Project 659-16-103, Replace Campus Fire Alarm System Federal contract opportunity
Solicitation number
36C24618R0839
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

36C24618R0839 CONTRACT ATTACHMENT B - Specifications - 659-16-103.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Project 659-16-103, Replace Campus Fire Alarm System, newest first.
File Type Posted
36C24618R0839-0003001.pdf PDF
36C24618R0839-0003000.docx DOCX document
36C24618R0839-0003002.pdf PDF
36C24618R0839-0002000.docx DOCX document
36C24618R0839-0002001.pdf PDF
36C24618R0839-004.pdf PDF
36C24618R0839-013.docx DOCX document
36C24618R0839-008.pdf PDF
36C24618R0839-009.pdf PDF
36C24618R0839-001.docx DOCX document
36C24618R0839-014.pdf PDF
36C24618R0839-005.pdf PDF
36C24618R0839-003.pdf PDF
36C24618R0839-010.pdf PDF
36C24618R0839-007.pdf PDF
36C24618R0839-011.pdf PDF
36C24618R0839-002.pdf PDF
36C24618R0839-006.pdf PDF
36C24618R0839-000.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Salisbury VAMC April 20, 2017

Replace Campus Fire Alarm System 100% Construction Documents

Salisbury, NC 28144 Project No.659-16-103

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 10 Table of Contents

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 06-15

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13

01 33 23 Shop Drawings, Product Data, and Samples 07-15

01 35 26 Safety Requirements 10-14

01 42 19 Reference Standards 07-15

01 45 29 Testing Laboratory Services 06-15

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 09-13

01 91 00 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 05 – METALS

05 50 00 Metal Fabrications 07-14

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping 10-15

DIVISION 09 – FINISHES

09 29 00 Gypsum Board 11-14

09 51 00 Acoustical Ceilings 12-14

09 91 00 Painting 10-15

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 07-15

26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13

26 05 26 Grounding and Bonding for Electrical Systems 12-12

26 05 33 Raceway and Boxes for Electrical Systems 05-14

26 05 41 Underground Electrical Construction 12-12

26 24 16 Panelboards 05-14

26 27 26 Wiring Devices 08-14

00 01 10-2

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 06-15

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Telecommunication Room Fittings 06-15

27 15 00 Communications Horizontal Cabling 06-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 09-11

