36C25520R0060-0002000.docx
DOCX document Posted
- Solicitation number
- 36C25520R0060
About this file
This document provides details for a federal contract solicitation to replace roofs on two buildings at the Harry S. Truman Memorial Veterans' Hospital in Columbia, Missouri. The contractor shall completely prepare the site and furnish labor and materials to replace the roofs on Buildings 1 and 23, including removing existing roofing systems down to the decking, installing new roof insulation and EPDM single-ply membrane roofing, and properly flashing all penetrations. For Building 1, the contractor will also remove an existing skylight system and install a new skylight. The contract cost is estimated between $1 million and $2 million. The NAICS code is 236220 and this is an SDVOSB set-aside. Proposals are due by May 13, 2020 and award will be made using LPTA. The performance period is 180 days from notice to proceed.
36C25520R0060 0002 36C25520R0060 0002.docx
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 04-14-2020 589A4-19-101 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 To all Offerors/Bidders
36C25520R0060
X X X
May 13, 2020 by 2:00 pm CDT Replace Roofs Building 1 & 23, Project 589A4-19-101
a. This amendment provides the following: Questions and Answers received prior to and during pre-bid meeting.
b. Attached to this amendment is the list of attendees for the Pre-bid conference call.
c. All questions for this project must be submitted by April 24, 2020 by 2:00 pm CDT.
d. Proposals must be received by the contracting officer by May 13, 2020 no later than 2:00pm CDT.
Proposals must be e-mailed to contracting officer : jeanette.mathena@va.gov Contractors are responsible call contracting officer at 913-946-1129 to verify proposal email has been received.
e. This amendment deletes the requirement for a DVD to be submitted as identified on SF1442 block 13a & Proposal Submittal Instructions. Revised Proposal Submittal Instructions attached.
f. All other terms and conditions remain unchanged.
CONTINUATION PAGE
| Project: |
| Harry S Truman Veterns' Hospital |
| Job Number: |
| Roof Replacement - Buildings 1 & 23 |
| Date: |
| 04/14/20 |
| 800 Hospital Drive |
| File: |
| BN |
| Columbia, MO 65201 |
| By: |
| Bob Dunn |
| Page: |
| 3 of 13 |
ADDENDUM NO: 1
According to contract documents dated: 02-27-2019
NOTICE TO CONTRACTORS
Contractors bidding on the above described work are hereby notified that the Contract Documents, pursuant to which the work is to be done, have been amended per the attached information.
INDICATE RECEIPT OF ADDENDUM IN LOCATION PROVIDED ON BID FORM.
Addendum Fo x A rc h i te c ts fox-arch.com 1 Memorial Drive
Suite t 621 4343 St. Louis, MO 63102-2448
USA
f
621 0261
Addendum
| Project: |
| Harry S Truman Veterns' Hospital |
| Job Number: |
| Addendum No.: |
| 1 |
| Date: |
| 04/14/20 |
| Page: |
| 4 of 13 |
Fo x A rc h i te c ts fox-arch.com 1 Memorial Drive
Suite t
621 4343 St. Louis, MO 63102
USA
f
621 0261
Page 1 of Pre-Bid RFI, statements and resulting drawing addendum:
RFI-01
Specification 07 53 23-6 2.4 EPDM Roofing Membrane. It is listed as a fabric backed membrane however the ASTM number is pointing us to a reinforced EPDM. Can you please specify if they are wanting a fabric backed EPDM or a reinforced membrane?
Answer The existing membrane on BLDG 23 is non-reinforced white EPDM. Non reinforced EPDM is acceptable. Contractor to provide an EPDM Type I - non reinforced, White in 60 mils.
RFI-02
Specification 07 53 23-6 2.4 . It is referencing Fire Resistant membrane. Firestone does not manufacturer a reinforced white Fire Resistant Membrane. Please clarify if this is a requirement.
Answer Fire Resistant Membrane is required, but the reinforced membrane is not. Contractor to provide a Class A material as specified but does not need to be a Reinforced Membrane. See RFI 1 above. This is contrary to what was stated in the pre-bid conference today. This RFI answer supersedes that statement.
RFI-03
Details on sheet A1.1 denote a range of different roof construction types. What is the roof assemble for Bldg 23.
Answer Building 23 is metal decking over steel. Not a composite or concrete slab roof.
RFI-04
Is Bldg 23 a partial roof tear off or full tear off down to deck.
Answer Building 23 is a full tear off down to existing metal deck. The Roof structure does not slope. New tamper insulation used, see RFI-05 below.
RFI-05
The existing roof and/or new roof slopes are not noted nor are the existing roof drain locations to calculate the tapered insulation slope.
