This solicitation package seeks proposals for a construction project to replace roofs on Buildings 1 and 23 at the Harry S. Truman Memorial Veterans Hospital in Columbia, Missouri. The contractor will remove existing roofing and insulation down to the concrete deck on Building 23, and install new roofing materials and insulation to provide a fully functioning roof system. For Building 1, the contractor will remove the existing skylight system and install a new system, which will involve lifting materials by crane and sealing the skylights to ensure water tightness. The project cost is estimated between $1-2 million. Proposals are due by May 4, 2020, and award will be made using Best Value LPTA. The completion period is 180 days from notice to proceed. This is a SDVOSB set-aside being conducted by the Department of Veterans Affairs VISN 15.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Roofs Building 1 and 23 Bid Item
Bid item 1 Base Bid includes all work as documented in drawings dated 02-27-2019 as well as revised in this Addendum No: 3 dated 05-14-2020 and include the replacement of existing vertical translucent fiberglass wall panels with new on the bridge located between the east and west shed skylights. Period of Performance 210 calendar days.
Bid item 2 Bid Deduct 1; The same as Bid 1 except omit all work associated with Building 1 bridge replacement of existing vertical translucent fiberglass panels with new vertical translucent fiberglass panels. Period of Performance 180 calendar days.
Bid item 3 Bid Deduct 2; The same as Bid 1 except in lieu of the insulated glass unit GL-1 and added 4”x 8” aluminum box tube, provide translucent fiberglass panel TFG-01 in lieu of GL-1 without the use or need for an added aluminum box tube. Period of Performance 210 calendar days.
Bid item 4 Bid Deduct 3; The same as Bid 3 except omit all work associated with Building 1 bridge replacement of existing vertical translucent fiberglass panels with new vertical translucent fiberglass panels. Period of Performance 180 calendar days.