28 05 13 Conductors and Cables for Electronic Safety and

Security

09-11

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 06-13

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EARTHWORK

32 05 23 Cement and Concrete for Exterior Improvements 10-12

32 12 16 Asphalt Paving 10-09

32 90 00 Planting

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL INFORMATION

GI001 COVER SHEET

GI002 SITE KEY PLAN

FIRE ALARM INFORMATION

F1001 FIRE ALARM GENERAL NOTES AND LEGENDS

FIRE ALARM EXISTING/DEMOLITION

FD101 FIBER-OPTIC SITE PLAN EXISTING/DEMOLITION

FD102 BLDG 1 EXISTING/DEMOLITION

FD103 BLDG 2 GROUND FLOOR EXISTING/DEMOLITION

FD104 BLDG 2 FIRST FLOOR EXISTING/DEMOLITION

FD105 BLDG 2 SECOND FLOOR EXISTING/DEMOLITION

FD106 BLDG 2 THIRD FLOOR EXISTING/DEMOLITION

FD107 BLDG 2 FOURTH FLOOR EXISTING/DEMOLITION

FD108 BLDG 2 FIFTH FLOOR AND PENTHOUSE EXISTING/DEMOLITION

FD109 BLDG 3 AND 20 GROUND FLOOR EXISTING/DEMOLITION

FD110 BLDG 3 FIRST FLOOR EXISTING/DEMOLITION

FD111 BLDG 3 SECOND FLOOR EXISTING/DEMOLITION

FD112 BLDG 3 THIRD FLOOR EXISTING/DEMOLITION

FD113 BLDG 3 FOURTH FLOOR AND PENTHOUSE EXISTING/DEMOLITION

FD114 BLDG 4 GROUND FLOOR AND BLDG 36 EXISTING/DEMOLITION

FD115 BLDG 4 FIRST FLOOR EXISTING/DEMOLITION

FD116 BLDG 4 SECOND FLOOR EXISTING/DEMOLITION

FD117 BLDG 4 THIRD FLOOR EXISTING/DEMOLITION

FD118 BLDG 4 FOURTH FLOOR AND PENTHOUSE EXISTING/DEMOLITION

FD119 BLDG 5 GROUND FLOOR, BLDG 31, BLDG 35 EXISTING/DEMOLITION

FD120 BLDG 5 FIRST FLOOR EXISTING/DEMOLITION

FD121 BLDG 6 GROUND FLOOR AND BASEMENT EXISTING/DEMOLITION

FD122 BLDG 6 FIRST FLOOR EXISTING/DEMOLITION

FD123 BLDG 7, BLDG 24, BLDG 30 EXISTING/DEMOLITION

00 01 15 - 2

FD124 BLDG 8 GROUND AND FIRST FLOOR EXISTING/DEMOLITION

FD125 BLDG 8 SECOND FLOOR EXISTING/DEMOLITION

FD126 BLDG 8 THIRD FLOOR EXISTING/DEMOLITION

FD127 BLDG 11 GROUND FLOOR EXISTING/DEMOLITION

FD128 BLDG 11 FIRST FLOOR EXISTING/DEMOLITION

FD129 BLDG 11A, BLDG 11B, BLDG 11C EXISTING/DEMOLITION

FD130 BLDG 12, BLDG 14W, BLDG 14E EXISTING/DEMOLITION

FD131 BLDG 13 EXISTING/DEMOLITION

FD132 BLDG 15 EXISTING/DEMOLITION

FD133 BLDG 16 EXISTING/DEMOLITION

FD134 BLDG 17, BLDG 28, BLDG 32, BLDG 33 EXISTING/DEMOLITION

FD135 BLDG 18, BLDG 17A, BLDG 17B, BLDG 17C EXISTING/DEMOLITION

FD136 BLDG 19 EXISTING/DEMOLITION

FD137 BLDG 21 GROUND FLOOR AND BLDG 37 EXISTING/DEMOLITION

FD138 BLDG 21 FIRST FLOOR EXISTING/DEMOLITION

FD139 BLDG 21 SECOND FLOOR AND PENTHOUSE EXISTING/DEMOLITION

FD140 BLDG 21A, BLDG 21B EXISTING/DEMOLITION

FD141 BLDG 42 GROUND FLOOR EXISTING/DEMOLITION

FD142 BLDG 42 FIRST FLOOR EAST EXISTING/DEMOLITION

FD143 BLDG 42 FIRST FLOOR WEST EXISTING/DEMOLITION

FD144 BLDG 42 SECOND FLOOR EAST EXISTING/DEMOLITION

FD145 BLDG 42 SECOND FLOOR WEST EXISTING/DEMOLITION

FD146 BLDG 43 EXISTING/DEMOLITION

FD601 FIBER INTERCONNECTION EXISTING/DEMOLITION

FIRE ALARM NEW

FA101 NEW FIRE ALARM SYSTEM FIBER ROUTING

FA102 BLDG 1 GROUND, FIRST, SECOND FLOOR

FA103 BLDG 2 GROUND FLOOR

FA104 BLDG 2 FIRST FLOOR

FA105 BLDG 2 SECOND FLOOR

FA106 BLDG 2 THIRD FLOOR

FA107 BLDG 2 FOURTH FLOOR

FA108 BLDG 2 FIFTH FLOOR AND PENTHOUSE

FA109 BLDG 3 AND 20 GROUND FLOOR

FA110 BLDG 3 FIRST FLOOR

FA111 BLDG 3 SECOND FLOOR

00 01 15 - 3