Answer See existing roof drain locations are denoted by RD and tapered insulation roof slope is at 1/4” / 1’-0” slope. See image below; Revised Plan 6/A1.1.
End of RFI’s to date, 04-14-20.
PROPOSAL SUBMITTAL INSTRUCTIONS
FOR LOWEST PRICE TECHNICALLY ACCEPTABLE COMPETITION
SOLICITATION: 36C25520R0060
PROJECT: Replace Roofs Buildings 1 & 23, 589A4-19-101 LOCATION: Department of Veteran Affairs, Columbia, Missouri VAMC
1. PREPARATION AND SUBMITTAL OF PROPOSALS
a. GENERAL INFORMATION.
Selection of an offeror for contract award will be made on the basis of an assessment of each offeror’s response to the Request for Proposal (RFP). As a Request for Proposals (RFP) based on Lowest Price Technically Acceptable (LPTA) Source Selection Process, in accordance with Federal Acquisition Regulation (FAR) Part 15.101-2, the VA will make the award based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The FIVE (5) evaluation factors for determination of technical acceptability consist of:
| 1. | Relevant Past Performance of Prime Contractor; | |
| 2. | Technical Construction Experience of Prime Contractor; | |
| 3. | Technical Construction Experience of the Direct Digital Controls subcontractor; | |
| 4. | Technical Qualifications and Experience of Proposed Key Staffing; | |
| 5. | Contractor Safety Plan; |
NOTE: Failure to comply with the RFP requirements may be grounds to eliminate the proposal from further consideration for contract award.
b. THE OFFER.
The submission of the documentation specified below will constitute the Offeror’s acceptance of the terms and conditions of the RFP, including the Plans & Specifications for the construction of these projects. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
c. AWARD BASED ON INITIAL OFFERS.
Pursuant to clause 52.215-1 (included by reference), the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price, and technical qualifications standpoint. The VA reserves the right to conduct discussions if the Contracting Officer later determines such discussions to be necessary.
d. NUMBER OF COPIES TO SUBMIT. Offerors shall submit 2 pdf attachments by email to the contracting officer Jeanette Mathena to email address: Jeanette.mathena@va.gov. Contractors are required to verify proposal email with 2 pdf attachments containing Volume 1 – Technical Proposal and Volume 2 Price proposal. The 2 volumes shall include:
(a) Two (2) electronic pdf attachments, attachment 1: Volume 1 Technical Proposal and pdf attachment 2: Volume 2 Price Proposal Marked: ORIGINAL - RESPONSE TO RFP – 36C25520R0060 Replace Roofs Buildings 1 & 23, 589A4-19-101 These two pdf attachments are to contain a copy of signed original of the documents listed below;
2. DOCUMENTS TO SUBMIT.
The documents to be included in the attachments identified above consist of:
a. Volume 2 documents: STANDARD FORM 1442. Submit the SF 1442 issued under this solicitation, with Blocks 10 (DUNS Number) and Blocks 14 through 20 properly filled-out by the Offeror. Include acknowledgment of any and all Amendments that may have been issued, either by: (1) listing them in Block 19 of the SF 1442, or (2) including copies of the Amendment document(s) (Standard Form 30) with Blocks 8 and 15 filled in and signed, or (3) including signed acknowledgement in the form of a separate letter that includes a reference to the solicitation and amendment numbers, (4) Appendix 1- Price Breakout Calculation by division self-performed and subcontracted work. NOTE: Failure to acknowledge any and all Amendments issued pursuant to this solicitation may be cause for rejection of your offer.
b. OFFER GUARANTEE (BID BOND). In accordance with solicitation provision 52.228-1, Bid Guarantee, failure to furnish a bid guarantee, in the proper form and amount, by the deadline established for submitting offers, may be cause for rejection of the offer. (Submit with volume 2)
c. Volume 1 documents: DOCUMENTATION OF TECHNICAL ACCEPTABILITY. Proposals received in response to this solicitation will be evaluated in accordance with procedures outlined in Federal Acquisition Regulations (FAR) Part 15.101-2 for the Lowest Price Technically Acceptable (LPTA) Offer. (Submit Appendix 2-Environmental Violations & Experience modification rate with volume 1.)
The following significant Evaluation Factors will be used as the basis for determining Technical Acceptability:
Relevant Past Performance of Prime Contractor;
Technical Construction Experience of Prime Contractor;
Technical Construction Experience of the Roofing subcontractor;
Technical Qualifications and Experience of Proposed Key Staffing.
Contractor Safety Plan
NOTE: There is a realistic possibility that some offerors may choose to submit the same construction project as a qualifying example for both the past performance and the technical experience evaluation factors. This is not prohibited, but the supporting documentation must demonstrate that the submitted projects absolutely do comply with the specific minimal requirements, identified below, for each separate evaluation factor.
