This document contains an amendment to an invitation for bid for a federal construction contract opportunity. The amendment extends the bid opening date from January 7, 2022 to January 12, 2022 at 10:00 AM EST. It also provides answers to clarification questions from bidders regarding updated drawings and specifications. The opportunity is for the Remodel Front Entrance Project 539-21-211 at the Cincinnati VA Medical Center, with a project magnitude between $500,000 and $1,000,000. The solicitation is set aside 100% for service-disabled veteran-owned small businesses. Bidders must meet registration, size standard, and performance requirements as outlined in the document.

View the file

Other files

File Type Posted
36C25022B0002 0008.docx DOCX document
36C25022B0002 0007.docx DOCX document
Attachment 1 - 539-21-211 100_ BID Dwgs_10.28.2021.pdf PDF
36C25022B0002 0006.docx DOCX document
Attachment 3 - 2008-12-12_Cincinnati VAMC Boring Profile.pdf PDF
Attachment 4 - 2008-12-20 Geotechnical Report.pdf PDF
36C25022B0002 0004.docx DOCX document
Attachment 2 - Addendum 02.pdf PDF
Attachment 1 - 539-21-211_RFI AE Responses.pdf PDF
36C25022B0002 0003.docx DOCX document
36C25022B0002 0002.docx DOCX document
BN Justification - Johnson Controls - PACS.pdf PDF
Addendum 01_12.02.2021_Part2_Drwngs.pdf PDF
Addendum 01_12.02.2021_Part1_Cover Letter.pdf PDF
Pre-Bid Site Visit Sign-In Sheet.pdf PDF
Attachment 3 - 539-21-211 A-E CD Drawings (Rev Format 24Nov21).pdf PDF
36C25022B0002 0001.docx DOCX document
36C25022B0002 IFB Solicitation (Rev 24Nov21).pdf PDF
36C25022B0002_1.docx DOCX document
Attachment 4 - Specifications (539-21-211).pdf PDF
Attachment 6 - RFI.pdf PDF
Attachment 1 - VHA Directive 1192 01.pdf PDF
Attachment 2 - BN Justification - Corbin Russwin Locksets.pdf PDF
Attachment 3 - Drawings (539-21-211).pdf PDF
Attachment 5 - WD OH20210001 (9-24-2021).pdf PDF
Attachment 7 - EMR.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01/0 /2022 539-22-1-6905-0006 539-21-211 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 Dayton VA Medical Center 3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 Dayton VA Medical Center 3140 Governors Place Blvd. Suite 210 Kettering OH 45409-1337 To all Offerors/Bidders

36C25022B0002 11-22-2021

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 10:00 AM EST - 12 January 2022

539-3620162-6905-854200-3220 23NRNR000

See Block 14 Continuation Page (Pg. 2)

Luke Turner Contracting Officer

BLOCK 14 CONTINUATION PAGE

The purpose of this Amendment is to:

1) Extend the Bid Opening due date by five (5) calendar days, from 7 January 2022 at 10:00 AM EST to 12 January 2022 at 10:00 AM EST.

2) Provide answers to follow-up RFI questions for clarification of the RFI answers provided in Amendment 0004 concerning updated drawing and specifications. See the following:

· Q1: It still appears that Sheet A311 is missing. Was it/Will it be sent separately?

· A1: The information from sheet A311 is located on page 14 of 23 of the updated drawings provided in Amendment 0004.

· Q2: The answer to Question 6 references drawings and specs dated 10/28/2021, see below. The latest complete drawing/spec set I see on file is from Amendment 001, shown as “100% Construction Documents”, dated 07/30/2021 with no revisions noted. This is where the question 6 was generated. The latest complete specification I see is dated July 13, 2021. Was there a complete drawing/spec set issued sometime after Amendment 001?

· A2: This confusion stems from the placement of the date for the updated drawings. There are 3 pages (pages 3, 10 and 14) in the updated drawings provided in Amendment 0004 that are dated 10/28/2021. The issue date was not changed, the date remained 07/30/2021, but if you look at the left hand side of the referenced pages you will find the date 10/28/2021. These are the updated drawings we referenced in Amendment 0004. Also, the answer provided to RFI #6 did state specs dated 10/28/2021 were included. The specs in question were provided as part of the “Addendum 2” attachment of Amendment 0004, but the spec sheet itself does not clearly reflect this date.

· Q3: The most updated Drawings and Specifications have not been uploaded to Sam.Gov. Amendment 4 RFI Question 6 states “The incorrect drawings were sent out to bid. The drawings and specs that should be disseminated for bidding are called 539-21-211 100% Bid Drawings and 539-21-211 100% Bid Specs respectively and both dated 10/28/2021.” Amendment 4 did not contain the Drawings or Specs dated 10/28/2021 and we have not received the updated drawings to date. The most recent drawing available is dated 7/30/2021 from Amendment 1. Could the updated Drawings and Specifications be posted? Could the bid due date be extended to allow adequate review of the bid documents?

· A3: Please reference A2, which addresses the drawings and specifications concerns. The Bid Opening date is being extended with this Amendment.

· Q4: Do you need the original, signed bid bond in your hand before accepting our emailed proposal? Or, can we also email the bid bond and mail the original?

· A4: A copy of the Bid Bond can be sent electronically with the bid, but will also need the original to be mailed to the address in the IFB so the original copy can be filed.

File details come from the government source that posted it. Updated .