FA112 BLDG 3 THIRD FLOOR

FA113 BLDG 3 FOURTH FLOOR AND PENTHOUSE

FA114 BLDG 4 GROUND FLOOR AND BLDG 36

FA115 BLDG 4 FIRST FLOOR

FA116 BLDG 4 SECOND FLOOR

FA117 BLDG 4 THIRD FLOOR

FA118 BLDG 4 FOURTH FLOOR AND PENTHOUSE

FA119 BLDG 5 GROUND FLOOR, BLDG 31, BLDG 35

FA120 BLDG 5 FIRST FLOOR

FA121 BLDG 6 GROUND FLOOR

FA122 BLDG 6 FIRST FLOOR AND BASEMENT

FA123 BLDG 7, BLDG 24, BLDG 30

FA124 BLDG 8 GROUND AND FIRST FLOOR

FA125 BLDG 8 SECOND FLOOR

FA126 BLDG 8 THIRD FLOOR

FA127 BLDG 11 GROUND FLOOR

FA128 BLDG 11 FIRST FLOOR

FA129 BLDG 11A, BLDG 11B, BLDG 11C

FA130 BLDG 12, BLDG 14W, BLDG 14E

FA131 BLDG 13

FA132 BLDG 15

FA133 BLDG 16

FA134 BLDG 17, BLDG 28, BLDG 32, BLDG 33

FA135 BLDG 18, BLDG 17A, BLDG 17B, BLDG 17C

FA136 BLDG 19

FA137 BLDG 21 GROUND FLOOR AND BLDG 37

FA138 BLDG 21 FIRST FLOOR

FA139 BLDG 21 SECOND FLOOR AND PENTHOUSE

FA140 BLDG 21A, BLDG 21B

FA141 BLDG 42 GROUND FLOOR

FA142 BLDG 42 FIRST FLOOR EAST

FA143 BLDG 42 FIRST FLOOR WEST

FA144 BLDG 42 SECOND FLOOR EAST

FA145 BLDG 42 SECOND FLOOR WEST

FA146 BLDG 43

FA501 DETAILS

FA601 FIBER INTERCONNECTION DIAGRAM

00 01 15 - 4

- - - END - - -

Salisbury VAMC December 11, 2017 i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SURVEYING SERVICES

1.13 LAYOUT OF WORK

1.14 AS-BUILT DRAWINGS

1.15 USE OF ROADWAYS

1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.17 TEMPORARY USE OF EXISTING ELEVATORS

1.18 TEMPORARY TOLIETS

1.19 AVAILABILITY AND USE OF UTILITY SERVICES

1.20 TESTS

1.21 INSTRUCTIONS

1.22 SAFETY SIGN

1.23 PHOTOGRAPHIC DOCUMENTATION

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the replacement/upgrade of the campus Fire Alarm System at Salisbury VA Medical Center as required by drawings and specifications.

B. Visits to the site by Bidders shall be made only by appointment with the COR.

C. Offices of Apogee Consulting Group, PA, as Architect-Engineers, shall render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. BID ITEM I (BASE BID) GENERAL CONSTRUCTION: Work includes general construction, alterations, boring, conduits, core drilling, ceiling work, fire stopping, phasing, ICRA requirements, painting, patching and

01 00 00 -2 certain other items. Work includes all the work indicated on the plans to revision/demolish of the existing fire alarm campus fiber-optic fire alarm network( the remainder of the fiber shall be used for network and security, coordinate all work with VA) as indicated on sheets FD101 thru FD601, and provide a new campus fiber-optic fire alarm network as shown on FA101 thru FA601; and to perform fire alarm system upgrades within the buildings as shown on sheets FD102-FD146 (demolition) and

FA102-FA146, FA501 and FA601 (new).

Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including panels, conduit, wire, fiber optic cable, terminations, fiber boxes, patch panel, patch cords, boring, conduits, sleeves, supports, fire stopping, fire alarm system devices and equipment and all related labor and material for a complete operations fire alarm system, this also includes testing and commissioning of the fire alarm system, also the work includes the removal of the existing fire alarm systems, conduit and wire as shown on the demo drawings and as specified herein.