FACTOR 1: RELEVANT PAST PERFORMANCE OF PRIME CONTRACTOR.
To be Technically Acceptable, Offerors should identify no less than ONE (1), and no more than THREE (3), previously awarded, and completed construction contracts, which were issued by either: Federal, State, or Local Government Agencies; and/or Private Organizations. To be evaluated as Relevant Past Performance, the construction contracts submitted by offerors must involve:
| A. | Renovation and structural work, at a hospital or medical facility, as a prime contractor; | |
| B. | A dollar magnitude equal to, or greater than $1,000,000.00; | |
| C. | Work that was 100% completed within a time period of no more than FIVE (5) years prior to the date of submitting this proposal. If the contract/work is incomplete or was completed more than five years prior to the date of submitting this proposal, it will not be deemed relevant. | |
| For each of the submitted Relevant Past Performance contracts, provide the following information: | ||
| (1) | The name of the construction contract and the contract ID number; | |
| (2) | The name of the contracting agency or organization the contract was awarded by; | |
| (3) | The date of the construction contract award and the contract award amount in dollars; | |
| (4) | The date of the construction contract completion and the final contract amount, in dollars; | |
| (5) | A brief description of the construction contract scope of work; and | |
| (6) | Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable). |
Factor 1 SPECIAL NOTE for Offerors That May Lack Past Performance Information: In accordance with FAR Part 15.305(a)(2), in the case of an offeror that is without a record of relevant past performance, or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. Such offerors may submit relevant past performance information regarding predecessor companies; key personnel who have relevant experience; or subcontractors that will be performing major or critical aspects of this requirement; provided that such information is relevant to the construction in this solicitation. Offerors may provide information on problems encountered on the identified contracts and the offeror’s corrective actions. The government also reserves the right to consider past performance information from all available sources, in addition to any information submitted by offerors.
FACTOR 2: TECHNICAL CONSTRUCTION EXPERIENCE OF PRIME CONTRACTOR.
To be Technically Acceptable, Prime contractor must provide evidence that they have the technical qualifications and experience needed to meet the technical performance requirements of this project. Unless you are submitting as a CVE Certified Joint venture the SDVOSB Prime Contractor must submit their own experience not your subcontractors experience.
Offerors must submit no less than TWO (2) and no more than THREE examples of their successful technical construction experience with projects that involved technical requirements similar to the requirements of this project. The construction project submitted must involve:
Work as a prime under the same NAICS code as this solicitation (236220, Commercial and Institutional Building Construction), that involved construction for medical facilities, with emphasis on renovations in occupied medical facilities.
Work of a dollar magnitude equal to, or greater than $500,000.00. If offering subcontracted work, the prime contractor completed as proof of technical construction experience, offerors must submit evidence that supports the magnitude of the work they performed as a subcontractor.
Work where the offeror self-performed at least FIFTEEN percent (15%) of the cost of the project labor performed on site, using the offeror's own employees or employees of other eligible SDVOSB concerns IAW with 852.219-10.
Work that was of a similar nature to the scope of work for this project. This is defined as work performed at an active and occupied Hospital or Medical Facility. If an offeror chooses to submit experience that was not conducted at a Hospital or Medical Facility, they must explain how the nature and complexity of the work conducted involved technical construction requirements equivalent to that described in the Plans & Specifications of this solicitation.
For each of the submitted Technical Construction Experience projects, provide the following information:
| (1) | The name and location of the construction project; |
| (2) | The performance period, including the starting and completion dates; |
| (3) | The total cost of the project, in dollars, for both awarded and final. |
| (4) | The percentage of total labor self-performed by the offeror's employees. |
| (5) | A brief description of the construction project scope of work, which explains how the project involved work as a prime contractor under NAICS Code 236220 involving construction work that was technically similar to the project work under this Solicitation. |
FACTOR 3: TECHNICAL CONSTRUCTION EXPERIENCE OF THE ROOFING SUBCONTRACTOR.
Offerors must provide evidence that the roofing subcontractor has the experience needed to meet the technical performance requirements of this project. To be evaluated as technical experience the information submitted by offerors must involve the following:
(1) Roofing subcontractor is currently and regularly engaged in roofing installation of similar material.
(2) Roofing subcontractor has technical qualifications of at least five years of continuous experience. Provide documentation of trained supervisory personnel, installation personnel, and fabricators used to complete installation of similar roofing material
(3) Proposed Roofing subcontractor shall submit a list of two or more prior hospital installations. The list shall include the names and addresses of the Medical Center, project title and point of contact’s name and telephone number.
