SEE MECHANICAL AND ELECTRICAL DRAWINGS.
27. EXISTING SPRINKLER SYSTEM PIPING TO REMAIN.
PROVIDE TEMPORARY HEADS AND TURN HEADS
UPRIGHT DURING CONSTRUCTION ACTIVITIES.
28. ALL X-RAY SHIELDING WALLS SHALL BE REMOVED BY
THE VA PRIOR TO STARTING DEMOLITION…