ITEM II, Bid Alternates:

A. (DEDUCT ALTERNATE ITEM NO. 1): Provide all work per BASE BID

ABOVE EXCEPT: Delete work associated with new fire alarm work in building 4. (The Main Terminal equipment located in G022-4, conduit for fiber loop, fiber cable, patch panels, patch cords, fiber boxes, terminations, connections to the new fire alarm fiber loop, boring shall remain in base bid). All work shall include final cleanup, completion of any punch list items, testing and training.

B. (DEDUCT ALTERNATE ITEM NO. 2): Provide all work per ALTERNATE NO.

1 ABOVE EXCEPT: Delete new fire alarm work in building 12.

(Conduit for fiber loop, fiber cable, patch panels, patch cords, fiber boxes, terminations, connections to new fire alarm fiber loop, boring shall remain in base bid). All work shall include final cleanup, completion of any punch list items, testing and training.

01 00 00 -3

C. (DEDUCT ALTERNATE ITEM NO. 3): Provide all work per ALTERNATE NO.

2 ABOVE EXCEPT: Delete new fire alarm work in building 15.

(Conduit for fiber loop, fiber cable, patch panels, patch cords, fiber boxes, terminations, connections to new fire alarm fiber loop, boring shall remain in base bid). All work shall include final cleanup, completion of any punch list items, testing and training.

D. (DEDUCT ALTERNATE ITEM NO. 4): Provide all work per ALTERNATE NO.

3 ABOVE EXCEPT: Delete new fire alarm work in building 1.

(Conduit for fiber loop, fiber cable, patch panels, patch cords, fiber boxes, terminations, connections to new fire alarm fiber loop, boring shall remain in base bid). All work shall include final cleanup, completion of any punch list items, testing and training.

E. (DEDUCT ALTERNATE ITEM NO. 5): Provide all work per ALTERNATE NO.

4 ABOVE EXCEPT: Delete new fire alarm work in building 5.(Leave new head end in base with all conduit for fiber loop, fiber cable, patch panels, patch cords, fiber boxes, terminations, connections to new fire alarm fiber loop, boring shall remain in base bid) All work shall include final cleanup, completion of any punch list items, testing and training.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents shall be obtained from the website where the solicitation is posted. Additional copies shall be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that shall remain effective for the entire duration of the project.

01 00 00 -4

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down the project site and order

General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

01 00 00 -5

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

01 00 00 -6

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR.

01 00 00 -7

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment shall be permitted subject to fire and safety requirements.

G. Phasing:

The Medical Center shall maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service shall be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include:

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COR and Contractor.

Contractor shall coordinate all his phasing work with the COR two weeks in advance, and shall submit their phasing plan for VA approval.

H. Building will be occupied during performance of work but immediate areas of alterations will be vacated.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and

01 00 00 -8 affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations may continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

J. When a building or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever shall be required to respond to an alarm from Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be

01 00 00 -9 accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption shall cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system shall be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service shall be interrupted on approval of COR. Such approval shall be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee will be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, and pipes, and their hangers or supports, which are abandoned by this work but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in

01 00 00 -10 unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane shall be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before work is started, the Contractor shall make a thorough survey with the COR , of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the COR. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, and shades, required by drawings to be either reused or relocated, or both.