Special Note: During the period of performance of the Contract, the Contractor shall make NO substitutions of the Subcontractors unless the substitution is approved by the contracting officer in advance of the change. Any replacement Subcontractor shall have equal or better qualifications subject to the approval of the Contracting Officer (See FAR clause 52.244-2 Subcontracts).
FACTOR 4. TECHNICAL QUALIFICATIONS AND EXPERIECE OF PROPOSED KEY STAFFING.
To be Technically Acceptable, qualified offerors must submit a detailed resume of each key individual. This will be evaluated to determine if they have the appropriate technical training and or previous construction experience to meet the technical requirements of a project of this nature. The Project Manager and Superintendent positions cannot be held by the same person. No one individual can perform more than two of the staffing positions below:
(a) Project Manager – Must have a minimum of 5 years of experience as a project manager must provide a minimum of 3 projects with similar scope of this project. Provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; The date of the construction contract award and the contract award amount in dollars; The date of the construction contract completion, and the final contract amount, in dollars; A brief description of the construction contract scope of work; Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable). Project Manager will be required to attend weekly project meetings in person at the station facilities office.
(b) Quality Control Manager – Provide a minimum of 3 projects with similar scope of this project that they have acted as the QC manager. Provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; and the date of the construction contract award. A brief description of the construction contract scope of work and the QC program that was implemented.; Identify at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
(c) On Site Safety Officer – must have OSHA 30 training (must provide certificate with proposal) with a minimum of 5 years of experience as a safety officer.; provide a list of safety training, which includes at a minimum life safety, fall protection training, scaffold safety. Provide a minimum of 3 projects with similar scope of this project. Provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; Provide a brief description of the construction contract scope of work and how the safety program was implemented; Identify at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
(d) On Site Superintendent – Must have minimum of 5 years of experience as a site superintendent and must have OSHA 30 training. Provide at least 3 projects as a site superintendent with similar scope of this project. Provide the name of the construction contract, and the contract ID number; The name of the contracting agency or organization the contract was awarded by; The date of the construction contract award and the contract award amount in dollars; The date of the construction contract completion, and the final contract amount, in dollars; A brief description of the construction contract scope of work; Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable). Superintendent will be required to attend weekly project meetings in person at the station facilities office.
Special Note: During the period of performance of the Contract, the Contractor shall make NO substitutions of the Staffing unless the substitution is necessitated by illness, death, or termination of employment. The contractor shall notify the contracting officer, in writing within five (5) calendar days after the occurrence of any of these events. Any replacement of Staffing shall have equal or better qualifications subject to the approval by the contracting officer.
FACTOR 5: CONTRACTOR SAFETY PLAN
Offerors must provide a construction safety plan:
1. The contractor's Safety Plan shall be evaluated for their compliance with local/State/Federal rules and regulations and the company's consideration of safety of its employees and the general public. The contractor's Safety Plan at the minimum shall address their safety policy, commitment to safety, detailed disciplinary action to be taken with respect to employees violating safety requirements, personnel safety responsibilities, personnel safety training, personal protective equipment, accident / incident reporting procedure and investigations, emergency procedures guidelines.
2. The contractor’s Safety Plan shall address their plan for completing all contract work on and around an active hospital without impact patient care and completing all work in accordance with all construction documents and all local/State/Federal rules and regulations.
d. PRICE PROPOSAL.
Price is to be submitted in Block 17 of the Standard Form 1442. Offerors must provide a price for bid item. In addition, offerors shall include a breakdown of material and labor costs, by specification division for each bid item. Overhead, profit and bond costs shall be added after a subtotal of materials and labor costs has been calculated see Appendix 1- Price Breakout Calculation Self performed and subcontracted work.
3. BASIS OF AWARD.
VA will make the award based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. Note that offers that are not technically acceptable cannot be selected, regardless of price.
4. Special Contract Requirements
SUBSTITUTIONS OF SUBCONTRACTORS AND / OR KEY PERSONNEL
1. When an offeror submits its proposal in response to this Request for Proposals, and key personnel who are proposed to work on the project are required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.
2. When an offeror submits its proposal in response to this Request for Proposals, and the name and experience of a specific subcontractor is a required evaluation factor, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.
5. SAFETY AND ENVIRONMENTAL VIOLATIONS AND EXPERIENCE MODIFICATION RATE (APPENDIX 2) All Bidders/Offerors shall submit the following information pertaining to their past Safety and Environmental record see Appendix 2. The information shall contain, at a minimum, a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.
All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the bidder’s/offeror’s insurance company and be furnished on the insurance carrier’s letterhead.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases will be used to make the Determination of Responsibility. Failure to affirm being within the guidelines above or submit this information will result in a determination of “Non-Responsibility” for the bidder/offeror. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility will make the bidder/offeror ineligible for award.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.