Addendum 4 Change Summary of Specs and Drawings.pdf

PDF 167 KB Posted

Attached to
Z2DA--Renovate MICU/SICU 539-20-104
Solicitation number
36C25026B0001
Issued by

About this file

This document is Addendum #4 for the Cincinnati Renovate MICU 539-20-104 project at the Cincinnati VA Medical Center (CVAMC), located at 3200 Vine Street in Cincinnati, Ohio. The addendum, issued by John Poe Architects on 2026-01-06, details multiple revisions to drawings and specifications. Key drawing changes include: revising Note 5 on Sheet PP102 to reference "UNDER BID ITEM 2", adding a leak detection controller in the AHU vestibule on Sheet MH103, adding a note to the Split System Cooling Coils schedule on Sheet M602, and incorporating a new control sequence for leak detection and mitigation on Sheet M902. Specification modifications include removing duplicate specifications for Divisions 21-28, reissuing the entire specification book, removing Bid Item 4 from section 01 00 00 1.3/D, and eliminating the manufacturer-specific reference "as manufactured by Arjo" from section 11 73 00/2.0/A.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3131 Newmark Drive Suite 200 Miamisburg, OH

JOHN POE A R C H I T E C T S 45342

A D D E N D U M 937 461 3290 jpa@johnpoe.com

Addendum #4

Project: Cincinnati Renovate MICU 539-20-104

CVAMC, 3200 Vine Street

Cincinnati, Ohio 45220

Date: 2026-01-06

To: Ron Heideman

THE DRAWINGS ARE REVISED AS FOLLOWS:

General Information:

1.

Drawing Sheets:

2. Sheet PP102 – Revised drawing attached.

a. Note 5 was changed to read “UNDER BID ITEM 2.”

3. Sheet No. MH103– Revised drawing attached.

a. Added leak detection controller in AHU vestibule

b. Added plan note 10.

4. Sheet No. M602– Revised drawing attached.

a. Added note 3 to Split System Cooling Coils schedule.

5. Sheet No. M902– Revised drawing attached.

a. Added control sequence for leak detection and mitigation.

Specifications:

6. Duplicate specifications for Division 21, 22, 23, 26,27,and 28 removed. Entire specification book reissued.

7. 01 00 00 1.3/D Removed Bid Item 4.

8. 11 73 00/2.0/A- Removed “as manufactured by Arjo”.

Attachments: Sheets PP102, MH103, M602, M902, Specifications

Copy To: File