3. Shall note discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, material storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR , to

01 00 00 -11 be in such condition that their use is impossible or impractical, shall be furnished or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph, the contract shall be modified accordingly, under provisions of clause entitled

"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. Submit a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, shall form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

01 00 00 -12

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work, to avoid interfering with Contractor's operation.

a. Copies of the following listed CFR titles may be obtained from the Government Printing Office:

40 CFR 261........Identification and Listing of Hazardous Waste

40 CFR 262........Standards Applicable to Generators of Hazardous

Waste

40 CFR 263........Standards Applicable to Transporters of

Hazardous Waste

40 CFR 761........PCB Manufacturing, Processing, Distribution in

Commerce, and use Prohibitions

49 CFR 172........Hazardous Material tables and Hazardous

Material Communications Regulations

49 CFR 173........Shippers - General Requirements for Shipments and Packaging

49 CRR 173........Subpart A General

49 CFR 173........Subpart B Preparation of Hazardous Material for

Transportation

01 00 00 -13

49 CFR 173........Subpart J Other Regulated Material; Definitions and Preparation

TSCA..............Compliance Program Policy Nos. 6-PCB-6 and 6-

PCB-7

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that shall remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the COR.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the

Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

Elimination System (NPDES) permit is required for this project. The

01 00 00 -14

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.

Many of the permit requirements shall be satisfied by completing construction as shown and specified. Some requirements involve the

Contractor's method of operations and operations planning and the

Contractor is responsible for employing best management practices. The affected activities often include:

- Designating areas for equipment maintenance and repair;

- Providing waste receptacles at convenient locations and provide regular collection of wastes;

- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

- Providing adequately maintained sanitary facilities.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, ) disturbed or removed as a result of performing required new work, shall be patched, repaired, 01 00 00 -15 reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.11 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by COR and

Contractor.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

C. A copy of the soil report will be made available for inspection by bidders upon request to the Contracting Officer at the VA Medical

Center, and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

01 00 00 -16

Veterans Affairs, bidders shall be permitted to make subsurface explorations of their own at site.

1.12 PROFESSIONAL SURVEYING SERVICES

A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.13 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for the work are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey

01 00 00 -17 shall include location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which shall be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, and C shall also apply to all shop drawings.

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or

01 00 00 -18 similar construction, they shall be protected by well-constructed bridges.

B. When new permanent roads are a part of this contract, Contractor may construct them immediately for use to facilitate building operations.

These roads may be used by all who have business thereon within zone of building operations.

C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto shall be completed and available for use at time set for completion of such buildings or parts thereof.

1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power shall be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system shall be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

01 00 00 -19

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Damage to the equipment or excessive wear due to prolonged use shall be repaired replaced by the contractor at the contractor’s expense.

1.17 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevators for handling building materials and

Contractor's personnel shall be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators.

The COR shall ascertain that elevators are in proper condition.

Contractor may use elevators and for special nonrecurring time intervals when permission is granted. Personnel for operating elevators shall not be provided by the Department of Veterans

Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a. Entrance jambs, heads soffits and threshold plates.

b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c. Finish flooring.

3. Government shall accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, during temporary use, they shall be removed and replaced by new hoisting ropes at the contractor’s expense.

4. If brake lining of elevators are excessively worn or damaged during temporary use, they shall be removed and replaced by new brake lining at the contractor’s expense.

5. All parts of main controller, starter, relay panel, selector, worn or damaged during temporary use shall be removed and replaced with new parts at the contractor’s expense, if recommended by elevator inspector after elevator is released by Contractor.

01 00 00 -20

6. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by Contracting Officer.

1.18 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith shall be removed prior to completion of contract, and premises left perfectly clean.

A*. Contractor may have for use of Contractor's workmen, such toilet accommodations as may be assigned to Contractor by Medical Center .

Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workmen. Failure to maintain satisfactory condition in toilets shall deprive Contractor of the privilege to use such toilets.

1.19 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C. Contractor shall install meters at Contractor's expense and furnish the

Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

01 00 00 -21

D. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

1.20 TESTS

A. As per specification section 28 08 00 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan shall provide a schedule and a written sequence of what shall be tested, how and what the expected outcome shall be. This document shall be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test shall not be conducted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.

Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

F. Individual test result of any component, where required, shall only be accepted when submitted with the test results of related components and of the entire system.

01 00 00 -22

1.21 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals shall reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished shall not be accepted.

C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned

Department of Veterans Affairs personnel in the operation and complete maintenance…